CN108286770A - A kind of workshop winter heating system - Google Patents
A kind of workshop winter heating system Download PDFInfo
- Publication number
- CN108286770A CN108286770A CN201710485988.9A CN201710485988A CN108286770A CN 108286770 A CN108286770 A CN 108286770A CN 201710485988 A CN201710485988 A CN 201710485988A CN 108286770 A CN108286770 A CN 108286770A
- Authority
- CN
- China
- Prior art keywords
- workshop
- pipeline
- baffle
- dust
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/04—Ventilation with ducting systems, e.g. by double walls; with natural circulation
- F24F7/06—Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/28—Arrangement or mounting of filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F2007/005—Cyclic ventilation, e.g. alternating air supply volume or reversing flow direction
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Drying Of Solid Materials (AREA)
Abstract
The present invention provides a kind of workshop winter heating system.The air of equipment inside workshop in normal operation inside generated heat and workshop is drawn by wind turbine.Wind turbine is by the air transfer of absorption to dust-extraction unit.Dust-extraction unit is dusted processing to impurity such as the dust that contains in air.The air handled through dust-extraction unit is sent from dust-extraction unit by pipeline, and is drained into outside workshop via louver.Louver can adjust the air force that air flows through louver, and then adjust the air quantity for being back to dust-extraction unit and drain into the air quantity outside workshop.The air for being back to dust-extraction unit is discharged by wind turbine, and then realizes the air circulation inside workshop, realizes temperature build.Present invention offer workshop winter heating system is simple in structure, automation control, can realize the internal insulation of workshop, and keep the temperature at low cost.
Description
Technical field
The present invention relates to workshop heating technical field more particularly to a kind of workshop winter heating systems.
Background technology
In the industrial production of manufacture type, workshop is essential production configuration.In rice production, chemical fertilizer production
And in the industrial circles such as rubber production, workshop is usually the workshop of open type, to ensure workshop inner air flow.
To reinforce workshop inner air flow, wind net is usually mounted with inside workshop.Wind net can be constantly from workshop
A large amount of wind are extracted in inside, to indoor formation negative pressure.Due to forming negative pressure inside workshop, outdoor air accelerates into life
Either inside is produced, to form forced-air circulation.
In general, to be formed by the heat that forced-air circulation can be taken away in spring, summer, autumn in workshop gentle for wind net
Taste.But in winter, wind net is formed by air forced circulation and to be chronically at low-temperature condition inside workshop.Although raw
Production either inside is equipped with heating, but since the space of workshop is big, heating area is small, heating temperature is sufficient to compensate for wind net
The heat taken away, thus the production equipment inside workshop is chronically at low-temperature condition.To make each production equipment reach raw
Necessary requirement is produced, production equipment needs the preheating that is switched in advance, this will consume a large amount of energy.In addition, being processed in such as rice production
Workshop in, husk rice, the profit process such as rough, color sorting and polishing need certain processing temperature, and wind net is formed
Air forced circulation caused by workshop inner cryogenic production equipment can not operate normally.
To solve the above problems, improving heating temperature usually inside workshop or increasing heating area, to improve life
Produce the temperature of either inside.But a large amount of energy can be consumed by improving heating temperature or increasing heating area, improve production cost, this
It is unfavorable for the benign development of processing enterprise.
Invention content
The present invention provides a kind of workshop winter heating system, to solve existing workshop heat supply in winter energy consumption
Big problem.
The present invention provides a kind of workshop winter heating system, and the system comprises the wind being set to inside workshop
Machine, dust-extraction unit and louver, the import of the dust-extraction unit are connected with the wind turbine, and the outlet of the dust-extraction unit is logical
It is connected outside piping and workshop;The louver is arranged inside the pipeline, and the louver is vertical
In the length extending direction of the pipeline.
Preferably, the louver is baffle, and the baffle is movably arranged on inside the pipeline, outside the baffle
Shape matches with the pipeline interior cross-sectional shape.
Preferably, the baffle is arranged by rotary shaft inside the pipeline, and the baffle is rotated along the rotary shaft.
Preferably, the rectangle bearing of inner hollow is provided on the pipeline, a short end of the rectangle bearing is opened
Mouthful;The open side edges of the rectangle bearing and the center line of the pipeline longitudinal cross-section are in the same plane, and the rectangle
The bond length of bearing is identical as the diameter of the pipeline;The long side length of the rectangle bearing is at least the 1.5 of bond length
Times;The rectangle bearing inner wall is provided with sliding slot, and the baffle is slided along the sliding slot.
Preferably, the fixed seat of inner hollow is provided on the pipeline, the pipeline runs through the fixed seat, and described
Pipeline is arranged concentrically with the fixed seat;It is connected with the hollow fixed seat inside the pipeline;Positioned at the fixed seat
The baffle is set on the internal pipeline, and the edge of the baffle is between the pipeline and the fixed seat;Institute
It is spliced baffle to state baffle, and the baffle is along the pipe slides.
Preferably, the system also includes the temperature sensor being set to inside the workshop and it is set to described remove
The controller of dirt device lateral wall, the controller are electrically connected with the temperature sensor, the baffle respectively.
Preferably, setting imaging sensor and laser emitter inside the pipeline, described image sensor and described swash
Optical transmitting set is located at the both sides of the baffle;Described image sensor and the laser emitter respectively with the controller
Electrical connection.
Preferably, the louver is volume damper, and the volume damper is fixed inside the pipeline,
The shape of the volume damper matches with the pipeline interior cross-sectional shape.
Preferably, the system also includes the temperature sensor being set to inside the workshop and it is set to described remove
The controller of dirt device lateral wall, the controller are electrically connected with the temperature sensor, the volume damper respectively.
The technical solution that the embodiment of the present invention provides can include the following benefits:
The present invention provides a kind of workshop winter heating system, which includes being set to life
Produce wind turbine, dust-extraction unit and the louver of either inside.The import of dust-extraction unit is connected with wind turbine, outlet by pipeline with
It is connected outside workshop.Louver is arranged inside pipeline, and louver is directly in the length extending direction of pipeline.It is raw
The production equipment of production either inside will produce heat, the air inside generated heat and workshop in normal operation
It is drawn by wind turbine.Wind turbine is by the air transfer with certain temperature of absorption to dust-extraction unit.It may will produce in production process
The impurity such as dust, therefore the air with certain temperature may contain the impurity such as dust.Dust-extraction unit is to the powder that contains in air
The impurity such as dirt are dusted processing.The air handled through dust-extraction unit is sent from dust-extraction unit by pipeline, and is arranged via louver
To workshop.Louver can adjust the air force that air flows through louver, and then adjust and be back to dedusting
The air quantity of device and drain into air quantity outside workshop.The air for being back to dust-extraction unit is discharged by wind turbine, and then is realized
Air circulation inside workshop.When workshop internal temperature is relatively low, louver completely closes, then passes through dedusting and fill
The hot wind for setting processing completely returns to, and realizes the accumulation of workshop internal temperature.When workshop internal temperature reaches production requirement
When, to drain into the heat outside workshop by adjusting louver and is consistent with the heat that wind turbine is drawn.So that raw
The temperature of production either inside is in more constant state.Present invention offer workshop winter heating system is simple in structure, easily
In control, the internal insulation of workshop can be realized, and keep the temperature at low cost.
It should be understood that above general description and following detailed description is only exemplary and explanatory, not
It can the limitation present invention.
Description of the drawings
The drawings herein are incorporated into the specification and forms part of this specification, and shows the implementation for meeting the present invention
Example, and be used to explain the principle of the present invention together with specification.
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, for those of ordinary skill in the art
Speech, without having to pay creative labor, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of workshop winter heating system provided in an embodiment of the present invention;
Fig. 2 is the mounting structure schematic diagram of the first baffle provided in an embodiment of the present invention;
Fig. 3 is the mounting structure schematic diagram of second of baffle provided in an embodiment of the present invention;
Fig. 4 is the mounting structure schematic diagram of the third baffle provided in an embodiment of the present invention;
Fig. 5 is structural schematic diagram when baffle provided in an embodiment of the present invention is spread;
Fig. 6 is the mounting structure schematic diagram of volume damper provided in an embodiment of the present invention;
Symbolic indication:
1- wind turbines, 2- dust-extraction units, 3- louvers, 4- pipelines, 5- baffles, 6- rotary shafts, 7- rectangle bearings, 8- are slided
Slot, 9- fixed seats, 10- temperature sensors, 11- controllers, 12- imaging sensors, 13- laser emitters, 14- air quantity are adjusted
Valve, 15- workshops, 16- fan blades.
Specific implementation mode
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to
When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment
Described in embodiment do not represent and the consistent all embodiments of the present invention.On the contrary, they be only with it is such as appended
The example of the consistent device and method of some aspects being described in detail in claims, of the invention.
Attached drawing 1 is please referred to, attached drawing 1 shows that the structure of workshop winter heating system provided in an embodiment of the present invention is shown
It is intended to.
Workshop winter heating system provided in an embodiment of the present invention includes the wind turbine being set to inside workshop 15
1, dust-extraction unit 2 and louver 3.The import of dust-extraction unit 2 is connected with wind turbine 1, and the outlet of dust-extraction unit 2 passes through pipeline 4
Be connected outside workshop 15.Louver 3 is arranged in the inside of pipeline 4, and louver 3 is perpendicular to pipeline 4
Length extending direction.
Specifically, wind turbine 1 is the component for extracting 15 inner air of workshop.In general, wind turbine 1 is installed on workshop 15
Internal top.Certainly, wind turbine 1 can also be mounted in the side walls inside workshop 15.The quantity of wind turbine 1 and installation position
It sets and is determined with specific reference to the size of workshop 15, the heat production of workshop appliance and the distribution of workshop appliance.Production equipment is being transported
It will produce heat in row, therefore, the air that wind turbine 1 is extracted has certain temperature.During processing, workshop
The impurity such as dust may be will produce inside 15, thus contain the impurity such as dust in the air of the extraction of wind turbine 1.Dust-extraction unit 2 can
Processing is dusted to impurity such as the dust that contains in air.Air after dust removal process is expelled to production via louver 3
Outside workshop 15.In embodiments of the present invention, since the air quantity of the extraction of wind turbine 1 is larger, and the medium of dedusting is air, therefore,
Dust-extraction unit 2 is preferably using the pulse dust collector by blowing pressurized air filtering dust.Louver 3 is regulating air volume
Device.Louver 3 is set to the inside of pipeline 4, and louver 3 is perpendicular to the length extending direction of pipeline 4.Therefore,
When louver 3 is closed, the air that dust-extraction unit 2 is discharged is back to production vehicle via dust-extraction unit 2, wind turbine 1 again completely
Between inside 15.When louver 3 is half-open, the air portion lease making that dust-extraction unit 2 is discharged is back to life by dust-extraction unit 2, wind turbine 1
It produces inside workshop 15, another part is expelled to outside workshop 15.When louver 3 is opened completely, dust-extraction unit 2 is discharged
Air be completely exhausted out to workshop 15.
The course of work of workshop winter heating system provided in an embodiment of the present invention is:Wind turbine 1 extracts workshop
Air inside 15, and the air extracted is transmitted to dust-extraction unit 2.Dust-extraction unit 2 removes the dust etc. contained in air
After impurity, air is drained into louver 3 via pipeline 4.Louver 3 adjusts discharge according to the temperature inside workshop 15
The flow of air outside to workshop 15, rest part air are back to workshop 15 via dust-extraction unit 2, wind turbine 1
It is internal.At this point, 15 inside of workshop forms air circulation.When production equipment inside workshop 15 just starts, vehicle is produced
Between temperature inside 15 it is relatively low, the requirement of heat preservation is not achieved.At this point, louver 3 is in the completely closed state, the sky after dedusting
Gas completely returns to inside workshop 15.Since heat caused by production equipment only recycles inside workshop 15, because
This, with the extension of production equipment run time, the accumulation of 15 internal temperature of workshop is finally reached the temperature of heat preservation.Generally
, 15 internal temperature of workshop is 20 DEG C or so.When 15 internal temperature of workshop is more than required temperature, opens and adjust wind dress
3 are set, and controls the opening degree of louver 3, is i.e. control is expelled to the flow of the air outside workshop 15, to realize
15 inside of workshop and external temperature exchange, and then control the internal temperature of workshop 15.
In workshop winter heating system provided in an embodiment of the present invention, louver 3 is baffle 5.Due to adjusting wind
Device 3 is arranged in the inside of pipeline 4, and louver 3, perpendicular to the length extending direction of pipeline 4, therefore, baffle 5 is also provided with
In the inside of pipeline 4, and baffle 5 is perpendicular to the length extending direction of pipeline 4.That is the axis of the longitudinal center line of baffle 5 and pipeline 4
It is same straight line to center line.For ease of adjusting the air mass flow for flowing through baffle 5, baffle 5 is movably arranged on the inside of pipeline 4.
When production equipment inside workshop 15 just starts, the temperature inside workshop 15 is relatively low.To realize production equipment institute
The heat of generation is entirely located in inside workshop 15, and the shape and the interior cross-sectional shape of pipeline 4 of baffle 5 match.When
When the cross section of pipeline 4 is rectangular or rectangle, baffle 5 is also rectangular or rectangle.Meanwhile the size of baffle 5 and 4 cross section of pipeline
Size it is consistent.When the cross section of pipeline 4 is round, baffle 5 is also circle.Meanwhile the diameter of baffle 5 and pipeline 4 are horizontal
The diameter in section is consistent.
Attached drawing 2 is please referred to, attached drawing 2 shows the structural schematic diagram of the first baffle 5 provided in an embodiment of the present invention, and attached
Fig. 2 is sectional view of the attached drawing 1 along the directions A-A.
It is movably set with rotary shaft 6 in pipeline 4 provided in an embodiment of the present invention.The both ends of rotary shaft 6 are arranged in pipeline 4
On wall.Certainly, rotary shaft 6 may also pass through pipeline 4 so that the both ends of rotary shaft 6 are located at the outside of pipeline 4.Rotary shaft 6
Center or the center of circle across 4 cross section of pipeline.Rotary shaft 6 can rotate in situ.Baffle 5, i.e. rotary shaft are set in rotary shaft 6
6 run through the center of baffle 5.When rotary shaft 6 rotates in place, baffle 5 can be rotated in pipeline 4 or baffle 5 with pipe
Road generates angle between 4 cross section.When baffle 5 does not rotate, baffle 5 blocks the air after dedusting and flow to production vehicle completely
Between access outside 15, realize the isolation in 15 inside and outside portion of workshop.When baffle 5 rotates, due to baffle 5 and pipeline 4
Angle is generated between cross section, thus the air after dedusting can be flow to outside workshop 15 by angle.It is kept off by adjusting
The size of angle, can adjust the flow that the air after dedusting is flow to outside workshop 15 between 4 cross section of plate 5 and pipeline,
And then adjust the temperature inside workshop 15.
Attached drawing 3 is please referred to, attached drawing 3 shows the structural schematic diagram of second of baffle 5 provided in an embodiment of the present invention.
The rectangle bearing 7 of inner hollow is provided on pipeline 4 provided in an embodiment of the present invention.One of rectangle bearing 7 is short
Avris is open, and therefore, the inside of rectangle bearing 7 is communicated with the outside by the opening of short side.At this point, rectangle bearing 7 is in class U
Type.The open side edges of rectangle bearing 7 and the center line of 4 longitudinal cross-section of pipeline are in the same plane.To realize rectangle bearing 7
Open side edges and the center line of 4 longitudinal cross-section of pipeline are in the same plane, and rectangle bearing 7 is connected on pipeline 4 or pipeline 4
Through rectangle bearing 7.Attached drawing 3 show the set-up mode that rectangle bearing 7 is connected on pipeline 4.
Further, when rectangle bearing 7 is connected on pipeline 4, since the opening of 7 short side of rectangle bearing is arranged, rectangle
The inside of bearing 7 is connected with the inside of pipeline 4.In the vertical direction, 5 activity of baffle be connected to rectangle bearing 7 and pipeline 4 it
Between, and baffle 5 can move between rectangle bearing 7 and pipeline 4.To realize that baffle 5 is fallen within completely in rectangle bearing 7,
The bond length of rectangle bearing 7 is identical as the diameter of pipeline 4, and the long side length of rectangle bearing 7 is at least the 1.5 of bond length
Times.To realize movement of the baffle 5 between rectangle bearing 7 and pipeline 4, sliding slot 8 is provided on the inner wall of rectangle bearing 7, and sliding
Slot 8 is arranged on the long side side wall of rectangle bearing 7.The top of baffle 5 is set as a side far from rectangle bearing 7.Baffle 5
It being capable of the sliding in sliding slot 8.When workshop winter heating system provided in an embodiment of the present invention does not work, 5 complete position of baffle
In in pipeline 4, and the top of baffle 5 and 4 close contact of pipeline.At this point, dust-extraction unit 2 is not connected with 15 outside of workshop
It is logical.When workshop winter heating system works, the sliding in sliding slot 8 of controllable register 5, and then make top and the pipe of baffle 5
Distance is generated between road 4.Air part by 2 dedusting of dust-extraction unit drains into production vehicle by the gap between baffle 5 and pipeline 4
Between outside 15.Distance is generated between the top and pipeline 4 of baffle 5 to be adjusted, and then is realized to 15 internal temperature of workshop
Adjusting, realize 15 internal insulation of workshop.
Attached drawing 4 is please referred to, attached drawing 4 shows the structural schematic diagram of the third baffle 5 provided in an embodiment of the present invention.
The fixed seat 9 of inner hollow is provided on pipeline 4 provided in an embodiment of the present invention.Fixed seat 9 is cylindrical or vertical
It is rectangular.In setting, pipeline 4 runs through fixed seat 9, and the middle vacancy phase of the inside of pipeline 4 and fixed seat 9 for pipeline 4 and fixed seat 9
Connection.Further, pipeline 4 is arranged concentrically with fixed seat 9, i.e., the longitudinal center line of pipeline 4 passes through the center of fixed seat 9.Baffle 5
It is set to the inside of pipeline 4, and positioned at the connectivity part of pipeline 4 and fixed seat 9.Baffle 5 can exist along the longitudinal section direction of pipeline 4
It is slided between pipeline 4 and fixed seat 9.
In embodiments of the present invention, baffle 5 is set as sliceable structure, is such as uniformly set as 4 blocks of plates, 6 blocks of plates or 8 pieces
Plate.In general, baffle 5 is uniformly cut into the structure of Spliced type centered on center.When baffle 5 is spliced baffle,
Baffle 5, which can be spread centered on the longitudinal center line of pipeline 4 to 9 direction of fixed seat, to be moved.At this point, at the center of former baffle 5
Occur can by air by through-hole.When air after baffle 5 stops dedusting drains into 15 outside of workshop, spliced gear
Plate 5 is an entirety, as shown in Fig. 4.When air after dedusting drains into 15 outside of workshop by dust-extraction unit 2, splicing
The baffle 5 of formula, which is spread centered on the longitudinal center line of pipeline 4 to 9 direction of fixed seat, to be moved, until baffle 5 reaches required through-hole
Size, as shown in Fig. 5, wherein attached drawing 5 be attached drawing 4 the directions B-B sectional view.
Further, the diffusion for ease of control baffle 5 between pipeline 4 and fixed seat 9 or contraction type sliding, baffle 5
Edge is located between the outside and the inside of fixed seat 9 of pipeline 4.
The regulative mode of the baffle 5 of three kinds of structures based on the embodiment of the present invention, baffle 5 is manual adjustment, production
Temperature inside workshop 15 is by human perception or thermometer measure.But the acquisition of temperature is susceptible to deviation, and manual adjustment side
It is accurate that formula is not easy to adjust, and then causes the heat being trapped in inside workshop 15 excessive or very few, cannot play Winter protection
Effect.
To solve the above problems, workshop winter heating system provided in an embodiment of the present invention further includes being set to production
Temperature sensor 10 inside workshop 15 and the controller 11 for being set to 2 lateral wall of dust-extraction unit, please refer to attached drawing 1.Temperature passes
Sensor 10 can incude the temperature inside workshop 15, form temperature data.Controller 11 is capable of the switch of control baffle 5,
Realize that the automation of baffle 5 is adjusted.When specific setting, controller 11 is electrically connected temperature sensor 10 and baffle 5, to receive
The temperature data and control baffle 5 that temperature sensor 10 is sent.Specifically, temperature sensor 10 detects in workshop 15
After the temperature in portion, temperature data is independently uploaded to controller 11.Controller 11 by the temperature data received with preset
Temperature compared.When temperature data is less than predetermined temperature, 11 control baffle 5 of controller turns down or closes, into
And largely or entirely returned inside workshop 15 via the air of 2 dedusting of dust-extraction unit, realize that 15 inside of workshop is protected
Temperature.When temperature data is higher than predetermined temperature, 11 control baffle 5 of controller opens big or standard-sized sheet, and then is filled via dedusting
The air for setting 2 dedustings largely or entirely drains into outside workshop 15, realizes the internal heat dissipating of workshop 15.
Further, to accurately control the opening-closing size of baffle 5 by controller 11, pipeline 4 is internally provided with image sensing
Device 12 and laser emitter 13, specifically please refer to attached drawing 2.Imaging sensor 12 and laser emitter 13 are located at baffle 5
Both sides, and imaging sensor 12 and laser emitter 13 are respectively electrically connected to controller 11.Laser emitter 13 can send out light
Beam.Light beam is radiated on baffle 5, and can form image in 12 direction of imaging sensor.Imaging sensor 12 can receive the shadow
Picture, and convert image to electronic signal.Area by calculating image just can detect learn baffle 5 be turned on and off journey
Degree.
Specifically, the temperature data and predetermined temperature that reduced temperature sensor 10 is sent by analysis, determine
When needing controllable register 5, controller 11 sends out detection signal to imaging sensor 12 and laser emitter 13.Laser emitter 13
Light beam is sent out, light beam is radiated on baffle 5 and can form image in 12 direction of imaging sensor.Imaging sensor 12 receives institute's shape
At image, and the image data is uploaded to controller 11.Controller 11 carries out imagery coverage according to the image data of reception
It calculates, to learn the state before the adjustment of baffle 5.Controller 11 is according to temperature comparisons' result and the imagery coverage being calculated
Control baffle 5 is adjusted.Baffle 5 adjust during, controller 11 in real time monitoring baffle 5 be formed by imagery coverage and
Temperature comparisons are as a result, until baffle 5 is adjusted to required temperature, the automation control of realization baffle 5.
In workshop winter heating system provided in an embodiment of the present invention, louver 3 is volume damper 14, is asked
Refer to the attached drawing 6.Since louver 3 is arranged in the inside of pipeline 4, and louver 3 is perpendicular to the length extension side of pipeline 4
To therefore, volume damper 14 is also disposed on the inside of pipeline 4, and volume damper 14 is perpendicular to the length extension side of pipeline 4
To.That is the longitudinal center line of the center line of volume damper 14 and pipeline 4 is same straight line.Volume damper 14 is fixed at
The inside of pipeline 4, and the shape of volume damper 14 and the interior cross-sectional shape of pipeline 4 match.When the cross section of pipeline 4
For rectangular or rectangle when, the cross section of volume damper 14 is rectangular or rectangle.When the cross section of pipeline 4 is round, air quantity
The cross section of regulating valve 14 is also circle.
When production equipment inside workshop 15 just starts, the temperature inside workshop 15 is relatively low, and guarantor is not achieved
The requirement of temperature.At this point, 16 Close All of fan blade of volume damper 14.Air after dedusting completely returns in workshop 15
Portion.When production equipment is run to 15 internal temperature of workshop more than required temperature, need to adjust volume damper 14.Specifically
Ground adjusts fan blade 16 and opens, and controls the opening degree of fan blade 16, i.e. control is expelled to the stream of the air outside workshop 15
Amount to realize 15 inside of workshop and external temperature exchange, and then controls the internal temperature of workshop 15.
Further, it is the automation control of realization volume damper 14, workshop winter provided in an embodiment of the present invention
Heating system also includes the temperature sensor 10 being set to inside workshop 15 and the control for being set to 2 lateral wall of dust-extraction unit
Device 11.When specific setting, controller 11 is electrically connected temperature sensor 10 and volume damper 14, to receive temperature sensor
10 temperature datas sent and control volume damper 14.Specifically, temperature sensor 10 detects inside workshop 15
Temperature after, temperature data is independently uploaded to controller 11.Controller 11 by the temperature data received with it is preset
Temperature is compared.When temperature data is less than predetermined temperature, controller 11 controls the fan blade 16 of volume damper 14
It turns down or closes, and then is largely or entirely returned inside workshop 15 via the air of 2 dedusting of dust-extraction unit, realize production
15 internal insulation of workshop.When temperature data is higher than predetermined temperature, controller 11 controls fan blade 16 and opens big or standard-sized sheet, into
And largely or entirely drained into outside workshop 15 via the air of 2 dedusting of dust-extraction unit, realize the inside of workshop 15
Heat dissipation.Likewise, workshop winter heating system provided in an embodiment of the present invention further includes imaging sensor 12 and laser hair
Emitter 13.The course of work of fan blade 16 is controlled with control baffle 5 by controller 11, imaging sensor 12 and laser emitter 13
The course of work it is consistent, details are not described herein again.
The setting that workshop winter heating system provided in an embodiment of the present invention passes through louver 3 so that production is set
The standby heat generated can recycle inside workshop 15, realize air circulation.Meanwhile it can also by controlling louver 3
It enough realizes 15 inside of workshop and external temperature exchange, is in relatively stable to control the temperature inside workshop 15
In the range of.Louver 3 provided in an embodiment of the present invention can automation control, do not need manpower monitoring.The present invention provides
Workshop winter heating system is simple in structure, easily controllable, can realize the internal insulation of workshop, and keep the temperature cost
It is low.
Those skilled in the art will readily occur to its of the present invention after considering specification and putting into practice the disclosure invented here
Its embodiment.This application is intended to cover the present invention any variations, uses, or adaptations, these modifications, purposes or
Person's adaptive change follows the general principle of the present invention and includes undocumented common knowledge in the art of the invention
Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following
Claim is pointed out.
It should be understood that the relational terms of such as " first " and " second " or the like be used merely to an entity or
Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any
This actual relationship or sequence.The invention is not limited in the precision architecture for being described above and being shown in the accompanying drawings,
And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is only limited by the attached claims
System.
Claims (9)
1. a kind of workshop winter heating system, which is characterized in that the system comprises the wind being set to inside workshop
The import of machine (1), dust-extraction unit (2) and louver (3), the dust-extraction unit (2) is connected with the wind turbine (1), described
The outlet of dust-extraction unit (2) outside pipeline (4) and workshop by being connected;The louver (3) is arranged in the pipe
Road (4) is internal, and the louver (3) is perpendicular to the length extending direction of the pipeline (4).
2. workshop winter heating system according to claim 1, which is characterized in that the louver (3) is gear
Plate (5), the baffle (5) are movably arranged on the pipeline (4) inside, and the shape and the pipeline (4) of the baffle (5) are internal
Cross-sectional shape matches.
3. workshop winter heating system according to claim 2, which is characterized in that the baffle (5) passes through rotation
Axis (6) setting is internal in the pipeline (4), and the baffle (5) rotates along the rotary shaft (6).
4. workshop winter heating system according to claim 2, which is characterized in that be provided on the pipeline (4)
The rectangle bearing (7) of inner hollow, a short side end opening of the rectangle bearing (7);The open side of the rectangle bearing (7)
The center line on side and the pipeline (4) longitudinal cross-section is in the same plane, and the bond length of the rectangle bearing (7) and institute
The diameter for stating pipeline (4) is identical;The long side length of the rectangle bearing (7) is at least 1.5 times of bond length;The rectangle branch
Seat (7) inner wall is provided with sliding slot (8), and the baffle (5) is slided along the sliding slot (8).
5. workshop winter heating system according to claim 2, which is characterized in that be provided on the pipeline (4)
The fixed seat (9) of inner hollow, the pipeline (4) run through the fixed seat (9), and the pipeline (4) and the fixed seat (9)
It is arranged concentrically;It is connected with the hollow fixed seat (9) inside the pipeline (4);The institute internal positioned at the fixed seat (9)
It states and the baffle (5) is set on pipeline (4), and the edge of the baffle (5) is located at the pipeline (4) and the fixed seat (9)
Between;The baffle (5) is spliced baffle, and the baffle (5) is slided along the pipeline (4).
6. the workshop winter heating system according to any one of claim 2-5, which is characterized in that the system
Further include the temperature sensor (10) being set to inside the workshop and the control for being set to the dust-extraction unit (2) lateral wall
Device (11) processed, the controller (11) are electrically connected with the temperature sensor (10), the baffle (5) respectively.
7. workshop winter heating system according to claim 6, which is characterized in that setting inside the pipeline (4)
Imaging sensor (12) and laser emitter (13), described image sensor (12) and the laser emitter (13) are located at
The both sides of the baffle (5);Described image sensor (12) and the laser emitter (13) respectively with the controller (11)
Electrical connection.
8. workshop winter heating system according to claim 1, which is characterized in that the louver (3) is wind
Adjustable valve (14), the volume damper (14) are fixed at the pipeline (4) inside, the volume damper (14)
Shape matches with the pipeline (4) interior cross-sectional shape.
9. workshop winter heating system according to claim 8, which is characterized in that the system also includes be set to
Temperature sensor (10) inside the workshop and the controller (11) for being set to the dust-extraction unit (2) lateral wall, institute
Controller (11) is stated to be electrically connected with the temperature sensor (10), the volume damper (14) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710485988.9A CN108286770A (en) | 2017-06-23 | 2017-06-23 | A kind of workshop winter heating system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710485988.9A CN108286770A (en) | 2017-06-23 | 2017-06-23 | A kind of workshop winter heating system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108286770A true CN108286770A (en) | 2018-07-17 |
Family
ID=62831417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710485988.9A Pending CN108286770A (en) | 2017-06-23 | 2017-06-23 | A kind of workshop winter heating system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108286770A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1769806A (en) * | 2005-09-13 | 2006-05-10 | 张乙钟 | Dry type ventiduct system with helical structure pipe and reflux-proof and fireproof throttle |
JP2010169332A (en) * | 2009-01-23 | 2010-08-05 | Dai-Dan Co Ltd | Air supply device |
CN102538117A (en) * | 2012-01-06 | 2012-07-04 | 青岛海信房地产股份有限公司 | Ventilation drying system for tower range of underground garage of high-rise residential building |
CN102563746A (en) * | 2010-12-07 | 2012-07-11 | 西安大昱光电科技有限公司 | Thermostatic control system of special studio |
CN104359164A (en) * | 2014-10-17 | 2015-02-18 | 广东美的制冷设备有限公司 | Outdoor unit of air conditioner and control method of same |
CN205245498U (en) * | 2015-12-11 | 2016-05-18 | 青岛圣美尔纤维科技有限公司 | Energy saving of air conditioning system between air current spinning wheel |
DE202016105797U1 (en) * | 2015-10-19 | 2016-11-03 | Hadyna - International, Spol. S R.O. | Device for venting and / or air filtration, especially in industrial halls |
CN205717727U (en) * | 2016-04-20 | 2016-11-23 | 中国海洋石油总公司 | A kind of air-duct apparatus of scalable converter exhaust air rate |
CN207350687U (en) * | 2017-06-23 | 2018-05-11 | 宁夏金双禾粮油有限公司 | A kind of workshop winter heating system |
-
2017
- 2017-06-23 CN CN201710485988.9A patent/CN108286770A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1769806A (en) * | 2005-09-13 | 2006-05-10 | 张乙钟 | Dry type ventiduct system with helical structure pipe and reflux-proof and fireproof throttle |
JP2010169332A (en) * | 2009-01-23 | 2010-08-05 | Dai-Dan Co Ltd | Air supply device |
CN102563746A (en) * | 2010-12-07 | 2012-07-11 | 西安大昱光电科技有限公司 | Thermostatic control system of special studio |
CN102538117A (en) * | 2012-01-06 | 2012-07-04 | 青岛海信房地产股份有限公司 | Ventilation drying system for tower range of underground garage of high-rise residential building |
CN104359164A (en) * | 2014-10-17 | 2015-02-18 | 广东美的制冷设备有限公司 | Outdoor unit of air conditioner and control method of same |
DE202016105797U1 (en) * | 2015-10-19 | 2016-11-03 | Hadyna - International, Spol. S R.O. | Device for venting and / or air filtration, especially in industrial halls |
CN205245498U (en) * | 2015-12-11 | 2016-05-18 | 青岛圣美尔纤维科技有限公司 | Energy saving of air conditioning system between air current spinning wheel |
CN205717727U (en) * | 2016-04-20 | 2016-11-23 | 中国海洋石油总公司 | A kind of air-duct apparatus of scalable converter exhaust air rate |
CN207350687U (en) * | 2017-06-23 | 2018-05-11 | 宁夏金双禾粮油有限公司 | A kind of workshop winter heating system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106765975B (en) | Air conditioner control method and device | |
CN204704987U (en) | The indoor set of aircondition and aircondition | |
WO2020093632A1 (en) | Humidifying and cooling draught fan wet curtain device and control method | |
CN107631423A (en) | A kind of air-conditioner control method and air conditioner based on position of human body | |
CN106440246A (en) | central air conditioning system and control method and control device thereof | |
KR101883868B1 (en) | Interior zone divisional environment management system of cow house using temperature humidity index and apparatus | |
CN106091506A (en) | Air conditioner anti-frosting method and system | |
CN103375848A (en) | Air conditioner | |
CN108019901A (en) | A kind of orientation adjustment air-conditioning | |
CN101545660A (en) | Indoor temperature and humidity independent control system | |
CN103375849A (en) | Air conditioner | |
CN105974973A (en) | Method and system for simulating condensation process of cabinet | |
CN109708195A (en) | A kind of heat pump and its control method suitable for High aititude | |
CN110006149A (en) | A kind of adaptive constant temperature air-conditioning method and system | |
CN105371449A (en) | Air conditioner | |
CN207350687U (en) | A kind of workshop winter heating system | |
CN205747349U (en) | A kind of air-conditioning monitoring and controlling system | |
CN108286770A (en) | A kind of workshop winter heating system | |
CN110925984A (en) | Timed wind-sheltering and air-out method and system for target figure based on fuselage swinging vane linkage | |
JP7081124B2 (en) | Control device and agricultural house | |
CN105107555B (en) | Plant leaf surface frosting apparatus and method thereof | |
CN204373063U (en) | A kind of binary channels return air air-conditioning box | |
CN106440297A (en) | Air guide device and air conditioner | |
CN206094488U (en) | Air guide device and air conditioner | |
CN112484286A (en) | Automatic air outlet direction adjusting system and method for louver |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |