CN108263945A - The installation method of back yard industry crane - Google Patents
The installation method of back yard industry crane Download PDFInfo
- Publication number
- CN108263945A CN108263945A CN201810157726.4A CN201810157726A CN108263945A CN 108263945 A CN108263945 A CN 108263945A CN 201810157726 A CN201810157726 A CN 201810157726A CN 108263945 A CN108263945 A CN 108263945A
- Authority
- CN
- China
- Prior art keywords
- crane
- installation
- track
- steel wire
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C6/00—Girders, or track-supporting structures, specially adapted for cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Emergency Lowering Means (AREA)
Abstract
The installation method of back yard industry crane, step include:Step 1:The track of the crane is made of I-steel welding, the length of the weld seam at the position of welding in need cover entire contact surface;Step 2:The installation of supporting beam, using crane by the position of the track crane to supporting beam, orbital docking is connected with;After completing first installation, second splicing installation is carried out, and so on;Step 3:After integral installation, with spirit level leveling par, the track is corrected, connector piece 2~3mm of gap, horizontal error is controlled in 5~10mm, then tightens splice bolt, then every oblique pull steel wire rope is tightened to appropriate location;The present invention is always tightened the gaily decorated basket used in constructor using oblique pull steel wire rope during mounting industrial crane, avoids causing danger;Even if dangerous situation occurs in steel wire rope, also it can ensure that sinking speed does not exceed human body ability to bear by the control of safety rope.
Description
Technical field
The present invention relates to industrial processing technology field more particularly to the installation methods of back yard industry crane.
Background technology
In the workshop of industrialized production, during the production that especially workpiece is heavier, volume is larger, it is required to crane
Auxiliary construction.This is just needed after setting crossbeam in factory, and crane is mounted on crossbeam.Due to being needed in installation process
It uses larger strength and lifts various necessary equipment and part, lead to the generation of safety problem.
Invention content
It is an object of the invention to propose a kind of installation method of safer back yard industry crane.
For this purpose, the present invention uses following technical scheme:
The installation method of back yard industry crane, step include:
Step 1:The installation of track
The track of the crane is made of I-steel welding, the length of the weld seam at the position of welding in need cover entirely
Contact surface;
After welding, antirust paint progress antirust treatment is applied after knocking out welding slag;
The track using crane is hung to preset crossbeam in workshop to be installed, and is connected by screw bolts;
First construction hanging basket is installed, and the safety rope of a diameter 25mm is set for every hanging basket, safety rope is from uppermost storey knot
Structure column ties, and then vertically puts down bottom surface;
Step 2:The installation of supporting beam
With the snap ring of steel wire rope then iron code is mounted on the preset crossbeam in workshop by supporting beam fix tightly in orbit, and
With bolt fix tightly, steel wire rope one end is fixed on the iron code, then move supporting beam to exterior wall from floor, is fixed with bolt
On iron code, oblique pull steel wire rope is then tightened to proper level position with the gaily decorated basket;
Using crane by the position of the track crane to supporting beam, orbital docking is connected with;After completing first installation,
Second splicing installation is carried out, and so on;
Step 3:Adjustment
After integral installation, with spirit level leveling par, the track is corrected, connector piece 2~3mm of gap, water
Then flat control errors tighten splice bolt, then every oblique pull steel wire rope is tightened to appropriate location in 5~10mm;
After orbit correction is good, electric block is installed on the track, commissioning test, after inspection is all gone well, carries out examination and hang.
On the safety rope be configured a secure latch as construction personnel in nacelle construction when hanging buckle safety belt.
It the track is sling in step 2 is sling with chain block and carry out assembly.
It is clamping fixed not less than the steel wire rope of three same specifications that the drag-line both ends of the steel wire rope should be used.
During examination is hung, suspension hook is opened and drops to extreme position, whether reliable watches limiter.
The present invention is always tightened the gaily decorated basket used in constructor using oblique pull steel wire rope during mounting industrial crane,
It avoids causing danger;Even if dangerous situation occurs in steel wire rope, also it can ensure that sinking speed does not exceed human body by the control of safety rope
Ability to bear.
Specific embodiment
The installation method of back yard industry crane, step include:
Step 1:The installation of track
The track of the crane is made of I-steel welding, the length of the weld seam at the position of welding in need cover entirely
Contact surface;
After welding, antirust paint progress antirust treatment is applied after knocking out welding slag;
The track using crane is hung to preset crossbeam in workshop to be installed, and is connected by screw bolts;
First construction hanging basket is installed, and the safety rope of a diameter 25mm is set for every hanging basket, safety rope is from uppermost storey knot
Structure column ties, and then vertically puts down bottom surface;
Step 2:The installation of supporting beam
With the snap ring of steel wire rope then iron code is mounted on the preset crossbeam in workshop by supporting beam fix tightly in orbit, and
With bolt fix tightly, steel wire rope one end is fixed on the iron code, then move supporting beam to exterior wall from floor, is fixed with bolt
On iron code, oblique pull steel wire rope is then tightened to proper level position with the gaily decorated basket;
Using crane by the position of the track crane to supporting beam, orbital docking is connected with;After completing first installation,
Second splicing installation is carried out, and so on;
Step 3:Adjustment
After integral installation, with spirit level leveling par, the track is corrected, connector piece 2~3mm of gap, water
Then flat control errors tighten splice bolt, then every oblique pull steel wire rope is tightened to appropriate location in 5~10mm;
After orbit correction is good, electric block is installed on the track, commissioning test, after inspection is all gone well, carries out examination and hang.
The present invention is always tightened the gaily decorated basket used in constructor using oblique pull steel wire rope during mounting industrial crane,
It avoids causing danger;Even if dangerous situation occurs in steel wire rope, also it can ensure that sinking speed does not exceed human body by the control of safety rope
Ability to bear.
On the safety rope be configured a secure latch as construction personnel in nacelle construction when hanging buckle safety belt.
When causing danger, safety rope can protect construction personnel not fall.
It the track is sling in step 2 is sling with chain block and carry out assembly.
It is clamping fixed not less than the steel wire rope of three same specifications that the drag-line both ends of the steel wire rope should be used.
During examination is hung, suspension hook is opened and drops to extreme position, whether reliable watches limiter.
The technical principle of the present invention is described above in association with specific embodiment.These descriptions are intended merely to explain the present invention's
Principle, and it cannot be construed to limiting the scope of the invention in any way.Based on explanation herein, the technology of this field
Personnel would not require any inventive effort the other specific embodiments that can associate the present invention, these modes are fallen within
Within protection scope of the present invention.
Claims (5)
1. the installation method of back yard industry crane, it is characterised in that:Step includes:
Step 1:The installation of track
The track of the crane is made of I-steel welding, the length of the weld seam at the position of welding in need cover entirely
Contact surface;
After welding, antirust paint progress antirust treatment is applied after knocking out welding slag;
The track using crane is hung to preset crossbeam in workshop to be installed, and is connected by screw bolts;
First construction hanging basket is installed, and the safety rope of a diameter 25mm is set for every hanging basket, safety rope is from uppermost storey knot
Structure column ties, and then vertically puts down bottom surface;
Step 2:The installation of supporting beam
With the snap ring of steel wire rope then iron code is mounted on the preset crossbeam in workshop by supporting beam fix tightly in orbit, and
With bolt fix tightly, steel wire rope one end is fixed on the iron code, then move supporting beam to exterior wall from floor, is fixed with bolt
On iron code, oblique pull steel wire rope is then tightened to proper level position with the gaily decorated basket;
Using crane by the position of the track crane to supporting beam, orbital docking is connected with;After completing first installation,
Second splicing installation is carried out, and so on;
Step 3:Adjustment
After integral installation, with spirit level leveling par, the track is corrected, connector piece 2~3mm of gap, water
Then flat control errors tighten splice bolt, then every oblique pull steel wire rope is tightened to appropriate location in 5~10mm;
After orbit correction is good, electric block is installed on the track, commissioning test, after inspection is all gone well, carries out examination and hang.
2. the installation method of back yard industry crane according to claim 1, it is characterised in that:It is configured on the safety rope
One secure latch hanging buckle safety belt in nacelle construction as construction personnel.
3. the installation method of back yard industry crane according to claim 1, it is characterised in that:The rail is sling in step 2
Road is sling with chain block carries out assembly.
4. the installation method of back yard industry crane according to claim 1, it is characterised in that:The drag-line two of the steel wire rope
It is clamping fixed not less than the steel wire rope of three same specifications that end should be used.
5. the installation method of back yard industry crane according to claim 1, it is characterised in that:During examination is hung, by suspension hook
It opens and drops to extreme position, whether reliable watch limiter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810157726.4A CN108263945A (en) | 2018-02-24 | 2018-02-24 | The installation method of back yard industry crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810157726.4A CN108263945A (en) | 2018-02-24 | 2018-02-24 | The installation method of back yard industry crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108263945A true CN108263945A (en) | 2018-07-10 |
Family
ID=62774352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810157726.4A Pending CN108263945A (en) | 2018-02-24 | 2018-02-24 | The installation method of back yard industry crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108263945A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109823961A (en) * | 2019-02-28 | 2019-05-31 | 五冶集团上海有限公司 | The design and installation method of Crane Rail |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101239693A (en) * | 2008-02-18 | 2008-08-13 | 广州市建筑集团有限公司 | Overhead monorail for unit type glass curtain wall mounting construction and its mounting method |
CN102050383A (en) * | 2010-12-24 | 2011-05-11 | 南通振华重型装备制造有限公司 | Assembling technology for controlling trolley rail gauge of rail mounted container gantry crane |
CN102086000A (en) * | 2009-12-08 | 2011-06-08 | 中冶成工上海五冶建设有限公司 | Onsite splicing and mounting method for extra-large and overweight box crane girders |
CN102660304A (en) * | 2012-05-08 | 2012-09-12 | 中国十九冶集团有限公司 | Monorail crane installation construction method |
CN103231993A (en) * | 2013-05-13 | 2013-08-07 | 国家电网公司 | Indoor GIS (Gas Insulated Switchgear) transporting and locating device and use method |
-
2018
- 2018-02-24 CN CN201810157726.4A patent/CN108263945A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101239693A (en) * | 2008-02-18 | 2008-08-13 | 广州市建筑集团有限公司 | Overhead monorail for unit type glass curtain wall mounting construction and its mounting method |
CN102086000A (en) * | 2009-12-08 | 2011-06-08 | 中冶成工上海五冶建设有限公司 | Onsite splicing and mounting method for extra-large and overweight box crane girders |
CN102050383A (en) * | 2010-12-24 | 2011-05-11 | 南通振华重型装备制造有限公司 | Assembling technology for controlling trolley rail gauge of rail mounted container gantry crane |
CN102660304A (en) * | 2012-05-08 | 2012-09-12 | 中国十九冶集团有限公司 | Monorail crane installation construction method |
CN103231993A (en) * | 2013-05-13 | 2013-08-07 | 国家电网公司 | Indoor GIS (Gas Insulated Switchgear) transporting and locating device and use method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109823961A (en) * | 2019-02-28 | 2019-05-31 | 五冶集团上海有限公司 | The design and installation method of Crane Rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101966965A (en) | Special hanger with guide cover wheel hub and turning and hanging method | |
CN112761348A (en) | Hanging basket suspension system without counter weight and installation method | |
CN107447674A (en) | A kind of steel box arch rib lifting positioner and its construction method | |
CN108263945A (en) | The installation method of back yard industry crane | |
CN201722059U (en) | Vertical hoisting tool for pitch bearing of direct-drive permanent magnet wind generator | |
CN207191310U (en) | One kind is used for ship plank construction portable unit | |
CN204745416U (en) | Railway landing stage safety belt lift kits | |
CN206513098U (en) | A kind of apparatus for work for being used to remove towering structure | |
CN102328739A (en) | Erection-free combined scaffold device for ship | |
CN108066916A (en) | A kind of high-rise working technological service suspension equipment | |
CN105883605A (en) | Web reinforcing device for crane | |
CN108951861A (en) | A kind of construction steel structure girder | |
CN210889029U (en) | Anti-falling support device for pipeline | |
CN206809562U (en) | A kind of repeatable life line bracket utilized | |
CN207293927U (en) | A kind of interim suspender peculiar to vessel | |
CN102241381B (en) | Hoist frame high-altitude grouping operation platform hanging bracket and using method thereof | |
CN204826704U (en) | A horizontal lifeline system for steel construction factory building | |
CN204980977U (en) | A promote hoist for colliery underground transportation | |
CN204012362U (en) | A kind of one pole insurance support | |
CN205709470U (en) | A kind of punching hanging apparatus having enough to meet the need | |
CN217472603U (en) | Main transformer ascending operation anti-falling device | |
CN115350419A (en) | Tension type flexible and semi-rigid horizontal vertical anti-falling protection system for transmission tower | |
CN220073674U (en) | Pipe fitting welding device | |
CN108130561A (en) | A kind of aluminum electrolyzing cell used stern notch through-flow bus device temporarily | |
CN219045293U (en) | High-altitude assembly supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||