CN108265725A - Drawknot stake supporting and the construction method of basement process - Google Patents

Drawknot stake supporting and the construction method of basement process Download PDF

Info

Publication number
CN108265725A
CN108265725A CN201611258348.6A CN201611258348A CN108265725A CN 108265725 A CN108265725 A CN 108265725A CN 201611258348 A CN201611258348 A CN 201611258348A CN 108265725 A CN108265725 A CN 108265725A
Authority
CN
China
Prior art keywords
stake
drawknot
pile
supporting
straining beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611258348.6A
Other languages
Chinese (zh)
Inventor
任贵生
邹登亮
沈元红
周嘉林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING GEO-ENGINEERING Co
Original Assignee
BEIJING GEO-ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GEO-ENGINEERING Co filed Critical BEIJING GEO-ENGINEERING Co
Priority to CN201611258348.6A priority Critical patent/CN108265725A/en
Publication of CN108265725A publication Critical patent/CN108265725A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The construction method of a kind of drawknot stake supporting and basement process is disclosed in the present invention, by the way that the former CFG stakes designed in ground or foundation pile are transformed into drawknot stake in the form of increasing steel reinforcement cage or increase arrangement of reinforcement, and it is attached using the straining beam of armored concrete, form the support system for being similar to Gravity Retaining Wall formula again similar to multiline pile supporting, the defects of overcoming that single pile body Support Deformation is big, bearing horizontal bearing force difference;By adding stress dissipation mattress layer more than tie beam, the adverse effect of shearing or punching of the straining beam to proposed sole plate is reduce or eliminated;It is equivalent to increases a set of intensive strip footing in the case where shallow foundation deforms relatively large substrate areas, this region pile body stress is more uniformly distributed, and more conducively reduces the differential settlement caused by difference of height excavates.

Description

Drawknot stake supporting and the construction method of basement process
Technical field
The present invention relates to vertical side slope supporting construction field, more particularly to a kind of drawknot stake supporting and the construction of basement process Method.
Background technology
In the work progress of balcony, the ground of multiple balconys while situation about excavating can often occur, to save balcony Construction time, wherein, the ground in main building and ground library can be connected as a single entity, the embedded depth of foundation of main building and the embedded depth of foundation for being adjacent to library It can there are the embedded depth of foundation between difference of height, or adjacent balcony can there are differences of height.Due under the shallower main building basis of buried depth CFG or engineering pile are provided with, and the difference of height between adjacent two embeddeds depth of foundation does not have and puts between 3 to 6 meters Slope excavation condition can only use vertical side slope supporting measure.
If to vertical side slope using pile-anchor retaining, prestressed anchor is inserted into the shallower ground of buried depth, prestressed anchor CFG stakes or the engineering pile at the shallower basic foundation of buried depth may be destroyed, the ground for causing buried depth shallower is unstable.If To vertical side slope individually using cantilever pile supporting, due to the gravity of the main building above the shallower ground of buried depth, cantilever pile stake The soil body between body can be towards external diffusion, and the ground for causing buried depth shallower is larger in the position deflection of vertical side slope, influences buried depth The stability of shallower ground top structure object.
Invention content
The purpose of the present invention is to provide a kind of drawknot stake supporting and the construction method of basement process, to solve using CFG Stake or foundation pile carry out ground foundation reason and close to the pattern foundation pit supporting structure between basis there are larger difference of height and when not having slope condition And the influence slope retaining that can not realize is stable during Foundation Treatment or basement process is caused to destroy, quality controllability Difference, the problem of construction speed is slow and of high cost.
The present invention above-mentioned purpose technical scheme is that:A kind of drawknot stake supporting and basement process Construction method, include the following steps:
Step 1, earth excavation to relatively shallow base area CFG or foundation pile construction work surface absolute altitude;
Step 2, according to CFG or foundation pile position, select drawknot stake, determine straining beam spacing, straining beam width and straining beam height Parameter;
Step 3 needs the moment of flexure born and shearing according to drawknot stake, determines the steel reinforcement cage being configured in CFG or foundation pile Reinforcing bar content;
Step 4, drawknot stake and intrinsic CFG or engineering pile pile;
Step 5 understands inter-pile soil, rejects pile crown;
Step 6, the steel reinforcement cage for binding straining beam, and casting concrete;
Step 7, deep foundation region substep carry out earth excavation, and carry out spray anchor protection to exposed drawknot stake inter-pile soil, until Substrate absolute altitude.
By using above-mentioned technical proposal, by will be provided with the drawknot stake of steel reinforcement cage using armored concrete straining beam into Row connection forms the support system for being similar to Gravity Retaining Wall formula again similar to multiline pile supporting, overcomes single pile body branch The defects of protecting deformation greatly, bearing horizontal bearing force difference.
Preferably, increase following steps before step 7:
The stress dissipation mattress layer of 20 to 60 ㎝ thickness is laid in drawknot stake top portion, the material of stress dissipation mattress layer is middle sand, grain Diameter does not surpass the rubble or graded sand and stone of 30 ㎜, and stress dissipation mattress layer vibrates or Static compaction, and compacting degree is no more than 0.9.
By using above-mentioned technical proposal, by adding stress dissipation mattress layer more than tie beam, reduce or eliminate Adverse effect of the straining beam to shearing or the punching of proposed sole plate.
Preferably, increase the monitoring of top of the slope economic deeply mixing cement-soil pile in step 7, when the deformation of deformation measurement data feedback compared with When big or rate of deformation is very fast, individual layer cutting depth should be reduced or excavate range, and control a rate of advance or suitably returned It fills out.
By using above-mentioned technical proposal, the digging process at basic difference of height is carried out after drawknot pile supporting system is formed Middle progress top and the monitoring of deeply mixing cement-soil pile can dynamically grasp the stability of system, the generation effectively prevented accident.
In conclusion the invention has the advantages that:The setting of multi-functional drawknot stake is equivalent at substrate difference of height A set of intensive strip footing is increased in the case where shallow foundation deforms relatively large substrate areas, this region pile body stress is more equal It is even, more conducively reduce the differential settlement caused by difference of height excavates, connected by the straining beam of armored concrete, after processing Shallower foundation form support system, avoiding the additional duration for carrying out supporting and cost increases.Due to instead of piled anchor Supporting also avoids the destruction that prestressed anchor is constructed to the proposed following stratum in basis.
Description of the drawings
Fig. 1 is the topology view of main building ground and garage ground;
Fig. 2 is the front view of drawknot stake;
Fig. 3 is drawknot pile cages topology view;
Fig. 4 is the vertical view of drawknot stake top shield;
Fig. 5 is the A portions enlarged view in Fig. 1;
Fig. 6 is the flow chart of the construction method of drawknot stake supporting and basement process.
In figure, 1, drawknot stake;10th, steel reinforcement cage;11st, it puts more energy into muscle;12nd, main reinforcement;13 pile tops;14th, spiral bar;15th, muscle is protected; 2nd, straining beam;20th, steel tie cage;21st, transverse bar;22 vertical muscle;23rd, support template;3rd, main building ground;30th, stake holes;4th, library Base;5th, upper structure;6th, lower structure body;7th, stress dissipation mattress layer;8th, conventional stake.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
Embodiment 1
A kind of drawknot stake supporting, as shown in Figure 1, including drawknot stake 1 and the straining beam 2 being set to above drawknot stake 1.
With reference to Fig. 2 and Fig. 3, drawknot stake 1 includes steel reinforcement cage 10 and the concrete being cast in steel reinforcement cage 10, treats reinforcing bar After concrete final set inside cage 10, drawknot stake 1 is formed.
Steel reinforcement cage 10 includes several put more energy into and muscle 11 and is welded on the main reinforcement 12 put more energy on muscle 11.Muscle 11 put more energy into according to drawing The length of knot stake 1 determines usage quantity, and the spacing between muscle 11 of putting more energy into need to be consistent.Put more energy into muscle 11 outer diameter on weld main reinforcement 12, it according to the supporting intensity needed for drawknot stake 1, determines the usage quantity of main reinforcement 12 in steel reinforcement cage 10, makes drawknot stake 1 after molding Meet the requirement of pile body bending resistance and shearing resistance, the spacing between each main reinforcement 12 is consistent.In a 12 upper edge main reinforcement 12 of main reinforcement Required amount of muscle 11 of putting more energy into is welded in direction, and outer diameter and the main reinforcement 12 of muscle 11 of putting more energy into are welded, shape between muscle 11 and main reinforcement 12 of putting more energy into Into pad, since pad, positioning is uniformly got ready on the outer diameter of each muscle 11 of putting more energy into, welds remaining main reinforcement 12 successively, Ensure that the spacing of each main reinforcement 12 is consistent.
One end of each main reinforcement 12 extends outwardly and bends simultaneously, and the main reinforcement 12 after bending is collected to a bit, after collecting Main reinforcement 12 be welded to each other, formed pile top 13.Pile top 13 can facilitate stake position and the verticality of control drawknot stake 1, facilitate drawknot Stake 1 smoothly enters in stake holes 30.
Wrapping around for main reinforcement 12 is provided with spiral bar 14, and spiral bar 14 extends to steel reinforcement cage 10 from 10 top of steel reinforcement cage At pile top, the junction of spiral bar 14 and main reinforcement 12 is by being welded and fixed.The outside of spiral bar 14 is welded and fixed a certain number of Muscle 15 is protected, when the steel reinforcement cage 10 of concrete cast drawknot stake 1, muscle 15 is protected to protect spiral bar 14 not because of the impact of concrete Power and it is exposed.
The crisscross pile crown position for being set to drawknot stake 1 of straining beam 2, straining beam 2 can control vertical edges to the maximum extent Slope deforms.With reference to Fig. 4, according to the quantity of the drawknot stake 1 of required supporting, the supporting area of straining beam 2 is determined.Straining beam 2 includes drawknot Steel reinforcement cage 20, steel tie cage 20 include transverse bar 21 and the vertical muscle 22 being perpendicularly fixed on transverse bar 21.Horizontally-arranged drawknot stake 1 Outside place two transverse bars 21, the length of transverse bar 21 be slightly longer than needed for supporting drawknot stake 1 outer rim spacing, transverse bar 21 and phase There are certain spacing between adjacent drawknot stake 1.Two vertical muscle 22 are equally placed in the both sides of the drawknot stake 1 of tandem, indulge the length of muscle 22 Degree is slightly longer than the outer rim spacing of the drawknot stake 1 of required supporting, and vertical there are certain spacing between muscle 22 and adjacent drawknot stake 1.It is horizontal Muscle 21 passes through banding fixed with the position that vertical muscle 22 is in contact.
Second layer transverse bar 21 needed for setting and vertical muscle 22 above first layer transverse bar 21 and vertical muscle 22, according to drawknot stake 1 Pile crown height determines the usage quantity of vertical direction transverse bar 21 and vertical muscle 22.In transverse bar 21 and vertical 22 four pieces of branch of outside setting of muscle Template 23 is protected, is mutually enclosed between four pieces of support templates 23, to casting concrete in the space that four pieces of support templates 23 are formed, is treated After concrete initial set, support template is removed, the concrete of straining beam 2 is conserved.
Embodiment 2
A kind of drawknot stake supporting and the construction method of basement process, as shown in Figure 6, construction method is as follows:
The shallower main building ground 3 of buried depth is excavated in base soil layer first, opens up several stake holes 30 downwards in the position of main building ground 3, 5 quantification of upper structure that stake holes 30 is pre-seted according to the size and 3 top of main building ground of main building ground 3, stake holes 30 Depth is determined according to the intensity of required 3 top structure body of supporting main building ground;
Determine the position of the deeper ground library ground 4 of embedded depth of foundation, the stake holes 30 in closely 4 position of library ground of main building ground 3 is divided The steel reinforcement cage 10 of a certain number of drawknot stakes 1 is not transferred, and making for steel reinforcement cage 10 is determined by the intensity needed for vertical sloping timbering Use quantity;
To stake holes 30 and 30 casting concrete of stake holes for the steel reinforcement cage 10 for placing drawknot stake 1, after concrete final set, difference Form conventional stake 8 and drawknot stake 1.Conventional stake 8 is used to support structure 5, and drawknot stake 1 both may be used as supporting structure 5, and may insure the stability of vertical side slope;
The laitance of 1 stake top of drawknot stake and weak concrete are removed, while removes the inter-pile soil of drawknot stake 1, rejects the stake of drawknot stake 1 Head;
Stake top binding transverse bar 21 and vertical muscle 22 in drawknot stake 1, support template 23 is installed in the outside of transverse bar 21 and vertical muscle 22, to Cast concrete in support template 23 after concrete initial set, removes support template 23 and concrete is conserved, concrete is whole After solidifying, the concrete poured into a mould between transverse bar 21 and vertical muscle 22 and both forms crisscross in 1 pile crown position of drawknot stake Straining beam 2, straining beam 2 and the drawknot stake 1 of lower section are integrally formed, and form drawknot stake supporting construction;
The garage ground 4 deeper to adjacent embedded depth of foundation excavates, and excavates on one side, on one side to drawknot stake 1 exposed after excavation The inter-pile soil gunite concrete of body completes supporting to the pile body of drawknot stake 1.Meanwhile the shallower main building ground 3 of embedded depth of foundation with At the critical drawknot stake 1 of the deeper ground library ground 4 of embedded depth of foundation, setting pile body top and deeply mixing cement-soil pile observation point, ground library In 4 digging process of ground, the deformation and deeply mixing cement-soil pile of vertical side slope top of the slope are monitored.When monitoring vertical side slope The deflection of top of the slope is larger or when rate of deformation is very fast, it should reduce cutting depth or excavate range, control a rate of advance or The measures such as appropriate backfill, to ensure the stability of vertical side slope;
When ground library ground 4 is excavated to default absolute altitude, main building ground 3 is finished with 4 construction of ground library ground;
Before the upper structure 5 of main building ground 4 is constructed, stress dissipation mattress layer 7 is laid at the top of the straining beam 2 of drawknot stake 1, is disappeared The top strain for dissipating drawknot stake 1 is concentrated.The thickness of stress dissipation mattress layer 7 determines that general control exists according to the stake diameter of drawknot stake 1 Between 20 ~ 60cm, meanwhile, the width that is laid with of stress dissipation mattress layer 7 is set according to the width of drawknot stake 1, stress dissipation mattress Layer 7 should exceed 30 ~ 50cm of outer rim of drawknot stake 1.Sand, rubble or graded sand and stone during stress dissipation mattress layer 7 is generally selected, it is broken Stone maximum particle diameter is not easy to be more than 30mm, and stress dissipation mattress layer 7 should vibrate or Static compaction, and compacting degree is not preferably greater than 0.9.With reference to Fig. 5, conventional 8 top setting of stake is relatively thin or does not need to setting stress dissipation mattress layer 7, and drawknot stake 1 is less than conventional stake 8, conventional There are certain gradients with the stress dissipation mattress layer 7 above drawknot stake 1 for stake 8.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (3)

1. a kind of drawknot stake supporting and the construction method of basement process, it is characterized in that, include the following steps:
Step 1, earth excavation to relatively shallow base area CFG or foundation pile construction work surface absolute altitude;
Step 2, according to CFG or foundation pile position, select drawknot stake, determine straining beam spacing, straining beam width and straining beam height Parameter;
Step 3 needs the moment of flexure born and shearing according to drawknot stake, determines the steel reinforcement cage being configured in CFG or foundation pile Reinforcing bar content;
Step 4, drawknot stake and intrinsic CFG or engineering pile pile;
Step 5 understands inter-pile soil, rejects pile crown;
Step 6, the steel reinforcement cage for binding straining beam, and casting concrete;
Step 7, deep foundation region substep carry out earth excavation, and carry out spray anchor protection to exposed drawknot stake inter-pile soil, until Substrate absolute altitude.
2. drawknot stake supporting according to claim 1 and the construction method of basement process, it is characterized in that, increase before step 7 Add following steps:
The stress dissipation mattress layer of 20 to 60 ㎝ thickness is laid in drawknot stake top portion, the material of stress dissipation mattress layer is middle sand, grain Diameter does not surpass the rubble or graded sand and stone of 30 ㎜, and stress dissipation mattress layer vibrates or Static compaction, and compacting degree is no more than 0.9.
3. drawknot stake supporting according to claim 1 and the construction method of basement process, it is characterized in that, increase in step 7 Add the economic deeply mixing cement-soil pile monitoring of top of the slope, when the larger or rate of deformation of deformation measurement data feedback deformation is very fast, should subtract Few individual layer cutting depth excavates range, and control a rate of advance or suitably backfilled.
CN201611258348.6A 2016-12-30 2016-12-30 Drawknot stake supporting and the construction method of basement process Pending CN108265725A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611258348.6A CN108265725A (en) 2016-12-30 2016-12-30 Drawknot stake supporting and the construction method of basement process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611258348.6A CN108265725A (en) 2016-12-30 2016-12-30 Drawknot stake supporting and the construction method of basement process

Publications (1)

Publication Number Publication Date
CN108265725A true CN108265725A (en) 2018-07-10

Family

ID=62754853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611258348.6A Pending CN108265725A (en) 2016-12-30 2016-12-30 Drawknot stake supporting and the construction method of basement process

Country Status (1)

Country Link
CN (1) CN108265725A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024614A (en) * 2018-08-31 2018-12-18 中国二十二冶集团有限公司 The construction method of equipment foundation pit composite foundation Sloping
CN109537601A (en) * 2018-11-14 2019-03-29 李翠霞 A kind of foundation pit supporting construction and its construction method based on campshed and inner support
CN111719581A (en) * 2020-03-21 2020-09-29 东莞市大乘建筑工程技术有限公司 Building anti-seismic structure and processing technology
CN112681333A (en) * 2020-12-15 2021-04-20 中国建筑第八工程局有限公司 Foundation pit supporting structure of waterside bridge abutment foundation and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278160A (en) * 2002-03-27 2003-10-02 Goko Kensetsu Kk Simplified landslide protection wall construction method
CN103938634A (en) * 2014-03-22 2014-07-23 王继远 Deep foundation pit supporting structure and construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278160A (en) * 2002-03-27 2003-10-02 Goko Kensetsu Kk Simplified landslide protection wall construction method
CN103938634A (en) * 2014-03-22 2014-07-23 王继远 Deep foundation pit supporting structure and construction method

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
吴海霞: "《建筑施工技术》", 31 January 2015, 西南交通大学出版社 *
罗富荣等: "《地铁车站洞桩法设计与施工关键技术》", 30 November 2005, 中国铁道出版社 *
胡伍生: "《神经网络理论及其工程应用》", 31 January 2006, 测绘出版社 *
郭明田等: "CFG桩复合地基及相邻建筑基底支护桩的试验研究", 《全国岩土与工程学术大会论文集(下册)》 *
陈昌富: "《地基处理》", 30 April 2016, 武汉理工大学出版社 *
陈治法等: "张拉短桩与双排桩结合基坑支护方法的应用", 《地质装备》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024614A (en) * 2018-08-31 2018-12-18 中国二十二冶集团有限公司 The construction method of equipment foundation pit composite foundation Sloping
CN109537601A (en) * 2018-11-14 2019-03-29 李翠霞 A kind of foundation pit supporting construction and its construction method based on campshed and inner support
CN111719581A (en) * 2020-03-21 2020-09-29 东莞市大乘建筑工程技术有限公司 Building anti-seismic structure and processing technology
CN111719581B (en) * 2020-03-21 2021-08-06 东莞市大乘建筑工程技术有限公司 Building anti-seismic structure and processing technology
CN112681333A (en) * 2020-12-15 2021-04-20 中国建筑第八工程局有限公司 Foundation pit supporting structure of waterside bridge abutment foundation and construction method thereof
CN112681333B (en) * 2020-12-15 2022-07-12 中国建筑第八工程局有限公司 Foundation pit supporting structure of waterside bridge abutment foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN108265725A (en) Drawknot stake supporting and the construction method of basement process
KR101972381B1 (en) Integral block reinforced cast-in-place pile structure using geo tube and mat, and Construction method thereof
JP6543176B2 (en) Building method
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN110397050A (en) A kind of light-duty draining barricade of novel beam anchor formula and its construction method
JP6806465B2 (en) Construction method of foundation structure
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
KR100638178B1 (en) Marine structure and construction method thereof
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN105926637B (en) The prestressing force support system and design of a kind of existing subway of protection
CN210263073U (en) Supporting construction that adjacent foundation ditch synchronous excavation was asynchronously backfilled
JP2001049667A (en) Construction method for road ground or the like
JP4226954B2 (en) Underpinning method and viaduct
CN216739655U (en) Foundation pit support meeting underground structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN108411934A (en) Floating pile pile, dykes and dams soil-baffling structure and its construction method
JP4915037B2 (en) Method for controlling the amount of deformation of the mountain wall
JP2604210B2 (en) Construction method of underground large-scale spatial structure
CN210421152U (en) Anchor road shoulder retaining wall
CN111472363A (en) Construction method of foundation pit enclosure structure located in underground space of existing building
CN201991015U (en) Foundation underpinning structure
CN217517600U (en) Deep foundation pit supporting structure for supporting inclined struts in pit
JP6543177B2 (en) Building method
JP3603134B2 (en) Mountain retaining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710