CN108382976A - A kind of assembled wall mast-up - Google Patents
A kind of assembled wall mast-up Download PDFInfo
- Publication number
- CN108382976A CN108382976A CN201810250416.7A CN201810250416A CN108382976A CN 108382976 A CN108382976 A CN 108382976A CN 201810250416 A CN201810250416 A CN 201810250416A CN 108382976 A CN108382976 A CN 108382976A
- Authority
- CN
- China
- Prior art keywords
- wall
- hanger
- connecting shaft
- fixed plate
- adjustment hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/06—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of assembled wall mast-ups, including hanger, platform sling, chain sling, hanging ring, adjustment hole, wall-body hoisting ring, wall, support plate, floor, adjustable column, fixed plate, the hanger is cuboid, top both sides are integrally formed with platform sling, two platform sling is connect by chain sling with hanging ring, the adjustment hole is set to inside hanger and is equally spaced, the wall is fixed top and is threadedly coupled with wall-body hoisting ring, steel wire penetrating adjustment hole on the wall-body hoisting ring is connect with hanger, the front and back and left and right sides is vertically and fixedly provided with four support plates at the top of the hanger, the floor respectively with hanger and support plate vertical connection, it is hinged with four support plate ends respectively at the top of four adjustable columns, the adjusting column bottom is hinged with fixed plate, the fixed plate is connect with the expansion bolt inside wall.The stabilized structure of the present invention, prevents wall to be swung left and right in the air and has an accident.
Description
Technical field
The present invention relates to a kind of mast-up more particularly to a kind of assembled wall mast-ups.
Background technology
In assembled architecture mast-up be it is essential can a part, lifting refers to crane or lifting mechanism to equipment
Install, general designation in place, equipment, workpiece, utensil, material etc. are hung using various hoisting machine tools in maintenance or maintenance process
It rises, brings it about change in location.Conventional hoisting structure is directly connected to by steel wire rope or chain with building body using hanging ring, this
Kind hoisting structure can play hanging ring the power shaken off, therefore need to solve such case in the air inevitably there is a situation where waving
Want a kind of firm hoisting structure.
Invention content
The purpose of the present invention is to provide a kind of assembled wall mast-ups, to solve the above technical problems.
The present invention uses following technical scheme to achieve the above object:
A kind of assembled wall mast-up, including hanger, platform sling, chain sling, hanging ring, adjustment hole, wall-body hoisting ring, wall, support plate,
Floor, adjustable column, fixed plate, the hanger are cuboid, and top both sides are integrally formed with platform sling, and two platform sling passes through chain sling
It being connect with hanging ring, the adjustment hole is set to inside hanger and is equally spaced, and the wall is fixed top and is threadedly coupled with wall-body hoisting ring,
Steel wire penetrating adjustment hole on the wall-body hoisting ring is connect with hanger, and the front and back and left and right sides is vertically fixed at the top of the hanger
Have four support plates, the floor respectively with hanger and support plate vertical connection, at the top of four adjustable columns respectively with four branch
Fagging end is hinged, and the adjusting column bottom is hinged with fixed plate, and the fixed plate is connect with the expansion bolt inside wall.
On the basis of above-mentioned technical proposal, the adjustable column 10 includes upper connecting shaft 12, upper fixing axle 13, rotating cylinder 14, prevents
Sliding line 15, lower fixing axle 16, lower connecting shaft 17,10 top of the adjustable column are equipped with upper connecting shaft 12, the upper connecting shaft 12 with
8 end of support plate connects, and 12 bottom of upper connecting shaft is fixed with fixing axle 13, and fixed axis is right with 14 upper end of rotating cylinder
Rotation is threadedly coupled, and anti-skid chequer 15,14 lower end of the rotating cylinder and lower 17 left hand thread of fixing axle are equipped in the middle part of 14 outer wall of the rotating cylinder
Connection, 17 bottom of lower connecting shaft is fixedly connected with lower connecting shaft 17.
On the basis of above-mentioned technical proposal, the fixed plate 11 includes pasting wallboard 18, connector 19, location hole 20, described
Patch wallboard 18 is affixed with metope, and the 18 top end of patch wallboard is vertically and fixedly provided with connector 19 described in connector 19 and lower connecting shaft
17 connections, the location hole 20 are set to 18 lower part of patch wallboard, and the location hole is tethered by nut and the expanding screw inside wall 7
It connects.
Compared with prior art, the present invention has the following advantages:Hanger of the present invention is connect with hanging ring by chain sling, next hangs
Frame by steel wire rope and wall connecting, reduces the active force that building body twists top hanging ring again;Hanger leads to before and after wall
Toning segmented column and wall Auxiliary support, prevent wall in the case where being swung left and right, and realize that one direction is rocked, substantially reduce wall
Body, which waves, generates the non-uniform active force in left and right;Adjustable column interior drum, can be according to wall by left and right rotation and fixed axis connection
The expansion bolt position in internal portion adjusts the length of adjustable column, and fixed plate is made to be fixed with wall.
Description of the drawings
Fig. 1 is appearance diagram of the present invention.
Fig. 2 is front view of the present invention.
Fig. 3 is adjustable column appearance diagram of the present invention.
Fig. 4 is fixed plate appearance diagram of the present invention.
In figure:1, hanger, 2, platform sling, 3, chain sling, 4, hanging ring, 5, adjustment hole, 6, wall-body hoisting ring, 7, wall, 8, support plate,
9, floor, 10, adjustable column, 11, fixed plate, 12, upper connecting shaft, 13, upper fixing axle, 14, rotating cylinder, 15, anti-skid chequer, 16, lower solid
Dead axle, 17, lower connecting shaft, 18, patch wallboard, 19, connector, 20, location hole.
Specific implementation mode
The present invention is further elaborated in the following with reference to the drawings and specific embodiments.
As shown in Figs 1-4, a kind of assembled wall mast-up, including hanger 1, platform sling 2, chain sling 3, hanging ring 4, adjustment hole 5,
Wall-body hoisting ring 6, wall 7, support plate 8, floor 9, adjustable column 10, fixed plate 11, it is characterised in that:The hanger 1 is cuboid
1, top both sides are integrally formed with platform sling 2, and two platform sling 2 is connect by chain sling 3 with hanging ring 4, and the adjustment hole 5 is set to hanger
It is equally spaced inside 1, the wall 7 is fixed top and is threadedly coupled with wall-body hoisting ring 6, and the steel wire rope on the wall-body hoisting ring 6 is worn
Toning knothole 5 is connect with hanger 1, and 1 top of the hanger is front and back and the left and right sides is vertically and fixedly provided with four support plates 8, the floor 9
Respectively with 8 vertical connection of hanger 1 and support plate, four adjustable columns, 10 top is hinged with four 8 ends of support plate respectively, institute
It is hinged with fixed plate 11 to state 10 bottom of adjustable column, the fixed plate 11 is connect with the expansion bolt inside wall 7.
The adjustable column 10 includes upper connecting shaft 12, upper fixing axle 13, rotating cylinder 14, anti-skid chequer 15, lower fixing axle 16, lower company
Spindle 17, the top of the adjustable column 10 are equipped with upper connecting shaft 12, and the upper connecting shaft 12 is connect with 8 end of support plate, it is described on
12 bottom of connecting shaft is fixed with fixing axle 13, and fixed axis is connect with 14 upper end right-handed thread of rotating cylinder, the rotating cylinder 14
Anti-skid chequer 15 is equipped in the middle part of outer wall, 14 lower end of the rotating cylinder is connect with lower 17 left hand thread of fixing axle, 17 bottom of lower connecting shaft
Portion is fixedly connected with lower connecting shaft 17.
The fixed plate 11 includes patch wallboard 18, connector 19, location hole 20, and the patch wallboard 18 is affixed with metope, institute
It states patch wallboard 18 top end and is vertically and fixedly provided with connector 19 described in connector 19 and connect with lower connecting shaft 17, the location hole 20 is set
In 18 lower part of patch wallboard, the location hole is connect by nut with the expansion bolt inside wall 7.
The operation principle of the present invention:4 top of hanging ring is connect with crane, and 4 lower part of hanging ring is connect by chain sling 3 with hanger 1, is hung
The adjustment hole 5 of 1 lower part of frame is connect by steel wire rope with the gun body hanging ring 6 at 7 top of wall, by four adjustable columns 10 according to wall 7
Fixed plate 11 is fixed on 7 surface of wall, wall 7 is moved to prepackage position by crane by internal expansion bolt location to adjust length
It sets, places and consolidated wall, then fixed plate 11 and wall-body hoisting ring 6 are disassembled.
The above is present pre-ferred embodiments, for the ordinary skill in the art, according to the present invention
Introduction, in the case where not departing from the principle of the present invention with spirit, changes, modifications, replacement and change that embodiment is carried out
Type is still fallen within protection scope of the present invention.
Claims (3)
1. a kind of assembled wall mast-up, including hanger(1), platform sling(2), chain sling(3), hanging ring(4), adjustment hole(5), wall
Hanging ring(6), wall(7), support plate(8), floor(9), adjustable column(10), fixed plate(11), it is characterised in that:The hanger
(1)For cuboid(1), top both sides and platform sling(2)It is integrally formed, two platform sling(2)Pass through chain sling(3)With hanging ring(4)Even
It connects, the adjustment hole(5)Set on hanger(1)Inside is equally spaced, the wall(7)Fixed top and wall-body hoisting ring(6)Screw thread
Connection, the wall-body hoisting ring(6)On steel wire penetrating adjustment hole(5)With hanger(1)Connection, the hanger(1)Before and after top
It is vertically and fixedly provided with four support plates with the left and right sides(8), the floor(9)Respectively with hanger(1)And support plate(8)Vertical connection,
Four adjustable columns(10)Top respectively with four support plates(8)End is hinged, the adjustable column(10)Bottom and fixed plate
(11)It is hinged, the fixed plate(11)With wall(7)Internal expansion bolt connection.
2. a kind of assembled wall mast-up according to claim 1, it is characterised in that:The adjustable column(10)Including upper
Connecting shaft(12), upper fixing axle(13), rotating cylinder(14), anti-skid chequer(15), lower fixing axle(16), lower connecting shaft(17), the tune
Segmented column(10)Top is equipped with upper connecting shaft(12), the upper connecting shaft(12)With support plate(8)End connects, the upper connecting shaft
(12)Bottom is fixed with fixing axle(13), fixed axis and rotating cylinder(14)Upper end right-handed thread connection, the rotating cylinder
(14)Anti-skid chequer is equipped in the middle part of outer wall(15), the rotating cylinder(14)Lower end and lower fixing axle(17)Left hand thread connects, under described
Connecting shaft(17)Bottom and lower connecting shaft(17)It is fixedly connected.
3. a kind of assembled wall mast-up according to claim 1, it is characterised in that:The fixed plate(11)Including patch
Wallboard(18), connector(19), location hole(20), the patch wallboard(18)It is affixed with metope, the patch wallboard(18)Top end
It is vertically and fixedly provided with connector(19)The connector(19)With lower connecting shaft(17)Connection, the location hole(20)Set on patch wallboard
(18)Lower part, the location hole pass through nut and wall(7)Internal expansion bolt connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810250416.7A CN108382976A (en) | 2018-03-26 | 2018-03-26 | A kind of assembled wall mast-up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810250416.7A CN108382976A (en) | 2018-03-26 | 2018-03-26 | A kind of assembled wall mast-up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108382976A true CN108382976A (en) | 2018-08-10 |
Family
ID=63072114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810250416.7A Withdrawn CN108382976A (en) | 2018-03-26 | 2018-03-26 | A kind of assembled wall mast-up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108382976A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110550539A (en) * | 2019-09-18 | 2019-12-10 | 中国科学院长春光学精密机械与物理研究所 | improved frame type hoisting device |
CN111119501A (en) * | 2020-01-19 | 2020-05-08 | 商丘师范学院 | Environment-friendly assembled wall installation device |
CN112027893A (en) * | 2020-09-09 | 2020-12-04 | 湖南汇渠建筑科技有限公司 | Hoisting accessory that assembled wall body hoist and mount were used based on BIM |
-
2018
- 2018-03-26 CN CN201810250416.7A patent/CN108382976A/en not_active Withdrawn
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110550539A (en) * | 2019-09-18 | 2019-12-10 | 中国科学院长春光学精密机械与物理研究所 | improved frame type hoisting device |
CN110550539B (en) * | 2019-09-18 | 2020-09-29 | 中国科学院长春光学精密机械与物理研究所 | Improved frame type hoisting device |
CN111119501A (en) * | 2020-01-19 | 2020-05-08 | 商丘师范学院 | Environment-friendly assembled wall installation device |
CN112027893A (en) * | 2020-09-09 | 2020-12-04 | 湖南汇渠建筑科技有限公司 | Hoisting accessory that assembled wall body hoist and mount were used based on BIM |
CN112027893B (en) * | 2020-09-09 | 2022-04-22 | 湖南汇渠建筑科技有限公司 | Hoisting accessory that assembled wall body hoist and mount were used based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108382976A (en) | A kind of assembled wall mast-up | |
CN208394599U (en) | A kind of assembled wall mast-up | |
CN107237071A (en) | One kind printing and dyeing cloth dewaterer | |
CN106809720B (en) | A kind of potting breaker arc-chutes hoisting fixture | |
CN105417400A (en) | Intelligent light swing arm type crane | |
CN206999277U (en) | A kind of wallboard turning device | |
CN213569236U (en) | Heavy-calibre pipeline loop wheel machine | |
CN203946815U (en) | Super-lifting device of crane and crane | |
CN106744251A (en) | A kind of hanging apparatus for steel structure modularization unit | |
CN206915667U (en) | A kind of firm locking-type glass fibre reinforced plastic pipe lifting mechanism | |
KR101772179B1 (en) | Apparatus for building refractory in converter | |
CN109774767A (en) | A kind of steel coil transporting trolley band lifting and rotated | |
CN210830784U (en) | Spring support and hanger with direction limiting and position guiding functions | |
CN209259612U (en) | A kind of feeding device for construction | |
CN207175321U (en) | A kind of safety-type elevator | |
CN107934741B (en) | A kind of motor-controlled lifting lifting device | |
CN207027812U (en) | The mobile shock platforms of HiAm anchorage grouting | |
CN207941914U (en) | Automatic forging hammer span regulating device | |
CN207431121U (en) | For balance sling cable wire hanging ring curved platform | |
CN202147111U (en) | Chain type tilter for telescopic arm of tilting crane | |
CN216785534U (en) | Outer wall construction hoisting equipment | |
CN106245913B (en) | Template regulating system | |
CN217297054U (en) | Steel construction section bar hoist device | |
CN103910281B (en) | A kind of multi-vehicle-type door closure on-line hanger | |
CN204675234U (en) | Adjustable counterweight mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180810 |