CN108274597A - Poling core pulling equipment and wallboard laminator - Google Patents
Poling core pulling equipment and wallboard laminator Download PDFInfo
- Publication number
- CN108274597A CN108274597A CN201810355250.5A CN201810355250A CN108274597A CN 108274597 A CN108274597 A CN 108274597A CN 201810355250 A CN201810355250 A CN 201810355250A CN 108274597 A CN108274597 A CN 108274597A
- Authority
- CN
- China
- Prior art keywords
- driving
- cross slide
- wallboard
- slide way
- core pulling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/16—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
- B28B7/18—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
A kind of poling core pulling equipment includes walking track, tube body, at least one pipeline support mechanism, track laying walk on the ground, tube body, the setting of pipeline support mechanism is on walking track, with in walking moving on rails, the walking track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, the tube body includes support underframe, first driving mechanism, link, several perforated pipes, pass through track of walking, tube body, the cooperation of pipeline support mechanism, realize the efficient poling of wallboard, manpower is saved, the structure of the present invention is relatively simple simultaneously, equipment production cost and later maintenance cost are relatively low.Include wallboard shaping equipment, poling core pulling equipment the present invention also provides a kind of wallboard laminator, the wallboard shaping equipment is equipped with several die cavitys, forms wallboard base to fill the wallboard raw materials for production configured, the front end of wallboard shaping equipment is uniformly arranged several through-holes.
Description
Technical field
The present invention relates to wallboard equipment technical field more particularly to a kind of poling core pulling equipment and wallboard laminators.
Background technology
The wall of building generally comprises load bearing wall and non-load bearing wall, and non-load bearing wall is generally called and does partition wall.Brick mix structure
The wall of building be typically all load bearing wall.And the interior of the building of frame structure made of steel bar concrete water is used in advance
The wall in portion is typically all partition wall.Partition wall has the effects that sound insulation, heat-insulated, partition space.Currently, there are mainly two types of shapes for building trade
The partition wall of formula, a form of partition wall are brick masonry walls made of being assembled with brick and mortar, another form of partition wall be with
The wall that the identical partition plate of story height is spliced, is bonded between partition plate and partition plate with mortar.The work of brick masonry wall
Industry is less efficient and sound insulation, heat-proof quality are general, while the links such as bake bricks are needed to consume high-quality soil, energy etc. and be discharged
A large amount of greenhouse gases.With the development of building trade, the rising of labor cost, the reduction of natural resources, environmental problem
It becomes increasingly conspicuous, brick masonry wall will gradually be replaced by partition plate.Partition plate generally has an exhausting hole, to play saving material, subtract
Light partition wall plate weight, heat-insulated, sound insulation effect.The making of traditional partition plate is typically that raw material are filled into mold, so
The raw material of the sizing in mold are obtained into eleven punch 11 by worker again afterwards.The mode of this production partition plate is less efficient and compares
It is physical compared with worker is expended.
Invention content
In view of this, it is necessary to provide a kind of efficient, labor-saving poling core pulling equipment and wallboard laminators.
A kind of poling core pulling equipment includes walking track, tube body, at least one pipeline support mechanism, walking track paving
If on the ground, tube body, the setting of pipeline support mechanism are on walking track, in walking moving on rails, the walking
Track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, first cross slide way
It is laid on the ground, the lower end of longitudinal rail is equipped with the first traveling wheel, so that longitudinal rail is laterally transported in first cross slide way
Dynamic, lower end longitudinal movement on longitudinal rail of tube body, the both sides of longitudinal rail are fixedly connected with the second cross slide way, with
Longitudinal rail and the second cross slide way synchronizing moving, the both sides of the lower end of third cross slide way is set to be equipped with the second traveling wheel, so that
The both sides of the transverse movement on the second cross slide way of third cross slide way, the upper end of third cross slide way are equipped with guide-track groove, pipeline
The transverse movement in the guide-track groove of third cross slide way of the lower end of supporting mechanism, the tube body include support underframe, first
Driving mechanism, link, several perforated pipes, the support underframe and the first driving mechanism are arranged on longitudinal rail, support
The lower end of chassis be equipped with the matched third traveling wheel of longitudinal rail so that support underframe is vertically moved along longitudinal rail,
The lower end of first driving mechanism is fixedly connected with longitudinal rail, so that the first driving mechanism is moved synchronously with longitudinal rail, first
The driving end of driving mechanism is connect with support underframe, to drive support underframe to be moved on longitudinal rail, the lower end of link with
Support underframe is fixedly connected, so that the first driving mechanism drives link longitudinal movement on long rails, the longitudinal direction of link
Side and one end of perforated pipe are detachably connected, and several perforated pipes are erected in pipeline support mechanism, the first driving mechanism
When driving link longitudinal movement, perforated pipe longitudinal movement in pipeline support mechanism.
A kind of wallboard laminator includes wallboard shaping equipment, poling core pulling equipment, and the wallboard shaping equipment is equipped with several
Die cavity forms wallboard base to fill the wallboard raw materials for production configured, and the front end of wallboard shaping equipment is uniformly arranged several through-holes,
The perforated pipe of poling core pulling equipment passes through the through-hole of wallboard shaping equipment, with to the wallboard base in die cavity into eleven punch 11.
Advantageous effect:The poling core pulling equipment of the present invention includes walking track, tube body, at least one pipeline support machine
Structure, walking track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, passes through row
The cooperation for walking track, tube body, pipeline support mechanism realizes the efficient poling of wallboard, has saved manpower, while the present invention
Structure it is relatively simple, equipment production cost and later maintenance cost are relatively low.
Description of the drawings
Fig. 1 is the structural schematic diagram of a preferred angle of the poling core pulling equipment of the present invention.
Fig. 2 is the structural schematic diagram of another preferred angle of the poling core pulling equipment of the present invention.
Fig. 3 is the structural representation of the only preferred angle of the poling core pulling equipment comprising one group of perforated pipe of the present invention
Figure.
Fig. 4 is the structural schematic diagram of a preferred angle of the poling core pulling equipment not comprising perforated pipe of the present invention.
Fig. 5 is the partial structural diagram of the poling core pulling equipment not comprising perforated pipe of the present invention.
Fig. 6 is the structural schematic diagram of the wallboard laminator of this practicability.
In figure:Poling core pulling equipment 10, walking track 101, first cross slide way 1011, longitudinal rail 1012,4 wheel driven
Motivation structure 10121, the second cross slide way 1013, third cross slide way 1014, the second driving mechanism 10141, tube body 102,
Support underframe 1021, the first driving mechanism 1022, the first driving motor 10221, driving gear 10222, driven gear 10223,
Drive chain 10224, link 1023, perforated pipe 1024, pipeline support mechanism 103, braced frame 1031, horizontal support piece
1032, third driving mechanism 1033, pipe-hanging hook 10331, guide rail beam 103311, fixed frame 10332, third driving motor
10333, card slot 10334, wallboard shaping equipment 20.
Specific implementation mode
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, common for this field
For technical staff, without creative efforts, other drawings may also be obtained based on these drawings.
Fig. 1 to Fig. 5 is please referred to, poling core pulling equipment 10 includes walking track 101, tube body 102, at least one pipeline
Supporting mechanism 103, walking track 101 are laid on the ground, and tube body 102, the setting of pipeline support mechanism 103 are in walking track
On 101, with walking track 101 on move, the walking track 101 including first cross slide way 1011, longitudinal rail 1012,
Two the second cross slide ways, 1013, two third cross slide ways 1014, first cross slide way 1011 are laid on the ground, longitudinally lead
The lower end of rail 1012 is equipped with the first traveling wheel, so that the transverse movement in first cross slide way 1011 of longitudinal rail 1012, poling
The longitudinal movement on longitudinal rail 1012 of the lower end of mechanism 102, the both sides of longitudinal rail 1012 are solid with the second cross slide way 1013
Fixed connection, so that 1013 synchronizing moving of longitudinal rail 1012 and the second cross slide way, the two of the lower end of third cross slide way 1014
Side is equipped with the second traveling wheel, so that the transverse movement on the second cross slide way 1013 of third cross slide way 1014, third are laterally led
The both sides of the upper end of rail 1014 are equipped with guide-track groove, the guide-track groove of the lower end of pipeline support mechanism 103 in third cross slide way 1014
Interior transverse movement, the tube body 102 include support underframe 1021, the first driving mechanism 1022, link 1023, several wear
Hole pipeline 1024, the support underframe 1021 and the first driving mechanism 1022 are arranged on longitudinal rail 1012, support underframe
1021 lower end be equipped with 1012 matched third traveling wheel of longitudinal rail so that support underframe 1021 is along longitudinal rail
1012 longitudinal movements, the lower end of the first driving mechanism 1022 is fixedly connected with longitudinal rail 1012, so that the first driving mechanism
1022 move synchronously with longitudinal rail 1012, and the driving end of the first driving mechanism 1022 is connect with support underframe 1021, to drive
Support underframe 1021 moves on longitudinal rail 1012, and the lower end of link 1023 is fixedly connected with support underframe 1021, so that
First driving mechanism 1022 drives the longitudinal movement on long rails of link 1023, longitudinal side and the perforation of link 1023
One end of pipeline 1024 is detachably connected, and several perforated pipes 1024 are erected in pipeline support mechanism 103, the first driving mechanism
When 1022 drive 1023 longitudinal movement of link, the longitudinal movement in pipeline support mechanism 103 of perforated pipe 1024.
It is in order to facilitate transverse shifting tube body 102 and pipeline support mechanism that first cross slide way 1011, which is arranged, in the present invention
103, enable to perforated pipe 1024 to be faced with wallboard to be perforated;Setting longitudinal rail 1012 is in order to facilitate poling machine
Structure 102 vertically moves, to carry out poling and core pulling operation to wallboard;It is mobile for convenience that the second cross slide way 1013, which is arranged,
Third cross slide way 1014;Setting third cross slide way 1014 is in order to facilitate transverse shifting pipeline support mechanism 103.Because of pipe
The transverse movement of road supporting mechanism 103 and the track of the longitudinal movement of tube body 102 will appear interference.In order not to mutually be concerned with
It relating to, third cross slide way 1014 is provided with two, when tube body 102 carries out poling or core pulling operates, two third transverse directions
Guide rail 1014 separates, to will not interfere with the longitudinal movement of tube body 102;When pipeline support mechanism 103 needs to lead from longitudinal
When the side of rail 1012 passes through the other side, two merging of third cross slide way 1014 are in contact.It, can in order to more figuratively bright
Long rails are regarded as river, two third cross slide ways 1014 are two sections of bridges, and tube body 102 is ship, pipeline support machine
Structure 103 is vehicle.In commercial process, multiple wallboard vertical arrays for waiting for poling are had together, one group of perforated pipe
1024 need to be placed in wallboard after perforating to corresponding wallboard, again extract perforated pipe 1024 out after a period of time.Such as
Fruit is extracted out immediately, and wallboard is easily deformed in the case where no sizing is completed.It, can be successively in order to keep perforation more efficient
Multigroup perforated pipe 1024 is corresponded to and is inserted into multiple wallboards, therefore multiple pipeline branch can be set on third cross slide way 1014
Support mechanism 103, to place perforated pipe 1024.Just being inserted into the perforated pipe 1024 of wallboard will not be taken out immediately, this can make pipe
Road supporting mechanism 103 is vacant, it is therefore desirable to which pipeline support mechanism 103 is moved on to the other side of longitudinal rail 1012.Until wallboard
After the completion of sizing, then perforated pipe 1024 is extracted out and is placed in vacant pipeline support mechanism 103, pipeline support mechanism 103
It moves backward again.After perforated pipe 1024 is inserted into wallboard, the link 1023 of punch block mechanism will be retracted to be worn with connecting another group
Hole pipeline 1024, therefore link 1023 is to be detachably connected with perforated pipe 1024.
By the cooperation of walk track 101, tube body 102, pipeline support mechanism 103, efficiently wearing for wallboard is realized
Pipe has saved manpower, while the structure of the present invention is relatively simple, and equipment production cost and later maintenance cost are relatively low.
Further, first driving mechanism 1022 include the first driving motor 10221, it is driving gear 10222, driven
Gear 10223, drive chain 10224, the driving motor are arranged in the side of longitudinal rail 1012, first driving motor
10221 shaft is fixedly connected with driving gear 10222, and driving gear 10222 and driven gear 10223 pass through drive chain
10224 connections, driven gear 10223 are arranged in the other side of long rails, the both sides of the lower end of link 1023 and drive chain
Item 10224 is fixedly connected, to make link 1023 be moved on long rails under the drive of the first driving motor 10221, even
The side for connecing frame 1023 is equipped at least one row connection through-hole, and the side that perforated pipe 1024 is connect with link 1023 is equipped with and connects
The matched through-hole in hole is connected, so that link 1023 and 1024 pin joint of perforated pipe.
Further, the pipeline support mechanism 103 includes braced frame 1031, several horizontal support pieces 1032, support
The lower end of frame 1031 is equipped with fourth line and walks wheel, and fourth line is walked wheel and moved on third cross slide way 1014, to make support frame
Frame 1031 is moved along third cross slide way 1014, and several horizontal support pieces 1032 are evenly arranged in the two of braced frame 1031
Side, and be detachably connected with braced frame 1031, so that perforated pipe 1024 is erected on horizontal support piece 1032.
In a better embodiment, the horizontal support piece 1032 is symmetrical structure, and horizontal support piece 1032 is plate,
A groove is respectively set in the both ends of horizontal support piece 1032, to place perforated pipe 1024.Not for easy to process and placement
With the perforated pipe 1024 of diameter, groove is arch.The middle-end of horizontal support piece 1032 can by bolt with braced frame 1031
Dismantling connection.Multiple threaded holes are arranged in braced frame 1031 accordingly, to facilitate fixing bolt, while convenient for adjusting cross-brace
Part 1032 is at a distance from ground.
Further, the guide-track groove of the third cross slide way 1014 is zigzag, is and leads correspondingly, fourth line walks wheel
The matched gear-like of track slot, so that the stabilized walking on third cross slide way 1014 of braced frame 1031.
Guide-track groove is zigzag, is conducive to moving synchronously for the both ends of braced frame 1031, to make perforated pipe 1024
It will not be displaced, to enable perforated pipe 1024 and wallboard to keep face.
Further, the pipeline support mechanism 103 further includes the second driving mechanism 10141, the second driving mechanism 10141
Driving end walk the shaft of wheel with fourth line and be fixedly connected, rotated with driving fourth line to walk wheel, to make pipeline support mechanism 103
It is moved on third cross slide way 1014.
Further, the pipeline support mechanism 103 further includes third driving mechanism 1033, and third driving mechanism 1033 is wrapped
Pipe-hanging hook 10331, fixed frame 10332, third driving motor 10333, driving wheel, electromagnet, card slot 10334 are included, it is described
The lower end of the both sides of pipe-hanging hook 10331 with second laterally walking track 101 be fixedly connected, the pipe-hanging hook 10331 it is upper
End is equipped with guide rail beam 103311, and fixed frame 10332 is set on guide rail beam 103311, and guide rail beam 103311 has two
Layer, the upper surface on the upper layer of guide rail beam 103311 are contacted with fixed frame 10332, third driving motor 10333 and fixed frame
Frame 10332 is fixedly connected, and the shaft of third driving motor 10333 is fixedly connected with driving wheel, and driving wheel is gear-like, and guide rail is horizontal
The upper surface of the lower layer of beam 103311 be equipped with the matched tooth socket of driving wheel so that driving wheel is steady on guide rail beam 103311
The lower end of fixed movement, fixed frame 10332 is equipped with electromagnet and guide hole, and the upper end of card slot 10334 is equipped with to match with guide hole
The slide post of conjunction, slide post move up and down in guide hole, and when electromagnet powers off, card slot 10334 is transported downwards by gravity
It is dynamic, and be stuck in the braced frame 1031 of pipeline support mechanism 103, when electromagnet is powered, card slot 10334 is inhaled by electromagnet
Draw and move upwards, and is detached from braced frame 1031.
Card slot 10334 can push pipeline support mechanism 103 to move, under the cooperation of guide rail beam 103311, Neng Gouyou
It is crooked that effect prevents braced frame 1031 from occurring.
Further, the poling core pulling equipment 10 further includes the 4th driving mechanism 10121, the 4th driving mechanism 10121
Driving end be fixedly connected with the shaft of the first traveling wheel, to drive the first walking rotation dynamic, to make the 4th driving mechanism
10121 drive longitudinal rails 1012 and the second cross slide way 1013 move synchronously.
Further, the poling core pulling equipment 10 further includes control device, control device include remote controler, receiver,
Controller, the first electromagnetic switch, the second electromagnetic switch, third electromagnetic switch, the 4th electromagnetic switch, the remote controler and receiver
Wireless communication connection, receiver are electrically connected with controller, and the control signal that remote controler is sent is sent to controller, are controlled
Device is also electrically connected with the first electromagnetic switch, the second electromagnetic switch, third electromagnetic switch, the 4th electromagnetic switch, and the first electromagnetism is opened
It closes and is electrically connected with the first driving motor 10221, the second electromagnetic switch is electrically connected with the second driving mechanism 10141, third electricity
Magnetic switch is electrically connected with third driving motor 10333, and the 4th electromagnetic switch is electrically connected with third driving motor 10333, with
The first driving motor 10221, the second driving mechanism 10141, third driving motor the 10333, the 4th are controlled by controller to drive
The startup or closing of mechanism.
Specifically, when longitudinal rail 1012 moves laterally to precalculated position, the 4th electromagnetic switch of remote controler remote control
Keep the 4th driving mechanism out of service, 1012 stop motion of longitudinal rail.The first electromagnetic switch of remote control control makes the first driving
Mechanism 1022 starts, and tube body 102 longitudinally moves to precalculated position, and the first driving mechanism 1022 is out of service, perforated pipe
1024 separate with link pin joint, two third cross slide ways 1014, the first driving mechanism 1022 of startup, before perforated pipe 1024
Into to wallboard, into eleven punch 11, after perforated pipe 1024 is moved to precalculated position, the first driving mechanism 1022 is out of service.At this point,
Perforated pipe 1024 is detached from pipeline support mechanism 103.Connecting pin is opened, perforated pipe 1024 is made to be separated with link 1023,
Start the first driving mechanism 1022, so that link 1023 is retreated to precalculated position, two third cross slide ways 1014 close up, empty
Pipeline support mechanism 103 is by the second driving mechanism 10141 or third driving mechanism 10333 from a sidesway of longitudinal rail 1012
It moves to the other side.Aforesaid operations are so repeated, until needing from wallboard to extract perforated pipe 1024 out.Then according to perforated pipe
The mode that road 1024 is inserted into wallboard again extracts all perforated pipes out.
Fig. 6 is please referred to, wallboard laminator includes wallboard shaping equipment 20, poling core pulling equipment 10, the wallboard sizing dress
It sets 20 and is equipped with several die cavitys, form wallboard base to fill the wallboard raw materials for production configured, the front end of wallboard shaping equipment 20 is equal
Even several through-holes of setting, the perforated pipe 1024 of poling core pulling equipment 10 passes through the through-hole of wallboard shaping equipment 20, with to die cavity
In wallboard base into eleven punch 11.
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly
It encloses, those skilled in the art can understand all or part of the processes for realizing the above embodiment, and is wanted according to right of the present invention
Equivalent variations made by asking, still belong to the scope covered by the invention.
Claims (9)
1. a kind of poling core pulling equipment, it is characterised in that:Including walking track, tube body, at least one pipeline support mechanism,
Track laying walk on the ground, tube body, the setting of pipeline support mechanism are on walking track, to be transported on walking track
Dynamic, the walking track includes first cross slide way, longitudinal rail, two the second cross slide ways, two third cross slide ways, the
One cross slide way is laid on the ground, and the lower end of longitudinal rail is equipped with the first traveling wheel, so that longitudinal rail is laterally led first
Transverse movement on rail, lower end longitudinal movement on longitudinal rail of tube body, the both sides of longitudinal rail and the second cross slide way
It is fixedly connected, so that longitudinal rail and the second cross slide way synchronizing moving, the both sides of the lower end of third cross slide way are equipped with second
Traveling wheel, so that the transverse movement on the second cross slide way of third cross slide way, the both sides of the upper end of third cross slide way are equipped with
Guide-track groove, lower end transverse movement in the guide-track groove of third cross slide way of pipeline support mechanism, the tube body include branch
Chassis, the first driving mechanism, link, several perforated pipes are supportted, the support underframe and the first driving mechanism are arranged in longitudinal direction
On guide rail, the lower end of support underframe be equipped with the matched third traveling wheel of longitudinal rail so that support underframe is led along longitudinal
Rail vertically moves, and the lower end of the first driving mechanism is fixedly connected with longitudinal rail, so that the first driving mechanism and longitudinal rail are same
Step movement, the driving end of the first driving mechanism is connect with support underframe, to drive support underframe to be moved on longitudinal rail, connection
The lower end of frame is fixedly connected with support underframe, so that the first driving mechanism drives link longitudinal movement on long rails, even
One end of the longitudinal side and perforated pipe that connect frame is detachably connected, and several perforated pipes are erected in pipeline support mechanism, the
When one driving mechanism drives link longitudinal movement, perforated pipe longitudinal movement in pipeline support mechanism.
2. poling core pulling equipment as described in claim 1, it is characterised in that:First driving mechanism includes the first driving electricity
Machine, driving gear, driven gear, drive chain, the driving motor are arranged in the side of longitudinal rail, the first driving electricity
The shaft of machine is fixedly connected with driving gear, and driving gear is connected with driven gear by drive chain, and driven gear setting exists
The both sides of the other side of long rails, the lower end of link are fixedly connected with drive chain, in the drive of the first driving motor
Under so that link is moved on long rails, the side of link is equipped at least one row and connects through-hole, perforated pipe and link
The side of connection is equipped with and connect the matched through-hole of through-hole, so that link and perforated pipe pin joint.
3. poling core pulling equipment as described in claim 1, it is characterised in that:The pipeline support mechanism include braced frame,
Several horizontal support pieces, the lower end of braced frame are equipped with fourth line and walk wheel, and fourth line is walked wheel and moved on third cross slide way, from
And braced frame is made to be moved along third cross slide way, several horizontal support pieces are evenly arranged in the both sides of braced frame, and with
Braced frame is detachably connected, so that perforated pipe is erected on horizontal support piece.
4. poling core pulling equipment as described in claim 1, it is characterised in that:The guide-track groove of the third cross slide way is sawtooth
Shape, correspondingly, fourth line walk wheel for the matched gear-like of guide-track groove so that braced frame on third cross slide way stablize
Walking.
5. poling core pulling equipment as described in claim 1, it is characterised in that:The pipeline support mechanism further includes the second driving
Mechanism, the shaft that wheel is walked at the driving end of the second driving mechanism with fourth line are fixedly connected, and are rotated with driving fourth line to walk wheel, to
Pipeline support mechanism is set to be moved on third cross slide way.
6. poling core pulling equipment as claimed in claim 3, it is characterised in that:The pipeline support mechanism further includes third driving
Mechanism, third driving mechanism include pipe-hanging hook, fixed frame, third driving motor, driving wheel, electromagnet, card slot, described outstanding
The lower end and the second lateral walking track for hanging the both sides of holder are fixedly connected, and the upper end of the pipe-hanging hook is equipped with guide rail beam,
Fixed frame is set on guide rail beam, and guide rail beam has two layers, upper surface and the fixed frame bridge joint on the upper layer of guide rail beam
It touches, third driving motor is fixedly connected with fixed frame, and the shaft of third driving motor is fixedly connected with driving wheel, and driving wheel is
Gear-like, the upper surface of the lower layer of guide rail beam be equipped with the matched tooth socket of driving wheel so that driving wheel is on guide rail beam
The lower end of stable motion, fixed frame is equipped with electromagnet and guide hole, and the upper end of card slot is equipped with and the matched sliding of guide hole
Column, slide post move up and down in guide hole, and when electromagnet powers off, card slot is moved downward by gravity, and is stuck in pipeline
In the braced frame of supporting mechanism, when electromagnet is powered, card slot is moved upwards by the attraction of electromagnet, and de- with braced frame
From.
7. poling core pulling equipment as described in claim 1, it is characterised in that:The poling core pulling equipment further includes the 4th driving
The driving end of mechanism, the 4th driving mechanism is fixedly connected with the shaft of the first traveling wheel, to drive the first walking rotation dynamic, to
Make the 4th driving mechanism that longitudinal rail and the second cross slide way be driven to move synchronously.
8. the poling core pulling equipment as described in claim 1 ~ 7 any one, it is characterised in that:The poling core pulling equipment is also wrapped
Control device is included, control device includes remote controler, receiver, controller, the first electromagnetic switch, the second electromagnetic switch, third electricity
Magnetic switch, the 4th electromagnetic switch, the remote controler are connected with receiver wireless communication, and receiver is electrically connected with controller, with
The control signal that remote controler is sent is sent to controller, controller is also electric with the first electromagnetic switch, the second electromagnetic switch, third
Magnetic switch, the 4th electromagnetic switch are electrically connected, and the first electromagnetic switch and the first driving motor are electrically connected, the second electromagnetic switch with
Second driving motor is electrically connected, and third electromagnetic switch is electrically connected with third driving motor, and the 4th electromagnetic switch is driven with third
Dynamic motor is electrically connected, to control the first driving motor, the second driving motor, third driving motor, 4 wheel driven by controller
The startup or closing of dynamic motor.
9. a kind of wallboard laminator, it is characterised in that:Including wearing described in wallboard shaping equipment, claim 1 ~ 8 any one
Pipe core pulling equipment, the wallboard shaping equipment are equipped with several die cavitys, and wallboard base is formed to fill the wallboard raw materials for production configured,
The front end of wallboard shaping equipment is uniformly arranged several through-holes, and the perforated pipe of poling core pulling equipment passes through the logical of wallboard shaping equipment
Hole, with to the wallboard base in die cavity into eleven punch 11.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810355250.5A CN108274597B (en) | 2018-04-19 | 2018-04-19 | Poling core pulling equipment and wallboard plate making machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810355250.5A CN108274597B (en) | 2018-04-19 | 2018-04-19 | Poling core pulling equipment and wallboard plate making machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108274597A true CN108274597A (en) | 2018-07-13 |
CN108274597B CN108274597B (en) | 2023-09-19 |
Family
ID=62811848
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810355250.5A Active CN108274597B (en) | 2018-04-19 | 2018-04-19 | Poling core pulling equipment and wallboard plate making machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108274597B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112571596A (en) * | 2020-12-08 | 2021-03-30 | 苏州宥安骏精密科技有限公司 | Ceramic mould |
CN113601685A (en) * | 2021-08-24 | 2021-11-05 | 德州海天机电科技有限公司 | Core pulling device for hollow wallboard production line |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2765753Y (en) * | 2005-01-06 | 2006-03-22 | 肖国强 | Assembly line apparatus for gypsum hollow wall plate |
CN2834851Y (en) * | 2005-09-29 | 2006-11-08 | 郑顺泉 | Apparatus for producing gypsum hollow wall plate |
CN201702842U (en) * | 2010-05-31 | 2011-01-12 | 鲍威 | Machine body and core tube separated core extractor |
CN201702843U (en) * | 2010-05-31 | 2011-01-12 | 鲍威 | Separated rotary core extractor for core tubes of engine body |
CN202241531U (en) * | 2011-08-01 | 2012-05-30 | 鲍威 | Stepping hydraulic core-pulling machine |
CN103802210A (en) * | 2014-03-05 | 2014-05-21 | 天津市得全轻质板制造有限公司 | Multi-functional tubeinserting and drawing equipment for lightweight wall plate formwork uprighting machine |
WO2017007435A1 (en) * | 2015-07-07 | 2017-01-12 | Baş Mehmet | A multi-hollow, cement based, lightweight building block and its manufacturing method |
CN107283604A (en) * | 2017-07-07 | 2017-10-24 | 周秘起 | A kind of light hollow wall plate mould preparation wears tube drawing all-in-one |
CN208148135U (en) * | 2018-04-19 | 2018-11-27 | 宁夏千秋墙体材料有限公司 | Poling core pulling equipment and wallboard laminator |
-
2018
- 2018-04-19 CN CN201810355250.5A patent/CN108274597B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2765753Y (en) * | 2005-01-06 | 2006-03-22 | 肖国强 | Assembly line apparatus for gypsum hollow wall plate |
CN2834851Y (en) * | 2005-09-29 | 2006-11-08 | 郑顺泉 | Apparatus for producing gypsum hollow wall plate |
CN201702842U (en) * | 2010-05-31 | 2011-01-12 | 鲍威 | Machine body and core tube separated core extractor |
CN201702843U (en) * | 2010-05-31 | 2011-01-12 | 鲍威 | Separated rotary core extractor for core tubes of engine body |
CN202241531U (en) * | 2011-08-01 | 2012-05-30 | 鲍威 | Stepping hydraulic core-pulling machine |
CN103802210A (en) * | 2014-03-05 | 2014-05-21 | 天津市得全轻质板制造有限公司 | Multi-functional tubeinserting and drawing equipment for lightweight wall plate formwork uprighting machine |
WO2017007435A1 (en) * | 2015-07-07 | 2017-01-12 | Baş Mehmet | A multi-hollow, cement based, lightweight building block and its manufacturing method |
CN107283604A (en) * | 2017-07-07 | 2017-10-24 | 周秘起 | A kind of light hollow wall plate mould preparation wears tube drawing all-in-one |
CN208148135U (en) * | 2018-04-19 | 2018-11-27 | 宁夏千秋墙体材料有限公司 | Poling core pulling equipment and wallboard laminator |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112571596A (en) * | 2020-12-08 | 2021-03-30 | 苏州宥安骏精密科技有限公司 | Ceramic mould |
CN113601685A (en) * | 2021-08-24 | 2021-11-05 | 德州海天机电科技有限公司 | Core pulling device for hollow wallboard production line |
Also Published As
Publication number | Publication date |
---|---|
CN108274597B (en) | 2023-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104260185B (en) | Multifunctional concrete prefabricated components battery mould production equipment and production line | |
CN208148135U (en) | Poling core pulling equipment and wallboard laminator | |
CN106089253B (en) | A kind of all-hydraulic template system poured for culvert | |
CN107053443A (en) | Block cutting production line | |
CN101795836A (en) | Line system for producing slabs | |
CN105057511B (en) | A kind of processing method and equipment of reinforcing bar keel | |
CN204195939U (en) | Multifunctional concrete prefabricated components battery mould production equipment and production line | |
CN104647577A (en) | Automatic production lien for assembling type housing prefabricated panels | |
CN108274597A (en) | Poling core pulling equipment and wallboard laminator | |
CN210969361U (en) | Production line for precast concrete hollow anti-seismic wallboard | |
CN103669872B (en) | A kind of walling method and walling equipment | |
CN100376761C (en) | Integrated climbform platform system | |
CN109139056A (en) | The telescoping steel form of tunnel side wall concrete lining cutting | |
CN206264117U (en) | The beam prefabricated equipment of T | |
CN207526506U (en) | separated steel mould trolley | |
CN101596740B (en) | Socket type pore-forming mold, socket type pore-forming device and method for preparing porous brick thereof | |
CN105040731A (en) | Assembled integral type reinforced concrete underground comprehensive pipe gallery and production mold thereof | |
CN203031752U (en) | Equipment for manufacturing composite box bodies for hollow floor slab filling | |
CN202213034U (en) | Large-specification fibrous plaster board forming equipment | |
CN201816135U (en) | Bridge body production auxiliary equipment and bridge body production system | |
CN116653079A (en) | Production method of prefabricated building block suitable for frame structure assembly type constructional column | |
CN212399901U (en) | Gypsum slat production host computer | |
CN2834850Y (en) | Forming machine for hollow wall plate | |
CN210969322U (en) | Production device of bidirectional core-pulling prefabricated hollow anti-seismic wallboard | |
CN208934709U (en) | The telescoping steel form of tunnel side wall concrete lining cutting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |