CN108329898A - A kind of oil drilling plugging operation liquid - Google Patents

A kind of oil drilling plugging operation liquid Download PDF

Info

Publication number
CN108329898A
CN108329898A CN201810337698.4A CN201810337698A CN108329898A CN 108329898 A CN108329898 A CN 108329898A CN 201810337698 A CN201810337698 A CN 201810337698A CN 108329898 A CN108329898 A CN 108329898A
Authority
CN
China
Prior art keywords
water
operation liquid
plugging operation
agent
emulsifier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810337698.4A
Other languages
Chinese (zh)
Inventor
黎凌
欧阳伟
陈俊斌
袁志平
李巍
吴正良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd, CNPC Chuanqing Drilling Engineering Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810337698.4A priority Critical patent/CN108329898A/en
Publication of CN108329898A publication Critical patent/CN108329898A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/426Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells for plugging

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Colloid Chemistry (AREA)

Abstract

The invention discloses a kind of oil drilling plugging operation liquid, are related to petroleum drilling technology field, are prepared by ratio of weight and the number of copies by solvent, suspension stabilizer, emulsifier, releasing agent, water-swellable sealing agent, retarder, and component and proportioning are as follows in parts by weight:Solvent:Suspension stabilizer:Emulsifier:Releasing agent, water-swellable sealing agent, retarder=30 ~ 50:0.6~1.2:3~4:2~3:100~150:0.5~1.Inventive formulation is simple, cost is relatively low, with controllable, the high aqueous energy of expansion rate and packet of gelling time.

Description

A kind of oil drilling plugging operation liquid
Technical field
The present invention relates to petroleum drilling technology field, rapid expanding solidifies and generates bullet after specifically relating to a kind of chance water Property glue induration plugging operation liquid, particularly suitable for Sichuan province crack, solution cavity especially containing flowing water layer it is pernicious Miss leak stopping problem.
Background technology
Serious mud leakage often occurs for Sichuan province crack, solution cavity development, the drilling well in these stratum, and some are leaked Layer itself is again water-bearing layer, or is connected to adjacent water table, and underground water is very active, and the leakage occurred leaks speed, leakage Amount is all very big.Leak stopping is carried out under the conditions of this circulating water, since conventional water base leak stopping slurries are easy the underground water institute flowed Erosion, destruction tend not to get an expected result.Such as using cement mortar easily by underground water erosion, displacement and dilute, it is difficult to build It erects and blocks partition wall, and lead to that drop ply top or bottom exist without cement plug or cement plug arranged at bottom and centre is without cement plug.
Publication No. CN101838525A, publication date are that the Chinese patent literature on the 22nd of September in 2010 discloses one kind firmly Glue general lubricity packet water emulsion drilling fluid belongs to the low density drilling fluid formula technique field crept into using underbalance well.It is bored by accounting for Well liquid total weight percent meter each component includes:Diesel oil:60-66%;Organoclay:3-4%;Drilling fluid emulsifies wetting agent with ebonite: 6-7%;The solid wall anti-sloughing agent of drilling fluid:8-9%;Oil base drilling fluid combustion-delaying agent:6-7%;Water:7.5-8%;Quick lime: 1.5-2%;Water-In-Oil drilling fluid stabilizer:2-3%.As use using above patent document as the bridge of representative slurry, DTR, DF-1, The leakage-stop liquids such as PCC block, and also can reduce leak stopping concentration of slurry by underground water erosion, frequently result in leak stopping failure.Sichuan province Pu Western 001-X1,2 wells of double spies encounter flowing water layer leakage, solidifying using bridge slurry, high dehydration sealing agent, barite sedimentation leak stopping, intelligence The multiple leak stopping of glue+cement mortar is invalid, and final tripping in expansion tube insulates water layer.Meanwhile many formation fracture sizes are difficult to judge, are led Cause to be difficult the size and dosage for determining pons hematoma material, it is often necessary to experiment is repeated several times, waste a large amount of plugging material and Drilling mud, consumption money take.
Invention content
The present invention is directed to existing for the above-mentioned prior art defects and deficiency, provide a kind of outstanding for crack, solution cavity It is the freezing by expansion plugging operation liquid of the water layer severe mud losses leak stopping containing flowing.Inventive formulation is simple, cost is relatively low, has glue Controllable, the high aqueous energy of expansion rate and packet of solidifying time.
The present invention is realized by using following technical proposals:
A kind of oil drilling plugging operation liquid, it is characterised in that:It is swollen by solvent, suspension stabilizer, emulsifier, releasing agent, chance water Swollen sealing agent, retarder are prepared by ratio of weight and the number of copies, and component and proportioning are as follows in parts by weight:Solvent:Suspension stabilizer: Emulsifier:Releasing agent, water-swellable sealing agent, retarder=30 ~ 50:0.6~1.2:3~4:2~3:100~150:0.5~1.
The solvent is selected from the solvent of following one or more kinds of arbitrary proportion mixing:1)Acetone, 2)Diesel oil;3)In vain Oil.
The suspension stabilizer is organoclay.
The emulsifier is selected from the emulsifier of following one or more kinds of arbitrary proportion mixing:1)Fatty acid amide; 2)Versamid;3)Neopelex.
The releasing agent is selected from the releasing agent of following one or more kinds of arbitrary proportion mixing:1)Organosilicon;2)It is poly- Vinyl alcohol;3)Cellulose acetate.
The water-swellable sealing agent is selected from the sealing agent that following one or two kinds of arbitrary proportions mix:1)It is water-soluble Property polyurethane;2)Oil soluble polyurethane.
The retarder is selected from following one or more kinds of arbitrary proportions and mixes:1)Citric acid;2)Tartaric acid; 3)Benzoic acid.
Compared with prior art, what the present invention was reached has the beneficial effect that:
1, it in the present invention, meets the solidification of water rapid expanding and administers severe mud losses plugging operation liquid by introducing diesel oil, emulsifier, demoulding Agent solves during indoor or extemporaneous preparation that chamber wall is aqueous to cause sealing agent to meet water reaction, adherency wall, difficult cleaning in advance Problem;
2, it in the present invention, meets the solidification of water rapid expanding and administers the gelling time of severe mud losses plugging operation liquid by water, temperature, pressure Power influences, and water is the 100% ~ 300% of water-swellable sealing agent quality, is increased with rate of water added, gelling time delay;Applicable temperature Ranging from 25 DEG C ~ 80 DEG C, as temperature increases, gelling time, pre-add bottom pressure is 0 ~ 10Mpa, with bottom pressure Raising, gelling time extend;
3, it in the present invention, meets the solidification of water rapid expanding and administers the expansion rate of severe mud losses plugging operation liquid by temperature and pressure shadow It rings, ranging from 25 DEG C ~ 80 DEG C of Applicable temperature, as temperature increases, expansion rate increases;Pre-add bottom pressure is 0 ~ 10Mpa, with The raising of bottom pressure, expansion rate reduce, and after bottom pressure is more than 1Mpa, expansion rate is influenced no longer apparent by pressure;
4, it in the present invention, meets the solidification of water rapid expanding and administers severe mud losses plugging operation liquid for different well depth drop plies, pass through tune Whole retarder dosage can flexibly regulation system gelling time, consolidation time be guaranteed with adapting to different pump time demands Enough safe constructions, there is no plugging operation liquid to meet water reaction in advance, leads to the down-hole accident for " plant flag bar " occur;
5, in the present invention, meeting water rapid expanding solidification improvement severe mud losses plugging operation liquid has wider density accommodation, For different pressures coefficient drop ply, leak stopping serum density can be adjusted by the way that heavy weight additive is added, to adapt to Different Strata pressure system The leak stopping demand of number drop ply;
6, in the present invention, chance water rapid expanding solidification improvement severe mud losses plugging operation liquid packet outlet capacity is strong, energy and different volumes The water flooding or water-base mud of ratio are mixed together the whole consolidation of realization, it is ensured that leakage-stop liquid enters after drop ply that there is no by water or water base Drilling fluid dilutes, and solves flowing water layer leak stopping problem, improves plugging effect.
7, in conclusion with using Publication No. CN101838525A patent documents compared with the prior art of representative, this hair It is bright to be different from traditional physics and chemical plugging material or working solution, there is rapid dispersion, emulsification, friendship in water after itself meeting water Connection, foaming, expansion, while CO can be discharged in foaming process2Gas, can be by the leak stopping slurries by the nearly well of pit shaft by gas pressure Band is pressed further into and fills the hole of fissured structure, is not influenced by fracture pattern and size;When reaching gelling time, leak stopping The structural viscosity of slurries gradually increases and volume expansion, there is very high viscosity resistance between leakage channel wall surface, final to cure The gluey induration of elasticity is formed, to play the effect of expansion and elastic waterstop;Extemporaneous preparation is simple and convenient, does not glue canister Wall surface can realize pumping using the mating slush pump of drilling machine, be not necessarily to additional equipment.
Relative to CN101838525A patent documents, difference lies in diesel oil, emulsifier, releasing agent these three groups by the application It is divided into a kind of leak stopping slurry base fluid component, can solves during indoor or extemporaneous preparation that chamber wall is aqueous to be caused to block up after triplicity The problem of water reaction, adherency wall, difficult cleaning is met in leakage agent in advance, and diesel oil and emulsifier are in patent document CN101838525A A kind of main inorganic agent of oil base drilling fluid system, there is no meet water reaction in advance and lead in process for preparation for this oil base drilling fluid Cause the problem of oil base drilling fluid adherency wall.
Description of the drawings
Below in conjunction with specification drawings and specific embodiments, the present invention is described in further detail, wherein:
Fig. 1 is present invention gelling time under different temperatures pressure condition;
Fig. 2 is the present invention in different temperatures pressure condition expansion rate.
Specific implementation mode
Embodiment 1
As the preferred forms of the present invention, solvent, emulsifier, releasing agent, water-swellable sealing agent, delays suspension stabilizer Solidifying agent is prepared by ratio of weight and the number of copies, and component and proportioning are as follows in parts by weight:
Solvent:Suspension stabilizer:Emulsifier:Releasing agent, water-swellable sealing agent, retarder=50:1.0:3:2:120:1.0.
The solvent is selected from the solvent of following one or more kinds of arbitrary proportion mixing:1)Acetone, 2)Diesel oil;3)In vain Oil.
The suspension stabilizer is organoclay.
The emulsifier is selected from the emulsifier of following one or more kinds of arbitrary proportion mixing:1)Fatty acid amide; 2)Versamid;3)Neopelex.
The releasing agent is selected from the releasing agent of following one or more kinds of arbitrary proportion mixing:1)Organosilicon;2)It is poly- Vinyl alcohol;3)Cellulose acetate.
The water-swellable sealing agent is selected from the sealing agent that following one or two kinds of arbitrary proportions mix:1)It is water-soluble Property polyurethane;2)Oil soluble polyurethane.
The retarder is selected from following one or more kinds of arbitrary proportions and mixes:1)Citric acid;2)Tartaric acid; 2)Benzoic acid.
Under normal temperature and pressure conditions, which presses 1 with water:After the mixing of 1 volume ratio, gelling time is 120min, cubical expansivity 360%;Packet water is 3 times of own vols.
Embodiment 2
As another better embodiment of the present invention, solvent, suspension stabilizer, emulsifier, releasing agent, water-swellable leak stopping Agent, retarder are prepared by ratio of weight and the number of copies, and component and proportioning are as follows in parts by weight:
Solvent:Suspension stabilizer:Emulsifier:Releasing agent, water-swellable sealing agent, retarder=30:0.8:3:2:100:0.8.
The solvent is selected from the solvent of following one or more kinds of arbitrary proportion mixing:1)Acetone, 2)Diesel oil;3)In vain Oil.
The suspension stabilizer is organoclay.
The emulsifier is selected from the emulsifier of following one or more kinds of arbitrary proportion mixing:1)Fatty acid amide; 2)Versamid;3)Neopelex.
The releasing agent is selected from the releasing agent of following one or more kinds of arbitrary proportion mixing:1)Organosilicon;2)It is poly- Vinyl alcohol;3)Cellulose acetate.
The water-swellable sealing agent is selected from the sealing agent that following one or two kinds of arbitrary proportions mix:1)It is water-soluble Property polyurethane;2)Oil soluble polyurethane.
The retarder is selected from following one or more kinds of arbitrary proportions and mixes:1)Citric acid;2)Tartaric acid; 2)Benzoic acid.
Under normal temperature and pressure conditions, which presses 1 with water:After the mixing of 1 volume ratio, gelling time is 105min, cubical expansivity 300%;Packet water is 2.5 times of own vols.
Embodiment 3
As another better embodiment of the present invention, solvent, suspension stabilizer, emulsifier, releasing agent, water-swellable leak stopping Agent, retarder are prepared by ratio of weight and the number of copies, and component and proportioning are as follows in parts by weight:
Solvent:Suspension stabilizer:Emulsifier:Releasing agent, water-swellable sealing agent, retarder=45:0.9:3:2:110:0.9.
The solvent is selected from the solvent of following one or more kinds of arbitrary proportion mixing:1)Acetone, 2)Diesel oil;3)In vain Oil.
The suspension stabilizer is organoclay.
The emulsifier is selected from the emulsifier of following one or more kinds of arbitrary proportion mixing:1)Fatty acid amide; 2)Versamid;3)Neopelex.
The releasing agent is selected from the releasing agent of following one or more kinds of arbitrary proportion mixing:1)Organosilicon;2)It is poly- Vinyl alcohol;3)Cellulose acetate.
The water-swellable sealing agent is selected from the sealing agent that following one or two kinds of arbitrary proportions mix:1)It is water-soluble Property polyurethane;2)Oil soluble polyurethane.
The retarder is selected from following one or more kinds of arbitrary proportions and mixes:1)Citric acid;2)Tartaric acid; 2)Benzoic acid.
Under normal temperature and pressure conditions, which presses 1 with water:After the mixing of 1 volume ratio, gelling time is 110min, cubical expansivity 320%;Packet water is 2.5 times of own vols.
Table 1 is the present invention to different fluid packet liquid measure table.
Table 1
Table 2 is that the present invention meets water plugging effect table.
Table 2.

Claims (7)

1. a kind of oil drilling plugging operation liquid, it is characterised in that:By solvent, suspension stabilizer, emulsifier, releasing agent, meet water Expansion sealing agent, retarder are prepared by ratio of weight and the number of copies, and component and proportioning are as follows in parts by weight:Solvent:It is suspending stabilized Agent:Emulsifier:Releasing agent, water-swellable sealing agent, retarder=30 ~ 50:0.6~1.2:3~4:2~3:100~150:0.5~1.
2. a kind of oil drilling plugging operation liquid according to claim 1, it is characterised in that:The solvent is selected from following The solvent of one or more kinds of arbitrary proportion mixing:1)Acetone, 2)Diesel oil;3)White oil.
3. a kind of oil drilling plugging operation liquid according to claim 1, it is characterised in that:The suspension stabilizer is Organoclay.
4. a kind of oil drilling plugging operation liquid according to claim 1, it is characterised in that:The emulsifier be selected from The emulsifier of lower one or more arbitrary proportion mixing:1)Fatty acid amide;2)Versamid;3)Detergent alkylate Sodium sulfonate.
5. a kind of oil drilling plugging operation liquid according to claim 1, it is characterised in that:The releasing agent be selected from The releasing agent of lower one or more arbitrary proportion mixing:1)Organosilicon;2)Polyvinyl alcohol;3)Cellulose acetate.
6. a kind of oil drilling plugging operation liquid according to claim 1, it is characterised in that:The water-swellable leak stopping Agent is selected from the sealing agent that following one or two kinds of arbitrary proportions mix:1)Soluble polyurethane;2)Oil soluble polyurethane.
7. a kind of oil drilling plugging operation liquid according to claim 1, it is characterised in that:The retarder be selected from Lower one or more arbitrary proportion mixes:1)Citric acid;2)Tartaric acid;3)Benzoic acid.
CN201810337698.4A 2018-04-16 2018-04-16 A kind of oil drilling plugging operation liquid Pending CN108329898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810337698.4A CN108329898A (en) 2018-04-16 2018-04-16 A kind of oil drilling plugging operation liquid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810337698.4A CN108329898A (en) 2018-04-16 2018-04-16 A kind of oil drilling plugging operation liquid

Publications (1)

Publication Number Publication Date
CN108329898A true CN108329898A (en) 2018-07-27

Family

ID=62933244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810337698.4A Pending CN108329898A (en) 2018-04-16 2018-04-16 A kind of oil drilling plugging operation liquid

Country Status (1)

Country Link
CN (1) CN108329898A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111499792A (en) * 2020-03-27 2020-08-07 中国石油天然气集团有限公司 Amphiphobic nanoscale plugging agent for oil-based drilling fluid and preparation method and application thereof
CN112940696A (en) * 2021-02-03 2021-06-11 天津大学 Modified cyanogen coagulation plugging agent for high-temperature oil reservoir plugging and preparation method and application thereof
CN117568001A (en) * 2024-01-17 2024-02-20 中国石油集团川庆钻探工程有限公司 Plugging working fluid and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015072317A1 (en) * 2013-11-15 2015-05-21 株式会社クレハ Temporary sealing agent for use in well boring
CN105368409A (en) * 2015-11-24 2016-03-02 中国石油集团川庆钻探工程有限公司工程技术研究院 Composite type leakage plugging agent for oil-based drilling fluid and preparation method thereof
CN106281265A (en) * 2016-07-20 2017-01-04 中石化石油工程技术服务有限公司 A kind of extremely-low density sealing agent being applicable to low pressure and leakmess formation and preparation method
CN107189772A (en) * 2017-05-02 2017-09-22 中国地质大学(武汉) One kind can water swelling sealing agent

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015072317A1 (en) * 2013-11-15 2015-05-21 株式会社クレハ Temporary sealing agent for use in well boring
CN105368409A (en) * 2015-11-24 2016-03-02 中国石油集团川庆钻探工程有限公司工程技术研究院 Composite type leakage plugging agent for oil-based drilling fluid and preparation method thereof
CN106281265A (en) * 2016-07-20 2017-01-04 中石化石油工程技术服务有限公司 A kind of extremely-low density sealing agent being applicable to low pressure and leakmess formation and preparation method
CN107189772A (en) * 2017-05-02 2017-09-22 中国地质大学(武汉) One kind can water swelling sealing agent

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
严瑞瑄: "《水溶性高分子》", 30 June 1998, 化学工业出版社 *
乌效鸣等: "《钻井液与岩土工程浆材》", 31 July 2014, 中国地质大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111499792A (en) * 2020-03-27 2020-08-07 中国石油天然气集团有限公司 Amphiphobic nanoscale plugging agent for oil-based drilling fluid and preparation method and application thereof
CN111499792B (en) * 2020-03-27 2021-09-28 中国石油天然气集团有限公司 Amphiphobic nanoscale plugging agent for oil-based drilling fluid and preparation method and application thereof
CN112940696A (en) * 2021-02-03 2021-06-11 天津大学 Modified cyanogen coagulation plugging agent for high-temperature oil reservoir plugging and preparation method and application thereof
CN117568001A (en) * 2024-01-17 2024-02-20 中国石油集团川庆钻探工程有限公司 Plugging working fluid and preparation method thereof

Similar Documents

Publication Publication Date Title
CN105368409B (en) A kind of oil base drilling fluid compound sealing agent and preparation method thereof
US7892348B2 (en) Well cementing material
EP0748782B1 (en) Cementing compositions and the application of such compositions to cementing oil or analogous wells
CN103525387B (en) Foamed cement slurry system and composition
US8100180B2 (en) Method of servicing a wellbore with a sealant composition comprising solid latex
EP2766447B1 (en) Cement oil-based mud spacer formulation
CN103320105B (en) The micro-foam drilling fluid that can be recycled
CN101263211A (en) Water swellable polymers as lost circulation control agents material
CN102382632B (en) Pretreating agent preventing leaking stoppage from being diluted by formation water and preparation method and application thereof
RU2635310C1 (en) Hardening compositions containing cement dust, and methods for their application
CN107235691B (en) Plugging agent for plugging malignant leakage stratum cracks and preparation method thereof
CN102587858B (en) Method for blocking water for fracture and hole type reservoir
CN108329898A (en) A kind of oil drilling plugging operation liquid
US7435768B2 (en) Foamed cement slurry
AU2012262965B2 (en) Use of methylhydroxyethyl cellulose as cement additive
CN109868125A (en) A kind of deep drilling well high bearing strength sealing agent and preparation method thereof
US20100035772A1 (en) Sealant compositions comprising solid latex
AU2011284547A1 (en) A cement composition containing a substituted ethoxylated phenol surfactant for use in an oil-contaminated well
WO2009074658A1 (en) Squeeze composition for restoring isolation
CN104531105B (en) The temporarily stifled workover fluid and compound method of a kind of low pressure sandstone reservoir gas well
US20140352963A1 (en) Powder Defoaming Compositions and Methods of Reducing Gas Entrainment In Fluids
CN102086387B (en) Filtrate reducer of cement slurry and application in cementing
CN111663948B (en) Water-rich sand-gravel stratum shield muck improvement additive and preparation method thereof
CN112341998A (en) Plugging material and preparation method thereof
US2330145A (en) Method of sealing pores in subterranean formations contiguous to deep well bores

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180727

RJ01 Rejection of invention patent application after publication