CN108385904A - A kind of parapet of roofing and its construction method - Google Patents

A kind of parapet of roofing and its construction method Download PDF

Info

Publication number
CN108385904A
CN108385904A CN201810379104.6A CN201810379104A CN108385904A CN 108385904 A CN108385904 A CN 108385904A CN 201810379104 A CN201810379104 A CN 201810379104A CN 108385904 A CN108385904 A CN 108385904A
Authority
CN
China
Prior art keywords
parapet
steel bar
steel
roofing
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810379104.6A
Other languages
Chinese (zh)
Other versions
CN108385904B (en
Inventor
刘蒙
彭扬
徐永浩
程国华
陈紫妍
黄飞龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd, Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201810379104.6A priority Critical patent/CN108385904B/en
Publication of CN108385904A publication Critical patent/CN108385904A/en
Application granted granted Critical
Publication of CN108385904B publication Critical patent/CN108385904B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/14Junctions of roof sheathings to chimneys or other parts extending above the roof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/14Junctions of roof sheathings to chimneys or other parts extending above the roof
    • E04D13/1407Junctions of roof sheathings to chimneys or other parts extending above the roof for flat roofs
    • E04D13/1415Junctions to walls extending above the perimeter of the roof

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of parapet of roofing, including pouring molding in the parapet flange at floor layer edge, pouring molding is in the concrete wall on parapet flange, and outside banded plate, the outside banded plate is vertically connected on floor layer, the concrete wall is internally provided with steel bar girder, and the steel bar girder is fixedly connected with outside banded plate, and steel bar girder bottom anchor is in parapet flange.The parapet of roofing uses skeleton of the prefabricated steel bar girder as parapet horizontal force and template when undertaking construction, in-site installation speed is fast, and scaffold need not be set up in parapet work progress, save cost, work progress is simple, worker from outside of the building without operating simultaneously, construction safety.

Description

A kind of parapet of roofing and its construction method
Technical field
The invention belongs to building construction technology fields, and in particular to a kind of parapet of roofing and its construction method are suitable for All kinds of steel structural roofs using profiled steel sheet combination floor, steel bar truss floor support plate roofing engineering.
Background technology
Parapet of roofing be roofing be connected with exterior wall processing a kind of mode, as on roof railing or house shape at A kind of measure of reason, can prevent personnel from falling, can also play the role of roof waterproof.Floor of steel structure is due to that need not prop up at present Mould pours floorslab concrete, and convenient and quick construction is widely used in all kinds of steel structure floors, roofworks, such as profiled sheet group Close floor, steel bar truss floor support plate etc.;However branch module and cast-in-situ is still needed for the parapet of roofing of this kind of floor of steel structure, and For high-rise or super high steel structure floor, if desired the outboard template of armored concrete parapet sets up overhanging in building The builder's jack of beyond the region of objective existence is constructed, and difficulty of construction is big, of high cost, and there are security risks in work progress.
It is above-mentioned to solve therefore, it is necessary to design a kind of novel parapet that need not set up scaffold formwork and casting method There are the problem of.
Invention content
The purpose of the present invention is overcoming the parapet of roofing of existing floor of steel structure to need branch module and cast-in-situ, difficulty of construction is big, Problem of high cost.
For this purpose, an embodiment of the present invention provides a kind of parapet of roofing, including pouring molding is in the daughter at floor layer edge Wall flange, pouring molding vertically connect in concrete wall and outside banded plate on parapet flange, the outside banded plate It being connected on floor layer, the concrete wall is internally provided with steel bar girder, and the steel bar girder is fixedly connected with outside banded plate, And steel bar girder bottom anchor is in parapet flange.
Further, the floor layer is profiled steel sheet combination floor, including edge sealing girder steel, profiled sheet and concrete building Plate layer, the profiled sheet are fixed on by shear stud on edge sealing girder steel, and the concrete floor layer is cast in the die mould On steel plate.
Further, it is provided with roof boarding steel bar layer on the profiled sheet.
Further, the outside banded plate is L-type structure, including level board and vertical plate, and the level board passes through anti- Peg is cut to be fixed on the floor layer, the steel bar girder bottom is welded on the level board, the vertical plate with it is described It is concordant on the outside of floor layer.
Further, the steel bar girder includes die mould floor support plate, with die mould floor support plate parallel arrangement wind up reinforcing bar and Lower edge reinforcing bar, and be arranged in the web member reinforcing bar that undulate is arranged between reinforcing bar and lower edge reinforcing bar that winds up;It holds in the die mould building Board bottom portion and the vertical plate of the outside banded plate overlap, and the bottom end of wind up reinforcing bar and the lower edge reinforcing bar is weldingly fixed on On the level board of the outside banded plate.
Further, it is provided with horizontal reinforcement on the reinforcing bar that winds up, and horizontal reinforcement is perpendicular to steel bar arrangement of winding up.
Further, die mould floor support plate is provided with several split bolts on the die mould floor support plate.
In addition, the present invention also provides the construction method of above-mentioned parapet of roofing, include the following steps:
1) precast reinforced truss and outside banded plate, and steel bar girder bottom welds to form parapet steel construction with outside banded plate Support system;
2) the parapet steel support structure that step 1) obtains is fixed on by shear stud on the outside of floor layer;
3) in floor layer edge pouring molding parapet flange so that steel bar girder bottom anchor is inside parapet flange;
4) it is disposed with inner side template in steel bar girder in parapet flange inside parallel, and inner side template is fixed by split bolt On steel bar girder;
5) casting concrete between inner side template and steel bar girder forms concrete wall, waits for that concrete wall reaches design Inner side template is removed after intensity.
Further, above-mentioned steps 3) in pour parapet flange before, on floor layer bind roof boarding steel bar layer, Several horizontal reinforcements are bound on steel bar girder.
Further, the inner side template is plank sheathing.
Compared with prior art, beneficial effects of the present invention:This parapet of roofing provided by the invention is using prefabricated Skeleton of the steel bar girder as parapet horizontal force and template when undertaking construction, in-site installation speed is fast, and need not set up foot Hand cradle is saved cost, is operated from outside of the building without worker, construction safety.
The present invention is described in further details below with reference to attached drawing.
Description of the drawings
Fig. 1 is the mounting structure schematic diagram of steel bar girder in parapet of roofing of the present invention;
Fig. 2 is the close-up schematic view of steel bar girder in parapet of roofing of the present invention;
Fig. 3 is the mounting structure schematic diagram of roof boarding steel bar layer and horizontal reinforcement in parapet of roofing of the present invention;
Fig. 4 is parapet flange molding structure schematic diagram in parapet of roofing of the present invention;
Fig. 5 is inner side template mounting structure schematic diagram in parapet of roofing of the present invention;
Fig. 6 is molding structure schematic diagram in parapet of roofing of the present invention.
Reference sign:1, profiled sheet;2, edge sealing girder steel;3, outside banded plate;4, shear stud;5, reinforcing bar purlin Frame;6, web member reinforcing bar;7, wind up reinforcing bar;8, lower edge reinforcing bar;9, die mould floor support plate;10, roof boarding steel bar layer;11, horizontal reinforcement; 12, parapet flange;13, concrete floor layer;14, inner side template;15, split bolt;16, concrete wall.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term "center", "upper", "lower", "front", "rear", " left side ", The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on ... shown in the drawings Orientation or positional relationship is merely for convenience of description of the present invention and simplification of the description, do not indicate or imply the indicated device or Element must have a particular orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention; In description of the invention, unless otherwise indicated, " multiple ", " several " are meant that two or more.
As shown in Fig. 1, Fig. 4 and Fig. 6, a kind of parapet of roofing, including pouring molding are present embodiments provided in floor layer The parapet flange 12 at edge, pouring molding is in concrete wall 16 and outside banded plate 3 on parapet flange 12, institute It states outside banded plate 3 to be vertically connected on floor layer, the concrete wall 16 is internally provided with steel bar girder 5, the reinforcing bar purlin Frame 5 is fixedly connected with outside banded plate 3, and 5 bottom anchor of steel bar girder is in parapet flange 12.By reinforcing bar in the embodiment The steel structure system that truss 5 vertically places as parapet need not set up scaffold for undertaking construction stage horizontal loading Also the cast-in-place construction process of parapet of roofing can be completed, while worker is not necessarily to operate on the outside of building, construction safety, and And steel bar girder can be prefabricated in advance, in-site installation speed is fast, improves construction efficiency.
The embodiment of refinement, the parapet of roofing structure of the present embodiment can be used for the roofworks of all kinds of steel structure floors In, thus the floor layer can be the building that profiled steel sheet combination floor, steel bar truss floor support plate or other steel constructions use Plate form, for this embodiment by floor layer using for profiled steel sheet combination floor, concrete structure is as shown in Figure 1 and Figure 4, including Edge sealing girder steel 2, profiled sheet 1 and concrete floor layer 13, the profiled sheet 1 are fixed on edge sealing girder steel 2 by shear stud 4 On, the concrete floor layer 13 is cast on the profiled sheet 1.And in order to increase the intensity of floor layer, as shown in figure 3, Roof boarding steel bar layer 10, the roof boarding can be arranged in optimization before casting concrete floor layer 13 on the profiled sheet 1 Steel bar layer 10 is made of the several of crisscross setting with reinforcing bar.
It is specific as follows for the connection structure between parapet of roofing structure and floor layer:As shown in Figures 2 and 3, described Outside banded plate 3 is L-type structure, including level board and vertical plate, the level board be fixed on the floor by shear stud 4 On the edge sealing girder steel 2 of layer, the outer edge of edge sealing girder steel 2 can be aligned with level board, can also be misaligned setting, at the same the level board and Intermittent fillet welding seam welding is used between edge sealing girder steel 2, to ensure stability of the follow-up steel bar girder in the construction stage, the reinforcing bar 5 bottom of truss is welded on the level board, and the vertical plate is concordant on the outside of the floor layer.And as shown in Fig. 2, the steel The structure of muscle truss 5 includes die mould floor support plate 9, wind up reinforcing bar 7 and the lower edge reinforcing bar 8 being arranged in parallel with die mould floor support plate 9, and It is arranged in the web member reinforcing bar 6 that undulate is arranged between reinforcing bar 7 and lower edge reinforcing bar 8 that winds up, 9 thickness 0.3mm of die mould floor support plate, erects It is straight to be positioned on the outside of floor layer, as the outboard template of parapet of roofing, and 9 bottom of die mould floor support plate and the outer side seal The vertical plate of side plate 3 overlaps, and wind up reinforcing bar 7 and lower edge reinforcing bar 8 are fixed on die mould floor support plate 9 by the concatenation of web member reinforcing bar 6 On, as shown in Figure 2 and Figure 4, the bottom end of wind up reinforcing bar 7 and the lower edge reinforcing bar 8 is weldingly fixed on the outside banded plate 3 vertically Level board on, and anchored by parapet flange 12, the reinforcing bar 7 that winds up, lower edge reinforcing bar 8 and web member reinforcing bar 6 are set as The parapet of roofing construction stage provides anti-side rigidity and intensity.Parapet steel construction branch will be used as in the parapet of roofing structure The steel bar girder 5 and steel structure floor of support(Profiled steel sheet combination floor)And outside banded plate 3 formed by shear stud 4 it is whole Body, while outside banded plate 3 and 2 weld seam of edge sealing girder steel weld, be effectively ensured steel bar girder 5 the construction stage stability. Further, for the intensity of 5 construction stage of stiffener truss, as shown in figure 3, being provided with level on the reinforcing bar 7 that winds up Reinforcing bar 11, and horizontal reinforcement 11 is arranged perpendicular to the reinforcing bar 7 that winds up, so that steel bar girder 5 has the steel of crisscross distribution Muscle support system.
The construction method of above-mentioned parapet of roofing specifically includes following process:
First, precast reinforced truss and outside banded plate can be shifted to an earlier date in factory, it is as depicted in figs. 1 and 2, steel bar girder 5 is vertical Place, and by steel bar girder 5 wind up reinforcing bar 7 and lower edge reinforcing bar 8 is welded on the level board of outside banded plate 3, steel bar girder 5 Die mould floor support plate 9 bottom it is Chong Die with the vertical plate of outside banded plate 3 be welded and fixed, to form parapet steel structure support System;And in order to avoid construction and installation inner side template 14 on the inside of follow-up parapet, it can be on the die mould floor support plate 9 of steel bar girder 5 Installation split bolt 15 in advance, so as to being fixedly connected between follow-up inner side template 14 and steel bar girder 5.Later, by the daughter Wall steel support structure is fixed on by shear stud 4 on the outside of floor layer, specifically, the level board of outside banded plate 3 is put It is placed on the edge sealing girder steel 2 of floor layer and is fixed by shear stud 4, the vertical plate in the outside and outside banded plate 3 of edge sealing girder steel 2 Can be concordant, also can not be concordant, the intermittent weld between the level board and edge sealing girder steel 2 of welding outside banded plate 3.Optimization, In order to reinforce the intensity of parapet, as shown in figure 3, roof boarding steel bar layer 10 can be bound on the profiled sheet 1 of floor layer, in steel Several horizontal reinforcements 11 are bound on muscle truss 5.
Then, as shown in Figure 4 and Figure 5, the casting concrete floor layer 13 on profiled sheet 1, and it is corresponding on floor layer Pouring molding parapet flange 12 above the level board of outside banded plate 3, after parapet flange 12 reaches some strength, reinforcing bar purlin 5 bottom anchor of frame is inside parapet flange 12;The arrangement of steel bar girder 5 is parallel on 12 inside floor layer of parapet flange again There is inner side template 14, and inner side template 14 is fixed on by split bolt 15 on the die mould floor support plate 9 of steel bar girder 5;Preferably, The inner side template 14 selects plank sheathing, and the ribbing on plank sheathing, while wooden model can be chosen whether according to parapet height difference Plate is also convenient for stitching according to whether tuning fork is arranged and adjusting shape of template, and parapet indent, tuning fork is facilitated to stitch isostructure realization.
Finally, as shown in fig. 6, between inner side template 14 and steel bar girder 5 casting concrete, formed concrete wall 16, the construction that inner side template 14 completes parapet of roofing is removed after concrete wall 16 reaches design strength.
This parapet of roofing provided by the invention is horizontal as parapet when undertaking construction using prefabricated steel bar girder The skeleton of power and template, in-site installation speed is fast, and scaffold need not be set up in parapet work progress, and saving is made Valence, work progress is simple, while worker is not necessarily to operate from outside of the building, construction safety.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all Be with the present invention it is same or analogous design all belong to the scope of protection of the present invention within.

Claims (10)

1. a kind of parapet of roofing, it is characterised in that:Including pouring molding in the parapet flange at floor layer edge, pouring molding In concrete wall and outside banded plate on parapet flange, the outside banded plate is vertically connected on floor layer, institute It states concrete wall and is internally provided with steel bar girder, the steel bar girder is fixedly connected with outside banded plate, and steel bar girder bottom It is anchored in parapet flange.
2. parapet of roofing as described in claim 1, it is characterised in that:The floor layer is profiled steel sheet combination floor, packet Edge sealing girder steel, profiled sheet and concrete floor layer are included, the profiled sheet is fixed on by shear stud on edge sealing girder steel, institute Concrete floor layer is stated to be cast on the profiled sheet.
3. parapet of roofing as claimed in claim 2, it is characterised in that:Roof boarding reinforcing bar is provided on the profiled sheet Layer.
4. parapet of roofing as described in claim 1, it is characterised in that:The outside banded plate is L-type structure, including level Plate and vertical plate, the level board are fixed on by shear stud on the floor layer, and the steel bar girder bottom is welded on institute It states on level board, the vertical plate is concordant on the outside of the floor layer.
5. parapet of roofing as claimed in claim 4, it is characterised in that:The steel bar girder includes die mould floor support plate, with pressure Wind up reinforcing bar and the lower edge reinforcing bar of type floor support plate parallel arrangement, and be arranged in the undulate between reinforcing bar and lower edge reinforcing bar that winds up The web member reinforcing bar of arrangement;Die mould floor support plate bottom and the vertical plate of the outside banded plate overlap, the steel that winds up The bottom end of muscle and lower edge reinforcing bar is weldingly fixed on the level board of the outside banded plate.
6. parapet of roofing as claimed in claim 5, it is characterised in that:It is provided with horizontal reinforcement on the reinforcing bar that winds up, and Horizontal reinforcement is perpendicular to steel bar arrangement of winding up.
7. parapet of roofing as claimed in claim 5, it is characterised in that:Perpendicular to die mould floor support plate on the die mould floor support plate It is provided with several split bolts.
8. a kind of construction method of parapet of roofing, which is characterized in that include the following steps:
1) precast reinforced truss and outside banded plate, and steel bar girder bottom welds to form parapet steel construction with outside banded plate Support system;
2) the parapet steel support structure that step 1) obtains is fixed on by shear stud on the outside of floor layer;
3) in floor layer edge pouring molding parapet flange so that steel bar girder bottom anchor is inside parapet flange;
4) it is disposed with inner side template in steel bar girder in parapet flange inside parallel, and inner side template is fixed by split bolt On steel bar girder;
5) casting concrete between inner side template and steel bar girder forms concrete wall, waits for that concrete wall reaches design Inner side template is removed after intensity.
9. the construction method of parapet of roofing as claimed in claim 8, which is characterized in that the step 3) pours parapet and turns over Before side, roof boarding steel bar layer is bound on floor layer, several horizontal reinforcements are bound on steel bar girder.
10. the construction method of parapet of roofing as claimed in claim 8, which is characterized in that the inner side template is plank sheathing.
CN201810379104.6A 2018-04-25 2018-04-25 Roofing parapet wall and construction method thereof Active CN108385904B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810379104.6A CN108385904B (en) 2018-04-25 2018-04-25 Roofing parapet wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810379104.6A CN108385904B (en) 2018-04-25 2018-04-25 Roofing parapet wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN108385904A true CN108385904A (en) 2018-08-10
CN108385904B CN108385904B (en) 2024-02-27

Family

ID=63065756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810379104.6A Active CN108385904B (en) 2018-04-25 2018-04-25 Roofing parapet wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN108385904B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252624A (en) * 2018-10-23 2019-01-22 肖霞 A kind of parapet seepage-proof structure and its construction method
CN109736514A (en) * 2018-12-18 2019-05-10 浙江绿筑集成科技有限公司 A kind of connecting structure and preparation method thereof of prefabricated daughter's wallboard
CN111502085A (en) * 2020-04-29 2020-08-07 黑龙江宇辉新型建筑材料有限公司 Cast-in-place wall body with detachable combined truss reinforcing steel bars and steel plates and construction method
CN111663766A (en) * 2020-06-18 2020-09-15 北京城建七建设工程有限公司 Overhanging structure parapet single-face formwork connecting system and construction method thereof
CN113668852A (en) * 2021-08-25 2021-11-19 中建一局集团建设发展有限公司 Parapet wall formwork structure of steel structure roof and construction method thereof
CN113756496A (en) * 2021-09-17 2021-12-07 中建四局第一建设有限公司 Structure and construction method of small-space floor bearing plate under roof reverse-procedure construction
CN117027395A (en) * 2023-08-31 2023-11-10 北京建工四建工程建设有限公司 Construction method of oval cone concrete parapet forming structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4530193A (en) * 1984-07-16 1985-07-23 Minnesota Diversified Products, Inc. Built-up roof structure and method of preparing roof structure
JPH11159041A (en) * 1997-11-26 1999-06-15 Kumagai Gumi Co Ltd Construction method for riser for mounting concrete wall
JP2007314949A (en) * 2006-05-23 2007-12-06 Daiwa House Ind Co Ltd Secondary water stop structure of waterproof sheet roof
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN203613792U (en) * 2013-11-12 2014-05-28 中国建筑第八工程局有限公司 Parapet wall formwork pouring structure
CN205476118U (en) * 2016-01-17 2016-08-17 徐丽莎 Hollow building block parapet
CN106906962A (en) * 2017-03-14 2017-06-30 中冶建工集团有限公司 A kind of building roof parapet flashing construction technology
CN208152409U (en) * 2018-04-25 2018-11-27 中铁第四勘察设计院集团有限公司 A kind of parapet of roofing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4530193A (en) * 1984-07-16 1985-07-23 Minnesota Diversified Products, Inc. Built-up roof structure and method of preparing roof structure
JPH11159041A (en) * 1997-11-26 1999-06-15 Kumagai Gumi Co Ltd Construction method for riser for mounting concrete wall
JP2007314949A (en) * 2006-05-23 2007-12-06 Daiwa House Ind Co Ltd Secondary water stop structure of waterproof sheet roof
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN203613792U (en) * 2013-11-12 2014-05-28 中国建筑第八工程局有限公司 Parapet wall formwork pouring structure
CN205476118U (en) * 2016-01-17 2016-08-17 徐丽莎 Hollow building block parapet
CN106906962A (en) * 2017-03-14 2017-06-30 中冶建工集团有限公司 A kind of building roof parapet flashing construction technology
CN208152409U (en) * 2018-04-25 2018-11-27 中铁第四勘察设计院集团有限公司 A kind of parapet of roofing

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252624A (en) * 2018-10-23 2019-01-22 肖霞 A kind of parapet seepage-proof structure and its construction method
CN109736514A (en) * 2018-12-18 2019-05-10 浙江绿筑集成科技有限公司 A kind of connecting structure and preparation method thereof of prefabricated daughter's wallboard
CN111502085A (en) * 2020-04-29 2020-08-07 黑龙江宇辉新型建筑材料有限公司 Cast-in-place wall body with detachable combined truss reinforcing steel bars and steel plates and construction method
CN111663766A (en) * 2020-06-18 2020-09-15 北京城建七建设工程有限公司 Overhanging structure parapet single-face formwork connecting system and construction method thereof
CN113668852A (en) * 2021-08-25 2021-11-19 中建一局集团建设发展有限公司 Parapet wall formwork structure of steel structure roof and construction method thereof
CN113756496A (en) * 2021-09-17 2021-12-07 中建四局第一建设有限公司 Structure and construction method of small-space floor bearing plate under roof reverse-procedure construction
CN113756496B (en) * 2021-09-17 2022-08-19 中建四局第一建设有限公司 Structure and construction method of small-space floor bearing plate under roof reverse-procedure construction
CN117027395A (en) * 2023-08-31 2023-11-10 北京建工四建工程建设有限公司 Construction method of oval cone concrete parapet forming structure
CN117027395B (en) * 2023-08-31 2024-02-27 北京建工四建工程建设有限公司 Construction method of oval cone concrete parapet forming structure

Also Published As

Publication number Publication date
CN108385904B (en) 2024-02-27

Similar Documents

Publication Publication Date Title
CN108385904A (en) A kind of parapet of roofing and its construction method
CN109339229B (en) Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor
CN107023099A (en) Prefabricated superimposed sheet double combined overlapped shear wall and its construction method
CN210507829U (en) Assembly type building connecting node of steel pipe concrete column-precast concrete composite beam
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN111188457A (en) Edge sealing beam structure of super high-rise steel structure building and construction method
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN110067321B (en) Flexible connecting device for assembled shear wall and construction method thereof
CN211421637U (en) Connecting structure of prefabricated gutter
CN208152409U (en) A kind of parapet of roofing
CN112942574A (en) Prefabricated reinforced concrete full-fabricated roof cornice and construction method thereof
CN212104574U (en) Floor board and shear wall corner steel construction for assembly type building
CN111894193A (en) Assembled concrete inclined roof
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN209891551U (en) Combined beam composed of steel beam and steel bar truss floor support plate
CN209260922U (en) Band girder rib laminated floor slab pre-tensioning system connecting joint structure
CN218205143U (en) Permanent prefabricated combined template system
CN115288504A (en) Construction method of concrete floor on top of large-scale bin body structure
CN210288825U (en) Assembled and cast-in-situ combined beam plate structure
CN115233813A (en) Beam with clamping connection plate
CN211447283U (en) Connecting beam of main building and skirt house
CN219732323U (en) Novel fixing system for precast floor slab and superposed beam
CN215166500U (en) Prefabricated reinforced concrete full-assembled roof cornice
CN219100719U (en) Single-side formwork supporting device for roof overhanging gutter
CN212405661U (en) Assembled concrete inclined roof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination