CN108386230A - A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation - Google Patents

A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation Download PDF

Info

Publication number
CN108386230A
CN108386230A CN201810362620.8A CN201810362620A CN108386230A CN 108386230 A CN108386230 A CN 108386230A CN 201810362620 A CN201810362620 A CN 201810362620A CN 108386230 A CN108386230 A CN 108386230A
Authority
CN
China
Prior art keywords
module
laser ranging
deformation
inverted arch
preliminary bracing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810362620.8A
Other languages
Chinese (zh)
Inventor
徐有亮
吴青瑜
樊雪飞
陈家湘
胡金欣
杨光武
余灿
秦庆波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201810362620.8A priority Critical patent/CN108386230A/en
Publication of CN108386230A publication Critical patent/CN108386230A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • E21F17/185Rock-pressure control devices with or without alarm devices; Alarm devices in case of roof subsidence
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • G01B11/16Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The invention discloses a kind of warning devices for monitoring tunnel inverted arch preliminary bracing deformation, it is desirable to provide a kind of warning device easy to use for monitoring tunnel inverted arch preliminary bracing deformation.It includes laser ranging module, control module, alarm module, CC2530 embeded processors, memory module, power module, display module and battery;The CC2530 embeded processors are coupled with laser ranging module, control module, alarm module, display module and memory module respectively;The battery is electrically connected with power module;The power module is used for as laser ranging module, control module, alarm module, CC2530 embeded processors, memory module and display module power supply;The laser ranging module is used for the measurement of target line deformation distance.Safe ready of the present invention makes simple, application easy to spread.

Description

A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation
Technical field
The present invention relates to constructing tunnel equipment technical fields, more particularly, to one kind for monitoring tunnel inverted arch preliminary bracing The warning device of deformation.
Background technology
In Environment in Railway Engineering Construction work progress, because most of railway engineering circuit is set to remote mountains jungle, constructing tunnel accounts for According to larger specific gravity, and guarded drainage processing is particularly important in constructing tunnel, to ensure safety for tunnel engineering, need to be carried out to country rock a large amount of Monitoring, and data analysis is carried out, and monitoring method and disadvantage common at present:
1, artificial total powerstation monitoring is by manually setting up total powerstation, the measuring point of manual measurement embedded in advance well reflective prism, labeling Position, survey engineer export data obtain the sedimentation of observation point by computer software.Disadvantage:(1)Need manual operation, nothing Method accomplishes monitoring and automatic early-warning in real time;(2)Complicated for operation, an instrument could be operated by needing multiple topographical engineers to work in coordination Device;(3)Total powerstation equipment is expensive;(4)Monitoring process is interfered with each other with site operation, can only measure a data in a short time After move away from instrument, avoid influence construction speed;(5)It needs that prism labeling is installed in measuring point, it is cumbersome;(6)Need profession Mapping team is operated.
2, laser profile scanning is scanned ranging by installing motor-driven rotary laser rangefinder in monitoring section, On computer outside by network transmission to tunnel, the case where compared with Tunnel Design, and then judge tunnel deformation.Disadvantage: (1)It needs that equipment is installed on the monitoring section of normal construction, is easy to interfere tunnel and normally constructs;(2)It is easy by construction machine Tool touching destroys, Tunnel Blasting breakage in installation;(3)There are the mechanical parts such as motor, event is susceptible in dusty, moist hole Barrier, reliability are relatively low;(4)The computer equipment being connected to by cable outside hole is needed to be calculated, system complex is not easy to use And maintenance;(5)The construction section in tunnel needs ceaselessly forward impelling, instrument to need continuous wiring networking, need special The professional team of component carries out coordinative construction;(6)Construction interference cannot be avoided and be filtered out, the screening such as personnel's machinery to scanning laser Gear is blown out, dust influences the error that laser light scattering is brought;(7)It is expensive.
3, mechanical profile convergence measurement instrument measures the angle between wall bar by the mechanical wall lever apparatus of interconnection Variation, deformation values are scaled by angle.Disadvantage:(1)It needs that equipment is installed on the monitoring section of normal construction, is easy to interfere It normally constructs in tunnel;(2)It is easy to be touched by construction machinery and destroy, Tunnel Blasting breakage in installation;(3)Equipment is clumsy, and installation makes With inconvenience;(4)The computer equipment being connected to by cable outside hole is needed to be calculated, system complex, not easy to use and dimension Shield;(5)The construction section in tunnel needs ceaselessly forward impelling, equipment to need continuous wiring networking, need specialized components Professional team carry out coordinative construction;(6)It is expensive.
4, the photogrammetric light bulb by mounted in monitoring point sends out the light for representing position, and different time points are shot with camera Photo, the computer software outside network transmission to hole carries out judgement identification, passes through the variation of the bulb position of the same position Extrapolate the sedimentation and deformation numerical value of the point.Disadvantage:In addition to all disadvantages of above-mentioned monitoring method, there is also tunnel monitorings for this method Point is connected up to bulb powered and is bothered, and photo light is blocked by Construction traffic, dust is affected.
Due to various limitations existing for current real time monitoring means, at the construction field (site), there has been no one kind Monitoring alarm easy to use can be used widely, and cause to continuously emerge during the Tunnel Engineering inverted arch built excavates and enclose Collapse " shutdown " accident caused by rock gross distortion, face construction personnel is trapped in the accident of construction surface.To reinforce intricately Construction safety risk prevention work under the conditions of matter, effective accident prevention, the tunnel vault during needing to excavate tunnel inverted arch Sedimentation and the convergent accumulative displacement of abutment wall and rate of deformation are monitored in real time, and currently without corresponding equipment.
Invention content
The purpose of the present invention is intended to overcome the shortcomings of the prior art, and it is low to provide a kind of input cost, easy to use The warning device for monitoring tunnel inverted arch preliminary bracing deformation.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions:
A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation, including laser ranging module, control module, alarm Module, CC2530 embeded processors, memory module, power module, display module and battery;The CC2530 embedded processings Device is coupled with laser ranging module, control module, alarm module, display module and memory module respectively;The battery and power supply Module is electrically connected;The power module is used for as laser ranging module, control module, alarm module, CC2530 embedded processings Device, memory module and display module power supply;The laser ranging module is used for the measurement of target line deformation distance.
Preferably, the alarm module uses buzzer.
Preferably, the battery uses lithium polymer battery.
Compared with prior art, the invention has the advantages that:
Mounted on any position for not influencing construction when use of the present invention, deformation data, and scene can be monitored and shown in real time Alarm limits are set, has deformation just by sound prompting, has been more than limit value horse back sound-light alarm.Apparatus of the present invention are highly practical, Safe ready makes simple, application easy to spread.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is that monitoring schematic diagram is implemented in crown displacement.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of not making the creative labor Embodiment shall fall within the protection scope of the present invention.
Warning device shown in Fig. 1 for monitoring tunnel inverted arch preliminary bracing deformation, including laser ranging module 1, control Module 2, alarm module 3, CC2530 embeded processors 4, memory module 5, power module 6, display module 7 and battery 8;It is described CC2530 embeded processors 4 respectively with laser ranging module 1, control module 2, alarm module 3, display module 7 and storage mould Block 5 couples;The battery 8 is electrically connected with power module 6;The power module 6 is used for as laser ranging module 1, control module 2, alarm module 3, CC2530 embeded processors 4, memory module 5 and display module 7 are powered;The laser ranging module 1 is used In the measurement of target line deformation distance.
The effect of each function module is as described below:
1, laser ranging module:Model:C8T6B completes the measurement of target line distance by high-precision laser range-finding module.
2, CC2530 embedded processings module:System on chip of this module hardware based on Texas Instruments TI CC2530 (SoC)Solution.It is enhanced 8051 CPU of standard, In-System Programmable flash memory, 8-KB RAM and many other strong Big function, it can complete the "smart" products exploitation of low BOM costs with very flexible development scheme.Have it is low in energy consumption, Band carries battery monitor and temperature sensor, and 8 tunnels input and 12 ADC of configurable resolution ratio, AES security coprocessors, 2 powerful USART for supporting a variety of serial communication protocols, 21 general purpose Is/O pins.It is soft by built-in Embedded algorithm Part realizes the control to every other module in the present apparatus, completes system design functions(By the component for measuring acceleration of gravity Integral operation is carried out, three variate-values are obtained.(1) inclination angle of laser beam and horizontal plane;(2) laser beam current location and initial Position relative rotation in the horizontal plane;When monitoring point does not deform, buzzer interval longer " drop " ~ " drop " pipes;When When monitoring point has deformation to occur, the interval time of buzzer call shortens, and deformation is bigger, and the time that pipes is shorter, more rapid;Work as prison When wet environment is more than preset alarming value, buzzer yowls, and alarm occurs.Alarm module is by the embedded nucleus modules of SOC GPIO carries out instruction control.High-note buzzer generates high pitch by driving circuit driving piezoelectric ceramic piece, is total to by resonant cavity High pitch alarm buzz is sent out after airing of views is big).
3, display module:Model:STM32080C8T6, it is intuitive to show deformation data and deformation curve, (1) main interface: 1) accumulative displacement:Show the currently monitored real-time accumulated shift value;2) velocity of displacement:It shows in the currently monitored unit interval Velocity of displacement;3) system time:Show the time of current system;4) used time is measured:Display is from starting to measure current time Time;5) monitoring pattern:Show the monitoring pattern currently selected;6) equipment state:Show the state of current device work;7) just Beginning distance:Show initial baseline distance;8) laser distance:Show laser measured distance;9) horizontal angle:Show current device location With the level angle of initial position;10) vertical angle:Show the vertical angle of current device location and initial position.
4, memory module:Real-time measuring data and data analysis information, built-in TF memory card slots are stored, maximum supports 512G TF storage cards, can real time data preserve on a memory card, convenient for export data.
5, power module:To each module for power supply.Power unit is made of two parts:(1) pass through power supply after direct current 12V inputs Conversion module exports the voltages such as 3.3V, 5V, 12V and is used to the disparate modules of equipment;(2)Battery:By 2 pieces of lithium polymer batteries and Power supply charge-discharge protection circuit forms the backup power supply composition of 12V, automatic to carry out when there is external 12V power supplys power supply to the device Charging, when power outage, battery module is powered to equipment automatically;
The invention has the advantages that:
1, integrated design:One equipment can be achieved with the function of a whole set of monitoring system.Monitoring initial data need not be transmitted Computer is handled outside to hole, and equipment embedded data is filtered algorithm, in equipment can integrated data acquisition, The entire function such as filtering, parameter configuration, alarm.
2, installation site is flexible:Equipment need not be mounted on monitoring section, will not generate interference to construction, quilt is also not present The possibility that construction machinery destroys.
3, portable mobile:Weight of equipment is light, and compact is easy to carry about with one.Equipment is fixed on regular camera tripod, can With tripod integral shift to new monitoring point, do not stop to promote to adapt to constructing tunnel face.
4, using simple:Device configuration has display screen, can intuitive display data curve.The technology people of profession is not needed Member is operated, and site operation personnel are by simple training, you can equipment is intuitively configured and used by display screen.
Processor in equipment embeds intelligent algorithm(It is existing from tape program), it is adaptive to following disturbing factor, it is automatic to filter Wave:(1)Construction machinery, personnel not menopause mistake at the scene, interference is blocked to laser(2)Smog, dust, vibrations can be to Laser Measurings Interference away from data.(3)The strong electromagnetic that heavy construction equipment generates in the process of running.
5, data export:Prison whole measured data in scene can be exported by TF card.
6, equipment is reliable:Bad environments in tunnel, equipment can be under the environment such as blasting impact, dust, humidity, electromagnetic interference Normal use.
7, from charged pool:Equipment carries lithium battery, extremely easy to use without scene row's power cord.
8, on-the-spot record:Sensor convenient for computer for analysis and achieves standby in the storage to embedded memory card of construction site It looks into.
9, equipment price is cheap:By integrated global design, equipment cost and use are reduced.
When the present invention monitors, if accumulative deformation or rate of deformation are more than preset value, sound-light alarm is sent out, reminds scene Staff takes necessary engineering measure, adjustment construction, technique to prevent deformation from continuing to increase, and emergency alarm is occurring When, sound and light signal can be sent out, provides escape time to the emergency escape of construction personnel, the country rock that avoids being collapsed is bottled up.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (3)

1. a kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation, including laser ranging module, control module, report Alert module, CC2530 embeded processors, memory module, power module, display module and battery;It is characterized in that:It is described CC2530 embeded processors respectively with laser ranging module, control module, alarm module, display module and memory module coupling It connects;The battery is electrically connected with power module;The power module be used for for laser ranging module, control module, alarm module, CC2530 embeded processors, memory module and display module power supply;The laser ranging module for target line deform away from From measurement.
2. being used to monitor the warning device of tunnel inverted arch preliminary bracing deformation according to claim 1, it is characterised in that:It is described Alarm module uses buzzer.
3. the warning device according to claim 1 or claim 2 for monitoring tunnel inverted arch preliminary bracing deformation, it is characterised in that: The battery uses lithium polymer battery.
CN201810362620.8A 2018-04-20 2018-04-20 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation Withdrawn CN108386230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810362620.8A CN108386230A (en) 2018-04-20 2018-04-20 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810362620.8A CN108386230A (en) 2018-04-20 2018-04-20 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation

Publications (1)

Publication Number Publication Date
CN108386230A true CN108386230A (en) 2018-08-10

Family

ID=63065221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810362620.8A Withdrawn CN108386230A (en) 2018-04-20 2018-04-20 A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation

Country Status (1)

Country Link
CN (1) CN108386230A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109297427A (en) * 2018-10-17 2019-02-01 北京市政建设集团有限责任公司 A kind of portable laser monitoring instrument applied to tunnel convergence Deformation control
CN111272090A (en) * 2019-09-26 2020-06-12 中铁十一局集团第四工程有限公司 Vault crown deformation alarm device and method for tunnel lower step excavation
CN111927558A (en) * 2020-10-13 2020-11-13 中国科学院武汉岩土力学研究所 Safety early warning method and device for full-face tunneling of dynamic water weak surrounding rock tunnel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003019113A1 (en) * 2001-08-28 2003-03-06 Lacomm Co., Ltd. Apparatus for optically monitoring safety structure
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
CN206670573U (en) * 2017-04-26 2017-11-24 湖南北斗星空自动化科技有限公司 A kind of convergent measurement of surrounding rock of tunnel on-line monitoring system
CN107703801A (en) * 2017-09-30 2018-02-16 云南云岭高速公路交通科技有限公司 Round-the-clock Tunnel collapses early warning system and application method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003019113A1 (en) * 2001-08-28 2003-03-06 Lacomm Co., Ltd. Apparatus for optically monitoring safety structure
CN101458069A (en) * 2008-12-30 2009-06-17 中铁二十四局集团福建铁路建设有限公司 Tunnel wall rock deformation monitoring method and monitoring system thereof
CN206670573U (en) * 2017-04-26 2017-11-24 湖南北斗星空自动化科技有限公司 A kind of convergent measurement of surrounding rock of tunnel on-line monitoring system
CN107703801A (en) * 2017-09-30 2018-02-16 云南云岭高速公路交通科技有限公司 Round-the-clock Tunnel collapses early warning system and application method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109297427A (en) * 2018-10-17 2019-02-01 北京市政建设集团有限责任公司 A kind of portable laser monitoring instrument applied to tunnel convergence Deformation control
CN111272090A (en) * 2019-09-26 2020-06-12 中铁十一局集团第四工程有限公司 Vault crown deformation alarm device and method for tunnel lower step excavation
CN111927558A (en) * 2020-10-13 2020-11-13 中国科学院武汉岩土力学研究所 Safety early warning method and device for full-face tunneling of dynamic water weak surrounding rock tunnel
CN111927558B (en) * 2020-10-13 2021-01-12 中国科学院武汉岩土力学研究所 Safety early warning method and device for full-face tunneling of dynamic water weak surrounding rock tunnel
US11634987B2 (en) 2020-10-13 2023-04-25 Institute Of Rock And Soil Mechanics, Chinese Academy Of Sciences Safety early warning method and device for full-section tunneling of tunnel featuring dynamic water and weak surrounding rock

Similar Documents

Publication Publication Date Title
CN108386230A (en) A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation
CN109186480B (en) Tunnel surrounding rock scanning and observation system based on double-shield TBM (Tunnel boring machine) process
CN106372854A (en) Project safety management system based on BIM
CN206768889U (en) A kind of subway foundation pit automates DEFORMATION MONITORING SYSTEM
CN107101615A (en) Incline monitoring system for electric transmission line pole and its application process based on Bluetooth communication
CN103196416A (en) Robot monitoring method and robot monitoring system of deformation inside dam
CN203259143U (en) Internal dam deformation robot monitoring system
CN103646527A (en) Automatic monitoring and early-warning system and method for monitoring and measuring interior of tunnel
CN105347192A (en) Online monitoring system and method of deflection of portal crane girder
CN208089351U (en) A kind of warning device for monitoring tunnel inverted arch preliminary bracing deformation
CN109388115A (en) Mining intelligent individual soldier operation and safeguards system, method and intelligent polling method
CN114701961A (en) Tower crane safety monitoring system
CN105094070A (en) Operation monitoring system of passive outdoor equipment and operating method
CN206147889U (en) Temperature sensing fire alarm monitored control system of measuring tunnel crowd's temperature in real time
CN207816204U (en) A kind of optical sensing bridge monitoring system
CN104005795B (en) A kind of tunnel clearance monitoring security alarm instrument
CN113253637A (en) Health monitoring system of development machine
CN206020991U (en) Water resource well electricity dual control management system
CN209244608U (en) A kind of big cross section labyrinth deep drilled shaft concrete Sliding Mode Attitude monitoring system
CN103698555A (en) Disaster-prevention optical-fiber wind speed and direction monitoring system for railway
CN206546154U (en) A kind of penetration pipe displacement monitor
JP3712324B2 (en) Face collapse warning system
CN107703801B (en) All-weather tunnel primary support collapse early warning system and use method thereof
CN108060943A (en) A kind of mining equipment safety early warning system
CN105736054A (en) Tunnel construction safety monitoring equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180810

WW01 Invention patent application withdrawn after publication