CN108286770A - A kind of workshop winter heating system - Google Patents

A kind of workshop winter heating system Download PDF

Info

Publication number
CN108286770A
CN108286770A CN201710485988.9A CN201710485988A CN108286770A CN 108286770 A CN108286770 A CN 108286770A CN 201710485988 A CN201710485988 A CN 201710485988A CN 108286770 A CN108286770 A CN 108286770A
Authority
CN
China
Prior art keywords
workshop
pipeline
baffle
dust
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710485988.9A
Other languages
Chinese (zh)
Inventor
孙兵
朱淑萍
贺军
赵建业
王燕琴
王桐
苏保全
叶朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA JINSHUANGHE GRAIN OIL Co Ltd
Original Assignee
NINGXIA JINSHUANGHE GRAIN OIL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA JINSHUANGHE GRAIN OIL Co Ltd filed Critical NINGXIA JINSHUANGHE GRAIN OIL Co Ltd
Priority to CN201710485988.9A priority Critical patent/CN108286770A/en
Publication of CN108286770A publication Critical patent/CN108286770A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/04Ventilation with ducting systems, e.g. by double walls; with natural circulation
    • F24F7/06Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F2007/005Cyclic ventilation, e.g. alternating air supply volume or reversing flow direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

The present invention provides a kind of workshop winter heating system.The air of equipment inside workshop in normal operation inside generated heat and workshop is drawn by wind turbine.Wind turbine is by the air transfer of absorption to dust-extraction unit.Dust-extraction unit is dusted processing to impurity such as the dust that contains in air.The air handled through dust-extraction unit is sent from dust-extraction unit by pipeline, and is drained into outside workshop via louver.Louver can adjust the air force that air flows through louver, and then adjust the air quantity for being back to dust-extraction unit and drain into the air quantity outside workshop.The air for being back to dust-extraction unit is discharged by wind turbine, and then realizes the air circulation inside workshop, realizes temperature build.Present invention offer workshop winter heating system is simple in structure, automation control, can realize the internal insulation of workshop, and keep the temperature at low cost.

Description

A kind of workshop winter heating system
Technical field
The present invention relates to workshop heating technical field more particularly to a kind of workshop winter heating systems.
Background technology
In the industrial production of manufacture type, workshop is essential production configuration.In rice production, chemical fertilizer production And in the industrial circles such as rubber production, workshop is usually the workshop of open type, to ensure workshop inner air flow. To reinforce workshop inner air flow, wind net is usually mounted with inside workshop.Wind net can be constantly from workshop A large amount of wind are extracted in inside, to indoor formation negative pressure.Due to forming negative pressure inside workshop, outdoor air accelerates into life Either inside is produced, to form forced-air circulation.
In general, to be formed by the heat that forced-air circulation can be taken away in spring, summer, autumn in workshop gentle for wind net Taste.But in winter, wind net is formed by air forced circulation and to be chronically at low-temperature condition inside workshop.Although raw Production either inside is equipped with heating, but since the space of workshop is big, heating area is small, heating temperature is sufficient to compensate for wind net The heat taken away, thus the production equipment inside workshop is chronically at low-temperature condition.To make each production equipment reach raw Necessary requirement is produced, production equipment needs the preheating that is switched in advance, this will consume a large amount of energy.In addition, being processed in such as rice production Workshop in, husk rice, the profit process such as rough, color sorting and polishing need certain processing temperature, and wind net is formed Air forced circulation caused by workshop inner cryogenic production equipment can not operate normally.
To solve the above problems, improving heating temperature usually inside workshop or increasing heating area, to improve life Produce the temperature of either inside.But a large amount of energy can be consumed by improving heating temperature or increasing heating area, improve production cost, this It is unfavorable for the benign development of processing enterprise.
Invention content
The present invention provides a kind of workshop winter heating system, to solve existing workshop heat supply in winter energy consumption Big problem.
The present invention provides a kind of workshop winter heating system, and the system comprises the wind being set to inside workshop Machine, dust-extraction unit and louver, the import of the dust-extraction unit are connected with the wind turbine, and the outlet of the dust-extraction unit is logical It is connected outside piping and workshop;The louver is arranged inside the pipeline, and the louver is vertical In the length extending direction of the pipeline.
Preferably, the louver is baffle, and the baffle is movably arranged on inside the pipeline, outside the baffle Shape matches with the pipeline interior cross-sectional shape.
Preferably, the baffle is arranged by rotary shaft inside the pipeline, and the baffle is rotated along the rotary shaft.
Preferably, the rectangle bearing of inner hollow is provided on the pipeline, a short end of the rectangle bearing is opened Mouthful;The open side edges of the rectangle bearing and the center line of the pipeline longitudinal cross-section are in the same plane, and the rectangle The bond length of bearing is identical as the diameter of the pipeline;The long side length of the rectangle bearing is at least the 1.5 of bond length Times;The rectangle bearing inner wall is provided with sliding slot, and the baffle is slided along the sliding slot.
Preferably, the fixed seat of inner hollow is provided on the pipeline, the pipeline runs through the fixed seat, and described Pipeline is arranged concentrically with the fixed seat;It is connected with the hollow fixed seat inside the pipeline;Positioned at the fixed seat The baffle is set on the internal pipeline, and the edge of the baffle is between the pipeline and the fixed seat;Institute It is spliced baffle to state baffle, and the baffle is along the pipe slides.
Preferably, the system also includes the temperature sensor being set to inside the workshop and it is set to described remove The controller of dirt device lateral wall, the controller are electrically connected with the temperature sensor, the baffle respectively.
Preferably, setting imaging sensor and laser emitter inside the pipeline, described image sensor and described swash Optical transmitting set is located at the both sides of the baffle;Described image sensor and the laser emitter respectively with the controller Electrical connection.
Preferably, the louver is volume damper, and the volume damper is fixed inside the pipeline, The shape of the volume damper matches with the pipeline interior cross-sectional shape.
Preferably, the system also includes the temperature sensor being set to inside the workshop and it is set to described remove The controller of dirt device lateral wall, the controller are electrically connected with the temperature sensor, the volume damper respectively.
The technical solution that the embodiment of the present invention provides can include the following benefits:
The present invention provides a kind of workshop winter heating system, which includes being set to life Produce wind turbine, dust-extraction unit and the louver of either inside.The import of dust-extraction unit is connected with wind turbine, outlet by pipeline with It is connected outside workshop.Louver is arranged inside pipeline, and louver is directly in the length extending direction of pipeline.It is raw The production equipment of production either inside will produce heat, the air inside generated heat and workshop in normal operation It is drawn by wind turbine.Wind turbine is by the air transfer with certain temperature of absorption to dust-extraction unit.It may will produce in production process The impurity such as dust, therefore the air with certain temperature may contain the impurity such as dust.Dust-extraction unit is to the powder that contains in air The impurity such as dirt are dusted processing.The air handled through dust-extraction unit is sent from dust-extraction unit by pipeline, and is arranged via louver To workshop.Louver can adjust the air force that air flows through louver, and then adjust and be back to dedusting The air quantity of device and drain into air quantity outside workshop.The air for being back to dust-extraction unit is discharged by wind turbine, and then is realized Air circulation inside workshop.When workshop internal temperature is relatively low, louver completely closes, then passes through dedusting and fill The hot wind for setting processing completely returns to, and realizes the accumulation of workshop internal temperature.When workshop internal temperature reaches production requirement When, to drain into the heat outside workshop by adjusting louver and is consistent with the heat that wind turbine is drawn.So that raw The temperature of production either inside is in more constant state.Present invention offer workshop winter heating system is simple in structure, easily In control, the internal insulation of workshop can be realized, and keep the temperature at low cost.
It should be understood that above general description and following detailed description is only exemplary and explanatory, not It can the limitation present invention.
Description of the drawings
The drawings herein are incorporated into the specification and forms part of this specification, and shows the implementation for meeting the present invention Example, and be used to explain the principle of the present invention together with specification.
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, for those of ordinary skill in the art Speech, without having to pay creative labor, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of workshop winter heating system provided in an embodiment of the present invention;
Fig. 2 is the mounting structure schematic diagram of the first baffle provided in an embodiment of the present invention;
Fig. 3 is the mounting structure schematic diagram of second of baffle provided in an embodiment of the present invention;
Fig. 4 is the mounting structure schematic diagram of the third baffle provided in an embodiment of the present invention;
Fig. 5 is structural schematic diagram when baffle provided in an embodiment of the present invention is spread;
Fig. 6 is the mounting structure schematic diagram of volume damper provided in an embodiment of the present invention;
Symbolic indication:
1- wind turbines, 2- dust-extraction units, 3- louvers, 4- pipelines, 5- baffles, 6- rotary shafts, 7- rectangle bearings, 8- are slided Slot, 9- fixed seats, 10- temperature sensors, 11- controllers, 12- imaging sensors, 13- laser emitters, 14- air quantity are adjusted Valve, 15- workshops, 16- fan blades.
Specific implementation mode
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent and the consistent all embodiments of the present invention.On the contrary, they be only with it is such as appended The example of the consistent device and method of some aspects being described in detail in claims, of the invention.
Attached drawing 1 is please referred to, attached drawing 1 shows that the structure of workshop winter heating system provided in an embodiment of the present invention is shown It is intended to.
Workshop winter heating system provided in an embodiment of the present invention includes the wind turbine being set to inside workshop 15 1, dust-extraction unit 2 and louver 3.The import of dust-extraction unit 2 is connected with wind turbine 1, and the outlet of dust-extraction unit 2 passes through pipeline 4 Be connected outside workshop 15.Louver 3 is arranged in the inside of pipeline 4, and louver 3 is perpendicular to pipeline 4 Length extending direction.
Specifically, wind turbine 1 is the component for extracting 15 inner air of workshop.In general, wind turbine 1 is installed on workshop 15 Internal top.Certainly, wind turbine 1 can also be mounted in the side walls inside workshop 15.The quantity of wind turbine 1 and installation position It sets and is determined with specific reference to the size of workshop 15, the heat production of workshop appliance and the distribution of workshop appliance.Production equipment is being transported It will produce heat in row, therefore, the air that wind turbine 1 is extracted has certain temperature.During processing, workshop The impurity such as dust may be will produce inside 15, thus contain the impurity such as dust in the air of the extraction of wind turbine 1.Dust-extraction unit 2 can Processing is dusted to impurity such as the dust that contains in air.Air after dust removal process is expelled to production via louver 3 Outside workshop 15.In embodiments of the present invention, since the air quantity of the extraction of wind turbine 1 is larger, and the medium of dedusting is air, therefore, Dust-extraction unit 2 is preferably using the pulse dust collector by blowing pressurized air filtering dust.Louver 3 is regulating air volume Device.Louver 3 is set to the inside of pipeline 4, and louver 3 is perpendicular to the length extending direction of pipeline 4.Therefore, When louver 3 is closed, the air that dust-extraction unit 2 is discharged is back to production vehicle via dust-extraction unit 2, wind turbine 1 again completely Between inside 15.When louver 3 is half-open, the air portion lease making that dust-extraction unit 2 is discharged is back to life by dust-extraction unit 2, wind turbine 1 It produces inside workshop 15, another part is expelled to outside workshop 15.When louver 3 is opened completely, dust-extraction unit 2 is discharged Air be completely exhausted out to workshop 15.
The course of work of workshop winter heating system provided in an embodiment of the present invention is:Wind turbine 1 extracts workshop Air inside 15, and the air extracted is transmitted to dust-extraction unit 2.Dust-extraction unit 2 removes the dust etc. contained in air After impurity, air is drained into louver 3 via pipeline 4.Louver 3 adjusts discharge according to the temperature inside workshop 15 The flow of air outside to workshop 15, rest part air are back to workshop 15 via dust-extraction unit 2, wind turbine 1 It is internal.At this point, 15 inside of workshop forms air circulation.When production equipment inside workshop 15 just starts, vehicle is produced Between temperature inside 15 it is relatively low, the requirement of heat preservation is not achieved.At this point, louver 3 is in the completely closed state, the sky after dedusting Gas completely returns to inside workshop 15.Since heat caused by production equipment only recycles inside workshop 15, because This, with the extension of production equipment run time, the accumulation of 15 internal temperature of workshop is finally reached the temperature of heat preservation.Generally , 15 internal temperature of workshop is 20 DEG C or so.When 15 internal temperature of workshop is more than required temperature, opens and adjust wind dress 3 are set, and controls the opening degree of louver 3, is i.e. control is expelled to the flow of the air outside workshop 15, to realize 15 inside of workshop and external temperature exchange, and then control the internal temperature of workshop 15.
In workshop winter heating system provided in an embodiment of the present invention, louver 3 is baffle 5.Due to adjusting wind Device 3 is arranged in the inside of pipeline 4, and louver 3, perpendicular to the length extending direction of pipeline 4, therefore, baffle 5 is also provided with In the inside of pipeline 4, and baffle 5 is perpendicular to the length extending direction of pipeline 4.That is the axis of the longitudinal center line of baffle 5 and pipeline 4 It is same straight line to center line.For ease of adjusting the air mass flow for flowing through baffle 5, baffle 5 is movably arranged on the inside of pipeline 4. When production equipment inside workshop 15 just starts, the temperature inside workshop 15 is relatively low.To realize production equipment institute The heat of generation is entirely located in inside workshop 15, and the shape and the interior cross-sectional shape of pipeline 4 of baffle 5 match.When When the cross section of pipeline 4 is rectangular or rectangle, baffle 5 is also rectangular or rectangle.Meanwhile the size of baffle 5 and 4 cross section of pipeline Size it is consistent.When the cross section of pipeline 4 is round, baffle 5 is also circle.Meanwhile the diameter of baffle 5 and pipeline 4 are horizontal The diameter in section is consistent.
Attached drawing 2 is please referred to, attached drawing 2 shows the structural schematic diagram of the first baffle 5 provided in an embodiment of the present invention, and attached Fig. 2 is sectional view of the attached drawing 1 along the directions A-A.
It is movably set with rotary shaft 6 in pipeline 4 provided in an embodiment of the present invention.The both ends of rotary shaft 6 are arranged in pipeline 4 On wall.Certainly, rotary shaft 6 may also pass through pipeline 4 so that the both ends of rotary shaft 6 are located at the outside of pipeline 4.Rotary shaft 6 Center or the center of circle across 4 cross section of pipeline.Rotary shaft 6 can rotate in situ.Baffle 5, i.e. rotary shaft are set in rotary shaft 6 6 run through the center of baffle 5.When rotary shaft 6 rotates in place, baffle 5 can be rotated in pipeline 4 or baffle 5 with pipe Road generates angle between 4 cross section.When baffle 5 does not rotate, baffle 5 blocks the air after dedusting and flow to production vehicle completely Between access outside 15, realize the isolation in 15 inside and outside portion of workshop.When baffle 5 rotates, due to baffle 5 and pipeline 4 Angle is generated between cross section, thus the air after dedusting can be flow to outside workshop 15 by angle.It is kept off by adjusting The size of angle, can adjust the flow that the air after dedusting is flow to outside workshop 15 between 4 cross section of plate 5 and pipeline, And then adjust the temperature inside workshop 15.
Attached drawing 3 is please referred to, attached drawing 3 shows the structural schematic diagram of second of baffle 5 provided in an embodiment of the present invention.
The rectangle bearing 7 of inner hollow is provided on pipeline 4 provided in an embodiment of the present invention.One of rectangle bearing 7 is short Avris is open, and therefore, the inside of rectangle bearing 7 is communicated with the outside by the opening of short side.At this point, rectangle bearing 7 is in class U Type.The open side edges of rectangle bearing 7 and the center line of 4 longitudinal cross-section of pipeline are in the same plane.To realize rectangle bearing 7 Open side edges and the center line of 4 longitudinal cross-section of pipeline are in the same plane, and rectangle bearing 7 is connected on pipeline 4 or pipeline 4 Through rectangle bearing 7.Attached drawing 3 show the set-up mode that rectangle bearing 7 is connected on pipeline 4.
Further, when rectangle bearing 7 is connected on pipeline 4, since the opening of 7 short side of rectangle bearing is arranged, rectangle The inside of bearing 7 is connected with the inside of pipeline 4.In the vertical direction, 5 activity of baffle be connected to rectangle bearing 7 and pipeline 4 it Between, and baffle 5 can move between rectangle bearing 7 and pipeline 4.To realize that baffle 5 is fallen within completely in rectangle bearing 7, The bond length of rectangle bearing 7 is identical as the diameter of pipeline 4, and the long side length of rectangle bearing 7 is at least the 1.5 of bond length Times.To realize movement of the baffle 5 between rectangle bearing 7 and pipeline 4, sliding slot 8 is provided on the inner wall of rectangle bearing 7, and sliding Slot 8 is arranged on the long side side wall of rectangle bearing 7.The top of baffle 5 is set as a side far from rectangle bearing 7.Baffle 5 It being capable of the sliding in sliding slot 8.When workshop winter heating system provided in an embodiment of the present invention does not work, 5 complete position of baffle In in pipeline 4, and the top of baffle 5 and 4 close contact of pipeline.At this point, dust-extraction unit 2 is not connected with 15 outside of workshop It is logical.When workshop winter heating system works, the sliding in sliding slot 8 of controllable register 5, and then make top and the pipe of baffle 5 Distance is generated between road 4.Air part by 2 dedusting of dust-extraction unit drains into production vehicle by the gap between baffle 5 and pipeline 4 Between outside 15.Distance is generated between the top and pipeline 4 of baffle 5 to be adjusted, and then is realized to 15 internal temperature of workshop Adjusting, realize 15 internal insulation of workshop.
Attached drawing 4 is please referred to, attached drawing 4 shows the structural schematic diagram of the third baffle 5 provided in an embodiment of the present invention.
The fixed seat 9 of inner hollow is provided on pipeline 4 provided in an embodiment of the present invention.Fixed seat 9 is cylindrical or vertical It is rectangular.In setting, pipeline 4 runs through fixed seat 9, and the middle vacancy phase of the inside of pipeline 4 and fixed seat 9 for pipeline 4 and fixed seat 9 Connection.Further, pipeline 4 is arranged concentrically with fixed seat 9, i.e., the longitudinal center line of pipeline 4 passes through the center of fixed seat 9.Baffle 5 It is set to the inside of pipeline 4, and positioned at the connectivity part of pipeline 4 and fixed seat 9.Baffle 5 can exist along the longitudinal section direction of pipeline 4 It is slided between pipeline 4 and fixed seat 9.
In embodiments of the present invention, baffle 5 is set as sliceable structure, is such as uniformly set as 4 blocks of plates, 6 blocks of plates or 8 pieces Plate.In general, baffle 5 is uniformly cut into the structure of Spliced type centered on center.When baffle 5 is spliced baffle, Baffle 5, which can be spread centered on the longitudinal center line of pipeline 4 to 9 direction of fixed seat, to be moved.At this point, at the center of former baffle 5 Occur can by air by through-hole.When air after baffle 5 stops dedusting drains into 15 outside of workshop, spliced gear Plate 5 is an entirety, as shown in Fig. 4.When air after dedusting drains into 15 outside of workshop by dust-extraction unit 2, splicing The baffle 5 of formula, which is spread centered on the longitudinal center line of pipeline 4 to 9 direction of fixed seat, to be moved, until baffle 5 reaches required through-hole Size, as shown in Fig. 5, wherein attached drawing 5 be attached drawing 4 the directions B-B sectional view.
Further, the diffusion for ease of control baffle 5 between pipeline 4 and fixed seat 9 or contraction type sliding, baffle 5 Edge is located between the outside and the inside of fixed seat 9 of pipeline 4.
The regulative mode of the baffle 5 of three kinds of structures based on the embodiment of the present invention, baffle 5 is manual adjustment, production Temperature inside workshop 15 is by human perception or thermometer measure.But the acquisition of temperature is susceptible to deviation, and manual adjustment side It is accurate that formula is not easy to adjust, and then causes the heat being trapped in inside workshop 15 excessive or very few, cannot play Winter protection Effect.
To solve the above problems, workshop winter heating system provided in an embodiment of the present invention further includes being set to production Temperature sensor 10 inside workshop 15 and the controller 11 for being set to 2 lateral wall of dust-extraction unit, please refer to attached drawing 1.Temperature passes Sensor 10 can incude the temperature inside workshop 15, form temperature data.Controller 11 is capable of the switch of control baffle 5, Realize that the automation of baffle 5 is adjusted.When specific setting, controller 11 is electrically connected temperature sensor 10 and baffle 5, to receive The temperature data and control baffle 5 that temperature sensor 10 is sent.Specifically, temperature sensor 10 detects in workshop 15 After the temperature in portion, temperature data is independently uploaded to controller 11.Controller 11 by the temperature data received with preset Temperature compared.When temperature data is less than predetermined temperature, 11 control baffle 5 of controller turns down or closes, into And largely or entirely returned inside workshop 15 via the air of 2 dedusting of dust-extraction unit, realize that 15 inside of workshop is protected Temperature.When temperature data is higher than predetermined temperature, 11 control baffle 5 of controller opens big or standard-sized sheet, and then is filled via dedusting The air for setting 2 dedustings largely or entirely drains into outside workshop 15, realizes the internal heat dissipating of workshop 15.
Further, to accurately control the opening-closing size of baffle 5 by controller 11, pipeline 4 is internally provided with image sensing Device 12 and laser emitter 13, specifically please refer to attached drawing 2.Imaging sensor 12 and laser emitter 13 are located at baffle 5 Both sides, and imaging sensor 12 and laser emitter 13 are respectively electrically connected to controller 11.Laser emitter 13 can send out light Beam.Light beam is radiated on baffle 5, and can form image in 12 direction of imaging sensor.Imaging sensor 12 can receive the shadow Picture, and convert image to electronic signal.Area by calculating image just can detect learn baffle 5 be turned on and off journey Degree.
Specifically, the temperature data and predetermined temperature that reduced temperature sensor 10 is sent by analysis, determine When needing controllable register 5, controller 11 sends out detection signal to imaging sensor 12 and laser emitter 13.Laser emitter 13 Light beam is sent out, light beam is radiated on baffle 5 and can form image in 12 direction of imaging sensor.Imaging sensor 12 receives institute's shape At image, and the image data is uploaded to controller 11.Controller 11 carries out imagery coverage according to the image data of reception It calculates, to learn the state before the adjustment of baffle 5.Controller 11 is according to temperature comparisons' result and the imagery coverage being calculated Control baffle 5 is adjusted.Baffle 5 adjust during, controller 11 in real time monitoring baffle 5 be formed by imagery coverage and Temperature comparisons are as a result, until baffle 5 is adjusted to required temperature, the automation control of realization baffle 5.
In workshop winter heating system provided in an embodiment of the present invention, louver 3 is volume damper 14, is asked Refer to the attached drawing 6.Since louver 3 is arranged in the inside of pipeline 4, and louver 3 is perpendicular to the length extension side of pipeline 4 To therefore, volume damper 14 is also disposed on the inside of pipeline 4, and volume damper 14 is perpendicular to the length extension side of pipeline 4 To.That is the longitudinal center line of the center line of volume damper 14 and pipeline 4 is same straight line.Volume damper 14 is fixed at The inside of pipeline 4, and the shape of volume damper 14 and the interior cross-sectional shape of pipeline 4 match.When the cross section of pipeline 4 For rectangular or rectangle when, the cross section of volume damper 14 is rectangular or rectangle.When the cross section of pipeline 4 is round, air quantity The cross section of regulating valve 14 is also circle.
When production equipment inside workshop 15 just starts, the temperature inside workshop 15 is relatively low, and guarantor is not achieved The requirement of temperature.At this point, 16 Close All of fan blade of volume damper 14.Air after dedusting completely returns in workshop 15 Portion.When production equipment is run to 15 internal temperature of workshop more than required temperature, need to adjust volume damper 14.Specifically Ground adjusts fan blade 16 and opens, and controls the opening degree of fan blade 16, i.e. control is expelled to the stream of the air outside workshop 15 Amount to realize 15 inside of workshop and external temperature exchange, and then controls the internal temperature of workshop 15.
Further, it is the automation control of realization volume damper 14, workshop winter provided in an embodiment of the present invention Heating system also includes the temperature sensor 10 being set to inside workshop 15 and the control for being set to 2 lateral wall of dust-extraction unit Device 11.When specific setting, controller 11 is electrically connected temperature sensor 10 and volume damper 14, to receive temperature sensor 10 temperature datas sent and control volume damper 14.Specifically, temperature sensor 10 detects inside workshop 15 Temperature after, temperature data is independently uploaded to controller 11.Controller 11 by the temperature data received with it is preset Temperature is compared.When temperature data is less than predetermined temperature, controller 11 controls the fan blade 16 of volume damper 14 It turns down or closes, and then is largely or entirely returned inside workshop 15 via the air of 2 dedusting of dust-extraction unit, realize production 15 internal insulation of workshop.When temperature data is higher than predetermined temperature, controller 11 controls fan blade 16 and opens big or standard-sized sheet, into And largely or entirely drained into outside workshop 15 via the air of 2 dedusting of dust-extraction unit, realize the inside of workshop 15 Heat dissipation.Likewise, workshop winter heating system provided in an embodiment of the present invention further includes imaging sensor 12 and laser hair Emitter 13.The course of work of fan blade 16 is controlled with control baffle 5 by controller 11, imaging sensor 12 and laser emitter 13 The course of work it is consistent, details are not described herein again.
The setting that workshop winter heating system provided in an embodiment of the present invention passes through louver 3 so that production is set The standby heat generated can recycle inside workshop 15, realize air circulation.Meanwhile it can also by controlling louver 3 It enough realizes 15 inside of workshop and external temperature exchange, is in relatively stable to control the temperature inside workshop 15 In the range of.Louver 3 provided in an embodiment of the present invention can automation control, do not need manpower monitoring.The present invention provides Workshop winter heating system is simple in structure, easily controllable, can realize the internal insulation of workshop, and keep the temperature cost It is low.
Those skilled in the art will readily occur to its of the present invention after considering specification and putting into practice the disclosure invented here Its embodiment.This application is intended to cover the present invention any variations, uses, or adaptations, these modifications, purposes or Person's adaptive change follows the general principle of the present invention and includes undocumented common knowledge in the art of the invention Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following Claim is pointed out.
It should be understood that the relational terms of such as " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.The invention is not limited in the precision architecture for being described above and being shown in the accompanying drawings, And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is only limited by the attached claims System.

Claims (9)

1. a kind of workshop winter heating system, which is characterized in that the system comprises the wind being set to inside workshop The import of machine (1), dust-extraction unit (2) and louver (3), the dust-extraction unit (2) is connected with the wind turbine (1), described The outlet of dust-extraction unit (2) outside pipeline (4) and workshop by being connected;The louver (3) is arranged in the pipe Road (4) is internal, and the louver (3) is perpendicular to the length extending direction of the pipeline (4).
2. workshop winter heating system according to claim 1, which is characterized in that the louver (3) is gear Plate (5), the baffle (5) are movably arranged on the pipeline (4) inside, and the shape and the pipeline (4) of the baffle (5) are internal Cross-sectional shape matches.
3. workshop winter heating system according to claim 2, which is characterized in that the baffle (5) passes through rotation Axis (6) setting is internal in the pipeline (4), and the baffle (5) rotates along the rotary shaft (6).
4. workshop winter heating system according to claim 2, which is characterized in that be provided on the pipeline (4) The rectangle bearing (7) of inner hollow, a short side end opening of the rectangle bearing (7);The open side of the rectangle bearing (7) The center line on side and the pipeline (4) longitudinal cross-section is in the same plane, and the bond length of the rectangle bearing (7) and institute The diameter for stating pipeline (4) is identical;The long side length of the rectangle bearing (7) is at least 1.5 times of bond length;The rectangle branch Seat (7) inner wall is provided with sliding slot (8), and the baffle (5) is slided along the sliding slot (8).
5. workshop winter heating system according to claim 2, which is characterized in that be provided on the pipeline (4) The fixed seat (9) of inner hollow, the pipeline (4) run through the fixed seat (9), and the pipeline (4) and the fixed seat (9) It is arranged concentrically;It is connected with the hollow fixed seat (9) inside the pipeline (4);The institute internal positioned at the fixed seat (9) It states and the baffle (5) is set on pipeline (4), and the edge of the baffle (5) is located at the pipeline (4) and the fixed seat (9) Between;The baffle (5) is spliced baffle, and the baffle (5) is slided along the pipeline (4).
6. the workshop winter heating system according to any one of claim 2-5, which is characterized in that the system Further include the temperature sensor (10) being set to inside the workshop and the control for being set to the dust-extraction unit (2) lateral wall Device (11) processed, the controller (11) are electrically connected with the temperature sensor (10), the baffle (5) respectively.
7. workshop winter heating system according to claim 6, which is characterized in that setting inside the pipeline (4) Imaging sensor (12) and laser emitter (13), described image sensor (12) and the laser emitter (13) are located at The both sides of the baffle (5);Described image sensor (12) and the laser emitter (13) respectively with the controller (11) Electrical connection.
8. workshop winter heating system according to claim 1, which is characterized in that the louver (3) is wind Adjustable valve (14), the volume damper (14) are fixed at the pipeline (4) inside, the volume damper (14) Shape matches with the pipeline (4) interior cross-sectional shape.
9. workshop winter heating system according to claim 8, which is characterized in that the system also includes be set to Temperature sensor (10) inside the workshop and the controller (11) for being set to the dust-extraction unit (2) lateral wall, institute Controller (11) is stated to be electrically connected with the temperature sensor (10), the volume damper (14) respectively.
CN201710485988.9A 2017-06-23 2017-06-23 A kind of workshop winter heating system Pending CN108286770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710485988.9A CN108286770A (en) 2017-06-23 2017-06-23 A kind of workshop winter heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710485988.9A CN108286770A (en) 2017-06-23 2017-06-23 A kind of workshop winter heating system

Publications (1)

Publication Number Publication Date
CN108286770A true CN108286770A (en) 2018-07-17

Family

ID=62831417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710485988.9A Pending CN108286770A (en) 2017-06-23 2017-06-23 A kind of workshop winter heating system

Country Status (1)

Country Link
CN (1) CN108286770A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1769806A (en) * 2005-09-13 2006-05-10 张乙钟 Dry type ventiduct system with helical structure pipe and reflux-proof and fireproof throttle
JP2010169332A (en) * 2009-01-23 2010-08-05 Dai-Dan Co Ltd Air supply device
CN102538117A (en) * 2012-01-06 2012-07-04 青岛海信房地产股份有限公司 Ventilation drying system for tower range of underground garage of high-rise residential building
CN102563746A (en) * 2010-12-07 2012-07-11 西安大昱光电科技有限公司 Thermostatic control system of special studio
CN104359164A (en) * 2014-10-17 2015-02-18 广东美的制冷设备有限公司 Outdoor unit of air conditioner and control method of same
CN205245498U (en) * 2015-12-11 2016-05-18 青岛圣美尔纤维科技有限公司 Energy saving of air conditioning system between air current spinning wheel
DE202016105797U1 (en) * 2015-10-19 2016-11-03 Hadyna - International, Spol. S R.O. Device for venting and / or air filtration, especially in industrial halls
CN205717727U (en) * 2016-04-20 2016-11-23 中国海洋石油总公司 A kind of air-duct apparatus of scalable converter exhaust air rate
CN207350687U (en) * 2017-06-23 2018-05-11 宁夏金双禾粮油有限公司 A kind of workshop winter heating system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1769806A (en) * 2005-09-13 2006-05-10 张乙钟 Dry type ventiduct system with helical structure pipe and reflux-proof and fireproof throttle
JP2010169332A (en) * 2009-01-23 2010-08-05 Dai-Dan Co Ltd Air supply device
CN102563746A (en) * 2010-12-07 2012-07-11 西安大昱光电科技有限公司 Thermostatic control system of special studio
CN102538117A (en) * 2012-01-06 2012-07-04 青岛海信房地产股份有限公司 Ventilation drying system for tower range of underground garage of high-rise residential building
CN104359164A (en) * 2014-10-17 2015-02-18 广东美的制冷设备有限公司 Outdoor unit of air conditioner and control method of same
DE202016105797U1 (en) * 2015-10-19 2016-11-03 Hadyna - International, Spol. S R.O. Device for venting and / or air filtration, especially in industrial halls
CN205245498U (en) * 2015-12-11 2016-05-18 青岛圣美尔纤维科技有限公司 Energy saving of air conditioning system between air current spinning wheel
CN205717727U (en) * 2016-04-20 2016-11-23 中国海洋石油总公司 A kind of air-duct apparatus of scalable converter exhaust air rate
CN207350687U (en) * 2017-06-23 2018-05-11 宁夏金双禾粮油有限公司 A kind of workshop winter heating system

Similar Documents

Publication Publication Date Title
CN106765975B (en) Air conditioner control method and device
CN204704987U (en) The indoor set of aircondition and aircondition
WO2020093632A1 (en) Humidifying and cooling draught fan wet curtain device and control method
CN107631423A (en) A kind of air-conditioner control method and air conditioner based on position of human body
CN106440246A (en) central air conditioning system and control method and control device thereof
KR101883868B1 (en) Interior zone divisional environment management system of cow house using temperature humidity index and apparatus
CN106091506A (en) Air conditioner anti-frosting method and system
CN103375848A (en) Air conditioner
CN108019901A (en) A kind of orientation adjustment air-conditioning
CN101545660A (en) Indoor temperature and humidity independent control system
CN103375849A (en) Air conditioner
CN105974973A (en) Method and system for simulating condensation process of cabinet
CN109708195A (en) A kind of heat pump and its control method suitable for High aititude
CN110006149A (en) A kind of adaptive constant temperature air-conditioning method and system
CN105371449A (en) Air conditioner
CN207350687U (en) A kind of workshop winter heating system
CN205747349U (en) A kind of air-conditioning monitoring and controlling system
CN108286770A (en) A kind of workshop winter heating system
CN110925984A (en) Timed wind-sheltering and air-out method and system for target figure based on fuselage swinging vane linkage
JP7081124B2 (en) Control device and agricultural house
CN105107555B (en) Plant leaf surface frosting apparatus and method thereof
CN204373063U (en) A kind of binary channels return air air-conditioning box
CN106440297A (en) Air guide device and air conditioner
CN206094488U (en) Air guide device and air conditioner
CN112484286A (en) Automatic air outlet direction adjusting system and method for louver

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination