CN108372865A - Water system for rail detector car - Google Patents

Water system for rail detector car Download PDF

Info

Publication number
CN108372865A
CN108372865A CN201810313854.3A CN201810313854A CN108372865A CN 108372865 A CN108372865 A CN 108372865A CN 201810313854 A CN201810313854 A CN 201810313854A CN 108372865 A CN108372865 A CN 108372865A
Authority
CN
China
Prior art keywords
water
coupling
water tank
tank
tractor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810313854.3A
Other languages
Chinese (zh)
Other versions
CN108372865B (en
Inventor
李江
吕昭
张旭峰
李艳妮
贾晶岚
张保强
韩建锋
王乐
杨子
王鹏
马亚军
胡琼瑛
王英路
何苗
冯建昌
赵力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji CRRC Times Engineering Machinery Co Ltd
Original Assignee
Baoji CSR Times Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji CSR Times Engineering Machinery Co Ltd filed Critical Baoji CSR Times Engineering Machinery Co Ltd
Priority to CN201810313854.3A priority Critical patent/CN108372865B/en
Publication of CN108372865A publication Critical patent/CN108372865A/en
Application granted granted Critical
Publication of CN108372865B publication Critical patent/CN108372865B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61CLOCOMOTIVES; MOTOR RAILCARS
    • B61C17/00Arrangement or disposition of parts; Details or accessories not otherwise provided for; Use of control gear and control systems
    • B61C17/02Bunkers; Tanks; Tenders; Water or fuel pick-up or scoop apparatus; Water or fuel supply fittings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K9/00Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
    • B61K9/08Measuring installations for surveying permanent way
    • B61K9/10Measuring installations for surveying permanent way for detecting cracks in rails or welds thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Transportation (AREA)
  • Examining Or Testing Airtightness (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

A kind of water system for rail detector car is provided, include the water supply tank on tractor and the coupling water tank set on detection car, antifreeze liquid case, electrical auxiliary switch board and PLC control cabinet, water supply tank is set among tractor roof and contour structures integrally change moulding with tractor roof structure, coupling water tank is internally provided with heating tube, it is integrated with water pump and instantaneously heated type heater in electrical auxiliary switch board, liquid in coupling water tank and antifreeze liquid case is exported by the wheel flange lubricating for electrically assisting switch board to be transported to detection vehicle, liquid in coupling water tank and antifreeze liquid case passes sequentially through electrical auxiliary switch board and PLC control cabinet is transported to the front and back to the coupling mouth of a river of detection vehicle.Capacity that the present invention solves the existing life of existing inspection car and operation water system is small, water tank integrated moulding is poor, connection flexible pipe easily freezes, detects that vehicle operation water system parts disperse, water tank location leads to that body gravity is to the rear, job requirements are not achieved in severe cold winter with coolant-temperature gage in operation between tractor and detection vehicle.

Description

Water system for rail detector car
Technical field
The invention belongs to rail engineering machinery technical fields, and in particular to a kind of water system for rail detector car.
Background technology
Inspection car, which is installed on track, detects the special-purpose vehicle of rail defects and failures equipment or special train.Currently, inspection car is existing There is water system technology to have the following problems:1) it is limited by vehicle space, water tank capacity is small;2) because water tank capacity causes composition to be detected a flaw The tractor of vehicle saves vehicle water route with detection vehicle two and is connected so that water energy reasonable distribution uses, but connecting place hose is easy to freeze, right Vehicle life, operation affect greatly;3) water supply tank on existing tractor is located at tractor rear end, and due to water tank compared with Weight causes vehicle to tilt to the back-end, and in the prior art in such a way that water tank width accounts for vehicle width half, the other half is for going It walks, keeps water supply tank volume small;4) water supply tank moulding and vehicle integration moulding have difference;5) on detection vehicle, from water tank Water pump etc. used in water pump, water heater and anti-icing fluid to PLC control cabinet is distributed across on detection vehicle, it appears that whole system It is more scattered;Also it is unfavorable for user's operation and later period maintenance;6) in severe cold winter, work is not achieved with coolant-temperature gage in detection vehicle coupling operation Industry requirement.It is therefore desirable to propose to improve.
Invention content
Present invention solves the technical problem that:A kind of water system for rail detector car is provided, the present invention solves existing The capacity of the existing life of inspection car and operation water system is small and cannot fully meet personnel and job requirements, water tank integration are made Type is undesirable, connection flexible pipe easily freezes, detects vehicle operation water system parts dispersed placement and make whole between tractor and detection vehicle Body is ineffective, water tank location leads to tilting of car body and center of gravity is to the rear, operation is not achieved operation in severe cold winter with coolant-temperature gage and wants The problems such as asking.
The technical solution adopted by the present invention:For the water system of rail detector car, including be set on tractor and with traction The water supply tank and the coupling water tank set on detection car of interior each domestic water equipment connection, antifreeze liquid case, electrical auxiliary Switch board and PLC control cabinet, the water supply tank are set among tractor roof, the water supply tank contour structures and tractor Roof structure is adapted integralization moulding, and the coupling water tank is there are two detect that car portion is symmetrical and set, the coupling Water tank is internally provided with heating tube, and water pump and instantaneously heated type heater, the coupling water tank are integrated in the electrical auxiliary switch board With the liquid in antifreeze liquid case by electrically assisting the wheel flange lubricating for being transported to detection vehicle after switch board control to export, the coupling Liquid in water tank and antifreeze liquid case passes sequentially through be transported to detection vehicle after electrical auxiliary switch board and PLC control cabinet control before To the coupling mouth of a river and the backward coupling mouth of a river.
Wherein, roof corresponding with water supply tank both sides are equipped with scotch on the tractor, and bolt passes through scotch top Firmly the water tank scotch on water supply tank and prevent water supply tank from sliding;It is equipped in the middle part of the water supply tank upper surface anti-skidding remarkable Plate, the anti-skidding remarkable plate are made of aluminium alloy plate and are formed with crocodile nozzle aperture on aluminium alloy plate.
Further, solenoid valve III and overflow Inductance valve, the coupling water tank are additionally provided in the electrical auxiliary switch board It exports and the outlet of antifreeze liquid case is in parallel and electrically the pump entrance in auxiliary switch board is connect, the coupling water tank goes out rear and water pump It is equipped with switch QT1, filter I, solenoid valve I and check valve I successively from coupling water tank to water pump direction on the connecting line of entrance, The antifreeze liquid case outlet is equipped with switch QT6, mistake successively on the connecting line of pump entrance from antifreeze liquid case to water pump direction Filter II, solenoid valve II and check valve II;The exit of pump is connect by switch QT2 with instantaneously heated type heater entrance, described Instantaneously heated type heater outlet is connect with solenoid valve III and overflow Inductance valve, the connecting tube of the switch QT2 and instantaneously heated type heater Road, which is parallel with, makes the liquid of exit of pump directly reach opening for solenoid valve III and overflow Inductance valve without instantaneously heated type heater Close QT3;The solenoid valve III is connected with wheel flange lubricating outlet, and the wheel flange lubricating outlet is equipped with switch QT4 and switch QT5; Be equipped with PLC solenoid valves I and PLC solenoid valves II in the PLC control cabinet, the overflow Inductance valve by filter III respectively with PLC solenoid valves I and PLC solenoid valves II connect, and the PLC solenoid valves I couple mouth of a river company by normally opened hand-operated valve QT7 with forward direction It connects, the PLC solenoid valves II are connect by normally opened hand-operated valve QT8 with the backward coupling mouth of a river.
Further, the water supply tank volume is more than or equal to 1700L, and the coupling water tank total measurement (volume) is more than or equal to 3300L。
The present invention compared with prior art the advantages of:
1, this programme makes water supply tank and coupling water tank capacity maximize, can fully meet vehicle through reasonable location layout Personnel's life requirement and operation urban water demand;
2, water supply tank is arranged in roof by this programme, and roof, a lower height of mode, tank top are paved with using width Remarkable mode takes into account integrated moulding, the characteristics of making the moulding of roof water tank and vehicle roof moulding be consistent, and meets integration Design concept keeps layout more attractive generous under the premise of meeting domestic water;
3, water supply tank is located in the middle part of tractor roof, and active balance vehicle center of gravity solves caused by existing water tank The problem of vehicle tilts to the back-end;
4, this programme has the characteristics that detecting vehicle operation water system parts integrates, by water pump needed for operation water system and i.e. Heater etc. is integrated in electrical auxiliary switch board, easy to operation, convenient for controlling entire water system, improves operation Efficiency, while facilitating later period maintenance;
5, due to coupling water tank volume meet operation water consumption, so that it may cancel tractor and detection vehicle between connect it is soft Pipe, solves the problems, such as that connection flexible pipe is easily frozen;
6, water tank is coupled in this programme and is internally provided with heating tube, and is equipped with instant heating type heating in electrically auxiliary switch board Device forms two level mode of heating, operation coolant-temperature gage can be made to reach 65 DEG C in cold snap, fully meet flaw detection condition;
7, the liquid that operation uses in this programme is provided by coupling water tank or antifreeze liquid case, and water and anti-icing fluid all may act as The function in couplant source can use anti-icing fluid to be used as couplant for fault detection system, make when extremely trembling with fear temperature in winter Inspection car operation is suitable for varying environment.
Description of the drawings
Fig. 1 is that water supply tank is mounted on the structural front view on tractor in the present invention;
Fig. 2 is that water supply tank is mounted on the structure top view on tractor in the present invention;
Fig. 3 is I schematic enlarged-scale view in Fig. 2;
Fig. 4 is that vehicle water-feeding system mounting structure front view is detected in the present invention;
Fig. 5 be in Fig. 4 A-A to structural schematic diagram;
Fig. 6 is that vehicle water-feeding system schematic diagram is detected in the present invention.
Specific implementation mode
Capacity in order to solve existing for existing inspection car life and operation water system it is small and cannot fully meet personnel and Job requirements, water tank integration moulding be undesirable, connection flexible pipe easily freezes, detects vehicle operation water system between tractor and detection vehicle Parts dispersed placement and make that overall effect is bad, water tank location leads to tilting of car body and center of gravity is to the rear, operation coolant-temperature gage exists The problems such as job requirements are not achieved in severe cold winter and propose the present invention.
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill The every other embodiment that personnel are obtained without making creative work, shall fall within the protection scope of the present invention.
For the water system of rail detector car, as shown in figs. 1 and 4, include on tractor 1 and in tractor 1 The water supply tank 2 of each domestic water equipment connection and the coupling water tank 9 in detection vehicle 8, antifreeze liquid case 10, electrical auxiliary control Cabinet 11 processed and PLC control cabinet 12.
As illustrated in fig. 1 and 2, the water supply tank 2 be set to 1 roof of tractor among, 2 contour structures of the water supply tank with 1 roof structure of tractor is adapted integralization moulding.To solve water supply tank 2, there are one for inertia great Yi slidings in driving The problem of determining security risk, roof corresponding with water supply tank 2 both sides are equipped with scotch 3 on tractor 1, as shown in figure 3, spiral shell Bolt 5 withstands the water tank scotch 4 on water supply tank 2 across scotch 3 and prevents water supply tank 2 from sliding, and has reliability height, just In installation the advantages of.As shown in Fig. 2, being equipped with anti-skidding remarkable plate 6, the anti-skidding remarkable plate 6 in the middle part of 2 upper surface of the water supply tank It is made of aluminium alloy plate and is formed with crocodile nozzle aperture 7 on aluminium alloy plate.Water supply tank 2 is arranged in roof by the present invention, is used Width is paved with roof, a lower height of mode, and the remarkable mode of tank top takes into account integrated moulding, makes roof water tank moulding The characteristics of being consistent with vehicle roof moulding, meet integrated design theory, under the premise of meeting the life used time, makes layout more It is beautiful and generous.And water supply tank 2 is located in the middle part of tractor roof, and active balance vehicle center of gravity solves existing water tank and leads The problem of vehicle of cause tilts to the back-end.
As shown in figure 5, the coupling water tank 9 detection vehicle 8 inside is symmetrical set there are two, in the coupling water tank 9 Portion is equipped with heating tube, and water pump 1109 and instantaneously heated type heater 1112 are integrated in the electrical auxiliary switch board 11.By operation water Water pump 1109 and instantaneously heated type heater 1112 etc. needed for system are integrated in electrical auxiliary switch board 11, it is easy to operation, convenient for pair Entire water system is controlled, and improves operating efficiency, while facilitating later period maintenance.And it is internally provided with heating in coupling water tank 9 Pipe, and it is equipped with instantaneously heated type heater 1112 in electrically auxiliary switch board 11, two level mode of heating is formed, operation water can be made Temperature reaches 65 DEG C, fully meets flaw detection condition.
Liquid in the coupling water tank 9 and antifreeze liquid case 10 after electrically assisting switch board 11 to control by being transported to detection The wheel flange lubricating outlet 13 of vehicle 8, the liquid coupled in water tank 9 and antifreeze liquid case 10 pass sequentially through electrical auxiliary switch board 11 The forward direction coupling mouth of a river 14 of detection vehicle 8 and the backward coupling mouth of a river 15 are transported to after being controlled with PLC control cabinet 12.It is detected in the present invention The liquid that 8 operation of vehicle uses is provided by coupling water tank 9 or antifreeze liquid case 10, and water and anti-icing fluid all may act as couplant source Function can use anti-icing fluid to be used as couplant for fault detection system when extremely trembling with fear temperature in winter, keep inspection car operation suitable For varying environment.
Specifically, as shown in fig. 6, being additionally provided with solenoid valve III 1113 and overflow Inductance valve in the electrical auxiliary switch board 11 1114, the coupling water tank 9 outlet and antifreeze liquid case 10 export water pump 1109 entrance in parallel in electrical auxiliary switch board 11 Connection, the coupling water tank 9 go out afterwards on the connecting line of 1109 entrance of water pump from coupling water tank 9 to 1109 direction of water pump successively Equipped with switch QT11101, filter I 1102, solenoid valve I 1103 and check valve I 1104, the outlet of antifreeze liquid case 10 and water pump It is equipped with switch QT61105, filter II successively from antifreeze liquid case 10 to 1109 direction of water pump on the connecting line of 1109 entrances 1106, solenoid valve II 1107 and check valve II 1108;The outlet of the water pump 1109 passes through switch QT21110 and instantaneously heated type heater 1112 entrances connect, and the outlet of the instantaneously heated type heater 1112 is connect with solenoid valve III 1113 and overflow Inductance valve 1114, described The liquid for making water pump 1109 export is parallel on the connecting line of switch QT21110 and instantaneously heated type heater 1112 without i.e. hot Formula heater 1112 directly reaches the switch QT31111 of solenoid valve III 1113 and overflow Inductance valve 1114;The solenoid valve III 1113 connect with wheel flange lubricating outlet 13, and the wheel flange lubricating outlet 13 is equipped with switch QT41301 and switch QT51302;Institute It states and is equipped with PLC solenoid valves I 1201 and PLC solenoid valves II 1202 in PLC control cabinet 12, the overflow Inductance valve 1114 passes through filtering Device III 1115 is connect with PLC solenoid valves I 1201 and PLC solenoid valves II 1202 respectively, and the PLC solenoid valves I 1201 are by normally opened Hand-operated valve QT71401 and forward direction the coupling mouth of a river 14 connects, the PLC solenoid valves II 1202 by normally opened hand-operated valve QT81501 and The backward coupling mouth of a river 15 connects.
2 volume of the water supply tank is more than or equal to 1700L, and 9 total measurement (volume) of coupling water tank is more than or equal to 3300L.This hair It is bright through reasonable location layout, so that water supply tank 2 and coupling 9 volume of water tank is maximized, vehicle personnel's life requirement can be fully met With operation urban water demand.And since coupling 9 capacity satisfaction of water tank acts on water consumption, so that it may cancel tractor 1 and detection vehicle 8 Between the hose that connects, solve the problems, such as that connection flexible pipe is easily frozen.
Fig. 6 show inspection car operation water system schematic diagram, and each element state is state when detecting a flaw operation in figure.Flaw detection When vehicle operation water system works in section detection 8 operation of vehicle of inspection car second, suitable operating condition is provided for carrying out flaw detection operation. It is electrical that switch board 11 is assisted to work and control a series of action when starting operation:Switch QT11101 is normally opened, opens electricity Magnet valve I 1103, starts water pump 1109, when cold snap (environment temperature be less than 0 DEG C), turns off the switch QT31111, turns on the switch QT21110;Water out passes through immediately heating water heater 1112 by water pump 1109, after divide two-way, all the way through solenoid valve III 1113, into Enter wheel flange lubricating pipeline, when vehicle forward when driving, turn on the switch QT41301, front wheel felloe lubrication water outlet;When vehicle backward when driving, Turn on the switch QT51302, rear rim lubrication water outlet;In addition rear to enter all the way through overflow pressure reducing valve 1114 and filter III 1115 PLC control cabinet 12, when vehicle forward when driving, PLC solenoid valves I 1201 are in an open state, and through normally opened hand-operated valve QT71401, are entered Forward direction couples water lines;When vehicle backward when driving, PLC solenoid valves II 1202 are in an open state, through normally opened hand-operated valve QT81501, After to coupling water lines;When because of flaw detection operation, forward and backward coupling water needs and flaw detection trolley detecting system coordinates (coupling) work Make, this work is realized by PLC solenoid valves I 1201 and PLC solenoid valves II 1202.Wherein normally opened hand-operated valve QT71401, normally opened hand Dynamic valve QT81501 is normally open, only when PLC system failure, can through be turned off manually, open normally opened hand-operated valve QT71401, The normally opened of short duration realization job requirements of hand-operated valve QT81501, can also close normally opened hand-operated valve QT71401, normally opened hand-operated valve QT81501 To realize that system overhaul is safeguarded.
In cold snap, after the completion of detection operation, needs to allow anti-icing fluid full of pipeline while excluding pipeline memory water, with This prevents pipeline bursting by freezing.Concrete principle is as follows:QT61105 is turned on the switch, through filter II 1106, opens solenoid valve II 1107, through check valve II 1108, start water pump 1109, switch QT31111 is in off state, and turns on the switch QT21110;Anti-icing fluid Full of after pipeline herein by immediately heating water heater 1112 (at this time immediately heating water heater 1112 power-off do not work), after divide two-way, QT41301, switch QT51302 are turned on the switch, waits for that anti-icing fluid is full of into wheel flange lubricating pipeline through solenoid valve III 1113 all the way After wheel flange lubricating pipeline, i.e., anti-icing fluid (is equivalent in pipeline herein and deposits after spraying a few minutes from wheel flange lubricating line end at this time Water has been drained), close solenoid valve III 1113;In addition rear to enter all the way through overflow pressure reducing valve 1114 and filter III 1115 PLC control cabinet 12, through PLC solenoid valves I 1201, PLC solenoid valves II 1202, open the normally opened hand-operated valve QT71401 of valve, it is normally opened manually Valve QT81501 makes anti-icing fluid couple water lines full of forward and backward, and it is several to wait for that anti-icing fluid is sprayed from forward and backward coupling water lines end (it is equivalent to water in pipeline herein at this time to be drained) after minute, closes solenoid valve PLC solenoid valves I 1201, PLC solenoid valves II 1202, water pump 1109 is stopped.
In bitter cold weather or especially severe local environment, (in actual work, coupling water maximum temperature 65 DEG C of water arrive Freeze at once when rail surface, influence operation of normally detecting a flaw), it needs to replace working medium water with anti-icing fluid.Specially:Opening is opened QT61105 is closed, through filter II 1106, opens solenoid valve II 1107, through check valve II 1108, starts water pump 1109, switch QT21110 is in off state, and turns on the switch QT31111, after divide two-way, all the way through solenoid valve III 1113, into wheel flange lubricating pipe Road turns on the switch QT41301, switch QT51302, carries out wheel flange lubricating;In addition all the way through overflow pressure reducing valve 1114 and filter III 1115, enter PLC control cabinet 12 afterwards, through solenoid valve PLC solenoid valves I 1201, PLC solenoid valves II 1202, opens the normally opened hand of valve Dynamic valve QT71401, hand-operated valve QT81501 is opened, carries out forward and backward coupling anti-icing fluid supply.After the completion of operation, respective valves are closed .
Above-described embodiment, only presently preferred embodiments of the present invention, is not used for limiting the scope of the present invention, therefore all with this The equivalence changes that content is done described in invention claim should all be included within scope of the invention as claimed.

Claims (4)

1. for the water system of rail detector car, including being set on tractor (1) and being set with each domestic water in tractor (1) The water supply tank (2) of standby connection and the coupling water tank (9) in detection vehicle (8), electrically assist switch board at antifreeze liquid case (10) (11) and PLC control cabinet (12), it is characterised in that:The water supply tank (2) is set among tractor (1) roof, the life Water tank (2) contour structures are adapted integralization moulding with tractor (1) roof structure, and the coupling water tank (9) is in detection vehicle (8) it is internal it is symmetrical set there are two, the coupling water tank (9) is internally provided with heating tube, the electrical auxiliary switch board (11) Inside it is integrated with water pump (1109) and instantaneously heated type heater (1112), the liquid in the coupling water tank (9) and antifreeze liquid case (10) Wheel flange lubricating by being transported to detection vehicle (8) after electrically assisting switch board (11) to control exports (13), the coupling water tank (9) It is transported to inspection after passing sequentially through electrical auxiliary switch board (11) and PLC control cabinet (12) control with the liquid in antifreeze liquid case (10) The forward direction coupling mouth of a river (14) of measuring car (8) and the backward coupling mouth of a river (15).
2. the water system according to claim 1 for rail detector car, it is characterised in that:On the tractor (1) with The corresponding roof both sides of water supply tank (2) are equipped with scotch (3), and bolt (5) is withstood across scotch (3) on water supply tank (2) Water tank scotch (4) and prevent water supply tank (2) slide;Anti-skidding remarkable plate is equipped in the middle part of water supply tank (2) upper surface (6), the anti-skidding remarkable plate (6) is made of aluminium alloy plate and is formed with crocodile nozzle aperture (7) on aluminium alloy plate.
3. the water system according to claim 1 for rail detector car, it is characterised in that:The electrical auxiliary switch board (11) solenoid valve III (1113) and overflow Inductance valve (1114), coupling water tank (9) outlet and antifreeze liquid case are additionally provided in (10) outlet water pump (1109) entrance in electrical auxiliary switch board (11) in parallel connect, the coupling water tank (9) go out it is rear and On the connecting line of water pump (1109) entrance from coupling water tank (9) to water pump (1109) direction successively be equipped with switch QT1 (1101), Filter I (1102), solenoid valve I (1103) and check valve I (1104), antifreeze liquid case (10) outlet enter with water pump (1109) It is equipped with switch QT6 (1105), filter II successively from antifreeze liquid case (10) to water pump (1109) direction on the connecting line of mouth (1106), solenoid valve II (1107) and check valve II (1108);Water pump (1109) outlet is by switch QT2 (1110) and i.e. Heater (1112) entrance connects, and instantaneously heated type heater (1112) outlet incudes with solenoid valve III (1113) and overflow Valve (1114) connects, and being parallel on the connecting line of the switch QT2 (1110) and instantaneously heated type heater (1112) makes water pump (1109) liquid exported directly reaches solenoid valve III (1113) and overflow Inductance valve without instantaneously heated type heater (1112) (1114) switch QT3 (1111);The solenoid valve III (1113) is connect with wheel flange lubricating outlet (13), and the wheel flange lubricating goes out Mouth (13) is equipped with switch QT4 (1301) and switch QT5 (1302);PLC solenoid valves I are equipped in the PLC control cabinet (12) (1201) and PLC solenoid valves II (1202), the overflow Inductance valve (1114) by filter III (1115) respectively with PLC electromagnetism Valve I (1201) and PLC solenoid valves II (1202) connection, the PLC solenoid valves I (1201) pass through normally opened hand-operated valve QT7 (1401) With forward direction coupling the mouth of a river (14) connect, the PLC solenoid valves II (1202) by normally opened hand-operated valve QT8 (1501) with couple backward The mouth of a river (15) connects.
4. the water system according to claim 1,2 or 3 for rail detector car, it is characterised in that:The water supply tank (2) volume is more than or equal to 1700L, and coupling water tank (9) total measurement (volume) is more than or equal to 3300L.
CN201810313854.3A 2018-04-10 2018-04-10 Water system for rail flaw detection vehicle Active CN108372865B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810313854.3A CN108372865B (en) 2018-04-10 2018-04-10 Water system for rail flaw detection vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810313854.3A CN108372865B (en) 2018-04-10 2018-04-10 Water system for rail flaw detection vehicle

Publications (2)

Publication Number Publication Date
CN108372865A true CN108372865A (en) 2018-08-07
CN108372865B CN108372865B (en) 2024-04-12

Family

ID=63031990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810313854.3A Active CN108372865B (en) 2018-04-10 2018-04-10 Water system for rail flaw detection vehicle

Country Status (1)

Country Link
CN (1) CN108372865B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109316690A (en) * 2018-09-07 2019-02-12 三汽车制造有限公司 Fire fighting truck pipe defroster and fire fighting truck
CN109334707A (en) * 2018-11-08 2019-02-15 宝鸡中车时代工程机械有限公司 Novel water system for rail of subway inspection car
CN112026800A (en) * 2020-09-04 2020-12-04 安徽浦创轨道车辆装备有限责任公司 Water tank of rail inspection vehicle
CN112540637A (en) * 2020-11-27 2021-03-23 株洲时代电子技术有限公司 Coupling liquid intelligent control system
CN112540638A (en) * 2020-11-27 2021-03-23 株洲时代电子技术有限公司 Coupling liquid intelligent control method
CN113189207A (en) * 2021-04-26 2021-07-30 神华新朔铁路有限责任公司 Water route system and locomotive in car of detecting a flaw
CN113203799A (en) * 2021-04-26 2021-08-03 神华新朔铁路有限责任公司 Anti-freezing system of steel rail flaw detection vehicle and steel rail flaw detection vehicle

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6408766B1 (en) * 1999-06-25 2002-06-25 Mclaughlin Edward M. Auxiliary drive, full service locomotive tender
CN201162201Y (en) * 2008-03-06 2008-12-10 李蒙军 Ice-breaking vehicle by dissolving
CN201863807U (en) * 2010-11-22 2011-06-15 湖北省电力公司咸宁供电公司 Reserve tank at car roof
CN202316396U (en) * 2011-12-05 2012-07-11 广东电网公司佛山供电局 Charged water flushing vehicle of large-diameter transformer
CN102826096A (en) * 2012-09-14 2012-12-19 宝鸡南车时代工程机械有限公司 Multifunctional inspection detecting vehicle used for railway steel rail
CN104260736A (en) * 2014-10-09 2015-01-07 宝鸡南车时代工程机械有限公司 Multifunctional flaw detection vehicle for highland railway steel rail
CN205919497U (en) * 2016-08-24 2017-02-01 北京主导时代科技有限公司 Frostproofing heating device of coupling water and train wheels ultrasonic flaw detection system
CN107813839A (en) * 2017-08-14 2018-03-20 金鹰重型工程机械有限公司 A kind of power decentralized shaped steel rail inspection car
CN208164980U (en) * 2018-04-10 2018-11-30 宝鸡中车时代工程机械有限公司 Water system for rail detector car

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6408766B1 (en) * 1999-06-25 2002-06-25 Mclaughlin Edward M. Auxiliary drive, full service locomotive tender
CN201162201Y (en) * 2008-03-06 2008-12-10 李蒙军 Ice-breaking vehicle by dissolving
CN201863807U (en) * 2010-11-22 2011-06-15 湖北省电力公司咸宁供电公司 Reserve tank at car roof
CN202316396U (en) * 2011-12-05 2012-07-11 广东电网公司佛山供电局 Charged water flushing vehicle of large-diameter transformer
CN102826096A (en) * 2012-09-14 2012-12-19 宝鸡南车时代工程机械有限公司 Multifunctional inspection detecting vehicle used for railway steel rail
CN104260736A (en) * 2014-10-09 2015-01-07 宝鸡南车时代工程机械有限公司 Multifunctional flaw detection vehicle for highland railway steel rail
CN205919497U (en) * 2016-08-24 2017-02-01 北京主导时代科技有限公司 Frostproofing heating device of coupling water and train wheels ultrasonic flaw detection system
CN107813839A (en) * 2017-08-14 2018-03-20 金鹰重型工程机械有限公司 A kind of power decentralized shaped steel rail inspection car
CN208164980U (en) * 2018-04-10 2018-11-30 宝鸡中车时代工程机械有限公司 Water system for rail detector car

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109316690A (en) * 2018-09-07 2019-02-12 三汽车制造有限公司 Fire fighting truck pipe defroster and fire fighting truck
CN109334707A (en) * 2018-11-08 2019-02-15 宝鸡中车时代工程机械有限公司 Novel water system for rail of subway inspection car
CN109334707B (en) * 2018-11-08 2023-08-22 宝鸡中车时代工程机械有限公司 Novel water system for subway rail flaw detection vehicle
CN112026800A (en) * 2020-09-04 2020-12-04 安徽浦创轨道车辆装备有限责任公司 Water tank of rail inspection vehicle
CN112540637A (en) * 2020-11-27 2021-03-23 株洲时代电子技术有限公司 Coupling liquid intelligent control system
CN112540638A (en) * 2020-11-27 2021-03-23 株洲时代电子技术有限公司 Coupling liquid intelligent control method
CN112540637B (en) * 2020-11-27 2022-01-21 株洲时代电子技术有限公司 Coupling liquid intelligent control system
CN112540638B (en) * 2020-11-27 2022-01-21 株洲时代电子技术有限公司 Coupling liquid intelligent control method
CN113189207A (en) * 2021-04-26 2021-07-30 神华新朔铁路有限责任公司 Water route system and locomotive in car of detecting a flaw
CN113203799A (en) * 2021-04-26 2021-08-03 神华新朔铁路有限责任公司 Anti-freezing system of steel rail flaw detection vehicle and steel rail flaw detection vehicle
CN113203799B (en) * 2021-04-26 2024-02-27 神华新朔铁路有限责任公司 Anti-freezing system for rail flaw detection vehicle and rail flaw detection vehicle
CN113189207B (en) * 2021-04-26 2024-04-09 神华新朔铁路有限责任公司 Water route system and locomotive in flaw detection car

Also Published As

Publication number Publication date
CN108372865B (en) 2024-04-12

Similar Documents

Publication Publication Date Title
CN108372865A (en) Water system for rail detector car
US4286617A (en) Water system freeze protection apparatus
CN208164980U (en) Water system for rail detector car
CN101544240A (en) System control method for increasing the water supplying efficiency of railway carriage
CN109334707B (en) Novel water system for subway rail flaw detection vehicle
CN108791030A (en) Road surface dust suppression system and hydrogen cell automobile for hydrogen cell automobile
CN205524305U (en) Water supply system for EMUs
CN110509952A (en) Rail vehicle water filling device
CN204078037U (en) A kind of cleaning cabinet for marine piping cleaning
CN105926516A (en) Waterway system for road sweeper
CN206871381U (en) A kind of novel heat insulation aircraft clear water car
CN216331953U (en) Heavy-duty vehicle spray washing system capable of recycling cold coke water
CN104029822A (en) Ice removing and preventing device of airport
CN111851652B (en) Solar energy storage and high and cold resistant integrated pressurized pump room and operation method thereof
CN211918499U (en) Unmanned spraying vehicle
CN209014217U (en) A kind of city rail vehicle rain test device
CN207694109U (en) A kind of spray equipment used for buses
CN110258419A (en) The high pressure water circuit of caring the car of no-load starting acts convenient control system and starting method
CN208544188U (en) Road surface dust suppression system and hydrogen cell automobile for hydrogen cell automobile
CN202608511U (en) Device for directly heating water by using automobile exhaust pipe
CN212958586U (en) Sand washing and heat preservation device of oil-gas separator
CN107262445B (en) Water purification heating vehicle for cleaning movable aero-engine on wing
CN219446940U (en) Anti-freezing waterway system for car washer
CN213118438U (en) Intelligent drainage device for air storage tank of pneumatic control system of transport vehicle
CN209025033U (en) A kind of sanitation cart drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant