CN108389004A - A kind of engineering process dynamic cost managing and control system and method based on BIM technology - Google Patents
A kind of engineering process dynamic cost managing and control system and method based on BIM technology Download PDFInfo
- Publication number
- CN108389004A CN108389004A CN201810220325.9A CN201810220325A CN108389004A CN 108389004 A CN108389004 A CN 108389004A CN 201810220325 A CN201810220325 A CN 201810220325A CN 108389004 A CN108389004 A CN 108389004A
- Authority
- CN
- China
- Prior art keywords
- cost
- information
- supplier
- data
- bim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000010276 construction Methods 0.000 claims abstract description 28
- 238000007405 data analysis Methods 0.000 claims abstract description 19
- 241001269238 Data Species 0.000 claims description 6
- 230000003321 amplification Effects 0.000 claims description 6
- 230000004048 modification Effects 0.000 claims description 6
- 238000012986 modification Methods 0.000 claims description 6
- 238000003199 nucleic acid amplification method Methods 0.000 claims description 6
- 238000004088 simulation Methods 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000013523 data management Methods 0.000 claims description 3
- 238000001914 filtration Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000007726 management method Methods 0.000 abstract description 9
- 238000004458 analytical method Methods 0.000 abstract description 8
- 238000011161 development Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000012217 deletion Methods 0.000 description 2
- 230000037430 deletion Effects 0.000 description 2
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000007728 cost analysis Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of engineering process dynamic cost managing and control system and method based on BIM technology, belong to project management system field, solve the problems, such as that cost accounting is difficult in existing construction project, its key points of the technical solution are that, include smart machine, WEB server, data memory module, the data analysis module being connected with each other using development of Mobile Internet technology, further include by data analysis module, wherein data analysis module filters out the pel example of material requested by using Filter Element Collector classes(That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to the composition proportion information of respective material)Identical parameters and the identical material of pel are merged into output summary information, a kind of the engineering process dynamic cost managing and control system and method based on BIM technology of the present invention realizes calculating and analysis to material requested cost in building, is checked and management and control convenient for personnel are short-period.
Description
Technical field
The present invention relates to project management system and method, more particularly to it is a kind of based on BIM technology engineering process dynamic at
This managing and control system and method.
Background technology
With economic fast development, the quantity and scale of engineering construction project increasingly increase, and it is low how to improve construction industry
The loss that the management condition of effect, reduction mistake are brought has become the problem of every country is paid attention to.
For building cost field, in engineering project, cost can be effectively reduced by implementing project cost control, will
Actual cost controls within objective cost, to obtain more profits.Forecasting of cost is the starting point of cost management, and China is current
Building cost forecasting software be mainly budget class software, important booster action is played to cost budgeting, however due to skill
The limitation of art and operating mode, existing cost budgeting flow and software are there is many problems, difficult one of cost accounting
Main cause is exactly that data are huge, and construction involves lot of materials, and the price moment of each material changes, and each stage charging all needs
The a large amount of calculating and analysis for wanting personnel, carry out short cycle(The moon, season)Cost analysis is more difficult, and therefore, there is also certain
Room for improvement.
Invention content
The first object of the present invention is to provide a kind of engineering process dynamic cost managing and control system based on BIM technology, realizes
Calculating and analysis to material requested cost in building are checked and management and control convenient for personnel are short-period.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of engineering process dynamic cost managing and control system based on BIM technology, including:
Smart machine, the user having permission can log in and input instruction, be controlled to BIM models according to the command information of input
System, to carry out data management to BIM models and operating mode;
WEB server will be received from for carrying out data synchronization between smart machine, WEB server, data memory module
The instruction of the instruction of smart machine and WEB server input is sent to data memory module;
Data memory module, for store and according to by WEB server reception smart machine and WEB server instruction with
Update BIM models;
Data analysis module filters out the pel example of material requested by using Filter Element Collector classes
(That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to respective material at
Distribution ratio information), identical parameters and the identical material of pel are merged into output summary information;
Cost budgeting module receives the summary information of data analysis module output to calculate the cost of material requested;
Letter is realized using development of Mobile Internet technology between smart machine, WEB server, data memory module, data analysis module
The real-time upload of breath is downloaded.
Using the above scheme, it can be uploaded and be downloaded in real time using mobile Internet, the scene of capable of reacting in a short time
Construction Condition, and stored by data memory module, the user only having permission, which could enter, to check and changes, and ensure that
The safety and reliability of data, while by the cost of cost budgeting module calculating material requested, reducing personnel and calculating appearance
Error, also saves calculating and the analysis time of personnel.
Preferably, the cost budgeting module includes:
Schedule of prices database corresponds to the quotation of different suppliers for storing each material;
Database update unit, the data information for timely updating in schedule of prices database, the deletion of listings data add
Add, change and restores;
Comparing unit corresponds to the material that supplier supplies for comparing and analyzing the price variance between each supplier and calculate output
Expect cost data.
Using the above scheme, the supplier of material requested is summarized by preservation for commodity price by schedule of prices database,
And carry out the update of data in time by database update unit so that the calculated price of staff is accurate, finally by than
Unit exports the supply of material material cost data of each supplier and is used so that personnel purchase.
Preferably, the comparing unit includes by the contract monitoring unit of contract information typing, comparing unit will be signed and be closed
Same supplier's supply cost and the supplier's supply cost that do not sign a contract are compared export price different information.
Using the above scheme, it by the setting of contract monitoring unit, is closed by the supplier to have signed a contract and without signing
Supply cost difference between same supplier is analyzed and exported to be used so that personnel purchase.
Preferably, the cost budgeting module further includes alarm unit, the alarm unit is by cheapest supply
Quotient is marked, while interval time exports the price difference between the supplier and lowest price supplier of current contract signing
It is different.
Using the above scheme, by the setting of alarm unit, be more clear analyze the supplier of current contract signing with
And the price variance between lowest price supplier.
Preferably, the cost budgeting module can be connect by internet with data analysis module and summarize letter to receive
Breath, or summary information is directed into cost budgeting module by way of importing fileinfo and carries out cost calculation.
Using the above scheme, summary information is received by way of internet connection, more simply, conveniently, by leading
Entering the mode of fileinfo realizes the network that do not network and can also carry out the calculating and analysis of cost, more practical.
Preferably, the smart machine includes:
BIM model cootrol modules, can be used for controlling the displaying of BIM models, and amplification, diminution, rotation, section and display are therein each
Structure attribute, and according in structure attribute construction, remove the time come the performance of building in construction simulation;
Model modification device:It is modified to operating mode attribute information according to the work information of construction ground to update BIM model datas,
Then by WEB server between smart machine, WEB server, data memory module synchronized update operating mode content.
Using the above scheme, it is modified more to operating mode attribute information according to the work information of construction ground by smart machine
New BIM model datas easily facilitate the management and control of cost to realize the Construction Condition at the scene of reacting in a short time.
Preferably, the smart machine includes the password login list for carrying out system login for the input of password and account
Member and for fingerprint input nucleus to carry out system login fingerprint log in unit.
Using the above scheme, it is logged in such a way that password and account or fingerprint log in, the user having permission is
It can enter and check and change, ensure that the safety and reliability of data.
The second object of the present invention is to provide a kind of engineering process dynamic cost management-control method based on BIM technology, realizes
Calculating and analysis to material requested cost in building are checked and management and control convenient for personnel are short-period.
A kind of engineering process dynamic cost management-control method based on BIM technology, includes the following steps:
Step 1: carrying out system login by password and account or inputting by fingerprint to carry out system login;
Step 2: the displaying of BIM models is controlled according to condition of construction, amplification, diminution, rotation, section and display each structure therein
Part attribute, and according to the construction in structure attribute, the dismounting time performance of building in construction simulation, realize to operating mode
Attribute information modifies to update BIM model datas;
Step 3: filtering out the pel example of material requested by using Filter Element Collector classes, get is used
Parameter obtains the parameters for specifying pel, merges output and summarize letter identical parameters and the identical material of pel
Breath;
Step 4: receiving the summary information of data analysis module output by cost budgeting module and according to data summarization information meter
The cost of the Suan Ge suppliers supply of material;
Step 5: comparing and marking the supplier of the supplier to sign a contract and lowest price, and export two supplies
The quotation difference of quotient is analyzed and the buying of material for personnel.
Using the above scheme, the displaying that BIM models are controlled by condition of construction, modifies to come more to operating mode attribute information
New BIM model datas realize the Construction Condition at the scene of reacting in a short time, and calculate material requested by cost budgeting module
Cost, reduction personnel calculate make a fault, also save calculating and the analysis time of personnel.
In conclusion the invention has the advantages that:
It can be uploaded and be downloaded in real time by using mobile Internet, the Construction Condition at the scene of capable of reacting in a short time, and logical
It crosses data memory module to be stored, the user only having permission, which could enter, to check and change, and ensure that the safety of data
And reliability, while by the cost of cost budgeting module calculating material requested, reduction personnel calculate and make a fault, also save
The calculating of personnel and analysis time.
Description of the drawings
Fig. 1 is the system block diagram of Cost Management System in the present embodiment;
Fig. 2 is the modularization block diagram of smart machine in the present embodiment;
Fig. 3 is the modularization block diagram of cost budgeting module in the present embodiment.
In figure:1, smart machine;11, password login unit;12, fingerprint logs in unit;13, BIM model cootrols module;
14, model modification device;2, WEB server;3, data memory module;4, data analysis module;5, cost budgeting module;51、
Schedule of prices database;52, database update unit;53, comparing unit;54, alarm unit.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
A kind of engineering process dynamic cost managing and control system based on BIM technology disclosed in the present embodiment, in conjunction with Fig. 1 and Fig. 2
It is shown, including:
Smart machine 1, the user having permission can log in and input instruction, be carried out to BIM models according to the command information of input
Control, to carry out data management to BIM models and operating mode;
WEB server 2 will connect for carrying out data synchronization between smart machine 1, WEB server 2, data memory module 3
It receives the instruction that instruction and WEB server 2 from smart machine 1 input and is sent to data memory module 3;
Data memory module 3, for storing and receiving smart machine 1 and the finger of WEB server 2 according to by WEB server 2
It enables to update BIM models;
Data analysis module 4 filters out the pel example of material requested by using Filter Element Collector classes
(That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to respective material at
Distribution ratio information), identical parameters and the identical material of pel are merged into output summary information;
Cost budgeting module 5 receives the summary information of the output of data analysis module 4 to calculate the cost of material requested;
It is real using development of Mobile Internet technology between smart machine 1, WEB server 2, data memory module 3, data analysis module 4
The real-time upload of existing information is downloaded.
Wherein smart machine 1 can be the intelligent slidings moved end such as the ends mobile, the ends PAD, can facilitate the carrying of personnel, with
When used everywhere in job location, and smart machine 1 includes:
Password login unit 11, the input for password and account carry out system login;
Fingerprint logs in unit 12, for fingerprint input nucleus to carrying out system login;
BIM model cootrols module 13, can be used for controlling the displaying of BIM models, and amplification, diminution, rotation, section and display are therein
Each structure attribute, and according in structure attribute construction, remove the time come the performance of building in construction simulation;
Model modification device 14:It is modified to operating mode attribute information according to the work information of construction ground to update BIM pattern numbers
According to then by WEB server 2 between smart machine 1, WEB server 2, data memory module 3 in synchronized update operating mode
Hold, all data are updated using development of Mobile Internet technology, do not need personnel in intermediate transit, reduce error and data are lost
The risk of mistake.
As shown in figure 3, cost budgeting module 5 includes:
Schedule of prices database 51 corresponds to the quotation of different suppliers for storing each material;
Database update unit 52, the data information for timely updating in schedule of prices database 51, the deletion of listings data,
Addition, modification and recovery;
Comparing unit 53, for comparing and analyzing the price variance between each supplier and calculate the corresponding supplier's supply of material of output
Material cost data;Wherein comparing unit 53 includes that will sign the contract monitoring unit of contract information typing for comparing unit 53
The supplier's supply cost made a contract and the supplier's supply cost that do not sign a contract are compared export price different information;
Cheapest supplier is marked for alarm unit 54, alarm unit 54, while interval time exports current contract
Price variance between the supplier and lowest price supplier of signing.
Cost budgeting module 5 can be connect by internet to receive summary information with data analysis module 4, or pass through importing
Summary information is directed into cost budgeting module 5 and carries out cost calculation by the mode of fileinfo.
A kind of engineering process dynamic cost management-control method based on BIM technology, in conjunction with shown in Fig. 1 and Fig. 2, including walks as follows
Suddenly:
Step 1: carrying out system login by password and account or inputting by fingerprint to carry out system login;
Step 2: the displaying of BIM models is controlled according to condition of construction, amplification, diminution, rotation, section and display each structure therein
Part attribute, and according to the construction in structure attribute, the dismounting time performance of building in construction simulation, realize to operating mode
Attribute information modifies to update BIM model datas;
Step 3: filtering out the pel example of material requested by using Filter Element Collector classes, get is used
Parameter obtains the parameters for specifying pel, merges output and summarize letter identical parameters and the identical material of pel
Breath, wherein summary information can be exported with the format of excel;
Step 4: receiving the summary information of the output of data analysis module 4 by cost budgeting module 5 and according to data summarization information
Calculate the cost of each supplier's supply of material;
Step 5: comparing and marking the supplier of the supplier to sign a contract and lowest price, and export two supplies
The quotation difference of quotient is analyzed and the buying of material for personnel.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art
Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this
It is all protected by Patent Law in the right of invention.
Claims (8)
1. a kind of engineering process dynamic cost managing and control system based on BIM technology, it is characterized in that:Including:
Smart machine(1), the user having permission can log in and input instruction, according to the command information of input to BIM models into
Row control, to carry out data management to BIM models and operating mode;
WEB server(2), for smart machine(1), WEB server(2), data memory module(3)Between carry out data it is same
Step, will be received from smart machine(1)Instruction and WEB server(2)The instruction of input is sent to data memory module(3);
Data memory module(3), pass through WEB server for storing simultaneously basis(2)Receive smart machine(1)And WEB service
Device(2)Instruction to update BIM models;
Data analysis module(4), the pel reality of material requested is filtered out by using Filter Element Collector classes
Example(That is the specification of material requested), the parameters for specifying pel are obtained using get Parameter(Refer to respective material
Composition proportion information), identical parameters and the identical material of pel are merged into output summary information;
Cost budgeting module(5), receive data analysis module(4)The summary information of output is to calculate the cost of material requested;
Smart machine(1), WEB server(2), data memory module(3), data analysis module(4)Between use mobile interchange
Network technology realizes that the real-time upload of information is downloaded.
2. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 1, it is characterized in that:
The cost budgeting module(5)Including:
Schedule of prices database(51), the quotation of different suppliers is corresponded to for storing each material;
Database update unit(52), for the schedule of prices database that timely updates(51)Interior data information, listings data
It deletes, addition, change and restore;
Comparing unit(53), for comparing and analyzing the price variance between each supplier and calculate the corresponding supplier's supply of material of output
Material cost data.
3. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 2, it is characterized in that:
The comparing unit(53)Include by the contract monitoring unit of contract information typing, comparing unit(53)The supplier that will be signed a contract
Supply cost and the supplier's supply cost that do not sign a contract are compared export price different information.
4. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 3, it is characterized in that:
The cost budgeting module(5)It further include alarm unit(54), the alarm unit(54)Cheapest supplier is carried out
Label, at the same interval time export the price variance between the supplier and lowest price supplier of current contract signing.
5. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 2, it is characterized in that:
The cost budgeting module(5)It can be with data analysis module(4)It is connected by internet to receive summary information, or passes through importing
Summary information is directed into cost budgeting module by the mode of fileinfo(5)Carry out cost calculation.
6. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 1, it is characterized in that:
The smart machine(1)Including:
BIM model cootrol modules(13), can be used for controlling the displaying of BIM models, amplification, diminution, rotation, section and display are wherein
Each structure attribute, and according in structure attribute construction, remove the time come the performance of building in construction simulation;
Model modification device(14):It is modified to operating mode attribute information according to the work information of construction ground to update BIM models
Then data pass through WEB server(2)In smart machine(1), WEB server(2), data memory module(3)Between it is synchronous more
New operating mode content.
7. a kind of engineering process dynamic cost managing and control system based on BIM technology according to claim 1, it is characterized in that:
The smart machine(1)It include the password login unit that system login is carried out for the input of password and account(11)With for referring to
Line input nucleus logs in unit to the fingerprint for carrying out system login(12).
8. a kind of engineering process dynamic cost management-control method based on BIM technology, it is characterized in that:Include the following steps:
Step 1: carrying out system login by password and account or inputting by fingerprint to carry out system login;
Step 2: the displaying of BIM models is controlled according to condition of construction, amplification, diminution, rotation, section and display each structure therein
Part attribute, and according to the construction in structure attribute, the dismounting time performance of building in construction simulation, realize to operating mode
Attribute information modifies to update BIM model datas;
Step 3: filtering out the pel example of material requested by using Filter Element Collector classes, get is used
Parameter obtains the parameters for specifying pel, merges output and summarize letter identical parameters and the identical material of pel
Breath;
Step 4: passing through cost budgeting module(5)Receive data analysis module(4)The summary information of output and according to data summarization
Information calculates the cost of each supplier's supply of material;
Step 5: comparing and marking the supplier of the supplier to sign a contract and lowest price, and export two supplies
The quotation difference of quotient is analyzed and the buying of material for personnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810220325.9A CN108389004A (en) | 2018-03-16 | 2018-03-16 | A kind of engineering process dynamic cost managing and control system and method based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810220325.9A CN108389004A (en) | 2018-03-16 | 2018-03-16 | A kind of engineering process dynamic cost managing and control system and method based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108389004A true CN108389004A (en) | 2018-08-10 |
Family
ID=63066612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810220325.9A Pending CN108389004A (en) | 2018-03-16 | 2018-03-16 | A kind of engineering process dynamic cost managing and control system and method based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108389004A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109214858A (en) * | 2018-08-17 | 2019-01-15 | 上海海智在线网络科技有限公司 | A kind of components 3D drawing is intelligently verified prices system and method |
CN109871257A (en) * | 2019-02-19 | 2019-06-11 | 广州视源电子科技股份有限公司 | Page element display method, device and equipment |
CN111428965A (en) * | 2020-02-27 | 2020-07-17 | 中铁城建集团有限公司 | Method for rapidly analyzing project cost |
CN111506997A (en) * | 2020-04-15 | 2020-08-07 | 国网福建省电力有限公司漳州供电公司 | Power engineering quantity calculation method based on BIM |
CN112380661A (en) * | 2020-12-04 | 2021-02-19 | 升维科技有限公司 | Building management pipeline arrangement optimization system based on BIM |
CN113034199A (en) * | 2021-04-16 | 2021-06-25 | 湖南宏源中柱工程项目管理有限公司 | BIM technology-based cost control method and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278268A1 (en) * | 2013-03-15 | 2014-09-18 | Iti- Innovative Technology Inc. | Method for mapping elements of a construction project |
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN104766182A (en) * | 2015-04-30 | 2015-07-08 | 北京宁晖兴业科技有限公司 | Intelligent monitoring system for building design construction based on BIM |
CN106934540A (en) * | 2017-03-07 | 2017-07-07 | 西安理工大学 | A kind of architecture engineering material cost budgeting method based on Revit |
CN107133386A (en) * | 2017-04-10 | 2017-09-05 | 东易日盛家居装饰集团股份有限公司 | A kind of fitment material for family consumption inventory generation method and system based on BIM softwares |
CN107358340A (en) * | 2017-06-23 | 2017-11-17 | 深圳云联万企科技有限公司 | A kind of project management system based on list of engineering |
-
2018
- 2018-03-16 CN CN201810220325.9A patent/CN108389004A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278268A1 (en) * | 2013-03-15 | 2014-09-18 | Iti- Innovative Technology Inc. | Method for mapping elements of a construction project |
CN104680320A (en) * | 2014-12-03 | 2015-06-03 | 上海同筑信息科技有限公司 | BIM-based project management system and method |
CN104766182A (en) * | 2015-04-30 | 2015-07-08 | 北京宁晖兴业科技有限公司 | Intelligent monitoring system for building design construction based on BIM |
CN106934540A (en) * | 2017-03-07 | 2017-07-07 | 西安理工大学 | A kind of architecture engineering material cost budgeting method based on Revit |
CN107133386A (en) * | 2017-04-10 | 2017-09-05 | 东易日盛家居装饰集团股份有限公司 | A kind of fitment material for family consumption inventory generation method and system based on BIM softwares |
CN107358340A (en) * | 2017-06-23 | 2017-11-17 | 深圳云联万企科技有限公司 | A kind of project management system based on list of engineering |
Non-Patent Citations (1)
Title |
---|
赵占军: ""BIM技术在施工阶段的成本控制管理"", 《建筑技术》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109214858A (en) * | 2018-08-17 | 2019-01-15 | 上海海智在线网络科技有限公司 | A kind of components 3D drawing is intelligently verified prices system and method |
CN109871257A (en) * | 2019-02-19 | 2019-06-11 | 广州视源电子科技股份有限公司 | Page element display method, device and equipment |
CN109871257B (en) * | 2019-02-19 | 2023-02-17 | 广州视源电子科技股份有限公司 | Page element display method, device and equipment |
CN111428965A (en) * | 2020-02-27 | 2020-07-17 | 中铁城建集团有限公司 | Method for rapidly analyzing project cost |
CN111428965B (en) * | 2020-02-27 | 2023-11-03 | 中铁城建集团有限公司 | Method for rapidly analyzing project cost |
CN111506997A (en) * | 2020-04-15 | 2020-08-07 | 国网福建省电力有限公司漳州供电公司 | Power engineering quantity calculation method based on BIM |
CN112380661A (en) * | 2020-12-04 | 2021-02-19 | 升维科技有限公司 | Building management pipeline arrangement optimization system based on BIM |
CN113034199A (en) * | 2021-04-16 | 2021-06-25 | 湖南宏源中柱工程项目管理有限公司 | BIM technology-based cost control method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108389004A (en) | A kind of engineering process dynamic cost managing and control system and method based on BIM technology | |
JP6511120B2 (en) | Product development management system and method | |
CN202093536U (en) | Intelligent routing inspection system for substation equipment | |
CN103164754A (en) | Method and manufacturing execution system (MES) framework for production management and control process of clothing industry | |
CN106202401A (en) | A kind of insulator Life cycle information management platform and method thereof | |
CN105719070A (en) | Electronic auxiliary reviewing method and system | |
CN108280122A (en) | The contract management system of configurable contract template | |
CN103456202A (en) | Analogue simulation device based on plane test flight training and system thereof | |
CN103489078A (en) | Intelligent charging and battery-swapping service network asset life-cycle management method based on RFID | |
CN101540014A (en) | Information system for applying radio frequency identification to facility and equipment maintenance and management and method thereof | |
CN106484716A (en) | Organizational structure method of adjustment and system | |
CN107229791A (en) | Cost of construction metering method and device | |
CN110378672A (en) | A kind of project cost system | |
CN114970176B (en) | Virtual simulation method and device for electric power operation, computer equipment and storage medium | |
CN108052726A (en) | A kind of building materials business and construction Information uploading system based on BIM models | |
CN114677044A (en) | Management system and method for intelligent building supervision engineering project | |
CN115293798A (en) | Method and system for budget management of expropriation project based on BIM + GIS | |
CN105701220B (en) | A kind of intra-enterprise business data system and processing method | |
CN102930458B (en) | Electricity price evaluate simulation method and system | |
CN109981792A (en) | A kind of method and device for business processing based on cloud platform | |
CN108959227A (en) | A kind of self-defined report system and method based on B/S framework | |
CN102866985B (en) | For data formatter and the method for on-line analysing processing system | |
CN104765348A (en) | Energy amount measuring system | |
CN116796950A (en) | Online review system and method for power distribution network project capable of being researched | |
CN110610246A (en) | BIM technology-based rail transit equipment operation and maintenance device and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180810 |
|
RJ01 | Rejection of invention patent application after publication |