CN108322915A - The information processing method and device of base station planning - Google Patents

The information processing method and device of base station planning Download PDF

Info

Publication number
CN108322915A
CN108322915A CN201810455833.5A CN201810455833A CN108322915A CN 108322915 A CN108322915 A CN 108322915A CN 201810455833 A CN201810455833 A CN 201810455833A CN 108322915 A CN108322915 A CN 108322915A
Authority
CN
China
Prior art keywords
information
base station
region
territorial scope
resource use
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810455833.5A
Other languages
Chinese (zh)
Other versions
CN108322915B (en
Inventor
许丹丹
刘楠
刘静沙
刘颖慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN201810455833.5A priority Critical patent/CN108322915B/en
Publication of CN108322915A publication Critical patent/CN108322915A/en
Application granted granted Critical
Publication of CN108322915B publication Critical patent/CN108322915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention provides a kind of information processing method of base station planning and device, the method includes:Obtain the first resource use information and userbase predictive information in each region in preset territorial scope;The use total amount and/or usage amount that the first resource use information is used to characterize in first time period in the past Internet resources in the region change with time;The userbase predictive information changes with time for characterizing the user in the region and/or the quantity of population in second time period in future;According to the first resource use information in the region and userbase predictive information, the Secondary resource use information in the region is determined;According to the Secondary resource use information in each region in the territorial scope, determine that the base station planning information of the territorial scope, the base station planning information are used to characterize the distribution situation of base station in the territorial scope planned.The result of the planning of the present invention can accurately match the demand in each region and the integrated demand of territorial scope.

Description

The information processing method and device of base station planning
Technical field
The present invention relates to information technology field more particularly to the information processing methods and device of a kind of base station planning.
Background technology
With the development of mobile communication technology, in order to meet the needs of user is to wireless network communication, the rule of wireless network Ever more important is drawn, the base station planning of one of key as the network planning is even more the most important thing.
In existing base station planning method, can according to the design experiences of personnel, have the distribution situation of storage base station, to not The distribution situation for coming base station in territorial scope is planned.
However, the quality for the distribution situation that this method is planned depends on the design experiences and personnel's subjectivity of related personnel The factor of consideration, so, it can not accurately match the actual demand to Internet resources in territorial scope.
Invention content
The present invention provides a kind of information processing method and device of base station planning, to solve accurately match territorial scope The problem of interior actual demand to Internet resources.
According to the first aspect of the invention, a kind of information processing method of base station planning is provided, including:
Obtain the first resource use information and userbase predictive information in each region in preset territorial scope;It is described First resource use information is used to characterize in first time period in the past the use total amount of Internet resources and/or use in the region Amount changes with time;The userbase predictive information for characterize in second time period in future the user in the region and/ Or the quantity of population changes with time;
According to the first resource use information in the region and userbase predictive information, second money in the region is determined Source use information, the Secondary resource use information are used to characterize in the second time period making for Internet resources in the region It is changed with time with total amount and/or usage amount;
According to the Secondary resource use information in each region in the territorial scope, the base station planning of the territorial scope is determined Information, the base station planning information are used to characterize the distribution situation of base station to be planned in the territorial scope, and with rule The configuration information for the base station drawn.
Optionally, the Secondary resource use information according to each region in the territorial scope, determines the region model Before the base station planning information enclosed, further include:
The existing base station information in the territorial scope is obtained, the existing base station information is for characterizing the first time Have the distribution situation of base station and the configuration information of existing base station in section in the territorial scope;
The Secondary resource use information according to each region in the territorial scope determines the base station of the territorial scope Planning information, including:
According to the Secondary resource use information and the existing base station information for stating each region in territorial scope, the base is determined It stands planning information.
Optionally, the configuration information of the existing base station is for characterizing at least one of:
The construction type for having base station, the usage type for having base station, the scale type for having base station and existing base station Internet resources fan-out capability information.
Optionally, the configuration information of the base station to be planned is for characterizing at least one of:
The construction type of base station to be planned, the usage type of base station to be planned, the scale type of base station to be planned, And the Internet resources fan-out capability information of base station to be planned.
Optionally, the construction type of the base station includes flooring station, newly-built computer room, leasehold improvement computer room;The base station Usage type includes shared, newly-built shared, newly-built exclusively enjoys that reuse;The scale type of the base station includes macro base station and small base station.
Optionally, the first resource use information for obtaining each region in territorial scope, including:
Terminal interaction information all in the territorial scope is obtained, the terminal interaction information is that user is taken using network Information caused by the behavior of business;
It determines corresponding between the region belonging to the spot of the behavior and terminal interaction information caused by the behavior;
Terminal interaction information corresponding to each region calculates the first resource use information in the region.
Optionally, the terminal interaction information is for characterizing at least one of:
The spot of the behavior, the time of origin of the behavior, the type of network service used in the behavior, institute State Internet resources used in behavior size and the behavior caused by consumption charge.
Optionally, the userbase predictive information in each region in territorial scope is obtained, including:
According to active user's size values in the region, the corresponding userbase influent factor in the region, it is directed to institute The evaluation parameter of userbase influent factor and preset or housebroken survey model are stated, prediction obtains the use in the region Family scale forecast information;Active user's size values are used to characterize the user in presently described region and/or the quantity of population; The userbase influent factor is the default element for influencing the zone user scale variation;The evaluation parameter is evaluation institute State the current development situation of userbase influent factor and/or the parameter preset of future developing trend.
The userbase influent factor includes at least one of:
Resided in the type of commercial circle quantity, the commercial circle that the region is included, the region size of population or ratio, The race condition of operator, the residential block quantity in the region, the type of the residential block in the region.
According to the second aspect of the invention, a kind of information processing unit of base station planning is provided, including:
First acquisition module, for obtaining the first resource use information in each region and user in preset territorial scope Scale forecast information;The first resource use information is used to characterize in first time period in the past Internet resources in the region It is changed with time using total amount and/or usage amount;The userbase predictive information is for characterizing in second time period in future The user in the region and/or the quantity of population change with time;
Secondary resource use information determining module, for the first resource use information and userbase according to the region Predictive information determines the Secondary resource use information in the region, and the Secondary resource use information is for characterizing described second The use total amount and/or usage amount of Internet resources change with time in the region in period;
Base station planning module, described according to the Secondary resource use information in each region in the territorial scope, determining The base station planning information of territorial scope, the base station planning information is for characterizing base station to be planned in the territorial scope The configuration information of distribution situation and base station to be planned.
Optionally, the device further includes:
Second acquisition module, for obtaining the existing base station information in the territorial scope, the existing base station information is used Match confidence in the distribution situation and existing base station for having base station in the characterization first time period in the territorial scope Breath;
The base station planning module, specifically for according to Secondary resource use information and the institute for stating each region in territorial scope Existing base station information is stated, determines the base station planning information.
Optionally, the configuration information of the existing base station includes at least one of:
The construction type for having base station, the usage type for having base station, the scale type for having base station and existing base station Internet resources fan-out capability information.
Optionally, the configuration information of the base station to be planned is for characterizing at least one of:
The construction type of base station to be planned, the usage type of base station to be planned, the scale type of base station to be planned, And the Internet resources fan-out capability information of base station to be planned.
Optionally, the construction type of the base station includes flooring station, newly-built computer room, leasehold improvement computer room;The base station Usage type includes shared, newly-built shared, newly-built exclusively enjoys that reuse;The scale type of the base station includes macro base station and small base station.
Optionally, first acquisition module, is specifically used for:
Terminal interaction information all in the territorial scope is obtained, the terminal interaction information is that user is taken using network Information caused by the behavior of business;
It determines corresponding between the region belonging to the spot of the behavior and terminal interaction information caused by the behavior;
Terminal interaction information corresponding to each region calculates the first resource use information in the region.
Optionally, the terminal interaction information is for characterizing at least one of:
The spot of the behavior, the time of origin of the behavior, the type of network service used in the behavior, institute State Internet resources used in behavior size and the behavior caused by consumption charge.
Optionally, first acquisition module, is specifically used for:
According to active user's size values in the region, the corresponding userbase influent factor in the region, it is directed to institute The evaluation parameter of userbase influent factor and preset or housebroken first prediction model are stated, prediction obtains the area The userbase predictive information in domain;Active user's size values are used to characterize user and/or the population in presently described region Quantity;The userbase influent factor is the default element for influencing the zone user scale variation;The evaluation parameter It is to evaluate the current development situation of the userbase influent factor and/or the parameter preset of future developing trend.
Optionally, the userbase influent factor includes at least one of:
Resided in the type of commercial circle quantity, the commercial circle that the region is included, the region size of population or ratio, The race condition of operator, the residential block quantity in the region, the type of the residential block in the region.
According to the third aspect of the invention we, a kind of electronic equipment is provided, including:Memory, processor and computer Program, the computer program are stored in the memory, and the processor runs the computer program and executes first party Face and its method that may relate to.
According to the fourth aspect of the invention, a kind of storage medium is provided, computer program, the computer journey are stored with Sequence is performed the method realized first aspect and its may relate to.
The information processing method and device of base station planning provided by the invention, it is each in preset territorial scope by obtaining The first resource use information and userbase predictive information in region, according to the first resource use information in the region and user Scale forecast information determines the Secondary resource use information in the region, and according to of each region in the territorial scope Two resource using informations determine the base station planning information of the territorial scope so that the planning of base station can be with the of each region Two resource using informations are foundation, since Secondary resource use information is to use letter according to the first resource of past first time period What breath and the userbase predictive information predicted obtained, can the current conditions of demand of more accurate reaction network resource and The variation in userbase future, so that base station planning information can fully consider the demand in each region in territorial scope, in turn The result of planning is enable accurately to match the demand in each region and the integrated demand of territorial scope.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without having to pay creative labor, may be used also for those of ordinary skill in the art With obtain other attached drawings according to these attached drawings.
Fig. 1 is the flow diagram of the information processing method of base station planning in one embodiment of the invention;
Fig. 2 is the flow diagram of the information processing method of base station planning in another embodiment of the present invention;
Fig. 3 is the flow diagram of step S21 in Fig. 2;
Fig. 4 is the structural schematic diagram of the information processing unit of base station planning in one embodiment of the invention;
Fig. 5 is the structural schematic diagram of the information processing unit of base station planning in another embodiment of the present invention;
Fig. 6 is the structural schematic diagram of electronic equipment in one embodiment of the invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Term " first ", " second ", " third " " in description and claims of this specification and above-mentioned attached drawing The (if present)s such as four " are for distinguishing similar object, without being used to describe specific sequence or precedence.It should manage The data that solution uses in this way can be interchanged in the appropriate case, so as to the embodiment of the present invention described herein can in addition to Here the sequence other than those of diagram or description is implemented.In addition, term " comprising " and " having " and their any deformation, Be intended to cover it is non-exclusive include, for example, containing the process of series of steps or unit, method, system, product or setting It is standby those of to be not necessarily limited to clearly to list step or unit, but may include not listing clearly or for these mistakes The intrinsic other steps of journey, method, product or equipment or unit.
Technical scheme of the present invention is described in detail with specifically embodiment below.These specific implementations below Example can be combined with each other, and same or analogous concept or process may be repeated no more in some embodiments.
Fig. 1 is the flow diagram of the information processing method of base station planning in one embodiment of the invention.
Referring to FIG. 1, the information processing method of base station planning, including:
S11:Obtain the first resource use information and userbase predictive information in each region in preset territorial scope.
First resource use information, it will be appreciated that for for characterize in first time period Internet resources in the region It is changed with time using total amount and/or usage amount, the use total amount and usage amount of wherein Internet resources can be produced Uplink traffic and/or downlink traffic.
Using first resource use information, the actual conditions using Internet resources in region can be objectively responded, and then are the Two resource using informations and base station planning provide reliable realistic basis.
First time period, it will be appreciated that for any time period before current time.
Userbase predictive information, it will be appreciated that for for characterize in second time period in future the user in the region and/or The quantity of population changes with time;The variation of quantity can be wherein characterized with arbitrary time span, meanwhile, it can also be used second The user of finish time period and/or the quantity of population characterize the userbase after second time period warp.
It is directed to different userbases, the service condition meeting adaptability of Internet resources changes, so, utilize user Scale forecast information can reflect the possible situation of change of userbase, so that obtained Secondary resource use information energy Actual demand under enough more fitting userbase variations.
Second time period, it will be appreciated that for any time period after current time.First time period and second time period It can be the period of equal length, can also be different.
In addition, the relationship of the above territorial scope and region, it will be appreciated that include each region in territorial scope, which can be with For the region manually arbitrarily divided or fixed political divisions.
S12:According to the first resource use information in the region and userbase predictive information, the of the region is determined Two resource using informations.
Secondary resource use information, it will be appreciated that for for characterizing in the second time period Internet resources in the region It is changed with time using total amount and/or usage amount.It is the period after current time due to second time period, so, the Two resource using informations also are understood as the use total amount of Internet resources in the region in predicted second time period And/or usage amount changes with time.
S13:According to the Secondary resource use information in each region in the territorial scope, the base station of the territorial scope is determined Planning information.
Base station planning information, it will be appreciated that for for characterizing the distribution situation of base station to be planned in the territorial scope, And the configuration information of base station to be planned.Distribution situation therein, it will be appreciated that be base station position, configuration information therein, It can be regarded as the type of base station and how the Internet resources fan-out capability of base station, base station configure soft hardware equipment etc., it is seen then that The arbitrary information that can help to base station construction, all without departing from the range of the above base station planning information.
The information processing method of base station planning provided in this embodiment, by obtaining each region in preset territorial scope First resource use information and userbase predictive information, first resource use information and userbase according to the region Predictive information determines the Secondary resource use information in the region, and the second money according to each region in the territorial scope Source use information determines the base station planning information of the territorial scope so that the planning of base station can be with second money in each region Source use information is foundation, due to Secondary resource use information be according to the first resource use information of past first time period and What the userbase predictive information predicted obtained, it can more accurate reaction network resource current conditions of demand and user The variation in scale future, so that base station planning information can fully consider the demand in each region in territorial scope, so that The result of planning can accurately match the demand in each region and the integrated demand of territorial scope.
Fig. 2 is the flow diagram of base station planning method in another embodiment of the present invention.
Referring to FIG. 2, base station planning method, including:
S21:Obtain the first resource use information and userbase predictive information in each region in preset territorial scope.
First resource use information, it will be appreciated that for for characterize in first time period Internet resources in the region It is changed with time using total amount and/or usage amount, the use total amount and usage amount of wherein Internet resources can be produced Uplink traffic and/or downlink traffic.
Using first resource use information, the actual conditions using Internet resources in region can be objectively responded, and then are the Two resource using informations and base station planning provide reliable realistic basis.
First time period, it will be appreciated that for any time period before current time.
Userbase predictive information, it will be appreciated that for for characterize in second time period in future the user in the region and/or The quantity of population changes with time;The variation of quantity can be wherein characterized with arbitrary time span, meanwhile, it can also be used second The user of finish time period and/or the quantity of population characterize the userbase after second time period warp.
Meanwhile user therein can refer to the user of an operator, also can refer to the user of multiple operators.
It is directed to different userbases, the service condition meeting adaptability of Internet resources changes, so, utilize user Scale forecast information can reflect the possible situation of change of userbase, so that obtained Secondary resource use information energy Actual demand under enough more fitting userbase variations.
Second time period, it will be appreciated that for any time period after current time.First time period and second time period It can be the period of equal length, can also be different.
In addition, the relationship of the above territorial scope and region, it will be appreciated that include each region in territorial scope, which can be with For the region manually arbitrarily divided or fixed political divisions.
In specific implementation process, different regions can be distinguished according to regional code, and the information of different time can profit It is determined with the date monthly divided, wherein can be using 18 months as benchmark, i.e. first time period and/or second time period Length can be 18 months.
Fig. 3 is the flow diagram of step S21 in Fig. 2.
Referring to FIG. 3, step S21, including:
S211:Obtain terminal interaction information all in the territorial scope.
Terminal interaction information, it can be understood as information caused by behavior of the user using network service;Terminal interaction is believed Breath can be directly acquired or be generated by operator after behavior described above generation, such as can be distributed in each service of platform Device is centrally stored, and then the present embodiment can obtain it, realizes the integration of dispersion data.
Meanwhile terminal interaction information can according in the territorial scope behavior it is continuous generation and real-time update or periodically more Newly, so that the obtained first resource use information of the present embodiment can also timely update.
In one of which embodiment, the terminal interaction information can be used for characterizing at least one of:
The spot of the behavior, the time of origin of the behavior, the type of network service used in the behavior, institute State Internet resources used in behavior size and the behavior caused by consumption charge.
S212:It determines between terminal interaction information caused by the region belonging to the spot of the behavior and the behavior It is corresponding.
By above step, behavior can be corresponded in each region, to be used for the first resource of follow-up zoning Information provides foundation.
S213:Terminal interaction information corresponding to each region, the first resource for calculating the region use Information.
Although the use feelings of the not direct reaction network resource of the information such as type, the consumption charge of the above related network service Condition, but the type of different network services and consumption charge can indirect reaction to the service conditions of Internet resources, such as:For regarding Frequency associated network services, used Internet resources are more, and to word associated network services, used Internet resources can It can be less.The service condition of Internet resources can be also calculated by information such as the type of network service, consumption charges, or to counting The information such as size of Internet resources used in the service condition of the Internet resources arrived or the behavior are corrected, supplement, Adjustment being capable of more accurately reaction requirement so that the first resource use information being calculated is more targeted.
S214:According to active user's size values in the region, the corresponding userbase influent factor in the region, needle Evaluation parameter to the userbase influent factor and preset or housebroken prediction model, prediction obtain the area The userbase predictive information in domain.
Active user's size values, it will be appreciated that for the quantity of user and/or population for characterizing presently described region.When Preceding userbase information and userbase predictive information can be the of a sort data of characterization, for example, include user quantity with The quantity of population.In other optional embodiments, active user's size values and userbase predictive information can also be not Similar data.
Userbase influent factor, it will be appreciated that influence the default element of the zone user scale variation.It can be It can artificial preset arbitrary content.In one of which embodiment, the userbase influent factor includes at least one of: The size of population or ratio, the region are resided in the type of commercial circle quantity, the commercial circle that the region is included, the region The race condition of middle operator, the residential block quantity in the region, the type of the residential block.
The evaluation parameter is to evaluate the current development situation and/or future developing trend of the userbase influent factor Parameter preset.The content of parameter can think to be configured according to element, if element available quantity data evaluation, such as commercial circle Quantity, the resident size of population or ratio, residential block quantity etc., then evaluation parameter can be wherein specific numerical value;If element can It is evaluated with preset kind, such as the type of commercial circle, type of residential block etc., then evaluation parameter can be wherein specific type; By taking the type of commercial circle as an example, specific parameter can for example change the address commercial circle, newly-built commercial circle, old commercial circle etc.;Element is available Artificial opinion rating is evaluated, for example, in region operator race condition, can use the competitive information such as high, medium and low into Row evaluation, then the information such as high, medium and low therein can be used as evaluation parameter.
Preset or housebroken prediction model can be the arbitrary model that prediction can be achieved, one of which embodiment In, model can be to be established by the prediction models such as (random forest), support vector machines (svm), linear regression, mould The parameter of type can train determination according to the data of history, can also be that artificial setting is determining.Arbitrarily existing model exists Application in prediction, all without departing from the range of the present embodiment.
In addition, above step S214 can be implemented after step S213, also can step S211 between step S213, Before, any time implementation later or implementation in parallel, as long as performing above procedure respectively.
S22:According to the first resource use information in the region and userbase predictive information, the of the region is determined Two resource using informations.
Secondary resource use information, it will be appreciated that for for characterizing in the second time period Internet resources in the region It is changed with time using total amount and/or usage amount.It is the period after current time due to second time period, so, the Two resource using informations also are understood as the use total amount of Internet resources in the region in predicted second time period And/or usage amount changes with time.
The relationship of first resource use information and Secondary resource use information, in wherein a kind of embodiment, it will be appreciated that For for similar data, first resource use information be before first time period data, Secondary resource use information is it The data of the prediction of second time period afterwards;In other embodiments, the two is alternatively inhomogeneous data, such as:First money Use information characterization in source is that Internet usage amount changes with time in the region, and Secondary resource use information then table Levy the use total amount of Internet resources in the region.
During determining Secondary resource use information, arbitrary computation model can also be used, according to the change of userbase Change situation, corresponds to the variation for determining first resource use information, such as:If userbase is in rising trend, Secondary resource makes It is also in rising trend relative to first resource use information with information;If userbase is in after rising and downward trend, and the Two resource using informations can characterize usage amount with first resource use information and change with time, then Secondary resource use information And at any time be in first rise the variation declined afterwards.Two kinds of relatively simple variation patterns are only listed above, are being embodied In the process, the variation of resource using information is likely more complicated and changeable.By above step, more future accurately can be predicted Internet usage situation.
S23:Obtain the existing base station information of the territorial scope.
Has base station information, it will be appreciated that have base station in the first time period in the territorial scope for characterizing The configuration information of distribution situation and existing base station.Distribution situation therein, it will be appreciated that be the position of base station, configuration therein Information, it will be appreciated that soft hardware equipment etc. how is configured for the type and the Internet resources fan-out capability of base station, base station of base station, As it can be seen that the information of base station construction is arbitrarily can help to, all without departing from the range of the above base station planning information.
In one of which embodiment, the configuration information of the existing base station includes at least one of:Has base station Build type, the usage type for having base station, the scale type for having base station and the Internet resources fan-out capability of existing base station Information.
Have base station information by acquisition, foundation can be provided for the planning of base station, so that the result of planning can be with base It can reach such as with effect as smaller adjustment meet demand in turn in the ability for having base station, avoid base station construction It is produced bigger effect to having base station distribution.
S24:According to the Secondary resource use information in each region in the territorial scope, the base station of the territorial scope is determined Planning information.
In the case where obtaining existing base station information, step S24 can specifically include:According to stating the areas territorial scope Nei Ge The Secondary resource use information in domain and the existing base station information, determine the base station planning information.
Base station planning information, it will be appreciated that for for characterizing distribution situation of the planned base station in the territorial scope, And the configuration information of base station to be planned.Distribution situation therein, it will be appreciated that be base station position, configuration information therein, It can be regarded as the type of base station and how the Internet resources fan-out capability of base station, base station configure soft hardware equipment etc., it is seen then that The arbitrary information that can help to base station construction, all without departing from the range of the above base station planning information.
In one of which embodiment, the construction type of the base station includes flooring station, newly-built computer room, leasehold improvement machine Room;The usage type of the base station includes shared, newly-built shared, newly-built exclusively enjoys that reuse;The scale type of the base station includes macro Base station and small base station.
Base station distribution situation therein, also is understood as base station location, specifically can utilize base station covering radius, stand between It is characterized away from, site density etc..
Relationship between Secondary resource use information and base station planning information can utilize default or housebroken another meter It calculates model and establishes computation model to obtain, such as using object function, constraints, and then obtain base station planning information, or The information that can be used for determining base station planning information is obtained, the resource using information before can also be used is with base station planning information to mould Type is trained, and determines the parameter of model, and then Secondary resource use information is input in model, exportable base station planning letter Breath, or output can be used for determining the information of base station planning information.
As it can be seen that the present embodiment is by base station construction and can embody the terminal interaction information of user characteristics, embody existing base station spy The existing base station information of sign, and the userbase predictive information of urban planning can be embodied and be combined, the following base of precision matching The indexs such as station location, type and its usage type.
In addition, the present embodiment can be applied to the fields 5G, it is different from 4G and stresses to improve the developing goal of network speed, 5G stresses Point further includes improving network blind spot and taking into account differentiated user to experience other than improving network speed.In terms of base station selection, it is based on Base station construction is combined, precision by the network characterization of 5G high flow capacities, fast speed with user characteristics, base station storage, urban planning Match the indexs such as future 5G base station locations, type and its usage type.
The information processing method of base station planning provided in this embodiment, by obtain each region in territorial scope first Resource using information and userbase predictive information are predicted to believe according to the first resource use information and userbase in the region Breath determines the Secondary resource use information in the region, and is used according to the Secondary resource in each region in the territorial scope Information determines the base station planning information of the territorial scope so that the planning of base station can be used with the Secondary resource in each region Information is foundation, since Secondary resource use information is the first resource use information according to past first time period and is predicted Userbase predictive information obtain, can more accurate reaction network resource current conditions of demand and userbase not The variation come, so that base station planning information can fully consider the demand in each region in territorial scope, so that planning As a result the demand in each region and the integrated demand of territorial scope can accurately be matched.
Fig. 4 is the structural schematic diagram of the information processing unit of base station planning in one embodiment of the invention.
Referring to FIG. 4, the information processing unit 300 of base station planning, including:
First acquisition module 301, for obtain in preset territorial scope the first resource use information in each region and Userbase predictive information;For characterizing, network provides the first resource use information in the region in first time period in the past The use total amount and/or usage amount in source change with time;The userbase predictive information is for characterizing the second time in the future The user in the region and/or the quantity of population change with time in section.
Secondary resource use information determining module 302, for according to the first resource use information in the region and user Scale forecast information determines that the Secondary resource use information in the region, the Secondary resource use information are described for characterizing The use total amount and/or usage amount of Internet resources change with time in the region in second time period.
Base station planning module 303 determines institute for the Secondary resource use information according to each region in the territorial scope The base station planning information of territorial scope is stated, the base station planning information is for characterizing base station to be planned in the territorial scope Distribution situation and base station to be planned configuration information.
The information processing unit of base station planning provided in this embodiment, by obtaining each region in preset territorial scope First resource use information and userbase predictive information, first resource use information and userbase according to the region Predictive information determines the Secondary resource use information in the region, and the second money according to each region in the territorial scope Source use information determines the base station planning information of the territorial scope so that the planning of base station can be with second money in each region Source use information is foundation, due to Secondary resource use information be according to the first resource use information of past first time period and What the userbase predictive information predicted obtained, it can more accurate reaction network resource current conditions of demand and user The variation in scale future, so that base station planning information can fully consider the demand in each region in territorial scope, so that The result of planning can accurately match the demand in each region and the integrated demand of territorial scope.
Fig. 5 is the structural schematic diagram of the information processing unit of base station planning in another embodiment of the present invention.
Referring to FIG. 5, the information processing unit 400 of base station planning, including:
First acquisition module 401, for obtain in preset territorial scope the first resource use information in each region and Userbase predictive information;For characterizing, network provides the first resource use information in the region in first time period in the past The use total amount and/or usage amount in source change with time;The userbase predictive information is for characterizing the second time in the future The user in the region and/or the quantity of population change with time in section.
Secondary resource use information determining module 403, for according to the first resource use information in the region and user Scale forecast information determines that the Secondary resource use information in the region, the Secondary resource use information are described for characterizing The use total amount and/or usage amount of Internet resources change with time in the region in second time period.
Base station planning module 404 determines institute for the Secondary resource use information according to each region in the territorial scope The base station planning information of territorial scope is stated, the base station planning information is for characterizing base station to be planned in the territorial scope Distribution situation and base station to be planned configuration information.
Optionally, the device further includes:
Second acquisition module 402, for obtaining the existing base station information in the territorial scope, the existing base station information Match confidence for characterize in the first time period distribution situation and existing base station that have base station in the territorial scope Breath.
The base station planning module 404, specifically for according to the Secondary resource use information for stating each region in territorial scope With the existing base station information, the base station planning information is determined.
Optionally, the configuration information of the existing base station is for characterizing at least one of:The construction type of existing base station, Have the usage type of base station, have the scale type of base station and the Internet resources fan-out capability information of existing base station.
Optionally, the configuration information of the base station to be planned is for characterizing at least one of:Base station to be planned Build type, the usage type of base station to be planned, the scale type of base station to be planned and the network of base station to be planned Resource fan-out capability information.
Optionally, the construction type of the base station includes flooring station, newly-built computer room, leasehold improvement computer room;The base station Usage type includes shared, newly-built shared, newly-built exclusively enjoys that reuse;The scale type of the base station includes macro base station and small base station.
Optionally, first acquisition module 401, is specifically used for:
Terminal interaction information all in the territorial scope is obtained, the terminal interaction information is that user is taken using network Information caused by the behavior of business.
It determines corresponding between the region belonging to the spot of the behavior and terminal interaction information caused by the behavior.
Terminal interaction information corresponding to each region calculates the first resource use information in the region.
Optionally, the terminal interaction information is for characterizing at least one of:The spot of the behavior, the behavior Time of origin, the type of network service used in the behavior, Internet resources used in the behavior size, and Consumption charge caused by the behavior.
Optionally, first acquisition module, is specifically used for:
According to active user's size values in the region, the corresponding userbase influent factor in the region, it is directed to institute The evaluation parameter of userbase influent factor and preset or housebroken first prediction model are stated, prediction obtains the area The userbase predictive information in domain;Active user's size values are used to characterize user and/or the population in presently described region Quantity;The userbase influent factor is the default element for influencing the zone user scale variation;The evaluation parameter It is to evaluate the current development situation of the userbase influent factor and/or the parameter preset of future developing trend.
Optionally, the userbase influent factor includes at least one of:Commercial circle quantity that the region is included, The race condition of operator, the area in the size of population or ratio, the region are resided in the type of the commercial circle, the region The residential block quantity in domain, the type of the residential block.
The information processing unit of base station planning provided in this embodiment, by obtaining each region in preset territorial scope First resource use information and userbase predictive information, first resource use information and userbase according to the region Predictive information determines the Secondary resource use information in the region, and the second money according to each region in the territorial scope Source use information determines the base station planning information of the territorial scope so that the planning of base station can be with second money in each region Source use information is foundation, due to Secondary resource use information be according to the first resource use information of past first time period and What the userbase predictive information predicted obtained, it can more accurate reaction network resource current conditions of demand and user The variation in scale future, so that base station planning information can fully consider the demand in each region in territorial scope, so that The result of planning can accurately match the demand in each region and the integrated demand of territorial scope.
Fig. 6 is the structural schematic diagram of an electronic equipment of the invention.
Referring to FIG. 6, the present embodiment additionally provides a kind of electronic equipment 50 includes:Processor 51 and memory 52;Its In:
Memory 52, for storing computer program, which can also be flash (flash memory).
Processor 51, for executing executing instruction for memory storage, to realize each step in the above method.Specifically It may refer to the associated description in previous methods embodiment.
Optionally, memory 52 can also be integrated with processor 51 either independent.
When device except the memory 52 is independently of processor 51, the electronic equipment 50 can also include:
Bus 53, for connecting the memory 52 and processor 51.
The present embodiment also provides a kind of readable storage medium storing program for executing, is stored with computer program in readable storage medium storing program for executing, works as electronics When at least one processor of equipment executes the computer program, electronics executes the side that above-mentioned various embodiments provide Method.
The present embodiment also provides a kind of program product, which includes computer program, computer program storage In readable storage medium storing program for executing.At least one processor of electronic equipment can read the computer program from readable storage medium storing program for executing, At least one processor executes the computer program and electronic equipment is made to implement the method that above-mentioned various embodiments provide.
One of ordinary skill in the art will appreciate that:Realize that all or part of step of above-mentioned each method embodiment can lead to The relevant hardware of program instruction is crossed to complete.Program above-mentioned can be stored in a computer read/write memory medium.The journey When being executed, execution includes the steps that above-mentioned each method embodiment to sequence;And storage medium above-mentioned includes:ROM, RAM, magnetic disc or The various media that can store program code such as person's CD.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, it will be understood by those of ordinary skill in the art that:Its according to So can with technical scheme described in the above embodiments is modified, either to which part or all technical features into Row equivalent replacement;And these modifications or replacements, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of information processing method of base station planning, which is characterized in that including:
Obtain the first resource use information and userbase predictive information in each region in preset territorial scope;Described first Resource using information be used to characterize the use total amount and/or usage amount of Internet resources in the region in first time period with The variation of time;The userbase predictive information is used to characterize the user and/or people in the region in second time period in future The quantity of mouth changes with time;
According to the first resource use information in the region and userbase predictive information, determine that the Secondary resource in the region makes With information, the use that the Secondary resource use information is used to characterize Internet resources in the region in the second time period is total Amount and/or usage amount change with time;
According to the Secondary resource use information in each region in the territorial scope, the base station planning letter of the territorial scope is determined Breath, the base station planning information are used to characterize distribution situation of the base station to be planned in the territorial scope and to be planned Base station configuration information.
2. according to the method described in claim 1, it is characterized in that, second money according to each region in the territorial scope Source use information before the base station planning information for determining the territorial scope, further includes:
The existing base station information in the territorial scope is obtained, the existing base station information is for characterizing in the first time period Have the distribution situation of base station and the configuration information of existing base station in the territorial scope;
The Secondary resource use information according to each region in the territorial scope determines the base station planning of the territorial scope Information, including:
According to the Secondary resource use information and the existing base station information for stating each region in territorial scope, the base station rule are determined Draw information.
3. according to the method described in claim 2, it is characterized in that, the configuration information of the existing base station for characterize with down toward It is one of few:
The construction type for having base station, has the scale type of base station and the net of existing base station at the usage type for having base station Network resource fan-out capability information.
4. according to the method described in claim 1, it is characterized in that, the configuration information of the base station to be planned for characterize with It is at least one lower:
The construction type of base station to be planned, the usage type of base station to be planned, the scale type of base station to be planned, and The Internet resources fan-out capability information of base station to be planned.
5. method according to claim 3 or 4, which is characterized in that the construction type of the base station includes flooring station, creates Computer room, leasehold improvement computer room;The usage type of the base station includes shared, newly-built shared, newly-built exclusively enjoys that reuse;The base station Scale type includes macro base station and small base station.
6. method according to any one of claims 1 to 4, which is characterized in that each region in the acquisition territorial scope First resource use information, including:
Terminal interaction information all in the territorial scope is obtained, the terminal interaction information is that user uses network service Information caused by behavior;
It determines corresponding between the region belonging to the spot of the behavior and terminal interaction information caused by the behavior;
Terminal interaction information corresponding to each region calculates the first resource use information in the region.
7. according to the method described in claim 6, it is characterized in that, the terminal interaction information for characterize it is following at least it One:
The spot of the behavior, the time of origin of the behavior, the type of network service used in the behavior, the row For consumption charge caused by the size of used Internet resources and the behavior.
8. a kind of information processing unit of base station planning, which is characterized in that including:
First acquisition module, first resource use information and userbase for obtaining each region in preset territorial scope Predictive information;The first resource use information is used to characterize the use of Internet resources in the region in first time period in the past Total amount and/or usage amount change with time;The userbase predictive information is described in second time period in future for characterizing The user in region and/or the quantity of population change with time;
Secondary resource use information determining module, for being predicted with userbase according to the first resource use information in the region Information determines the Secondary resource use information in the region, and the Secondary resource use information is for characterizing second time The use total amount and/or usage amount of Internet resources change with time in the region in section;
Base station planning module determines the region for the Secondary resource use information according to each region in the territorial scope The base station planning information of range, the base station planning information is for characterizing the distribution of base station to be planned in the territorial scope Situation.
9. device according to claim 8, which is characterized in that further include:
Second acquisition module, the existing base station information for obtaining the territorial scope, the existing base station information is for characterizing Have the distribution situation of base station and the configuration information of existing base station in the first time period in the territorial scope;
The base station planning module, specifically for according to state the Secondary resource use information in each region in territorial scope with it is described There is base station information, determines the base station planning information.
10. device according to claim 8 or claim 9, which is characterized in that first acquisition module is specifically used for:
Terminal interaction information all in the territorial scope is obtained, the terminal interaction information is that user uses network service Information caused by behavior;
It determines corresponding between the region belonging to the spot of the behavior and terminal interaction information caused by the behavior;
Terminal interaction information corresponding to each region calculates the first resource use information in the region.
CN201810455833.5A 2018-05-14 2018-05-14 Information processing method and device for base station planning Active CN108322915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810455833.5A CN108322915B (en) 2018-05-14 2018-05-14 Information processing method and device for base station planning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810455833.5A CN108322915B (en) 2018-05-14 2018-05-14 Information processing method and device for base station planning

Publications (2)

Publication Number Publication Date
CN108322915A true CN108322915A (en) 2018-07-24
CN108322915B CN108322915B (en) 2022-01-25

Family

ID=62895717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810455833.5A Active CN108322915B (en) 2018-05-14 2018-05-14 Information processing method and device for base station planning

Country Status (1)

Country Link
CN (1) CN108322915B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110163249A (en) * 2019-04-09 2019-08-23 中国科学院计算技术研究所 Base station classifying identification method and system based on customer parameter feature
WO2021260410A1 (en) * 2020-06-22 2021-12-30 Telefonaktiebolaget Lm Ericsson (Publ) Radio design using machine learning
CN113938893A (en) * 2020-06-29 2022-01-14 ***通信集团广西有限公司 Network planning assisting method and device and electronic equipment
CN114390582A (en) * 2020-10-21 2022-04-22 ***通信集团设计院有限公司 Base station site prediction method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102325329A (en) * 2011-09-20 2012-01-18 中兴通讯股份有限公司 Cellular wireless communication network partition capacity expansion method and apparatus thereof
US20150036663A1 (en) * 2013-07-31 2015-02-05 Qualcomm Incorporated Handover and reselection searching using predictive mobility
CN105898762A (en) * 2015-01-26 2016-08-24 华为技术有限公司 Base station optimization and deployment method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102325329A (en) * 2011-09-20 2012-01-18 中兴通讯股份有限公司 Cellular wireless communication network partition capacity expansion method and apparatus thereof
US20150036663A1 (en) * 2013-07-31 2015-02-05 Qualcomm Incorporated Handover and reselection searching using predictive mobility
CN105898762A (en) * 2015-01-26 2016-08-24 华为技术有限公司 Base station optimization and deployment method and device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110163249A (en) * 2019-04-09 2019-08-23 中国科学院计算技术研究所 Base station classifying identification method and system based on customer parameter feature
WO2021260410A1 (en) * 2020-06-22 2021-12-30 Telefonaktiebolaget Lm Ericsson (Publ) Radio design using machine learning
CN113938893A (en) * 2020-06-29 2022-01-14 ***通信集团广西有限公司 Network planning assisting method and device and electronic equipment
CN114390582A (en) * 2020-10-21 2022-04-22 ***通信集团设计院有限公司 Base station site prediction method and device
CN114390582B (en) * 2020-10-21 2023-07-25 ***通信集团设计院有限公司 Base station site prediction method and device

Also Published As

Publication number Publication date
CN108322915B (en) 2022-01-25

Similar Documents

Publication Publication Date Title
CN108322915A (en) The information processing method and device of base station planning
Del Vecchio et al. A system dynamic approach for the smart mobility of people: Implications in the age of big data
Mo et al. Competition between shared autonomous vehicles and public transit: A case study in Singapore
CN109756911A (en) Network quality prediction technique, business reorganization method, relevant device and storage medium
Xiong et al. An integrated and personalized traveler information and incentive scheme for energy efficient mobility systems
Tang et al. Scheduling local and express trains in suburban rail transit lines: Mixed–integer nonlinear programming and adaptive genetic algorithm
US20210174270A1 (en) Rideshare vehicle demand forecasting device, method for forecasting rideshare vehicle demand, and storage medium
Šetinc et al. Optimization of a highway project planning using a modified genetic algorithm
CN109816520A (en) Professional attribute forecast method, apparatus, equipment and storage medium
Xiong et al. An integrated and personalized traveler information and incentive scheme for energy efficient mobility systems
Noursalehi et al. Predictive decision support platform and its application in crowding prediction and passenger information generation
Huang et al. A GIS-based framework for bus network optimization using genetic algorithm
Li et al. On the allocation of new lines in a competitive transit network with uncertain demand and scale economies
Tavassoli et al. Calibrating a transit assignment model using smart card data in a large-scale multi-modal transit network
Li et al. Quantifying benefits of traffic information provision under stochastic demand and capacity conditions: a multi-day traffic equilibrium approach
Frank et al. Principles for simulations in revenue management
Boyles Equity and network-level maintenance scheduling
Bernardino et al. Parking policy and urban mobility level of service–system dynamics as a modelling tool for decision making
Júnior et al. Modelling for performance measurement of bus rapid transit systems in Brazil
Otto et al. Zone‐based tariff design in public transportation networks
Huang et al. An optimal transit fare and frequency design model with equity impact constraints
US20230186223A1 (en) Method for determining spatial service performance of urban public welfare service facilities
CN106447517A (en) Angiography device of building enterprise carbon emission management system
Levinson An evolutionary transportation planning model: Structure and application
Yu et al. Multiclass, multicriteria dynamic traffic assignment with path-dependent link cost and entropy-based risk preference

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant