CN108330744A - A kind of track foundation construction method - Google Patents

A kind of track foundation construction method Download PDF

Info

Publication number
CN108330744A
CN108330744A CN201810092843.7A CN201810092843A CN108330744A CN 108330744 A CN108330744 A CN 108330744A CN 201810092843 A CN201810092843 A CN 201810092843A CN 108330744 A CN108330744 A CN 108330744A
Authority
CN
China
Prior art keywords
support plate
grapple
cured layer
slurry
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810092843.7A
Other languages
Chinese (zh)
Other versions
CN108330744B (en
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhaodi Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810092843.7A priority Critical patent/CN108330744B/en
Publication of CN108330744A publication Critical patent/CN108330744A/en
Application granted granted Critical
Publication of CN108330744B publication Critical patent/CN108330744B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of track foundation construction methods comprising:Piling step, the pile pile that end is evenly equipped with to several connecting holes vertically squeeze into earth's surface, and install the first grapple in each connection hole;Before pour slurry step, the slurry that can form the first cured layer is poured at the top of pile pile;Laying support plate step, the support plate that bottom is evenly equipped with to several second grapples are laid in the slurry surface layer so that the support plate is located at the surface of the pile pile, and so that the hook portion of first grapple and second hook is opposite;Smooth support plate step, before the slurry curing forms the first cured layer, support plate described in level correction;And attachment rail beam step, after the slurry curing formed the first cured layer after, the track girder is fixed to the support plate.Such track foundation construction method can ensure ride comfort when rail level is laid with, also, can also improve the resistance to plucking and anti-pressure ability of track infrastructure, to improve bearing capacity and service life.

