CN108265744A - Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line - Google Patents
Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line Download PDFInfo
- Publication number
- CN108265744A CN108265744A CN201810205839.7A CN201810205839A CN108265744A CN 108265744 A CN108265744 A CN 108265744A CN 201810205839 A CN201810205839 A CN 201810205839A CN 108265744 A CN108265744 A CN 108265744A
- Authority
- CN
- China
- Prior art keywords
- pile
- cushion cap
- phc
- piles
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005540 biological transmission Effects 0.000 title claims description 23
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 238000011065 in-situ storage Methods 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 34
- 210000003205 muscle Anatomy 0.000 claims description 10
- 238000009434 installation Methods 0.000 abstract description 3
- 238000004873 anchoring Methods 0.000 abstract description 2
- 238000005452 bending Methods 0.000 abstract description 2
- 239000000203 mixture Substances 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 17
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 238000009826 distribution Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000012407 engineering method Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
The invention provides a prefabricated PHC tubular pile, which comprises a tubular pile end plate provided with a threaded connecting hole, an upper joint, a lower joint and pile head anchoring steel bars, wherein the upper joint and the lower joint can be fixedly connected through threads; the upper joint is connected with a pile body and anchored into a bearing platform steel bar, the prefabricated PHC pipe pile extends into a foundation bearing platform by 300 mm and 500mm, and the extended part of the outer hoop spiral stirrup; the lower end of the pile body anchored into the steel bar of the bearing platform is fixedly connected with the upper joint; prefabricated PHC tubular pile, basic cushion cap, pile body anchor are gone into cushion cap reinforcing bar, spiral stirrup and the vertical reinforcing bar of cushion cap cast in situ and are formed, cancel the core concrete that fills, and altitude mixture control is nimble, vertical resistance to plucking, bending resistance and horizontal bearing capacity are high, anti-seismic performance is good, the installation is simple.
Description
Technical field
The invention belongs to architectural design field, more particularly to a kind of overhead transmission line PHC pipe pile foundations foundation pile and cushion cap
Connection structure, the structure have the characteristics that install simple, easy for construction and high capacity.
Background technology
With industry and civil buildings(Including structures)The structure scale of construction and structure height are continuously increased, what basis was born
Load also substantially increases, this proposes requirements at the higher level to foundation connection joint construction reliability.PHC pipe pile foundations have pile body matter
It measures, the significant advantages such as environmental pollution is small, speed of application is fast, mechanization degree is high, is widely applied in Practical Project,
And it is mainly used in the vertical pushing load of carrying.
For bearing the building of larger uplift load and horizontal loading(Structures)Basis, such as overhead power transmission line pole tower
Basis, the connecting structure of PHC pile piles and cushion cap need to carry out primary study in basis.PHC pipe pile foundation foundation piles are connect with cushion cap
When using mode is not cut, traditional connection method need to be welded around pile pile center in pile end board in circumferential equally distributed company
Steel plate is connect, junction steel plate anchors into pile cap steel muscle to weld, and junction steel plate and anchors into cushion cap number of steel bars and specification according to load
Size is calculated, and certain length wadding weft variation is at the same time poured inside pile pile, PHC pile piles are by anchoring into cushion cap reinforcing bar
And the bonding of wadding weft variation and stake inner wall realizes the connection with foundation platform.Overhead transmission line uses PHC pile piles more
Basis does not cut a connection mode with cushion cap, if directly existing in implementation process and centainly asking using above-mentioned Conventional attachment methods
Topic.Such as:Overhead transmission line foundation construction condition is poor compared with other industry and civil buildings, using electric welding junction steel plate and anchor
Enter cushion cap reinforcing bar, construction power supply is difficult to ensure, welding quality cannot be protected completely, and construction site is not easy detection welding matter
Amount;The usually more difficult accurate calculating of adhesion strength design value between wadding weft variation and pile pile inner wall, main cause is in pile pile
Wall is there are one layer of laitance layer, pile pile inner cavity often ponding and inner wall mud cleaning is difficult after piling construction in addition, in addition pile pile
Internal diameter is often smaller, causes wadding weft variation construction environment and quality stability poor, causes wadding weft variation and pile pile inner wall
Between cohesive force it is unreliable, other architectural engineerings determine adhesion strength, but overhead transmission line using field test substantially
Basis is in spot distribution, and Regional Distribution is wide, and orographic condition is totally different, and geological conditions is also multifarious, in very big objective of discreteness
In the case of carry out enough sample sizes and with statistical significance field test it is more difficult.
PHC pile pile pile sinking modes have two kinds of hammering and static pressure, and overhead transmission line is frequently with hammering construction method.Hammering is applied
Engineering method pile head elevation control is more difficult, and traditional foundation pile gos deep into cushion cap bottom surface Reinforcement with cushion cap connection mode for foundation pile
Lower certain length, but this mode need to increase cushion cap bottom surface Reinforcement lower cushion cap concrete when indivedual foundation piles surpass and beat
Thickness realizes the super connection for beating foundation pile and cushion cap, and it is poor to often result in engineering economy in this way, and works as overhead transmission line PHC
When pipe pile foundation foundation pile quantity is more, effective connection of whole foundation piles and cushion cap is controlled to become particularly difficult, in addition each Under Pile
When top mark is high inconsistent, foundation platform bottom longitudinal reinforcement binding constructional difficulties.
When overhead transmission line PHC pipe pile foundations bear to pull out with horizontal loads, foundation pile is born at cushion cap bottom surface
Maximum pulling force, moment of flexure and shearing, section controls PHC pile pile type selectings at this, and any other section often can much meet stress,
If be only meet foundation pile at cushion cap bottom surface stress and increase pile pile section or increase prestress reinforcement, it will cause huge waves
Take.
Invention content
It is an object of the invention to propose the connection structure shape of a kind of overhead transmission line PHC pipe pile foundations foundation pile and cushion cap
Formula, it is intended to which solving cushion cap in above-mentioned background, the connection construction under uplift load effect is difficult with foundation pile and reliability is insufficient, hammers
Pile head elevation control of constructing is difficult, foundation pile is foundation platform bottom surface local location intensity is insufficient the problems such as.
The technology used in the present invention means are as described below.
Present invention firstly provides a kind of prefabricated PHC pile piles, and with pile end board, deformed bar, improvement is:Institute
It is in circumferentially distributed several threaded connection holes to state pile end board and be provided with around pile pile center;Comprising mechanical connecting joint, it includes
There are top connection and lower contact, the top connection lower end has bolt head, the first external screw thread is provided on the outside of the bolt head, described
Inside top connection has the first internal thread;The lower contact upper outside, which is provided with, to be had and the matched second outer spiral shell of connecting hole
Line, the lower contact inside have the second internal thread to match with the bolt head;Comprising pile crown anchor bar, top with
The second internal thread lower thread connection on the inside of lower contact is fixed.
Furthermore:The position of the threaded connection hole is alternatively arranged with deformed bar, and the lower contact defaults in
In the threaded connection hole of pile end board, the pile crown anchor bar is threaded io at lower contact and deformed bar integral preform
Into PHC pile piles.
In this way the advantages of is need not to set wadding weft variation at the top of the PHC pile piles(Containing filling out in-core longitudinal reinforcement and hoop
Muscle), according to overhead transmission line foundation load feature, cancel wadding weft variation(Containing filling out in-core longitudinal reinforcement and stirrup)When, PHC
Pile pile itself section shear-carrying capacity can much meet stress needs, and the anti-pulling capacity provided can be by connecing
Head is effectively made up, and under the premise of connection safety and reliability is ensured, is reduced site operation difficulty, is accelerated construction
Progress.The mechanical connecting joint needs to be selected according to the principle of equal strength using two sections of compositions, material according to anchor bar stress
It takes, size is adjusted flexibly according to anchor bar stress needs.Mechanical connecting joint hypomere is embedded in pile pile inner wall, can same PHC
Pile pile other materials is in pre-fabricated factory processing and fabricating together.
The present invention is based on above-mentioned prefabricated PHC pile piles, it is further provided a kind of overhead transmission line PHC pipe pile foundation foundation piles
With the connection structure of cushion cap, improvement is:Cushion cap reinforcing bar, spiral hoop are anchored into comprising prefabricated PHC pile piles, foundation platform, pile body
Muscle and cushion cap longitudinal reinforcement;
Wherein, the prefabricated PHC pile piles, have pile end board, deformed bar, and the pile end board is provided with around pile pile center
In circumferentially distributed several threaded connection holes, position and the deformed bar of the threaded connection hole are alternatively arranged;Include machinery
Jointing, it includes having top connection and lower contact, the top connection lower end has bolt head, is provided on the outside of the bolt head
First external screw thread, the inside top connection have the first internal thread;The lower contact upper outside, which is provided with, to be had and connecting hole
Matched second external screw thread, the lower contact inside have the second internal thread to match with the bolt head;Include pile crown anchor
Gu reinforcing bar, top connect fixation with the second internal thread lower thread on the inside of lower contact, is alternatively arranged with deformed bar;Institute
It states lower contact to default in the threaded connection hole of pile end board, the pile crown anchor bar connects at lower contact and deformed bar
Integral preform is into PHC pile piles;
The prefabricated PHC pile piles stretch into foundation platform, the external setting tie hoop for the part stretched into;The pile body, which anchors into, to be held
Platform reinforcing bar lower end is threadedly coupled fixation with the first internal thread of top connection;The prefabricated PHC pile piles, foundation platform, pile body anchor into
Cushion cap reinforcing bar, tie hoop and cushion cap longitudinal reinforcement cast in situs molding.
Further:The cushion cap longitudinal reinforcement is blocked in the part that prefabricated PHC pile piles stretch into foundation platform, and in
Oblique 45 ° of the oblique reinforcing bar reinforcement of equal diameter is used herein or uses hood type longitudinal reinforcement.
Further:The tie hoop forms steel reinforcement cage, bearing rod lower end tool for vertically arranged bearing rod and spiral bar
Have tie hoop being fixed on foundation platform bottom cushion cap longitudinal reinforcement(9)On horizontal curved trisection.
Further:The distance that the prefabricated PHC pipe pile end portions stretch into foundation platform is 300 ~ 500mm.
Further:The spiral internal diameter of the tie hoop adds 100mm, tie hoop configuration for prefabricated PHC pile piles outer diameter
Height plus 100mm highly are stretched into for prefabricated PHC pile piles, tie hoop diameter is not less than 10mm, and a diameter of spiral bar of bearing rod is straight
Diameter adds 6mm.
Further:The thickness of the pile end board is not less than 30mm.
Further:The diameter of the oblique reinforcing bar is not less than longitudinal reinforcement diameter.
Technique effect is as follows caused by the present invention.
1st, pile crown anchor bar is configured, improves pile pile tension and moment capacity and shear-carrying capacity.
2nd, cancel wadding weft variation(Containing filling out in-core longitudinal reinforcement and stirrup), shorten construction period, reduce building cost.
3rd, anchor bar is connected using mechanical connecting joint, stress performance is stablized, easy for construction.
4th, mechanical connecting joint divides the mode that two sections assemble, and according to both sides anchor rib stress can need that ruler is adjusted flexibly
It is very little.
5th, pile end board opens up the connecting hole of connection mechanical connecting joint, and the number of openings and open pore size can be according to both sides
Anchor rib stress needs are adjusted flexibly.
6th, PHC pile piles stretch into cushion cap height H and can be adjusted flexibly in the range of 300 ~ 500mm, avoid impact pile driving machinery
It is tired to avoid the foundation platform bottom longitudinal reinforcement binding that pile crown absolute altitude is unanimously brought for the dimension of platform variation that construction error is brought
It is difficult.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is a-a diagrammatic cross-sections in Fig. 1.
Fig. 3 is b-b diagrammatic cross-sections in Fig. 1.
Fig. 4 is pile end board structure diagram in the present invention.
Fig. 5 is mechanical connecting joint schematic diagram in the present invention.
Fig. 6 is c-c diagrammatic cross-sections in Fig. 3.
Fig. 7 is tie hoop schematic diagram in the present invention.
Fig. 8 is using hood type longitudinal reinforcement structure diagram.
Fig. 9 is anchor ear reinforcing bar specific manifestation form structure schematic diagram.
Figure number explanation:
1-PHC pile piles;2-foundation platform;3-pile end board;4-mechanical connecting joint;5-pile body anchors into cushion cap reinforcing bar;
6-pile crown anchor bar;7-tie hoop;8-oblique reinforcing bar;9-cushion cap longitudinal reinforcement;Prestressing force in 10-pile pile
Muscle;11-pile pile inside spin stirrup;12-hood type longitudinal reinforcement.
Specific embodiment
It is the connection knot of a kind of overhead transmission line PHC pipe pile foundations foundation pile provided by the invention and cushion cap such as Fig. 1
Structure, comprising the prefabricated PHC pile piles 1 in lower part, top foundation platform 2, wherein the prefabricated PHC pile piles 1 are molded in prefabrication, with
The integral connection structure of the live formed by integrally casting of foundation platform 2.
Incorporated by reference to shown in Fig. 1 and Fig. 2, wherein the prefabricated PHC pile piles 1, have pile end board 3, deformed bar 10 and
The structures such as pile pile inside spin stirrup 11, with reference to shown in Fig. 4, wherein, it is provided on the pile end board 3 around pile pile center in circumferential direction
Several threaded connection hole 3-1 of distribution, the position of the threaded connection hole 3-1 can be alternatively arranged with deformed bar 10.Screw thread
The a diameter of D2 of connecting hole 3-1, for installing mechanical connecting joint 4.Threaded connection hole 3-1 is around pile pile center in circumferential uniform cloth
It puts, and branch has tensioning hole in pile end board(Or pier nose hole)Centre, geometric parameter determine according to mechanical splice, end plate thickness
H1 is not less than 30mm.Connection hole number can be carried out calculating according to foundation pile stressing conditions and be determined, connection bore dia is according to mechanical connection
The pile crown anchor bar diameter of connector hypomere connection determines.
It please refers to shown in Fig. 5, comprising mechanical connecting joint 4, it includes having top connection 4-1 and lower contact 4-2, wherein, institute
Top connection 4-1 lower ends are stated with bolt head 4-3, the bolt head 4-3 outsides are provided with the first external screw thread 4-4, the top connection
There is the first internal thread 4-5 on the inside of 4-1;The lower contact 4-2 upper outsides, which are provided with, to be had and connecting hole 3-1 matched second
There is the second internal thread 4-7 to match with the bolt head 4-3 on the inside of external screw thread 4-6, the lower contact 4-2.Continuing with ginseng
Fig. 6 is read, the outer diameter of the lower contact 4-2 is D2, internal diameter D1, for the hollow bushing with elongated internal thread, one side setting
The length of second external screw thread 4-6 is equal to pile end board thickness H1, to be screwed into the threaded connection hole 3-1 of pile end board 3.On
A diameter of D of the lower end of the bolt head 4-3 of connector 4-11, length is equal to 3 thickness H of pile end board1, pile pile is connected to be screwed into
The second external screw thread 4-6 of the lower contact 4-2 of end plate 3 realizes the connection of mechanical connecting joint two sections.Top connection 4-1 is tool
There are the hollow bushing of elongated internal thread, outer diameter D4, internal diameter D3.4 material of mechanical connecting joint is according to anchor bar stress needs
It is chosen according to the principle of equal strength, size is adjusted flexibly according to anchor bar stress needs.Mechanical connecting joint hypomere is embedded in pipe
Stake inner wall, with PHC pile piles other materials in pre-fabricated factory processing and fabricating together.
Again as depicted in figs. 1 and 2, this described prefabricated PHC pile pile 1 is also comprising pile crown anchor bar 6, anchorage length Lb,
Top connect fixation with the second internal thread 4-7 lower threads on the inside of lower contact 4-2.The position of the threaded connection hole 3-1 with
Deformed bar 10 is alternatively arranged, and the lower contact 4-2 is defaulted in the threaded connection hole 3-1 of pile end board 3 so that pile crown anchor
Gu reinforcing bar 6 is threaded io at lower contact 4-2 and is arranged at intervals with deformed bar 10, interlaced arrangement, positioned at pile pile inside spin hoop
11 inside of muscle.The anchorage length Lb is calculated according to related specifications.
The PHC pipe pile foundations foundation pile and the connection structure of cushion cap designed in the present invention for overhead transmission line uses
Prefabricated PHC pile piles 1, foundation platform 2, pile body anchor into the casts in situs such as cushion cap reinforcing bar 5, tie hoop 7, cushion cap longitudinal reinforcement 9 into
Type.The prefabricated PHC pile piles 1 stretch into foundation platform 2, and the outside of part that the prefabricated PHC pile piles 1 stretch into foundation platform 2 is set
Tie hoop 7 is put, the pile body anchors into 5 lower end of cushion cap reinforcing bar and is threadedly coupled fixation with the first internal thread 4-5 of top connection 4-1,
The anchorage length La that pile body anchors into cushion cap reinforcing bar 5 is calculated according to related specifications, and terminal hook can be used when anchorage length is larger
Or mechanical anchor measure arrangement;Also comprising cushion cap longitudinal reinforcement 9, the part that foundation platform 2 is stretched into prefabricated PHC pile piles 1 is cut
It is disconnected, and in oblique 8 reinforcement of reinforcing bar of equal diameter for using oblique 45 ° herein.Alternatively, as shown in Figure 8 and Figure 9, using anchor ear
Formula longitudinal reinforcement 12, it includes can surround the first hood type reinforcing bar 12-1, the second hood type reinforcing bar that center is border circular areas
12-2, third hood type reinforcing bar 12-3 and the 4th hood type reinforcing bar 12-4, central circular avoid the part stretched into, but fully
The stress equalization of cushion cap longitudinal reinforcement 9 is ensured.
Wherein, prefabricated PHC pile piles 1 stretch into foundation platform 2, and the distance stretched into is 300 ~ 500mm, and the PHC pile piles stretch into
Foundation platform height H, height 300 ~ 500mm in the range of can meet, can according to live impact pile driving situation flexible modulation,
The adjustable range of 200mm can fully meet existing impact pile driving machine error demand.It please refers to shown in Fig. 7, the tie hoop 7
Steel reinforcement cage is formed for vertically arranged bearing rod 7-1 and spiral bar 7-2, and bearing rod 7-1 lower ends horizontal curved trisection is to by spiral hoop
Muscle is fixed on foundation platform bottom cushion cap longitudinal reinforcement 9.
Wherein, the spiral internal diameter of the tie hoop 7 adds 100mm for prefabricated 1 outer diameter of PHC pile piles, and height is configured in tie hoop 7
It spends and stretches into height plus 100mm for prefabricated PHC pile piles 1,7 diameter of tie hoop is not less than 10mm, and a diameter of spiral bar of bearing rod is straight
Diameter adds 6mm.The diameter of the oblique reinforcing bar 8 is not less than 9 diameter of longitudinal reinforcement.
The structure stress mechanism of the present invention is as follows:On pull out with horizontal loading by top make somebody a mere figurehead transmission line tower structure transmit
In PHC pipe pile foundations, load is transmitted to PHC pile piles by PHC pipe pile foundations by foundation platform, and wherein pile body anchors into pile cap steel
Muscle, mechanical connecting joint, pile end board and pile crown anchor bar are to realize that load is transmitted to the weight of PHC pile piles from foundation platform
Want carrier and key stressed member;Pile crown anchor bar also serves as foundation pile pile body stress steel when cushion cap bottom surface position stretch bending calculates
Muscle.
The present invention construction procedure be:The prefabricated PHC pile piles of pre-fabricated factory, mechanical connecting joint hypomere is embedded in advance when prefabricated
PHC pile end boards set several screwed connection holes, while pile crown anchor bar is connected to mechanical connection and connects accordingly
Head hypomere;PHC pile piles are transported to construction site and carry out hammering construction, and be higher than foundation platform bottom with stake top absolute altitude after machining
Absolute altitude H is as hammer standard is stopped, and installation mechanical connecting joint epimere, PHC pile piles stretch into the high H parts of foundation platform after the completion of piling
The tie hoop bound in advance is placed in outside, and mechanical connecting joint epimere installation pile body anchors into cushion cap reinforcing bar, subsequently complete in order
Into the binding of cushion cap reinforcing bar, concreting work, the connection structure of PHC pipe pile foundations foundation pile and cushion cap of the present invention is realized.
Claims (9)
1. a kind of prefabricated PHC pile piles have pile end board(3), deformed bar(10), it is characterised in that:The pile end board
(3)It is in circumferentially distributed several threaded connection holes to be provided with around pile pile center(3-1);
Include mechanical connecting joint(4), it includes have top connection(4-1)And lower contact(4-2), the top connection(4-1)Lower end
With bolt head(4-3), the bolt head(4-3)Outside is provided with the first external screw thread(4-4), the top connection(4-1)Inside
With the first internal thread(4-5);
The lower contact(4-2)Upper outside, which is provided with, to be had and connecting hole(3-1)Matched second external screw thread(4-6), it is described
Lower contact(4-2)Inside has and the bolt head(4-3)The second internal thread to match(4-7);
Include pile crown anchor bar(6), top and lower contact(4-2)Second internal thread of inside(4-7)Lower thread connects
It is fixed.
2. a kind of prefabricated PHC pile piles as described in claim 1, it is characterised in that:The threaded connection hole(3-1)Position with
Deformed bar(10)It is alternatively arranged, the lower contact(4-2)Default in pile end board(3)Threaded connection hole(3-1)In, institute
State pile crown anchor bar(6)It is threaded io lower contact(4-2)Place and deformed bar(10)Integral preform is into PHC pile piles.
3. a kind of connection structure of overhead transmission line PHC pipe pile foundations foundation pile and cushion cap, it is characterised in that:Include prefabricated PHC
Pile pile(1), foundation platform(2), pile body anchor into cushion cap reinforcing bar(5), tie hoop(7)And cushion cap longitudinal reinforcement(9);
Wherein, the prefabricated PHC pile piles have pile end board(3), deformed bar(10), the pile end board(3)It is provided with
It is in circumferentially distributed several threaded connection holes around pile pile center(3-1), the threaded connection hole(3-1)Position and prestress steel
Muscle(10)It is alternatively arranged;
Include mechanical connecting joint(4), it includes have top connection(4-1)And lower contact(4-2), the top connection(4-1)Lower end
With bolt head(4-3), the bolt head(4-3)Outside is provided with the first external screw thread(4-4), the top connection(4-1)Inside
With the first internal thread(4-5);
The lower contact(4-2)Upper outside, which is provided with, to be had and connecting hole(3-1)Matched second external screw thread(4-6), it is described
Lower contact(4-2)Inside has and the bolt head(4-3)The second internal thread to match(4-7);
Include pile crown anchor bar(6), top and lower contact(4-2)Second internal thread of inside(4-7)Lower thread connects
It is fixed, with deformed bar(10)It is alternatively arranged;
The lower contact(4-2)Default in pile end board(3)Threaded connection hole(3-1)In, the pile crown anchor bar(6)Even
Connect lower contact(4-2)Place and deformed bar(10)Integral preform is into PHC pile piles;
Prefabricated PHC pile piles(1)Stretch into foundation platform(2), the external setting tie hoop for the part stretched into(7);
The pile body anchors into cushion cap reinforcing bar(5)Lower end and top connection(4-1)The first internal thread(4-5)It is threadedly coupled and fixes;
The prefabricated PHC pile piles(1), foundation platform(2), pile body anchor into cushion cap reinforcing bar(5)And tie hoop(7)And cushion cap longitudinal direction
Reinforcing bar(9)Cast in situs is molded.
4. the connection structure of a kind of overhead transmission line PHC pipe pile foundations foundation pile as claimed in claim 3 and cushion cap, feature
It is:The cushion cap longitudinal reinforcement(9)In prefabricated PHC pile piles(1)Stretch into foundation platform(2)Part block, and adopted in herein
With the oblique reinforcing bar of oblique 45 ° of equal diameters(8)Reinforcement uses hood type longitudinal reinforcement(12).
5. the connection structure of a kind of overhead transmission line PHC pipe pile foundations foundation pile and cushion cap as described in claim 3 or 4,
It is characterized in that:The tie hoop(7)For vertically arranged bearing rod(7-1)With spiral bar(7-2)Form steel reinforcement cage, bearing rod
(7-1)Lower end has tie hoop being fixed on foundation platform bottom cushion cap longitudinal reinforcement(9)On horizontal curved trisection.
6. the connection structure of a kind of overhead transmission line PHC pipe pile foundations foundation pile as claimed in claim 5 and cushion cap, feature
It is:The prefabricated PHC pile piles(1)Foundation platform is stretched into end(2)Distance be 300 ~ 500mm.
7. the connection structure of a kind of overhead transmission line PHC pipe pile foundations foundation pile as claimed in claim 6 and cushion cap, feature
It is:The tie hoop(7)Spiral internal diameter be prefabricated PHC pile piles(1)Outer diameter adds 100mm, tie hoop(7)Configuration is high
It spends for prefabricated PHC pile piles(1)Stretch into height plus 100mm, tie hoop(7)Diameter is not less than 10mm, a diameter of spiral of bearing rod
Muscle diameter adds 6mm.
8. the connection structure of a kind of overhead transmission line PHC pipe pile foundations foundation pile as claimed in claim 7 and cushion cap, feature
It is:The pile end board(3)Thickness be not less than 30mm.
9. the connection structure of a kind of overhead transmission line PHC pipe pile foundations foundation pile as claimed in claim 8 and cushion cap, feature
It is:The oblique reinforcing bar(8)Diameter be not less than longitudinal reinforcement(9)Diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810205839.7A CN108265744B (en) | 2018-03-13 | 2018-03-13 | Connection structure of overhead transmission line PHC tubular pile foundation pile and cushion cap |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810205839.7A CN108265744B (en) | 2018-03-13 | 2018-03-13 | Connection structure of overhead transmission line PHC tubular pile foundation pile and cushion cap |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108265744A true CN108265744A (en) | 2018-07-10 |
CN108265744B CN108265744B (en) | 2024-07-12 |
Family
ID=62774794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810205839.7A Active CN108265744B (en) | 2018-03-13 | 2018-03-13 | Connection structure of overhead transmission line PHC tubular pile foundation pile and cushion cap |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108265744B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109778894A (en) * | 2019-02-26 | 2019-05-21 | 中铁第四勘察设计院集团有限公司 | A kind of railroad bridge tubular pole and cushion cap connection structure, foundation structure and construction method |
CN110644471A (en) * | 2019-10-18 | 2020-01-03 | 中国铁路设计集团有限公司 | Staple bolt formula precast tubular pile and connection structure of prefabricated cushion cap |
CN113638361A (en) * | 2021-08-26 | 2021-11-12 | 哈尔滨工业大学 | Connection structure of port and pier PHC tubular pile and superstructure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6293071B1 (en) * | 1997-01-03 | 2001-09-25 | Apostolos Konstantinidis | Antiseismic spiral stirrups for reinforcement of load bearing structural elements |
CN102127913A (en) * | 2011-05-04 | 2011-07-20 | 江苏建华管桩有限公司 | Method for connecting concrete pile and bearing platform |
CN202073111U (en) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | Connection structure of a concrete pile and a bearing platform |
CN106320327A (en) * | 2016-09-18 | 2017-01-11 | 中船第九设计研究院工程有限公司 | Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate |
CN208121795U (en) * | 2018-03-13 | 2018-11-20 | 国家电网公司 | Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line |
-
2018
- 2018-03-13 CN CN201810205839.7A patent/CN108265744B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6293071B1 (en) * | 1997-01-03 | 2001-09-25 | Apostolos Konstantinidis | Antiseismic spiral stirrups for reinforcement of load bearing structural elements |
CN102127913A (en) * | 2011-05-04 | 2011-07-20 | 江苏建华管桩有限公司 | Method for connecting concrete pile and bearing platform |
CN202073111U (en) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | Connection structure of a concrete pile and a bearing platform |
CN106320327A (en) * | 2016-09-18 | 2017-01-11 | 中船第九设计研究院工程有限公司 | Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate |
CN208121795U (en) * | 2018-03-13 | 2018-11-20 | 国家电网公司 | Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109778894A (en) * | 2019-02-26 | 2019-05-21 | 中铁第四勘察设计院集团有限公司 | A kind of railroad bridge tubular pole and cushion cap connection structure, foundation structure and construction method |
CN110644471A (en) * | 2019-10-18 | 2020-01-03 | 中国铁路设计集团有限公司 | Staple bolt formula precast tubular pile and connection structure of prefabricated cushion cap |
CN110644471B (en) * | 2019-10-18 | 2024-04-05 | 中国铁路设计集团有限公司 | Connection structure of staple bolt formula precast tubular pile and prefabricated cushion cap |
CN113638361A (en) * | 2021-08-26 | 2021-11-12 | 哈尔滨工业大学 | Connection structure of port and pier PHC tubular pile and superstructure |
Also Published As
Publication number | Publication date |
---|---|
CN108265744B (en) | 2024-07-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104294753B (en) | A kind of hollow pier stud syndeton of bridge prefabrication and construction | |
CN100567659C (en) | The base configuration of iron tower | |
CN108678218B (en) | Assembly type concrete shear wall based on multipurpose thin-wall steel pipe and construction method thereof | |
US11274412B2 (en) | Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same | |
JP7175725B2 (en) | Reinforcing structure of masonry building | |
CN208121795U (en) | Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line | |
CN110258362B (en) | Deformation control method for urban underground engineering to pass through existing bridge | |
CN108265744A (en) | Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line | |
CN112575796A (en) | Foundation pit supporting structure and construction method thereof | |
CN111364352A (en) | Prefabricated pipe pier and cast-in-place pile connecting structure and construction method | |
CN211143502U (en) | Prefabricated column containing corrugated pipe and frame structure thereof | |
CN112376603A (en) | Assembly type fan foundation and assembly method thereof | |
CN108729541B (en) | Connect beam type Building block construction method | |
CN108678164B (en) | Connecting beam type assembled building structure | |
CN215925950U (en) | Pressure-bearing type uplift pile precast pile connecting structure | |
CN110725475A (en) | Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column | |
CN216041287U (en) | Assembled spiral anchor foundation | |
CN208563359U (en) | Prefabricated PHC tubular pile and connecting structure of prefabricated PHC tubular pile and bearing platform flange | |
CN213897088U (en) | PSB finish rolling screw-thread steel prestressed concrete fender pile structure | |
CN212200050U (en) | Assembled reinforced concrete side anti-collision guardrail for connecting bridge | |
CN220620183U (en) | Connection structure of PHC tubular pile and prefabricated bearing platform of overhead transmission line | |
CN114215528B (en) | Multi-arch tunnel reinforcement combined intermediate wall structure and construction method | |
CN211340385U (en) | Semi-assembly type pier with shear keys | |
CN216518128U (en) | Combined structure is consolidated to double arch tunnel mid-board | |
US11885092B2 (en) | Reinforcement structures for tensionless concrete pier foundations and methods of constructing the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |