CN108343456A - Underground excavation subway station internal explosion construction method - Google Patents

Underground excavation subway station internal explosion construction method Download PDF

Info

Publication number
CN108343456A
CN108343456A CN201810075468.5A CN201810075468A CN108343456A CN 108343456 A CN108343456 A CN 108343456A CN 201810075468 A CN201810075468 A CN 201810075468A CN 108343456 A CN108343456 A CN 108343456A
Authority
CN
China
Prior art keywords
earthwork
blasting
earth
station
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810075468.5A
Other languages
Chinese (zh)
Inventor
朱凡
张国庆
潘普国
仝培培
张晋东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201810075468.5A priority Critical patent/CN108343456A/en
Publication of CN108343456A publication Critical patent/CN108343456A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D13/00Large underground chambers; Methods or apparatus for making them

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to an implosion construction method for a subsurface excavated subway station, which comprises the following steps: dividing earthwork in the station into upper earthwork and lower earthwork, and vertically dividing the upper earthwork and the lower earthwork into a plurality of layers; excavating all earthwork layers in the upper earthwork by adopting vertical hole blasting in sequence; after the upper earthwork blasting is finished, constructing a main structure middle plate, and enabling the bottom of the middle plate to be 1.5-2 m higher than the upper surface layer of the earthwork at the lower part of the middle plate; and blasting the uppermost earthwork layer in the lower earthwork by adopting a horizontal hole, and excavating other earthwork layers by adopting vertical hole blasting in sequence, and finishing the subsequent construction operation in the station according to a conventional method after blasting. The invention integrates the open and underground excavation blasting construction technology, carries out layered and segmented blasting on earthwork in the station, adopts the adaptive blasting mode aiming at different positions, ensures the construction safety, saves time and labor, greatly improves the construction efficiency and effectively controls the influence of blasting construction on the finished product structure. The invention is suitable for excavation construction of foundation pits with rocky stratums, station structure reverse construction and short construction period.

Description

Blasting construction method in a kind of station of tunneling subway station
Technical field
The present invention relates to blasting construction methods in underground engineering technical field more particularly to a kind of tunneling subway station station.
Background technology
After founding of New, with the recovery of economic construction of China, blasting technique is developed rapidly, especially Since 1978, China's economy enters the rapid development stage, and the construction of various infrastructure has driven the fast development of blasting technique.
The Excavation Blasting of subway field rock stratum is generally used for open cut of subway station, running tunnel, tunneling subway It stands due to by inner ring border is arrived at a station and space is restricted, not having to blast working substantially.And rock stratum is applied in traditional Station station Work method has the defects of taking time and effort, waste of resource.Therefore, there is an urgent need in a kind of efficient and safe tunneling subway station station Blasting construction method.
Invention content
Technical problem to be solved by the invention is to provide explosions in a kind of efficient and safe tunneling subway station station Construction method.
To solve the above problems, blasting construction method in a kind of tunneling subway station station of the present invention, including:
The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;
Each earthwork layer in the top cubic metre of earth is excavated using vertical eye explosion successively;
On the top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis 1.5m~2m;
Vertical eye explosion is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in the lower part cubic metre of earth It is excavated, completes constructing operation in follow-up station after explosion according to a conventional method.
Preferably, use the earthwork layer thickness of vertical eye explosion for 2 ~ 2.2m.
Preferably, the top cubic metre of earth is divided into three layers, the lower part cubic metre of earth is divided into two layers.
Preferably, after the completion of plate applies in the agent structure, when its concrete structural strength reaches design strength Carry out the explosion of the lower part cubic metre of earth.
Compared with the prior art, the present invention has the following advantages:
The present invention combines the technology of bright tunneling blast working, is with vertical layered to earthwork progress in the station of tunneling subway station Main, layer and section explosion and for different location using adaptable blasting method(I.e. vertical eye blasting method and horizontal eye Blasting method), not only ensure that working security but it is time saving and energy saving, substantially increase construction efficiency, effectively control blast working Influence to finished product structure.The present invention is suitable for the inverse work of rocky stratum, station structure, the excavation of foundation pit of construction period anxiety is applied Work.
Description of the drawings
Specific embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is top provided in an embodiment of the present invention cubic metre of earth layering explosion situation schematic diagram.
Fig. 2 is lower part provided in an embodiment of the present invention cubic metre of earth layering explosion situation schematic diagram.
In figure:Plate in A-agent structure.
Specific implementation mode
With reference to figure 1 and Fig. 2, an embodiment of the present invention provides blasting construction method in a kind of station of tunneling subway station, tools Body includes the following steps:
(1)The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively.
In specific implementation process, controlled in 2 ~ 2.2m, because drilling rod generally selects using the earthwork layer thickness of vertical eye explosion It is conveniently operated the most with 2m, and a people facilitates hand steered, construction efficiency height.Also, it in top cubic metre of earth delaminating process, to protect It demonstrate,proves its bottom one layer thickness and guarantees to reach 1.5 ~ 2m below its board bottom after the completion of middle plate A is applied, and its maximum is thick Degree should not exceed 2.2m, if exceeding, need top cubic metre of earth being layered again.
In addition, making each layer in top cubic metre of earth as far as possible(The earthwork layer of vertical eye explosion is used in top cubic metre of earth)Thickness It is equal or of substantially equal, in lower part cubic metre of earth in addition to the top each layer(The earthwork of vertical eye explosion is used in lower part cubic metre of earth Layer)Thickness is equal or of substantially equal, in this case facilitates layering while construction efficiency is high and save working sources.
In addition, for quantities, the layer divided is more, and amount is bigger, so as possible in the feelings for meeting above-mentioned condition when layering It is layered less under condition.
Based on above-mentioned layering principle, for example top cubic metre of earth can be divided into tri- layers of S1, S2, S3 from top to bottom, S1 ~ S3 is equal For 2m;Lower part cubic metre of earth is divided into S4, S5 two layers from top to bottom(Structure in figure at S5 is built up after excavating), S4 4m, S5 is 2m.
(2)Each earthwork layer in top cubic metre of earth is excavated using vertical eye explosion successively.
During vertical eye Blasting Excavation, blasting in once-through bout length in 15 ~ 20m, generally by detonator section how much Control;The blast working of multiple paragraphs can be organized daily, and is not interfered between each other.As it can be seen that the more horizontal eye of vertical eye explosion is quick-fried It is broken efficient, therefore vertical eye explosion is selected to the explosion on top cubic metre of earth.
(3)On top cubic metre of earth after the completion of explosion, applies plate A in agent structure and make its board bottom higher than on middle plate lower part cubic metre of earth Surface layer 1.5m ~ 2m.
Middle harden structure construction before, for ensure the underground space stablize, foundation pit be not easy to excavate it is too deep, need to be by top earth excavation To about 1.5 ~ 2m below middle plate A board bottoms, one can be that lower part full framing set up and remove that there are the properly amount of setting up and operations Space, two can protect in plate A do not influenced by lower layer's explosion, play the role of vibration isolation.Wherein, plate A exists in agent structure Support and balanced action are played in standing.
After the completion of plate applies in agent structure, when concrete structural strength reaches design strength, lower part can be carried out The explosion of the earthwork, effectively to avoid middle plate A from being damaged in blasting process.
(4)Vertical eye is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in lower part cubic metre of earth Explosion is excavated, and completes constructing operation in follow-up station after explosion according to a conventional method.
Specifically, the explosion of lower part cubic metre of earth is divided into two separate explosions, and first time S4 uses horizontal eye explosion, second of S5 to use Vertical eye explosion.The reason is that:Middle plate A underlying spaces are smaller, do not have vertical eye operating space, and horizontal eye explosion coverage Small, plate A is segmented and pours in can coordinating, and after reaching design strength paragraph by paragraph, carrying out lower part paragraph by paragraph expires the dismounting of hall frame and blast working, compared with Conducive to the protection of centering plate;Second fast using vertical eye detonation velocity, efficient.
In addition, it is necessary to plate A Explosive Vibrating Velocity monitorings in strictly being carried out during blast working.
Technical solution provided by the present invention is described in detail above.Specific case used herein is to this hair Bright principle and embodiment is expounded, the explanation of above example is only intended to help understand the present invention method and its Core concept.It should be pointed out that for those skilled in the art, in the premise for not departing from the principle of the invention Under, it can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection of the claims in the present invention In range.

Claims (4)

1. blasting construction method in a kind of station of tunneling subway station, which is characterized in that including:
The earthwork in station is divided into top cubic metre of earth and lower part cubic metre of earth, and if the two is vertically divided into dried layer respectively;
Each earthwork layer in the top cubic metre of earth is excavated using vertical eye explosion successively;
On the top cubic metre of earth after the completion of explosion, applies plate in agent structure and make its board bottom higher than middle plate lower part cubic metre of earth upper epidermis 1.5m~2m;
Vertical eye explosion is used successively using horizontal eye explosion, other cubic metres of earth of layers to uppermost earthwork layer in the lower part cubic metre of earth It is excavated, completes constructing operation in follow-up station after explosion according to a conventional method.
2. the method as described in claim 1, which is characterized in that use the earthwork layer thickness of vertical eye explosion for 2 ~ 2.2m.
3. the method as described in claim 1, which is characterized in that the top cubic metre of earth is divided into three layers, by the lower part cubic metre of earth It is divided into two layers.
4. the method as described in claim 1, which is characterized in that after the completion of plate applies in the agent structure, wait for its coagulation Soil structure intensity carries out the explosion of the lower part cubic metre of earth when reaching design strength.
CN201810075468.5A 2018-01-26 2018-01-26 Underground excavation subway station internal explosion construction method Pending CN108343456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810075468.5A CN108343456A (en) 2018-01-26 2018-01-26 Underground excavation subway station internal explosion construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810075468.5A CN108343456A (en) 2018-01-26 2018-01-26 Underground excavation subway station internal explosion construction method

Publications (1)

Publication Number Publication Date
CN108343456A true CN108343456A (en) 2018-07-31

Family

ID=62961607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810075468.5A Pending CN108343456A (en) 2018-01-26 2018-01-26 Underground excavation subway station internal explosion construction method

Country Status (1)

Country Link
CN (1) CN108343456A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117967367A (en) * 2024-01-17 2024-05-03 中铁五局集团华南工程有限责任公司 Underground excavation station access passage structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562076A (en) * 2011-12-23 2012-07-11 中铁十九局集团第五工程有限公司 Underground excavation construction technology for large cross-section subway station under geological condition of soft upper layer and hard lower layer
CN102758632A (en) * 2012-07-19 2012-10-31 中铁隧道集团有限公司 Rock stratum double initial support layering method for establishing large-scale underground structure
CN202707075U (en) * 2012-07-23 2013-01-30 中铁一局集团有限公司 Long-span subway station main structure constructed based on column and arch method
CN104180733A (en) * 2014-08-22 2014-12-03 中铁四局集团有限公司 Comprehensive shock absorption method for hard rock tunnel mixed blasting close to existing underground structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562076A (en) * 2011-12-23 2012-07-11 中铁十九局集团第五工程有限公司 Underground excavation construction technology for large cross-section subway station under geological condition of soft upper layer and hard lower layer
CN102758632A (en) * 2012-07-19 2012-10-31 中铁隧道集团有限公司 Rock stratum double initial support layering method for establishing large-scale underground structure
CN202707075U (en) * 2012-07-23 2013-01-30 中铁一局集团有限公司 Long-span subway station main structure constructed based on column and arch method
CN104180733A (en) * 2014-08-22 2014-12-03 中铁四局集团有限公司 Comprehensive shock absorption method for hard rock tunnel mixed blasting close to existing underground structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
洪开荣等: "大型地下水封洞库修建技术", <中国铁道出版社> *
陈文尹: "分区组合***在硬岩暗挖地铁车站中的应用", 《工程***》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117967367A (en) * 2024-01-17 2024-05-03 中铁五局集团华南工程有限责任公司 Underground excavation station access passage structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104314574B (en) Hard rock tunnel non-blasting digging blocking method and construction method
CN100564802C (en) The method of crushing rock formation in the colliery
CN104806251B (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN107764144A (en) A kind of tunnel Millisecond Controlled Blasting method
CN106381868A (en) Water abrasive drilling construction method for manual hole digging pile
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN104564085B (en) Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city
CN107024154A (en) High slope deep hole blasting construction method under a kind of complex environment
CN111322077A (en) Super-underexcavation control energy-gathering water pressure smooth blasting construction method for slate tunnel
CN105804748B (en) A kind of method of block mining Wall ore under open air transport system
CN108301841A (en) The construction of advanced reserved side soil is led in highway large cross-section tunnel
CN106225618A (en) The method split is expanded in a kind of semo-infinite rock mass borehole blasting
CN104613831A (en) Construction method for additionally forming periphery auxiliary holes in periphery of vertical shaft periphery hole
CN103726858A (en) Underground large-scale cave depot project sphere-cylinder combination excavation method
CN107327306A (en) Tunnel excavation construction method is superimposed under the conditions of the shallow embedding of city
CN109899109A (en) The grouting filling method in irregular goaf
CN107060773A (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN103967024A (en) United construction method for forming holes and grooves in deep sandy gravel stratum
CN115163084A (en) Mechanical construction method for ultra-large section tunnel by double-side-wall pit guiding method
CN106869939A (en) A kind of water under high pressure splitting shaping and the construction method of drilling and blasting method use in conjunction tunneling
CN202360116U (en) U-shaped shed roadway junction support device
CN114382483A (en) Method for preventing and controlling strong mine pressure of hard roof working face under left coal pillar
CN110307034A (en) The strip-type grouting filling method in goaf
CN108343456A (en) Underground excavation subway station internal explosion construction method
CN109458214A (en) A kind of low air permeability coal seam static blasting permeability-increasing gas pumping method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180731

RJ01 Rejection of invention patent application after publication