CN108390372A - A kind of power grid accident fast power restoration method under baseline risk - Google Patents

A kind of power grid accident fast power restoration method under baseline risk Download PDF

Info

Publication number
CN108390372A
CN108390372A CN201810162559.2A CN201810162559A CN108390372A CN 108390372 A CN108390372 A CN 108390372A CN 201810162559 A CN201810162559 A CN 201810162559A CN 108390372 A CN108390372 A CN 108390372A
Authority
CN
China
Prior art keywords
telegram
reply
power grid
module
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810162559.2A
Other languages
Chinese (zh)
Inventor
钟永城
邓永敏
吴泽民
罗日欣
沈中园
熊洽
彭娇
陈宇隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Heyuan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201810162559.2A priority Critical patent/CN108390372A/en
Publication of CN108390372A publication Critical patent/CN108390372A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/001Methods to deal with contingencies, e.g. abnormalities, faults or failures
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention relates to the technical fields of electric power system dispatching operation, more particularly, to a kind of power grid accident fast power restoration method under baseline risk.A kind of power grid accident fast power restoration method under baseline risk, wherein the telegram in reply module being connect including decision-making module, with decision-making module, the computing module being connect with telegram in reply module;The telegram in reply model under electric network wiring scheme and the various baseline risk accidents of storage is established by each Substation parameters of EMS system, circuit model and connection relation.Stress model triggers accident event, and inverting accident process selects optimal telegram in reply path events, and Brief News are generated by tidal current chart Dynamic Display telegram in reply process with switch motion, equipment coloring mode.Whole process does not influence the normal operation of SCADA system.

Description

A kind of power grid accident fast power restoration method under baseline risk
Technical field
The present invention relates to the technical fields of electric power system dispatching operation, more particularly, to power grid under a kind of baseline risk Accident fast power restoration method.
Background technology
When power grid occurrence of large-area power outage, dispatcher is generally dynamic according to trouble-signal, decompression website and circuit, protection Make situation, failure judgement position compares the roadmap of accident prediction, determines processing method and telegram in reply path, or by tune Degree person handles the empirically determined telegram in reply path of power grid accident, this process often consumes the long time, is unfavorable for quickly locating Director's event;In addition, electric network accident management method differs, it is understood that there may be a variety of telegram in reply paths need to discuss when dispatcher is handled true Fixed a certain telegram in reply path.
Invention content
The present invention is at least one defect overcome described in the above-mentioned prior art, provides power grid accident under a kind of baseline risk Fast power restoration method, the support platform of application schedules automated system establish telegram in reply path optimal under all kinds of power grid accidents Scheme base, when power grid accident occurs, can quickly simulated accident is sent a telegram in reply path in dispatch automated system, and will be optimal Telegram in reply path is shown by dynamically leading the form of figure, and substitution is in the past refering to the roadmap of accident prediction or by scheduling Member experience come determine telegram in reply path method.
The technical scheme is that:A kind of power grid accident fast power restoration method under baseline risk, wherein including decision model Block, the telegram in reply module being connect with decision-making module, the computing module being connect with telegram in reply module;
The decision-making module has selected required scheme system load section and has executed event, and data standard is carried out for telegram in reply process It is standby;
The telegram in reply module includes central monitoring position, device unit and control centre;
Central monitoring position mainly monitors the variation of power grid and is sent to control centre, and center provides data in order to control;Device unit needle To relay protection, automatic device models and equipment, and center provides parameter and action logic in order to control;Control centre is telegram in reply module Core, after receiving the data of central monitoring position, the parameter information of coupling apparatus unit determines startup scheme, and according to device Action logic action in unit;
The computing module includes:Topology calculating, Load flow calculation and short circuit calculation;Service is provided during telegram in reply, when opening Off status by coloring, the modes such as out-of-limit provides intuitive displaying after changing for dispatcher.Since telegram in reply shows the time Limitation, frequent movement switch brings frequent topological Load flow calculation, has higher requirement to calculating speed.
In the present invention, when accident occurs for power grid, the unpromising dispatcher of EMS system does decision and provides the complementary of service Software, dispatcher can only be by checking SCADA alarm signals, according to protection act information analysis abort situation, in conjunction with current The method of operation, system loading determine processing method and restoration path etc..Often consuming the long period in this process influences Telegram in reply efficiency, and dispatcher is needed to have abundant experiences of power accidents disposal.Thus propose that power grid accident is quick under baseline risk Telegram in reply leads diagram technology, quickly determines that processing scheme selectes optimal telegram in reply path in accident to auxiliary dispatching personnel, when When baseline risk power grid accident occurs for riverhead power grid, according to prestoring, model Dynamic Display in a manner of switch changed position, topology coloring is multiple Electric process.By using EMS system data, generates dynamic telegram in reply at DTS system interface and lead figure, topology, which calculates, realizes Dynamic Display The optimal telegram in reply path when baseline risk power grid accident occurs.This system can be stored in a manner of section, load data and model, And refresh newest gathered data, various risk cases are triggered by leading figure interface simulation, inverting accident process is not influencing In the case of SCADA system normal operation, the process that simulated accident is sent a telegram in reply when handling can simultaneously serve as dispatcher's skills training With the platform of promotion.
Specifically, the decision-making module includes establishing scheme base, establishes scheme base and include accident event, send a telegram in reply to switch and hold Act part and corresponding trend section;
Start after executing telegram in reply, first carries out event of failure combination relay protection and automatic device model reappears phenomenon of the failure, later Execute on off sequence one by one, including Fault Isolation, telegram in reply and the completion of falling load telegram in reply process.
The central monitoring position includes measuring monitor,
It measures monitor and mainly monitors measuring value, short circuit calculation value, equipment live state and switch division state;When detection limit is sent out The data after variation are sent to control centre after changing;Wherein electriferous state and switch division state, state value only has two A need to judge it is different;And measuring value, short circuit calculation value need to consider variation reference value, different types of monitoring variable Detected value is different;Judgment mode is:
WhereinTo change reference value,For last computation value,For the value of this calculating.
The control centre is algorithm core, and all devices have been loaded when creating, and is monitored when receiving After the signal at center, the device involved by signal is filtered out, whether is started by decision logic determining device and manner of execution;Control Center processed is also responsible for the traffic control of whole process, including the time counts and call as needed auxiliary calculating, telegram in reply process letter Breath statistics etc..
Compared with prior art, advantageous effect is:Pass through each Substation parameters of EMS system, circuit model and connection relation Establish the telegram in reply model under riverhead electric network wiring scheme and the various baseline risk accidents of storage.Stress model triggers accident event, Inverting accident process selects optimal telegram in reply path events, multiple by tidal current chart Dynamic Display with switch motion, equipment coloring mode Electric process, and generate Brief News.Whole process does not influence the normal operation of SCADA system.
Description of the drawings
Fig. 1 is general frame flow diagram of the present invention.
Specific implementation mode
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;It is attached in order to more preferably illustrate the present embodiment Scheme certain components to have omission, zoom in or out, does not represent the size of actual product;To those skilled in the art, The omitting of some known structures and their instructions in the attached drawings are understandable.Being given for example only property of position relationship described in attached drawing Illustrate, should not be understood as the limitation to this patent.
As shown in Figure 1, a kind of power grid accident fast power restoration method under baseline risk, wherein including decision-making module and decision The telegram in reply module of module connection, the computing module being connect with telegram in reply module;
The decision-making module has selected required scheme system load section and has executed event, and data standard is carried out for telegram in reply process It is standby;
The telegram in reply module includes central monitoring position, device unit and control centre;
Central monitoring position mainly monitors the variation of power grid and is sent to control centre, and center provides data in order to control;Device unit needle To relay protection, automatic device models and equipment, and center provides parameter and action logic in order to control;Control centre is telegram in reply module Core, after receiving the data of central monitoring position, the parameter information of coupling apparatus unit determines startup scheme, and according to device Action logic action in unit;
The computing module includes:Topology calculating, Load flow calculation and short circuit calculation;Service is provided during telegram in reply, when opening Off status by coloring, the modes such as out-of-limit provides intuitive displaying after changing for dispatcher.Since telegram in reply shows the time Limitation, frequent movement switch brings frequent topological Load flow calculation, has higher requirement to calculating speed.
In the present invention, when accident occurs for power grid, the unpromising dispatcher of EMS system does decision and provides the complementary of service Software, dispatcher can only be by checking SCADA alarm signals, according to protection act information analysis abort situation, in conjunction with current The method of operation, system loading determine processing method and restoration path etc..Often consuming the long period in this process influences Telegram in reply efficiency, and dispatcher is needed to have abundant experiences of power accidents disposal.Thus propose that power grid accident is quick under baseline risk Telegram in reply leads diagram technology, quickly determines that processing scheme selectes optimal telegram in reply path in accident to auxiliary dispatching personnel, when When baseline risk power grid accident occurs for riverhead power grid, according to prestoring, model Dynamic Display in a manner of switch changed position, topology coloring is multiple Electric process.By using EMS system data, generates dynamic telegram in reply at DTS system interface and lead figure, topology, which calculates, realizes Dynamic Display The optimal telegram in reply path when baseline risk power grid accident occurs.This system can be stored in a manner of section, load data and model, And refresh newest gathered data, various risk cases are triggered by leading figure interface simulation, inverting accident process is not influencing In the case of SCADA system normal operation, the process that simulated accident is sent a telegram in reply when handling can simultaneously serve as dispatcher's skills training With the platform of promotion.
Specifically, the decision-making module includes establishing scheme base, establishes scheme base and include accident event, send a telegram in reply to switch and hold Act part and corresponding trend section;
Start after executing telegram in reply, first carries out event of failure combination relay protection and automatic device model reappears phenomenon of the failure, later Execute on off sequence one by one, including Fault Isolation, telegram in reply and the completion of falling load telegram in reply process.
The central monitoring position includes measuring monitor,
It measures monitor and mainly monitors measuring value, short circuit calculation value, equipment live state and switch division state;When detection limit is sent out The data after variation are sent to control centre after changing;Wherein electriferous state and switch division state, state value only has two A need to judge it is different;And measuring value, short circuit calculation value need to consider variation reference value, different types of monitoring variable Detected value is different;Judgment mode is:
WhereinTo change reference value,For last computation value,For the value of this calculating.
The control centre is algorithm core, and all devices have been loaded when creating, and is monitored when receiving After the signal at center, the device involved by signal is filtered out, whether is started by decision logic determining device and manner of execution;Control Center processed is also responsible for the traffic control of whole process, including the time counts and call as needed auxiliary calculating, telegram in reply process letter Breath statistics etc..
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention Protection domain within.

Claims (4)

1. a kind of power grid accident fast power restoration method under baseline risk, which is characterized in that connect including decision-making module, with decision-making module The telegram in reply module connect, the computing module being connect with telegram in reply module;
The decision-making module has selected required scheme system load section and has executed event, and data standard is carried out for telegram in reply process It is standby;
The telegram in reply module includes central monitoring position, device unit and control centre;
Central monitoring position mainly monitors the variation of power grid and is sent to control centre, and center provides data in order to control;Device unit needle To relay protection, automatic device models and equipment, and center provides parameter and action logic in order to control;Control centre is telegram in reply module Core, after receiving the data of central monitoring position, the parameter information of coupling apparatus unit determines startup scheme, and according to device Action logic action in unit;
The computing module includes:Topology calculating, Load flow calculation and short circuit calculation;Service is provided during telegram in reply, when opening Off status by coloring, the modes such as out-of-limit provides intuitive displaying after changing for dispatcher.
2. power grid accident fast power restoration method under a kind of baseline risk according to claim 1, it is characterised in that:Described Decision-making module includes establishing scheme base, and it includes accident event, telegram in reply switch execution event and corresponding trend to establish scheme base Section;
Start after executing telegram in reply, first carries out event of failure combination relay protection and automatic device model reappears phenomenon of the failure, later Execute on off sequence one by one, including Fault Isolation, telegram in reply and the completion of falling load telegram in reply process.
3. power grid accident fast power restoration method under a kind of baseline risk according to claim 1, it is characterised in that:Described Central monitoring position includes measuring monitor,
It measures monitor and mainly monitors measuring value, short circuit calculation value, equipment live state and switch division state;When detection limit is sent out The data after variation are sent to control centre after changing;Wherein electriferous state and switch division state, state value only has two A need to judge it is different;And measuring value, short circuit calculation value need to consider variation reference value, different types of monitoring variable Detected value is different;Judgment mode is:
WhereinTo change reference value,For last computation value,For the value of this calculating.
4. power grid accident fast power restoration method under a kind of baseline risk according to claim 1, it is characterised in that:Described Control centre is algorithm core, and all devices have been loaded when creating, after receiving the signal of central monitoring position, sieve Whether the device involved by select-out signal, started and manner of execution by decision logic determining device;Control centre is also responsible for whole The traffic control of a process, including time count and call as needed auxiliary calculating, telegram in reply procedural information statistics etc..
CN201810162559.2A 2018-02-27 2018-02-27 A kind of power grid accident fast power restoration method under baseline risk Pending CN108390372A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810162559.2A CN108390372A (en) 2018-02-27 2018-02-27 A kind of power grid accident fast power restoration method under baseline risk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810162559.2A CN108390372A (en) 2018-02-27 2018-02-27 A kind of power grid accident fast power restoration method under baseline risk

Publications (1)

Publication Number Publication Date
CN108390372A true CN108390372A (en) 2018-08-10

Family

ID=63069918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810162559.2A Pending CN108390372A (en) 2018-02-27 2018-02-27 A kind of power grid accident fast power restoration method under baseline risk

Country Status (1)

Country Link
CN (1) CN108390372A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101236575A (en) * 2008-01-30 2008-08-06 山东大学 Black start assistant decision making support/training system and its method
CN101958536A (en) * 2010-09-20 2011-01-26 中国电力科学研究院 Distribution network failure isolation and quick power service restoration decision support system
CN103296677A (en) * 2013-05-09 2013-09-11 国家电网公司 On-line large power grid recovery assistant decision-making system
US20160139212A1 (en) * 2014-11-13 2016-05-19 Eleon Energy, Inc. Methods and systems for power restoration planning employing simulation and transient test analysis
CN107171312A (en) * 2017-05-15 2017-09-15 国家电网公司 A kind of fast quick-recovery optimal path choosing method of power distribution network large-area power-cuts
CN107180569A (en) * 2017-06-26 2017-09-19 广东电网有限责任公司惠州供电局 A kind of intelligent simulation training system and method towards major network power system
CN107730093A (en) * 2017-09-27 2018-02-23 广东电网有限责任公司佛山供电局 A kind of System and method in power grid accident telegram in reply path

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101236575A (en) * 2008-01-30 2008-08-06 山东大学 Black start assistant decision making support/training system and its method
CN101958536A (en) * 2010-09-20 2011-01-26 中国电力科学研究院 Distribution network failure isolation and quick power service restoration decision support system
CN103296677A (en) * 2013-05-09 2013-09-11 国家电网公司 On-line large power grid recovery assistant decision-making system
US20160139212A1 (en) * 2014-11-13 2016-05-19 Eleon Energy, Inc. Methods and systems for power restoration planning employing simulation and transient test analysis
CN107171312A (en) * 2017-05-15 2017-09-15 国家电网公司 A kind of fast quick-recovery optimal path choosing method of power distribution network large-area power-cuts
CN107180569A (en) * 2017-06-26 2017-09-19 广东电网有限责任公司惠州供电局 A kind of intelligent simulation training system and method towards major network power system
CN107730093A (en) * 2017-09-27 2018-02-23 广东电网有限责任公司佛山供电局 A kind of System and method in power grid accident telegram in reply path

Similar Documents

Publication Publication Date Title
CN103220173B (en) A kind of alarm monitoring method and supervisory control system
CN111579923B (en) Power distribution network fault diagnosis system and method
CN104598369B (en) The software supervision method and apparatus realized in a mobile device
JPH08307524A (en) Method and equipment for discriminating risk in abnormal conditions of constitutional element of communication network
CN103533084B (en) Real-time DMS (device management system) of B/S (browser/server) framework and method thereof
CN103227662B (en) A kind of electric power communication device safety detection method based on mode control and system
CN102158364A (en) Time slice scheduling-based device polling method and device
CN110347694B (en) Equipment monitoring method, device and system based on Internet of things
CN107872339A (en) O&M implementation method and device, Virtual Networking System in a kind of virtualization network
CN103532738A (en) Port connection relationship determination method and device
CN111017756A (en) Distributed tower crane electric control system, equipment and storage medium for fault online diagnosis
CN109783311A (en) Monitor processing method, device, equipment and the readable storage medium storing program for executing of breakpoint behavior
CN111130867B (en) Intelligent household equipment alarm method and device based on Internet of things
CN102932170B (en) Network element load inequality detection processing method, device and system thereof
CN109193947A (en) Power distribution room monitoring method, device, server and computer readable storage medium
CN110224872B (en) Communication method, device and storage medium
CN108390372A (en) A kind of power grid accident fast power restoration method under baseline risk
CN108234162A (en) TDCS/CTC system early warning methods based on port data flow monitoring
CN105527909A (en) Data monitoring device, data monitoring method and monitoring system
CN106027297A (en) Method and sever for implementing alarming
CN115167297A (en) Intelligent manufacturing industry Internet of things based on thread control and control method
CN107977774A (en) A kind of method of electrical network weak link automatic identification after failure
CN116260747A (en) Monitoring method and device of terminal test equipment and electronic equipment
CN112711517A (en) Server performance monitoring method and device, storage medium and terminal
KR101155867B1 (en) Outage-management system and its method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810

RJ01 Rejection of invention patent application after publication