Description

A kind of track foundation construction method
Technical field
The present invention relates to field of track traffic more particularly to a kind of track foundation construction methods.
Background technology
For track construction operation, pile foundation construction is all more important construction link, in pile foundation construction operation It is generally difficult to ensure that each pile body height flushes in journey.Also, since track project usually requires several months or time several years, for jelly The pile foundation construction region of the geological conditions complexity such as native, soft thick soil stratum, even if by each pile body construction to substantially sustained height, it is each to manage With the variation of natural environment different degrees of sedimentation can occur for stake over time, in order to ensure the ride comfort of rail level to carry High riding comfort, it is necessary to reduce the subsiding extent of pile foundation as far as possible.
As Chinese utility model patent (204455724 U of CN) discloses a kind of tool of Deep Thick Soft Ground Area roadbed track Body construction method, including:
Step 1, Soft Soil Area construct span centre prefabricated pile and across end prefabricated pile.
Step 2 is constructed across the plain concrete bed course of end supporting beam lower part.
Step 3 is bound for, across reinforcing bar in end carriage, concreting being used in combination to be formed across end supporting beam across end supporting beam.
Step 4, by reinforcing bar in the plate in reinforcing bar in the span centre beam of span centre supporting beam and the embedded support plate of span centre sleeper into Row is staggeredly bound.Prefabricated tie block 4 is flowed into bar connecting by anti-fan, and is positioned on the bar construction bound.
Then span centre supporting beam and the embedded support plate formed by integrally casting of sleeper are molded by step 5, accurate adjustment track.After pouring The embedded support plate of sleeper end set in across end prefabricated pile on.
Step 6, according to same sequence construction second segment, and by the end of the adjacent embedded support plate of two sections of sleeper Be set to first segment across end prefabricated pile on.The sleeper of the end and second segment of the embedded support plate of sleeper of wherein first segment There are a deformation joints between the end of embedded support plate.It the end of the embedded support plate of sleeper and is used between holding precast beam The Bituminous hemp fiber of 5cm thickness is filled.It is laid with each section successively according to above-mentioned steps.
Step 7 is laid with pave-load layer in the embedded support plate of sleeper laid, completes roadbed track.
Although the concrete construction method of above-mentioned Deep Thick Soft Ground Area roadbed track is can to reduce ground to a certain degree heavy Drop, still, the concrete construction method of above-mentioned Deep Thick Soft Ground Area roadbed track is before accurate adjustment track and adjustment not yet in effect is prefabricated The mounting height of tie block, irregularity when this will cause rail level to be laid with.And due to only constructing between prefabricated pile and supporting beam Plain concrete bed course, this just causes to lack enough bonding strengths between prefabricated pile and supporting beam, thus cause entire roadbed track Resistance to plucking and anti-pressure ability it is not satisfactory.In addition, this construction method also has great in constructing amount, concreting amount is big to lack It falls into, is unfavorable for energy conservation and environmental protection.
Invention content
It is an object of the invention to solve existing construction method track infrastructure is caused to be asked there are bonding strength is insufficient Topic.
To achieve the purpose of the present invention, the present invention uses following technical scheme:
A kind of track foundation construction method, includes the following steps:
Piling step, the pile pile that end is evenly equipped with to several connecting holes vertically squeeze into earth's surface, and distinguish in each connection hole First grapple is installed;
Before pour slurry step, the slurry that can form the first cured layer is poured at the top of pile pile;
Laying support plate step, the support plate that bottom is evenly equipped with to several second grapples are laid in the slurry surface layer, make The surface that the support plate is located at the pile pile is obtained, and so that the hook portion of first grapple and second hook is opposite;
Smooth support plate step, before the slurry curing forms the first cured layer, support plate described in level correction;And
Attachment rail beam step, after the slurry curing forms the first cured layer, the bottom of the track girder is installed Plate is fixed to the support plate.
Further, in above-mentioned track foundation construction method, further include:
Slurry step is poured afterwards, pours slurry to form the second cured layer of the cladding bottom mounting plate and the support plate.
Further, in above-mentioned track foundation construction method, the bottom mounting plate is welded and fixed to the support The top of plate;
The top of second cured layer is set to be higher than the welding position height of the bottom mounting plate and the support plate.
Further, in above-mentioned track foundation construction method, the top of first cured layer is made to be less than the support The top of plate;
Alternatively, making the top of first cured layer and the top flush of the support plate.
Further, in above-mentioned track foundation construction method, aforementioned second grapple and aforementioned is made using metal material Support plate, and aforementioned second grapple is welded and fixed with aforementioned support plate.
Further, in above-mentioned track foundation construction method, aforementioned first grapple and aforementioned is made using rigid bar Second grapple.
Further, in above-mentioned track foundation construction method, the thickness of aforementioned first cured layer is made to be more than aforementioned first The height of grapple or aforementioned second grapple.
Further, in above-mentioned track foundation construction method, the thickness of aforementioned first cured layer is made to be more than aforementioned first The sum of the height of grapple and aforementioned second grapple.
Further, in above-mentioned track foundation construction method, the first cured layer and the are formed using slurry curing of the same race Two cured layers, afore-mentioned slurry are any one in cement mortar, concrete mortar, epoxy resin.
Further, in above-mentioned track foundation construction method, aforementioned connecting hole is threaded hole, the end of aforementioned first grapple The external screw thread in portion setting matching aforementioned threads hole, be screwed on first grapple at the threaded hole.
In the track foundation construction method that the present invention uses, pile pile strengthens the first cured layer of connection using the first grapple, uses In trapped orbit beam upper bottom portion mounting plate support plate using the second grapple strengthen connection the first cured layer, this allow for pile pile and There is higher bonding strength, to improve the resistance to plucking and anti-pressure ability of entire track foundation, to improve between support plate Bearing capacity and service life.
In addition, in the track foundation construction method that the present invention uses, it is first horizontal before the bottom mounting plate of trapped orbit beam Support plate is corrected, to improve the ride comfort for being laid with rail level.
In addition, in the track foundation construction method that the present invention uses, slurry is only poured at the top of pile pile and forms installation fixation First cured layer of support plate to reduce the concreting amount of construction volume and construction site, thus is conducive to energy-saving ring It protects.
Description of the drawings
Fig. 1 is a kind of schematic diagram of track infrastructure in embodiment.
Fig. 2 is the enlarged drawing of letter A corresponding parts in Fig. 1.
Fig. 3 is a kind of flow chart of track foundation construction method in embodiment.
In attached drawing:
100, track infrastructure;1, pile pile;101, connecting hole;102, lacing wire;2, support plate;3, the first cured layer;4、 Track girder;401, bottom mounting plate;5, the second cured layer;6, the first grapple;7, the second grapple.
Specific implementation mode
<EmbodimentOne>
As depicted in figs. 1 and 2, present embodiments providing a kind of track infrastructure includes:Pile pile 1, support plate 2, first Cured layer 3, track girder 4 and the second cured layer 5.
Specifically, pile pile 1 is vertically inserted in earth's surface and its top is uniformly configured with several inverted first grapples 6.Wherein, The top of pile pile 1 is evenly equipped with connecting hole 101 of several threaded holes as the first grapple 6, and the threaded hole is specifically by being embedded in pile pile 1 The nut of end is formed, and nut is strained and fixed by the lacing wire 102 (being made of rigid bar) being embedded in pile pile 1.First grabs Hook 6 is whole L-shape, and the external screw thread of the lower end setting matching threaded hole of first grapple 6, i.e. the first grapple 6 and pile pile 1 It is threadedly coupled.Certainly, in track infrastructure provided by the invention, the first grapple 6 can also be solid using snap fit with pile pile 1 Dingan County fills.
In the present embodiment, 2 preferred square plate of support plate or circular slab, and the vertical projection area of support plate 2 is more than pipe The vertical projection area of stake 1.Assembly is in use, support plate 2 is horizontally arranged and positioned at the surface of pile pile 1.Wherein, support plate 2 Bottom is evenly equipped with several second grapples 7, and in the present embodiment, the second grapple 7 is made of metal material with support plate 2, therefore, institute The epimere and 2 preferred weld of support plate for stating the second grapple 7 are fixed, and the hypomere portion of the second grapple 7 is bent into L shapes.In addition, it is necessary to Illustrating, the second grapple 7 can transport after factory first completes to be welded and fixed to construction site in advance with support plate 2, certainly, In order to facilitate transport, the second grapple 7 can be transported first in a manner of detaching to construction site with support plate 2, then directly constructed Site welding is fixed.
First cured layer 3 is formed by the slurry curing being filled between 1 top of pile pile and support plate 2, and by rigid bar 6 and second grapple 7 of manufactured first grapple is embedded in the first cured layer 3, more preferably, the hook portion of the first grapple 6 and The hook portion of second grapple 7 is opposite.Such structure design, can enhance the first cured layer 3 and pile pile 1 bonding strength and The bonding strength between support plate 2 and the first cured layer 3 is improved, to improve resistance to compression and the breakout capacity of track infrastructure.
In the present embodiment, the thickness W3 of the first cured layer 3 is more than the height W4 of the first grapple 6;Alternatively, the first cured layer 3 Thickness W3 be more than the second grapple 7 height W1 in track infrastructure provided by the invention, can also be first certainly The thickness W3 of cured layer 3 is more than the sum of the height W1 of the height W4 and the second grapple 7 of the first grapple 6;Such structure design, energy The first grapple 6 made of metal and the second corrosion due to exposed of grapple 7 are prevented, to prolong the service life.
In the present embodiment, the top of the first cured layer 3 is less than the top of support plate 2, and it is right that this prevents from the first cured layer 3 The interference of 401 mounting height of bottom mounting plate.Certainly, in track foundation construction method provided by the invention so that first is solid The top flush of the top for changing layer 3 and support plate 2 can also meet technology requirement.In order to realize this purpose, prevent under support plate 2 It falls into uncured slurry, it is preferred that 1 top of the lower end of the second grapple 7 and pile pile is to abutting, and the height of the second grapple 7 The sum of W1 and the height W2 of support plate 2 are more than the thickness W3 of the first cured layer 3;Alternatively, the upper end of the first grapple 6 and support plate 2 It abuts, and the sum of the height W4 of the first grapple 6 and the height W2 of support plate 2 are more than the thickness W3 of the first cured layer 3.
Track girder 4 is laid with along track extending direction and its bottom mounting plate 401 is fixed in support plate 2.In the present embodiment, The preferably metal with welding performance of bottom mounting plate 401 is made, and the top of bottom mounting plate 401 and support plate 2 is welded and fixed. In order to facilitate welding bottom mounting plate 401 and support plate 2, preferably the shape kissing of the shape Yu support plate 2 of bottom mounting plate 401 It closes (be all square plate or be all circular slab etc.), and bottom mounting plate 401 is less than support plate 2 in perpendicular in vertical projected area To projected area.
In the present embodiment, the second cured layer 5 is equally formed by slurry curing, forms first as a preferred technical solution, The slurry of cured layer 3 is identical with the slurry material of the second cured layer 5 is formed, and slurry is cement mortar, concrete mortar, asphalt mixtures modified by epoxy resin Any one in fat.
The bottom mounting plate 401 of metal material and support plate 2 corrosion or are corroded due to exposed in order to prevent, the second solidification Layer 5 coats the join domain at 2 top of bottom mounting plate 401 and support plate.In the present embodiment, due to bottom mounting plate 401 and branch The top of fagging 2 is welded and fixed, and therefore, this requires the tops of the second cured layer 5 to be higher than bottom mounting plate 401 and support plate 2 Welding position height.Certainly, in the track infrastructure using construction method of the present invention, bottom mounting plate 401 and support Plate 2 can also use threaded fastener to be threadedly coupled and fix.Likewise, the second cured layer 5 can coat 401 He of bottom mounting plate 2 join domain of support plate can meet requirement of shelter.
In addition, as shown in Figures 2 and 3, the present embodiment additionally provides a kind of track foundation construction method, including walks as follows Suddenly:
Piling step S10, the pile pile 1 that end is evenly equipped with to several connecting holes 101 vertically squeeze into earth's surface, and in each connecting hole First grapple 6 is installed respectively at 101;
Before pour slurry step S20, pour the slurry that can form the first cured layer 3 at 1 top of pile pile;
Laying support plate step S30, the support plate 2 that bottom is evenly equipped with to several second grapples 7 are laid in the slurry table Layer so that the support plate 2 is located at the surface of the pile pile 1, and first grapple 6 and described second is made to link up with 7 Hook portion is opposite;
Smooth support plate step S40, before the slurry curing forms the first cured layer 3, support plate described in level correction 2;And
Attachment rail beam step S50, after the slurry curing formed the first cured layer 3 after, by the bottom of the track girder 4 Mounting plate 401 is fixed to the support plate 2.
Slurry step S60 is poured afterwards, pours slurry to form the second of the cladding bottom mounting plate 401 and the support plate 2 Cured layer 5.
Specifically, in the step S10 that drives piles, be screwed on the first grapple 6 at aforementioned threads hole.
In being laid with support plate step S30, the top of the first cured layer 3 is made to be less than the top of support plate 2, alternatively, making the The top of one cured layer 3 and the top flush of support plate 2.
In addition, in being laid with support plate step S30, also need to make the thickness of the first cured layer 3 to be more than the first grapple 6 or the second The height of grapple 7, alternatively, making the thickness of the first cured layer 3 more than the sum of the height of the first grapple 6 and the second grapple 7.
In attachment rail beam step S50, bottom mounting plate 401 is welded and fixed with support plate 2 or is locked by fastening connection piece It fastens.
In track foundation construction method provided in this embodiment, pile pile 1 strengthens the first cured layer of connection using the first grapple 6 3, the support plate 2 for fixing bottom mounting plate 401 strengthens the first cured layer 3 of connection using the second grapple 7, this allows for pile pile There is higher bonding strength, to improve the resistance to plucking and anti-pressure ability of entire track foundation between 1 and support plate 2.
In addition, in track foundation construction method provided in this embodiment, the first level correction before fixed bottom mounting plate 401 Support plate 2, to improve the ride comfort for being laid with rail level.
In addition, in track foundation construction method provided in this embodiment, only slurry is poured at 1 top of pile pile and form installation admittedly The first cured layer 3 for determining support plate 2, to reduce the concreting amount of construction volume and construction site, thus is conducive to save It can environmental protection.
Above in association with the technical principle that detailed description of the preferred embodimentsthe present invention has been described, but it should be recognized that these above-mentioned Description is intended merely to explain the principle of the present invention, and cannot be construed to the specific limit to the scope of the present invention in any way System.Based on the explanation herein, those skilled in the art is not making the creative labor other tools that can associate the present invention Body embodiment or equivalent replacement, fall within protection scope of the present invention.

Claims (10)

1. a kind of track foundation construction method, which is characterized in that including:
Piling step, the pile pile that end is evenly equipped with to several connecting holes are vertically squeezed into earth's surface, and are installed respectively in each connection hole First grapple;
Before pour slurry step, the slurry that can form the first cured layer is poured at the top of pile pile;
Laying support plate step, the support plate that bottom is evenly equipped with to several second grapples are laid in the slurry surface layer so that institute The surface that support plate is located at the pile pile is stated, and so that the hook portion of first grapple and second hook is opposite;
Smooth support plate step, before the slurry curing forms the first cured layer, support plate described in level correction;And
Attachment rail beam step, after the slurry curing formed the first cured layer after, the bottom mounting plate of the track girder is consolidated The fixed extremely support plate.
2. track foundation construction method according to claim 1, which is characterized in that further include:
Slurry step is poured afterwards, pours slurry to form the second cured layer of the cladding bottom mounting plate and the support plate.
3. track foundation construction method according to claim 2, which is characterized in that the bottom mounting plate to be welded and fixed To the top of the support plate;
The top of second cured layer is set to be higher than the welding position height of the bottom mounting plate and the support plate.
4. track foundation construction method according to claim 1, which is characterized in that keep the top of first cured layer low In the top of the support plate;
Alternatively, making the top of first cured layer and the top flush of the support plate.
5. track foundation construction method according to claim 1, which is characterized in that be made described second using metal material Grapple and the support plate, and second grapple is welded and fixed with the support plate.
6. track foundation construction method according to claim 1, which is characterized in that be made described first using rigid bar Grapple and second grapple.
7. track foundation construction method according to claim 1, which is characterized in that keep the thickness of first cured layer big In the height of first grapple or second grapple.
8. track foundation construction method according to claim 7, which is characterized in that keep the thickness of first cured layer big In the sum of the height of first grapple and second grapple.
9. track foundation construction method according to claim 2, which is characterized in that form first using slurry curing of the same race Cured layer and the second cured layer;
The slurry is any one in cement mortar, concrete mortar, epoxy resin.
10. track foundation construction method according to claim 1, which is characterized in that the connecting hole is threaded hole, and institute The end set for stating the first grapple matches the external screw thread of the threaded hole;
Be screwed on first grapple at the threaded hole.
CN201810092843.7A 2018-01-31 2018-01-31 A kind of track foundation construction method Active CN108330744B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810092843.7A CN108330744B (en) 2018-01-31 2018-01-31 A kind of track foundation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810092843.7A CN108330744B (en) 2018-01-31 2018-01-31 A kind of track foundation construction method

Publications (2)

Publication Number Publication Date
CN108330744A true CN108330744A (en) 2018-07-27
CN108330744B CN108330744B (en) 2019-08-27

Family

ID=62927693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810092843.7A Active CN108330744B (en) 2018-01-31 2018-01-31 A kind of track foundation construction method

Country Status (1)

Country Link
CN (1) CN108330744B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201896283U (en) * 2010-12-15 2011-07-13 中国土木工程集团有限公司 Joint bar top-connection type composite foundation structure
CN204455724U (en) * 2015-01-04 2015-07-08 上海市城市建设设计研究总院 For the integral structure of Deep Thick Soft Ground Area roadbed track
CN204589787U (en) * 2015-04-28 2015-08-26 北京城建设计发展集团股份有限公司 The prefabricated bent cap of the T-shaped pier of Bridges on Urban Rail Transit
CN205276115U (en) * 2015-12-17 2016-06-01 中铁第四勘察设计院集团有限公司 Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
KR20170097413A (en) * 2016-02-18 2017-08-28 박창진 Precast Road Structure with Steel Girde

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201896283U (en) * 2010-12-15 2011-07-13 中国土木工程集团有限公司 Joint bar top-connection type composite foundation structure
CN204455724U (en) * 2015-01-04 2015-07-08 上海市城市建设设计研究总院 For the integral structure of Deep Thick Soft Ground Area roadbed track
CN204589787U (en) * 2015-04-28 2015-08-26 北京城建设计发展集团股份有限公司 The prefabricated bent cap of the T-shaped pier of Bridges on Urban Rail Transit
CN205276115U (en) * 2015-12-17 2016-06-01 中铁第四勘察设计院集团有限公司 Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
KR20170097413A (en) * 2016-02-18 2017-08-28 박창진 Precast Road Structure with Steel Girde

Also Published As

Publication number Publication date
CN108330744B (en) 2019-08-27

Similar Documents

Publication Publication Date Title
CN105113389B (en) Assembled type bridge pier column member with steel-concrete composite structure
CN108951425A (en) Cast-in-situ prestressed concrete continuous box girder primary concreting molding construction method
CN202954282U (en) Steel-structure pedestrian bridge
CN109853381B (en) Transitional structure for preventing bridge head from jumping and construction method thereof
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN109487681A (en) Erosion resistant ultra-high performance concrete constrains section assembling bridge pier and method of construction
CN109457568B (en) Construction process for prefabricated post-tensioning prestressed assembly pavement of bilateral superposed beam
CN109137762A (en) A kind of waveform arch bar Strengthening Method of Two-way Curved Arch Bridges
CN108086081A (en) A kind of road maintenance construction method
CN106087739A (en) A kind of combination U rib shaped steel floorings and preparation method thereof
CN109235662A (en) A kind of column board connecting equipment comprising multiple shear connector
CN110042770A (en) A method of using the original bridge of external prestressing steel Shu Tuokuan in length and breadth
CN113152185A (en) Full-assembly type road with pile plate roadbed supporting prefabricated pavement and construction method thereof
CN105133493A (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN215947749U (en) Prefabricated assembled ballast bed
CN209307882U (en) It is a kind of for improving the cushion cap device on pile foundation reinforcement basis
CN114150690A (en) Embedded flange for steel column-concrete foundation, connecting structure and construction method
CN206800166U (en) Integral reinforcing transforms the stone arch bridge of main arch
CN210507176U (en) Road and bridge crack reinforced structure
CN210797241U (en) Prestressed high-strength regenerated hybrid continuous rigid frame bridge system
CN108330744B (en) A kind of track foundation construction method
CN207904660U (en) A kind of track infrastructure
CN105507110A (en) Reinforcing structure and method for damaged concrete pavement panel
CN106320184A (en) Novel fabricated bridge construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210409

Address after: 313013 workshop 1 of Huzhou Wantuo metal products Co., Ltd., rujiadian Road, Lianshi Town, Nanxun District, Huzhou City, Zhejiang Province

Patentee after: Zhejiang Zhaodi Technology Co.,Ltd.

Address before: 315801 No.18, Puqian, Xiaogang street, Beilun District, Ningbo City, Zhejiang Province

Patentee before: Zhou Zhaodi

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method of track foundation

Effective date of registration: 20211227

Granted publication date: 20190827

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330002677

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220617

Granted publication date: 20190827

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou Lianshi Xiaowei franchise sub branch

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2021330002677

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method for track foundation

Effective date of registration: 20230707

Granted publication date: 20190827

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414

PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20190827

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2023330001414

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method for track foundation

Granted publication date: 20190827

Pledgee: Nanxun Rural Commercial Bank of Zhejiang, Limited by Share Ltd.

Pledgor: Zhejiang Zhaodi Technology Co.,Ltd.

Registration number: Y2024330001084