CN108374351A - 一种拆除箱梁贝雷片的简易起重装置及方法 - Google Patents
一种拆除箱梁贝雷片的简易起重装置及方法 Download PDFInfo
- Publication number
- CN108374351A CN108374351A CN201810475990.2A CN201810475990A CN108374351A CN 108374351 A CN108374351 A CN 108374351A CN 201810475990 A CN201810475990 A CN 201810475990A CN 108374351 A CN108374351 A CN 108374351A
- Authority
- CN
- China
- Prior art keywords
- girder
- box beam
- beret slice
- rope
- hoist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 238000011065 in-situ storage Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
本发明属于现浇箱梁贝雷片拆卸设备技术领域,具体一种拆除箱梁贝雷片的简易起重装置及方法。一种拆除箱梁贝雷片的简易起重装置,包括主梁,主梁的固定端与箱梁顶上连接,主梁的悬挂端伸出箱梁,主梁的长度方向与现浇筑箱梁的长度方向垂直,主梁上自悬挂端至固定端的方向依次设有第一定滑轮和第二定滑轮,第二定滑轮一侧设有预留孔洞,主梁上固定第一卷扬机和第二卷扬机,本发明拆卸高效,使用方便。
Description
技术领域
本发明属于现浇箱梁贝雷片拆卸设备技术领域,具体一种拆除箱梁贝雷片的简易起重装置及方法。
背景技术
贝雷片由于其结构简单、运输方便、架设快捷、载重量大、互换性好、适应性强的特点,在桥梁施工中被广泛运用,但在拆除过程中也会有诸多不便,现有的贝雷片拆除一般选用汽车起重机进行拆除,但汽车起重机需要更宽广的场地来进行的架设,尤其在一些施工场地较窄的地方就更难以实施,因此现有技术需要进一步的改进。
发明内容
本发明的目的在于提供一种拆卸高效,使用方便的拆除箱梁贝雷片组的简易起重装置及方法。
基于上述目的,本发明采取如下技术方案:
一种拆除箱梁贝雷片的简易起重装置,包括主梁,主梁包括两组,主梁的固定端与箱梁顶上连接,主梁的悬挂端伸出箱梁,主梁的长度方向与现浇筑箱梁的长度方向垂直,主梁上自悬挂端至固定端的方向依次设有第一定滑轮和第二定滑轮,第二定滑轮一侧设有预留孔洞,主梁上固定第一卷扬机和第二卷扬机,第一卷扬机连接第一绳索,第一绳索起吊端绕过第一定滑轮,第二卷扬机连接第二绳索,第二绳索起吊端绕过第二定滑轮且穿过预留孔洞。
进一步的,所述的主梁为两根,两根主梁的悬挂端之间通过横梁连接,第一定滑轮和第二定滑轮设置在两根主梁之间。
进一步的,所述的主梁固定端是通过数个预埋工字钢与箱梁顶上连接。
进一步的,所述的主梁长度方向与横梁的长度方向垂直。
进一步的,所述的一种拆除箱梁贝雷片的简易起重装置的方法,由以下步骤组成:
(1)在箱梁浇筑前,将预埋工字钢预埋至箱梁上,待箱梁张拉、压浆完成后进行主梁的安装。
(2)在预留孔洞的下方的箱梁上设置通孔,两组主梁中的其中一组主梁上的第二绳索的起吊端贯穿通孔连接待拆除箱梁贝雷片组一端,第一绳索的起吊端连接箱梁贝雷片组一端,其中另一组主梁上的第二绳索的起吊端贯穿通孔连接待拆除箱梁贝雷片组另一端,第一绳索的起吊端连接箱梁贝雷片组另一端;
(3)通过开闭第一卷扬机和第二卷扬机的收绳开关和放绳开关,调节箱梁贝雷片组的位置,将其移动至需要放置的地方。
本发明结构简单,可以减少机械使用,从而减少人工,节约能耗还能加快施工速度,并且设备拆卸方便,占用施工面积小,便于运输。
附图说明
图1为本发明的结构示意图;
图2为两组主梁的位置关系图;
图3为横梁与主梁的位置关系图。
具体实施方式
如图1-3所示的一种拆除箱梁贝雷片的简易起重装置,包括主梁1,主梁1包括两组,主梁1的固定端101与箱梁顶上2连接,主梁1的悬挂端102伸出箱梁2,主梁1的长度方向与现浇筑箱梁的长度方向垂直,主梁1上自悬挂端102至固定端101的方向依次设有第一定滑轮3和第二定滑轮4,第二定滑轮4一侧设有预留孔洞5,主梁1上固定第一卷扬机6和第二卷扬机7,第一卷扬机6连接第一绳索601,第一绳索601起吊端绕过第一定滑轮3,第二卷扬机7连接第二绳索701,第二绳索701起吊端绕过第二定滑轮4且穿过预留孔洞5。如图2所示,所述的主梁1为两根,两根主梁1的悬挂端102之间通过横梁9连接,第一定滑轮3和第二定滑轮4设置在两根主梁1之间。所述的主梁1固定端101是通过两个预埋工字钢8与箱梁顶上2连接,预埋工字钢为2HN500型钢,预埋工字钢8固定在边箱室两个腹板位置,所述的主梁1长度方向与横梁9的长度方向垂直。
使用所述的一种拆除箱梁贝雷片的简易起重装置的方法,由以下步骤组成:
(1)在箱梁浇筑前,将预埋工字钢8预埋至箱梁2的1/4处,待箱梁张拉、压浆完成后进行主梁1的安装。
(2)在预留孔洞5的下方设有箱梁2上设置通孔10,两组主梁1中的其中一组主梁1上的第二绳索701的起吊端贯穿通孔10连接待拆除箱梁贝雷片组11一端,第一绳索601的起吊端连接箱梁贝雷片组11一端,其中另一组主梁1上的第二绳索701的起吊端贯穿通孔连接待拆除箱梁贝雷片组11另一端,第一绳索601的起吊端连接箱梁贝雷片组11另一端;
(3)通过开闭第一卷扬机6和第二卷扬机7的收绳开关和放绳开关,调节箱梁贝雷片组11的位置,将其移动至需要放置的地方。
Claims (5)
1.一种拆除箱梁贝雷片的简易起重装置,其特征在于,包括主梁,主梁包括两组,主梁的固定端与箱梁顶上连接,主梁的悬挂端伸出箱梁,主梁的长度方向与现浇筑箱梁的长度方向垂直,主梁上自悬挂端至固定端的方向依次设有第一定滑轮和第二定滑轮,第二定滑轮一侧设有预留孔洞,主梁上固定第一卷扬机和第二卷扬机,第一卷扬机连接第一绳索,第一绳索起吊端绕过第一定滑轮,第二卷扬机连接第二绳索,第二绳索起吊端绕过第二定滑轮且穿过预留孔洞。
2.根据权利要求1所述的拆除箱梁贝雷片的简易起重装置,其特征在于,所述的主梁为两根,两根主梁的悬挂端之间通过横梁连接,第一定滑轮和第二定滑轮设置在两根主梁之间。
3.根据权利要求1所述的拆除箱梁贝雷片的简易起重装置,其特征在于,所述的主梁固定端是通过数个预埋工字钢与与箱梁顶上连接。
4.根据权利要求1所述的拆除箱梁贝雷片的简易起重装置,其特征在于,所述的主梁长度方向与横梁的长度方向垂直。
5.使用权利要求1所述的一种拆除箱梁贝雷片的简易起重装置的方法,其特征在于,由以下步骤组成:
(1)在箱梁浇筑前,将预埋工字钢预埋至箱梁上,待箱梁张拉、压浆完成后进行主梁的安装;
(2)在预留孔洞的下方的箱梁上设置通孔,两组主梁中的其中一组主梁上的第二绳索的起吊端贯穿通孔连接待拆除箱梁贝雷片组一端,第一绳索的起吊端连接箱梁贝雷片组一端,其中另一组主梁上的第二绳索的起吊端贯穿通孔连接待拆除箱梁贝雷片组另一端,第一绳索的起吊端连接箱梁贝雷片组另一端;
(3)通过开闭第一卷扬机和第二卷扬机的收绳开关和放绳开关,调节箱梁贝雷片组的位置,将其移动至需要放置的地方。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810475990.2A CN108374351B (zh) | 2018-05-17 | 2018-05-17 | 一种拆除箱梁贝雷片的简易起重装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810475990.2A CN108374351B (zh) | 2018-05-17 | 2018-05-17 | 一种拆除箱梁贝雷片的简易起重装置及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108374351A true CN108374351A (zh) | 2018-08-07 |
CN108374351B CN108374351B (zh) | 2020-09-04 |
Family
ID=63033545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810475990.2A Active CN108374351B (zh) | 2018-05-17 | 2018-05-17 | 一种拆除箱梁贝雷片的简易起重装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108374351B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965480A (zh) * | 2019-12-30 | 2020-04-07 | 中交路桥华南工程有限公司 | 临时支撑拆除装置和拆除方法 |
CN113846566A (zh) * | 2021-09-30 | 2021-12-28 | 中建隧道建设有限公司 | 一种桥梁人非通道施工方法 |
CN114960481A (zh) * | 2022-06-15 | 2022-08-30 | 中建八局第三建设有限公司 | 一种大跨度贝雷梁门架卸落拆除施工方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202416191U (zh) * | 2011-12-29 | 2012-09-05 | 中交第四公路工程局有限公司 | 下行式移动模架海上拆除主梁提升装置 |
CN103277582A (zh) * | 2013-05-15 | 2013-09-04 | 中国葛洲坝集团股份有限公司 | 一种斜井内压力钢管安装方法 |
CN203452013U (zh) * | 2013-08-29 | 2014-02-26 | 中交第四公路工程局有限公司 | 悬臂浇筑挂篮模板整体卸落装置 |
CN103711078A (zh) * | 2013-12-17 | 2014-04-09 | 北京工业大学 | 一种桥梁施工中临时梁式支架及其拆除方法 |
CN104195953A (zh) * | 2014-09-01 | 2014-12-10 | 中国铁建大桥工程局集团有限公司 | 一种桥梁底板部位梁式支架整体横向移出的方法及装置 |
CN104627879A (zh) * | 2015-01-30 | 2015-05-20 | 中国葛洲坝集团股份有限公司 | 地下洞室内卷扬机天锚滑轮吊装***及其仿真方法 |
CN204416978U (zh) * | 2015-01-30 | 2015-06-24 | 中国葛洲坝集团股份有限公司 | 地下洞室内卷扬机天锚滑轮吊装*** |
CN107142857A (zh) * | 2017-05-25 | 2017-09-08 | 中铁十局集团第三建设有限公司 | 现浇梁底贝雷片拆除技术 |
CN207048281U (zh) * | 2017-07-28 | 2018-02-27 | 马鞍山钢铁建设集团有限公司 | 一种矿焦槽料斗衬板安装*** |
CN208517821U (zh) * | 2018-05-17 | 2019-02-19 | 中交一公局厦门工程有限公司 | 一种拆除箱梁贝雷片的简易起重装置 |
-
2018
- 2018-05-17 CN CN201810475990.2A patent/CN108374351B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202416191U (zh) * | 2011-12-29 | 2012-09-05 | 中交第四公路工程局有限公司 | 下行式移动模架海上拆除主梁提升装置 |
CN103277582A (zh) * | 2013-05-15 | 2013-09-04 | 中国葛洲坝集团股份有限公司 | 一种斜井内压力钢管安装方法 |
CN203452013U (zh) * | 2013-08-29 | 2014-02-26 | 中交第四公路工程局有限公司 | 悬臂浇筑挂篮模板整体卸落装置 |
CN103711078A (zh) * | 2013-12-17 | 2014-04-09 | 北京工业大学 | 一种桥梁施工中临时梁式支架及其拆除方法 |
CN104195953A (zh) * | 2014-09-01 | 2014-12-10 | 中国铁建大桥工程局集团有限公司 | 一种桥梁底板部位梁式支架整体横向移出的方法及装置 |
CN104627879A (zh) * | 2015-01-30 | 2015-05-20 | 中国葛洲坝集团股份有限公司 | 地下洞室内卷扬机天锚滑轮吊装***及其仿真方法 |
CN204416978U (zh) * | 2015-01-30 | 2015-06-24 | 中国葛洲坝集团股份有限公司 | 地下洞室内卷扬机天锚滑轮吊装*** |
CN107142857A (zh) * | 2017-05-25 | 2017-09-08 | 中铁十局集团第三建设有限公司 | 现浇梁底贝雷片拆除技术 |
CN207048281U (zh) * | 2017-07-28 | 2018-02-27 | 马鞍山钢铁建设集团有限公司 | 一种矿焦槽料斗衬板安装*** |
CN208517821U (zh) * | 2018-05-17 | 2019-02-19 | 中交一公局厦门工程有限公司 | 一种拆除箱梁贝雷片的简易起重装置 |
Non-Patent Citations (6)
Title |
---|
朱月恒: "桥梁现浇箱梁支架施工技术", 《江西建材》 * |
杨成达: "跨既有线混凝土门式墩连续刚构桥综合施工技术", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
熊中庆: "实例探析现浇连续梁贝雷梁支架施工技术", 《黑龙江交通科技》 * |
路军涛: "桥梁工程中现浇箱梁支架的施工技术", 《交通建设》 * |
马岷成: "高位大悬挑混凝土结构支模平台施工技术", 《中国建材科技》 * |
魏久成: "桥梁现浇箱梁支架施工技术", 《交通世界》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965480A (zh) * | 2019-12-30 | 2020-04-07 | 中交路桥华南工程有限公司 | 临时支撑拆除装置和拆除方法 |
CN113846566A (zh) * | 2021-09-30 | 2021-12-28 | 中建隧道建设有限公司 | 一种桥梁人非通道施工方法 |
CN114960481A (zh) * | 2022-06-15 | 2022-08-30 | 中建八局第三建设有限公司 | 一种大跨度贝雷梁门架卸落拆除施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108374351B (zh) | 2020-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105317008B (zh) | 一种钢桁梁斜拉桥钢桁梁节段的整体吊运方法 | |
CN104963301B (zh) | 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法 | |
CN108374351A (zh) | 一种拆除箱梁贝雷片的简易起重装置及方法 | |
CN104652298B (zh) | 一种基于桥面支撑的整跨箱梁下放拆除***及其施工方法 | |
CN105200923B (zh) | 一种钢桁梁斜拉桥钢桁梁节段吊运装置及其吊运方法 | |
CN104727236A (zh) | 一种基于地面支撑的整跨桥梁下放拆除***及其施工方法 | |
CN110396931A (zh) | 一种中央双索面斜拉桥过索式桥面吊机及其施工方法 | |
CN110685433A (zh) | 一种应用液压提升翻模技术的烟筒施工装置及施工方法 | |
CN110258352A (zh) | 两跨连做的钢混组合桥梁施工方法 | |
CN106976797A (zh) | 三吊点回转吊具 | |
CN105256728A (zh) | 一种斜拉桥中华伦式钢桁梁的悬臂架设方法 | |
CN101818479B (zh) | 移动模架空中退行解体拆除施工工艺 | |
CN107022958B (zh) | 使用缆索吊机安装斜拉桥的中跨主梁的方法 | |
CN211286601U (zh) | 一种应用液压提升翻模技术的烟筒施工装置 | |
CN113882281B (zh) | 一种桥梁悬臂施工挂篮行走***及操作方法 | |
CN208517821U (zh) | 一种拆除箱梁贝雷片的简易起重装置 | |
CN103419279A (zh) | T梁模板整体拆除及纵向滑移施工方法 | |
CN108708281A (zh) | 一种多孔简支近似拱形钢桁梁架设方法 | |
CN108675170A (zh) | 屋面单轨吊及其施工方法 | |
CN101264845A (zh) | 天车高空整体悬吊换位施工方法 | |
CN205241086U (zh) | 模板吊装和安拆用炮车 | |
CN110904861A (zh) | 一种斜拉桥架梁吊机及其施工方法 | |
CN216238175U (zh) | 一种桥梁悬臂施工挂篮行走*** | |
CN115506371A (zh) | 一种深基坑超高内支撑拆除的施工方法 | |
CN211283445U (zh) | 一种缆载吊机安装机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 361021 Yinjiang Road 139, Jimei District, Xiamen City, Fujian Province Applicant after: CCCC FIRST HIGHWAY XIAMEN ENGINEERING Co.,Ltd. Applicant after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd. Address before: 361021 Yinjiang Road 139, Jimei District, Xiamen City, Fujian Province Applicant before: CCCC FIRST HIGHWAY XIAMEN ENGINEERING Co.,Ltd. Applicant before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |