CN108397027A CN201810266251.2A CN201810266251A CN108397027A CN 108397027 A CN108397027 A CN 108397027A CN 201810266251 A CN201810266251 A CN 201810266251A CN 108397027 A CN108397027 A CN 108397027A
Authority
CN
China
Prior art keywords
chamber
several
air
warehouse
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810266251.2A
Other languages
Chinese (zh)
Inventor
邓永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZUNYI LUXIN MACHINERY Co Ltd
Original Assignee
ZUNYI LUXIN MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZUNYI LUXIN MACHINERY Co Ltd filed Critical ZUNYI LUXIN MACHINERY Co Ltd
Priority to CN201810266251.2A priority Critical patent/CN108397027A/en
Publication of CN108397027A publication Critical patent/CN108397027A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

The present invention relates to the realm of building construction, disclose a kind of steel construction warehouse, including skeleton, orlop, bulkhead, silo roof;It is equipped with first chamber and second chamber in side plate, communicating pipe is equipped between first chamber and second chamber, shaft is installed in communicating pipe, rotating vane and fan tooth are coaxially installed in shaft;Side plate is equipped with several air intake vents;It is equipped with communication chamber and several air-pressure chambers in second chamber, through-hole is equipped between adjacent air-pressure chamber, gas overflow valve is installed in through-hole;Each the interior of air-pressure chamber slidably connects thermally conductive sheet, and the bottom of thermally conductive sheet is fixed with pitching pile;It is equipped with the heat-producing unit that heat can be generated when thermally conductive sheet slides in each air-pressure chamber;Communication chamber bottom is equipped with guide rail, slidably connects interface board on guide rail, interface board includes docking section and teeth portion.This programme can enhance stability of the warehouse in strong wind, and warehouse is prevented to be turned over by strong wind, and the kinds of goods in warehouse can be avoided to make moist, and extend the shelf life of kinds of goods.

Description

Steel construction warehouse
Technical field
The invention belongs to the realm of building construction.
Background technology
The warehouse of existing industrial enterprise generally use brick structure or simple timber structure, brick structure warehouse poor mobility, and Construction cost is also high, and post-processing gets up to be more troublesome.Simple timber structure warehouse rigid structure is inadequate, is easy the presence of deformation of collapsing Danger, while part timber structure is not easy to repeatedly use, environmental-protecting performance is poor.
Steel construction warehouse because its lighter weight, environmental-protecting performance preferably due to be widely used in industrial enterprise, be built into This is relatively low and is moved easily, so industrial enterprise can usually use steel construction warehouse when needing to build transit depot.But it is existing Some steel construction warehouses grabs ground ability is poor, and the connective stability at each position in warehouse is poor, is easy to be turned in strong wind, and storehouse Kinds of goods in library are also easy to make moist in wind and rain weather, and this greatly limits the applications in steel construction warehouse.
Invention content
The purpose of the present invention is to provide a kind of steel construction warehouse, to solve in background technology steel construction warehouse in strong wind It is easy to be turned over, the problem of kinds of goods are easy to make moist in warehouse.
In order to achieve the above object, base case of the invention provides steel construction warehouse, including several girders, girder it Between be equipped with attachment device, skeleton is collectively formed with several attachment devices in several girders, and the skeleton bottom is equipped with several Orlop is collectively formed in block bottom plate, several pieces of bottom plates;Skeleton side wall is equipped with several blocks of side plates, and storehouse is collectively formed in several blocks of side plates Wall;Several pieces of top plates are installed at the top of skeleton, silo roof is collectively formed in several pieces of top plates;First chamber and the are equipped in the side plate Two chambers, are equipped with communicating pipe between the first chamber and second chamber, be equipped with shaft in the communicating pipe, in the shaft It is coaxially installed with rotating vane and fan tooth;Side plate is equipped with several air intake vents being connected to first chamber;The second chamber It is interior to be equipped with communication chamber and several air-pressure chambers being sequentially communicated, it is equipped with through-hole between adjacent air-pressure chamber, is installed in the through-hole There is gas overflow valve;Thermally conductive sheet is slidably connected in each air-pressure chamber, the bottom of the thermally conductive sheet is fixed with pitching pile, described to insert Side plate bottom is stretched out in the one end of stake far from thermally conductive sheet;It is equipped with the production that heat can be generated when thermally conductive sheet slides in each air-pressure chamber Thermal;Communication chamber bottom is equipped with guide rail, and the guide rail bottom is provided with several the first recirculation holes being connected with air-pressure chamber, leads Interface board is slidably connected on rail, the interface board includes docking section and teeth portion, several and first are provided on the docking section Matched second recirculation hole of recirculation hole, the teeth portion stretch into connecting leg and with the fan tooth engagement within communicating pipe;It is connected to ceiling Portion is provided with several puff prots;Several exhaust outlets are provided at the top of the side plate, are provided on the exhaust outlet for enhancing top The stiffening device of connective stability between plate and side plate.
The principle of this base case is:When work, the girder of required connection is connected by attachment device, is formed Several pieces of top plates, several blocks of side plates, several pieces of bottom plates can be in turn mounted on corresponding position by skeleton at this time.
When there is strong wind to scrape next, the gas outside warehouse enters from the air intake vent on side plate in first chamber, then passes through Connecting leg, which enters in second chamber, increases, the air pressure of the air-pressure chamber in the air-pressure chamber of middle left end, to push thermally conductive sheet downward Mobile, thermally conductive sheet is during moving down, heat-producing unit heat production, to being heated into the indoor gas of the air pressure, and improves The aridity of gas.Thermally conductive sheet can drive pitching pile to be gradually inserted ground during moving down, to enhance warehouse grab ground energy Power prevents warehouse to be turned over by strong wind.If wind continues to blow, the gas outside warehouse, which enters the indoor inlet of the air pressure, gradually to be increased Greatly, the indoor air pressure of the air pressure is made to continue to increase, when the indoor air pressure of the air pressure reaches certain value, the gas of the air-pressure chamber overflows Stream valve is opened, and the indoor gas of the air pressure is entered from gas overflow valve in next air-pressure chamber, and pushes next gas It presses indoor heat-conducting plate to move down, to realize the heating to gas, and pitching pile is made to be inserted into ground, further enhance gas Heating effect and warehouse grabs ground ability.The motion conditions of remaining air-pressure chamber and so on, enable side plate according to gas Inlet come control be inserted into ground pitching pile quantity, to enhance the stability in warehouse.
Gas is by that can push turbine to generate rotation during connecting leg, turbine drives fan tooth to rotate by shaft, fan Tooth can be engaged gradually with the teeth portion of interface board in rotation process and interface board is driven to generate certain displacement to the left.Work as interface board When being moved to the left to certain distance, the second recirculation hole on interface board is opposite with the first-class lead to the hole site of guide rail bottom and realizes Connection, at this point, the gas in air-pressure chamber by heating is entered by the first recirculation hole and the second recirculation hole in communication chamber, and from It is injected in warehouse in puff prot, on the one hand dehumidifying can be dried to the kinds of goods in warehouse, improve the storage environment of kinds of goods, On the other hand the gas circulation in warehouse is also promoted, gas and moisture in warehouse is made gradually to be discharged from exhaust outlet.Gas For body from during exhaust outlet is discharged, stiffening device enhances connective stability between top plate and side plate, and top plate is made to be combined with side plate Must be even closer, preventing from blowing hard makes the top plate in warehouse be turned over.
The advantageous effect of this base case is:
1, this programme can enhance stability of the warehouse in strong wind, and warehouse is prevented to be turned over by strong wind, and can avoid storehouse Kinds of goods in library make moist, and extend the shelf life of kinds of goods.
2, the wind for blowing to warehouse surface can be directed in first chamber and as preventing kinds of goods by the air intake vent of this programme It makes moist and enhances the power of warehouse stability, need not additionally increase power source, energy conservation and environmental protection.
3, the turbine of this programme under the influence of gas, on the one hand can drive fan tooth rotation, fan tooth is made to match with interface board The connection for realizing air-pressure chamber and communication chamber is closed, on the other hand can also be detached the moisture being mingled in gas during rotation Out, humidity of the gas when entering warehouse is reduced, it is moisture-proof to achieve the purpose that.
4, the fan tooth of this programme can make interface board interval and displacement by the cooperation with interface board teeth portion, to make the One recirculation hole is connected to the realization of the second recirculation hole, and then the gas in air-pressure chamber by heating is enable to be entered by communication chamber In warehouse, on the one hand dehumidifying can be dried to the kinds of goods in warehouse, improve the storage environment of kinds of goods, on the other hand also promote Gas circulation in warehouse, makes gas and moisture in warehouse are gradually discharged from exhaust outlet, can also prevent air-pressure chamber because Air pressure is excessive and is destroyed.
5, the air-pressure chamber of this programme can drive thermally conductive sheet and pitching pile to move down when air pressure increases, to push pitching pile It is inserted into ground, enhances the grabs ground ability in warehouse, warehouse is prevented to be turned over by strong wind;And air-pressure chamber can when air pressure reaches certain value It is delivered gas in next air-pressure chamber by gas overflow valve, on the one hand can prevent air-pressure chamber due to air pressure is excessive by broken It is bad, it on the other hand can also enable side plate and increase according to the inlet of gas the quantity for the pitching pile for being inserted into ground, in air-pressure chamber The inlet of gas is bigger to illustrate that wind-force is bigger, and the pitching pile quantity for being inserted into ground at this time is more, and the stability in warehouse is stronger.
6, the heat-producing unit of this programme will produce heat in thermally conductive sheet during moving down, to the indoor gas of air pressure into Row heating, on the one hand improves the aridity of gas, on the other hand can also utilize the gas of heating to the kinds of goods in warehouse into The dry dehumidifying of row, improves the storage environment of kinds of goods, prevents kinds of goods from making moist during storage.
7, the stiffening device of this programme can utilize the gas being discharged by exhaust outlet to connect between top plate and side plate to enhance The stability connect makes top plate be combined with side plate even closer, and preventing from blowing hard makes the top plate in warehouse be turned over.
Scheme two:This is the preferred of basic scheme, and the stiffening device includes the strut being fixed on exhaust outlet, the branch Swing rod is hinged on bar, the swing rod is connected with resetting spring;It is equipped with above the exhaust outlet and reinforces chamber, the reinforcement intracavitary turns It is dynamic to be connected with baffle, connecting rod is fixed on the baffle, the one end of the connecting rod far from baffle is hinged with swing rod;Reinforce bottom of chamber portion Equipped with several cylinders, the output end of the cylinder is equipped with inserted link, several cylinders are connected with control switch, the control jointly System switch is mounted on the movement locus reinforced on chamber side wall and positioned at baffle;The mounting of roof plate, which has to stretch into, reinforces intracavitary The bottom of telescopic rod, the telescopic rod is provided with several and the matched socket of inserted link, and telescopic rod is located at the movement rail of baffle On mark.Mutually linking and match using gas and swing rod, strut, baffle, telescopic rod and the inserted link being discharged from exhaust outlet It closes, warehouse can be enable to further enhance the tight ness rating combined between top plate and side plate when there is larger gas flow to be discharged, prevent Only top plate is turned in wind.
Scheme three:This is preferred for scheme two, and the attachment device includes box body, and being provided with first at the top of the box body stretches into Mouthful, described first stretches into mouth and slidably connects the first rack, first rack be fixed on needed for the wherein master that connects Liang Shang;Box body bottom is opened stretches into mouth there are two second, and described second stretches into mouth and slidably connect the second rack, second tooth Item is fixed on the required another girder connected;Gear is engaged between second rack and the first rack, the gear is coaxial It is provided with ratchet, the ratchet is combined with check pawl, and the check pawl is mounted in box body.Attachment device passes through the first tooth The mutual cooperation of item, the second rack, gear, ratchet and check pawl can be such that two girders that needs connect firmly connect Together, the tight ness rating combined between girder is improved, to improve the stability in warehouse.
Scheme four:This is preferred for scheme three, and the heat-producing unit includes the first friction plate being arranged in thermally conductive sheet edge With the second friction plate being arranged in air pressure chamber interior walls, second friction plate offsets with the first friction plate.Thermally conductive sheet is in movement In the process, the indoor gas of air pressure can be heated by the cooperation of the first friction plate and the second friction plate, improves the temperature of gas Degree and aridity, prevent the kinds of goods in warehouse from making moist.
Scheme five:This is the preferred of basic scheme, and check valve is equipped at the air intake vent.Check valve at air intake vent makes The gas obtained outside warehouse can only enter from air intake vent in first chamber, and cannot be discharged from air intake vent, enhance gas pair Turbine blows effect and the promotion effect to thermally conductive sheet.
Scheme six:This is the preferred of basic scheme, and weather shield is equipped at the air intake vent.Weather shield can prevent rainwater Enter in first chamber from air intake vent, improves the aridity in first chamber, prevent rainwater from kinds of goods being made to make moist.
Scheme seven:This is the preferred of basic scheme, and drying device is equipped in the first chamber.It is dry in first chamber Dry device dries gas for the first time, improves the aridity of gas, and preventing the gas being blown into from bringing moisture into makes goods in warehouse Product make moist.
Scheme eight:This is the preferred of basic scheme, and dehydrating breather is equipped in the communication chamber.Dehydrating breather can be such that gas becomes It obtains and more dries, prevent gas from bringing moisture into warehouse, to prevent kinds of goods from making moist.
Scheme nine:This is the preferred of basic scheme, and heating device is equipped in first recirculation hole.Heating device can Gas is heated again, further increases the temperature and aridity of gas, to which lift gas does kinds of goods in warehouse Dry dehumidifying effect.
Description of the drawings
Fig. 1 is the structural schematic diagram in steel construction warehouse of the present invention;
Fig. 2 is the sectional view in steel construction warehouse of the present invention;
Fig. 3 is the enlarged drawing of A in Fig. 1;
Fig. 4 is the enlarged drawing of B in Fig. 2;
Fig. 5 is the enlarged drawing of C in Fig. 2.
Specific implementation mode
Below by the further details of explanation of specific implementation mode:
Reference numeral in Figure of description includes:Girder 1, skeleton 2, side plate 3, top plate 4, air intake vent 5, box body 6, first Rack 7, gear 9, ratchet 10, check pawl 11, exhaust outlet 12, reinforces chamber 13, strut 14, swing rod 15, baffle at second rack 8 16, connecting rod 17, telescopic rod 18, socket 19, inserted link 20, first chamber 21, second chamber 22, air-pressure chamber 23, communication chamber 24, rotation Blade 25, shaft 26, fan tooth 27, interface board 28, teeth portion 29, docking section 30, guide rail 31, the first recirculation hole 32, the second recirculation hole 33, puff prot 34, gas overflow valve 35, thermally conductive sheet 36, the first friction plate 37, the second friction plate 38, pitching pile 39, control switch 40, cylinder 41, connecting leg 42.
Embodiment is substantially as shown shown in Figure 1 and Figure 2:
Steel construction warehouse is mainly made of skeleton 2, silo roof, orlop, bulkhead.Skeleton 2 is by several girders 1 by several A attachment device is constituted, and as shown in Fig. 3, attachment device is mainly by box body 6, the first rack 7, the second rack 8, gear 9, ratchet 10, check pawl 11 is constituted, and the upper end of box body 6 is provided with first and stretches into mouth, and the first rack 7 is slidably connected at first and stretches into mouth, First rack 7 is welded on the required wherein girder 1 connected;6 bottom of box body is opened stretches into mouth there are two second, and second stretches into The second rack 8 is slidably connected in mouthful, the second rack 8 is welded on the required another girder 1 connected;Second rack 8 and Gear 9 is engaged between one rack 7,9 ratchet 10 of gear and coaxial arrangement, ratchet 10 are combined with check pawl 11, check pawl 11 are mounted in box body 6.
Silo roof is made of several pieces of top plates 4, and orlop is made of several pieces of bottom plates, and bulkhead is made of several side plates 3.Side plate First chamber 21 and the second chamber 22 positioned at 3 bottom of side plate are offered in 3, several and first chamber 21 are provided on side plate 3 The air intake vent 5 of connection is equipped with weather shield and check valve at air intake vent 5;Drying device, dry dress are installed in first chamber 21 It is set to drier.As shown in Fig. 5, communicating pipe is communicated between first chamber 21 and second chamber 22, communicating pipe, interior rotation connected It is connected to shaft 26, rotating vane 25 and fan tooth 27 are coaxially installed in shaft 26.Communication chamber 24 there are one being set in second chamber 22 The air-pressure chamber 23 being sequentially communicated with several, communication chamber 24 are located at 23 top of air-pressure chamber, are provided between adjacent air-pressure chamber 23 logical Hole is equipped with gas overflow valve 35 in through-hole.The interior of each air-pressure chamber 23 slidably connects thermally conductive sheet 36, the bottom of thermally conductive sheet 36 Portion is welded with pitching pile 39, and the lower end of pitching pile 39 stretches out 3 bottom of side plate and ground can be inserted.It is equipped in each air-pressure chamber 23 Thermally conductive sheet 36 can generate the heat-producing unit of heat when sliding, heat-producing unit is mainly by 38 structure of the first friction plate 37 and the second friction plate At the first friction plate 37 is mounted on 36 edge of thermally conductive sheet, and the second friction plate 38 is mounted on 23 inner wall of air-pressure chamber, the first friction plate 37 can generate heat with the 38 phase mutual friction of the second friction plate, be heated to gas.
24 lower end of communication chamber is welded with guide rail 31,31 lower part of guide rail be provided with several be connected with air-pressure chamber 23 it is first-class Through-hole 32 is equipped with heating device in first recirculation hole 32, and heating device is heating wire.Interface board is slidably connected on guide rail 31 28, interface board 28 is mainly made of docking section 30 and teeth portion 29, and 30 right part of docking section is provided with several and 32 phase of the first recirculation hole Second recirculation hole 33 of cooperation, teeth portion 29 is located at 28 left part of interface board and stretches into connecting leg 42, teeth portion 29 be located in communicating pipe Fan tooth 27 engage;24 top of communication chamber is provided with several puff prots 34.Dehydrating breather is installed in communication chamber 24.
3 top of side plate is provided with 4 exhaust outlets 12, is provided on each exhaust outlet 12 for enhancing between top plate 4 and side plate 3 The stiffening device of connective stability, as shown in Fig. 4, stiffening device mainly by reinforcement chamber 13, swing rod 15, baffle 16, connecting rod 17, Telescopic rod 18 and inserted link 20 are constituted, and exhaust outlet 12 is opened in 3 top of side plate, are fixed with strut 14 in exhaust outlet 12, on strut 14 It is hinged with swing rod 15, swing rod 15 is connected with resetting spring.Reinforce being rotatably connected to baffle 16 in chamber 13, the company of being fixed on baffle 16 Bar 17, the one end of connecting rod 17 far from baffle 16 are hinged with swing rod 15.Reinforce 13 bottom of chamber and 4 cylinders 41, each cylinder are installed 41 output end is mounted on 20,4 cylinders 41 of inserted link and is connected with control switch 40 jointly, and control switch 40, which is mounted on, reinforces chamber On movement locus on 13 side walls and positioned at baffle 16.Top plate 4 is equipped with the telescopic rod 18 that can be stretched into and reinforce in chamber 13, telescopic rod 18 bottom is provided with several and 20 matched socket 19 of inserted link, and telescopic rod 18 is located on the movement locus of baffle 16.
When work, two girders 1 of required connection are put into the both sides of box body 6, the first rack 7 of a girder 1 is made to insert Enter and stretches into mouth to first and engaged with gear 9, meanwhile, the second rack 8 of another girder 1 is inserted into second and is stretched into mouth simultaneously It is engaged with gear 9, the first rack 7 and the second rack 8 can push gear 9 to rotate during mobile in box body 6, gear 9 Rotation can drive ratchet 10 to rotate.When the first rack 7 and the second rack 8 are inserted into the limit, gear 9 and ratchet 10 stop Rotation, check pawl 11 offsets with ratchet 10 can prevent ratchet 10 from inverting, to prevent gear 9, the first rack 7 and the second rack 8 reversions, enhance the stability connected between two girders 1.Girder 1 forms skeleton 2 after all connecting, at this time can will be several Block top plate 4, several blocks of side plates 3, several pieces of bottom plates are in turn mounted on corresponding position.
When there is strong wind to scrape next, the gas outside warehouse enters from the air intake vent 5 on side plate 3 in first chamber 21, the Drier in one chamber 21 dries gas for the first time, improves the aridity of gas, prevents the gas being blown into from bringing moisture into The kinds of goods in warehouse are made to make moist.Gas into first chamber 21 enters middle left end in second chamber 22 by connecting leg 42 In air-pressure chamber 23, the air pressure of the air-pressure chamber 23 is set to increase, to push thermally conductive sheet 36 to move down, thermally conductive sheet 36 is in the mistake moved down Cheng Zhong, the first friction plate 37 for being located at 36 edge of thermally conductive sheet and the 38 phase mutual friction of the second friction plate on 23 side wall mountain of air-pressure chamber are produced Heat is heated to entering the gas in the air-pressure chamber 23.Thermally conductive sheet 36 can drive pitching pile 39 gradually to insert during moving down Enter ground, to enhance the grabs ground ability in warehouse, warehouse is prevented to be turned over by strong wind.If wind continues to blow, the gas outside warehouse enters Inlet in the air-pressure chamber 23 can gradually increase, and the air pressure in the air-pressure chamber 23 is made to continue to increase, when in the air-pressure chamber 23 When air pressure reaches certain value, the gas overflow valve 35 of the air-pressure chamber 23 is opened, and the gas in the air-pressure chamber 23 is from gas overflow It is entered in valve 35 in next air-pressure chamber 23, and the heat-conducting plate in next air-pressure chamber 23 is pushed to move down, to realize Heating to gas simultaneously makes pitching pile 39 be inserted into ground, further enhances the heating effect of gas, and enhance warehouse grabs ground energy Power.The motion conditions of remaining air-pressure chamber 23 and so on, so that side plate 3 is inserted into ground according to the inlet of gas to control The quantity of pitching pile 39, to enhance the stability in warehouse.
For wind by turbine can be pushed to generate rotation during connecting leg 42, turbine drives 27 turns of tooth of fan by shaft 26 Dynamic, fan tooth 27 can be engaged gradually with the teeth portion of interface board 28 29 in rotation process and interface board 28 is driven to generate to the left centainly Displacement.When interface board 28 is moved to the left to certain distance, the of the second recirculation hole 33 on interface board 28 and 31 bottom of guide rail One recirculation hole, 32 position is opposite and realizes connection, at this point, the gas in air-pressure chamber 23 by heating passes through 32 He of the first recirculation hole Second recirculation hole 33 enters in communication chamber 24, and the heating device in the first recirculation hole 32 again heats gas, improves Gas enters temperature when communication chamber 24.After gas enters communication chamber 24, it can become more under the hygroscopic effect of dehydrating breather It is dry, prevent gas from bringing moisture into warehouse.Gas by heating is injected to from puff prot 34 in warehouse, one side energy It is enough that dehumidifying is dried to the kinds of goods in warehouse, improve the storage environment of kinds of goods, on the other hand also promotes the gas in warehouse Circulation, makes gas and moisture in warehouse are gradually discharged from exhaust outlet 12.
Gas, which can generate swing rod 15 during being discharged from exhaust outlet 12, to be impacted and swing rod 15 is made to generate swing, swing rod 15 Upper end drives baffle 16 to generate swing by connecting rod 17, on the one hand baffle 16 can make baffle 16 to telescopic rod in swing process 18 extruding and barrier effect fade away, and telescopic rod 18, which is gradually elongated to, reinforces 13 bottom of chamber so that inserting on telescopic rod 18 Mouth 19 is opposite with 20 position of inserted link for reinforcing 13 bottom of chamber;On the other hand control switch 40 is also can trigger, control switch 40 controls Cylinder 41 is positive to be started, and cylinder 41 drives inserted link 20 to be inserted into the socket 19 of 18 bottom of telescopic rod, to make top plate 4 and side plate 3 combine even closer, and preventing from blowing hard makes the top plate 4 in warehouse be turned over.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and characteristic are not made herein in scheme Excessive description.It, without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these should also be considered as protection scope of the present invention, these all do not interfere with what the present invention was implemented Effect and patent practicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as specific implementation mode can be used for explaining the content of claim.

Claims (9)

1. steel construction warehouse, including several girders, attachment device is equipped between girder, several girders connect dress with several It sets and skeleton is collectively formed, the skeleton bottom is equipped with several pieces of bottom plates, and orlop is collectively formed in several pieces of bottom plates;Skeleton side wall is pacified Equipped with several blocks of side plates, bulkhead is collectively formed in several blocks of side plates;Several pieces of top plates are installed at the top of skeleton, several pieces of top plates are common Form silo roof;It is characterized in that, be equipped with first chamber and second chamber in the side plate, the first chamber and second chamber it Between be equipped with communicating pipe, shaft is installed in the communicating pipe, rotating vane and fan tooth are coaxially installed in the shaft;On side plate The air intake vent being connected to first chamber equipped with several;Equipped with communication chamber and several gas being sequentially communicated in the second chamber Pressure chamber is equipped with through-hole between adjacent air-pressure chamber, gas overflow valve is equipped in the through-hole;Sliding connects in each air-pressure chamber It is connected to thermally conductive sheet, the bottom of the thermally conductive sheet is fixed with pitching pile, and side plate bottom is stretched out in the one end of the pitching pile far from thermally conductive sheet;Often The heat-producing unit of heat can be generated when thermally conductive sheet slides by being equipped in a air-pressure chamber;Communication chamber bottom is equipped with guide rail, described to lead Flange of rail portion is provided with several the first recirculation holes being connected with air-pressure chamber, and interface board, the interface board are slidably connected on guide rail Including docking section and teeth portion, several and matched second recirculation hole of the first recirculation hole, the tooth are provided on the docking section Portion stretch into connecting leg and with the fan tooth engagement within communicating pipe;It is provided with several puff prots at the top of communication chamber;At the top of the side plate Several exhaust outlets are provided with, the reinforcement for enhancing connective stability between top plate and side plate is provided on the exhaust outlet and is filled It sets.
2. steel construction warehouse according to claim 1, it is characterised in that:The stiffening device includes being fixed on exhaust outlet Strut, be hinged with swing rod on the strut, the swing rod is connected with resetting spring;It is equipped with above the exhaust outlet and reinforces chamber, The reinforcement intracavitary is rotatably connected to baffle, and connecting rod, the connecting rod one end and swing rod far from baffle are fixed on the baffle It is hinged;Reinforce bottom of chamber portion and be equipped with several cylinders, the output end of the cylinder is equipped with inserted link, several cylinders are connected with jointly Control switch, the control switch are mounted on the movement locus reinforced on chamber side wall and positioned at baffle;The mounting of roof plate has The telescopic rod for reinforcing intracavitary can be stretched into, the bottom of the telescopic rod is provided with several and the matched socket of inserted link, and telescopic rod On the movement locus of baffle.
3. steel construction warehouse according to claim 2, it is characterised in that:The attachment device includes box body, the box body Top is provided with first and stretches into mouth, and described first stretches into mouth and slidably connect the first rack, needed for first rack is fixed on On a wherein girder for connection;Box body bottom is opened stretches into mouth there are two second, and described second stretches into mouth and slidably connect the Two racks, second rack are fixed on the required another girder connected;It is engaged between second rack and the first rack Gear, the gear are coaxially arranged with ratchet, and the ratchet is combined with check pawl, and the check pawl is mounted in box body.
4. steel construction warehouse according to claim 3, it is characterised in that:The heat-producing unit includes being arranged on thermally conductive sheet side First friction plate in portion and the second friction plate being arranged in air pressure chamber interior walls, second friction plate and the first friction plate phase It supports.
5. steel construction warehouse according to claim 1, it is characterised in that:Check valve is installed at the air intake vent.
6. steel construction warehouse according to claim 1, it is characterised in that:Weather shield is installed at the air intake vent.
7. steel construction warehouse according to claim 1, it is characterised in that:Drying device is installed in the first chamber.
8. steel construction warehouse according to claim 1, it is characterised in that:Dehydrating breather is installed in the communication chamber.
9. steel construction warehouse according to claim 1, it is characterised in that:Heating dress is installed in first recirculation hole It sets.
CN201810266251.2A 2018-03-28 2018-03-28 Steel construction warehouse Pending CN108397027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810266251.2A CN108397027A (en) 2018-03-28 2018-03-28 Steel construction warehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810266251.2A CN108397027A (en) 2018-03-28 2018-03-28 Steel construction warehouse

Publications (1)

Publication Number Publication Date
CN108397027A true CN108397027A (en) 2018-08-14

Family

ID=63093278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810266251.2A Pending CN108397027A (en) 2018-03-28 2018-03-28 Steel construction warehouse

Country Status (1)

Country Link
CN (1) CN108397027A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112067057A (en) * 2020-09-22 2020-12-11 苏州睿绮电子有限公司 Farming-pasture environment monitoring device applied to Internet of things

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5632674A (en) * 1995-11-02 1997-05-27 Butler Manufacturing Company Grain bin with side walls having integral vertical stiffeners and air conduits
AU6070099A (en) * 1998-09-10 2000-04-03 Techniplan Pty Ltd Bulk handling apparatus
CN201554020U (en) * 2009-11-20 2010-08-18 上海强劲基础工程有限公司 Rhombus-shaped concrete pile
CN104170603A (en) * 2014-08-18 2014-12-03 成都蜀农昊农业有限公司 Grain drying and storing warehouse
CN206570833U (en) * 2017-02-28 2017-10-20 浙江大学城市学院 A kind of composite pile for improving foundation bearing capacity
CN208168506U (en) * 2018-03-28 2018-11-30 遵义路鑫机械有限公司 Steel construction warehouse

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5632674A (en) * 1995-11-02 1997-05-27 Butler Manufacturing Company Grain bin with side walls having integral vertical stiffeners and air conduits
AU6070099A (en) * 1998-09-10 2000-04-03 Techniplan Pty Ltd Bulk handling apparatus
CN201554020U (en) * 2009-11-20 2010-08-18 上海强劲基础工程有限公司 Rhombus-shaped concrete pile
CN104170603A (en) * 2014-08-18 2014-12-03 成都蜀农昊农业有限公司 Grain drying and storing warehouse
CN206570833U (en) * 2017-02-28 2017-10-20 浙江大学城市学院 A kind of composite pile for improving foundation bearing capacity
CN208168506U (en) * 2018-03-28 2018-11-30 遵义路鑫机械有限公司 Steel construction warehouse

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112067057A (en) * 2020-09-22 2020-12-11 苏州睿绮电子有限公司 Farming-pasture environment monitoring device applied to Internet of things

Similar Documents

Publication Publication Date Title
CN205593350U (en) Novel high temperature heat pump drying -machine
CN208168506U (en) Steel construction warehouse
CN102878782B (en) Block-shaped wet blank drying chamber and manufacturing method thereof
CN108397027A (en) Steel construction warehouse
CN202216533U (en) Movable kiln capable of saving energy and reducing emission
CN103734891B (en) The integrated tobacco curing barn of the energy-conservation moisture regain of range selector and baking process
CN101843358B (en) Waste heat-sharing integral-body compact flue-curing barn and operating-using method thereof
CN209588532U (en) A kind of multi-functional timber baking room
CN209147626U (en) A kind of processing drying production line based on multiple-protection
CN217236284U (en) Gypsum building materials drying device
CN107504766B (en) Special drying kiln of solar heat-retaining circulation formula timber
CN205463077U (en) Water based paint drying system
CN202041059U (en) Vertical type double-tube dryer
CN210980586U (en) Mine/living beings normal position solar drying cabinet
CN208590536U (en) A kind of combined type air-drying device of walnut fruit
CN209341700U (en) A kind of multiple drying equipment of energy-saving fired brick and multiple dry code burn equipment
CN110762957A (en) Mine/biomass in-situ solar drying box
CN102003869A (en) Vertical double-cylinder drier
CN214039266U (en) Production insulated building for PC brick
CN207163083U (en) A kind of special dry kiln of circulating timber of solar energy heat-storage
CN2193648Y (en) Cableway quick-drying device for noodles
CN207330712U (en) Energy-saving sludge drying equipment
CN202172820U (en) Energy-saving efficient solar barn
CN206809251U (en) Dish-washing machine
CN201163992Y (en) Conjoined flue-curing barn for baking tobacco

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814