Prior art keywords
tube socket
pulling claw
upper tube
positioning
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611241449.2A
Other languages
Chinese (zh)
Other versions
CN108257696B (en
Inventor
代志兵
胡煜
严明
谢岩
郭旭波
张金平
朱伟
曲波
骆剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jianzhong Nuclear Fuel Co Ltd
Original Assignee
China Jianzhong Nuclear Fuel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jianzhong Nuclear Fuel Co Ltd filed Critical China Jianzhong Nuclear Fuel Co Ltd
Priority to CN201611241449.2A priority Critical patent/CN108257696B/en
Publication of CN108257696A publication Critical patent/CN108257696A/en
Application granted granted Critical
Publication of CN108257696B publication Critical patent/CN108257696B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C21/00Apparatus or processes specially adapted to the manufacture of reactors or parts thereof
    • G21C21/02Manufacture of fuel elements or breeder elements contained in non-active casings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/02Measuring arrangements characterised by the use of mechanical techniques for measuring length, width or thickness
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Manufacturing & Machinery (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • General Physics & Mathematics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The present invention relates to fuel assembly manufacturing technology fields, and in particular to a kind of for upper pipe seat of fuel component compression assembling and the device measured.When being compressed to upper tube socket, support supplementary structure from upper tube socket upper end is packed into first, block plate is made to resist the guiding pipe clamp pipe in tube socket, the lifting lug of tube socket side is blocked in positioning;Then pulling claw is hooked to the fabrication hole of upper tube socket wing plate, ball will be positioned again to be put into the location hole of positioning disk center processing, rotate screw rod, upper tube socket, is then arranged on V-type stent by the compression of tube socket in realization, makes it close to cluster component guide pipe nozzle, then upper tube socket is pushed into guide pipe, assembling is completed, barrier slides then will be measured and extremely be fitted closely with upper tube socket upper surface, the linear measure longimetry in tube socket direction in completion.This invention simplifies operating process, improve reliability, reduce security risk when length component measures.

Description

A kind of device for upper pipe seat of fuel component compression assembling and measurement
Technical field
The present invention relates to fuel assembly manufacturing technology fields, and in particular to one kind is for upper pipe seat of fuel component compression assembling And the device measured.
Background technology
It needs first to compress the spring of upper tube socket when assembling fuel assembly, upper tube socket is then placed horizontally at support On frame, slipper bracket makes it be assembled into fuel assembly with other components, after completing assembling, and measures the length in upper tube socket direction Reading utilizes the length for comparing measuring method and learning fuel assembly.
Existing compression set and measuring device easily make spring built in tube socket occur to squeeze inclined phenomenon in compression, easily make Into cylinder difference axis inside and outside in horizontal compression, cylinder scratches phenomenon inside and outside generation;And at the existing entire platform of measurement method The linear measure longimetry of upper tube socket direction is carried out in being tilted a certain angle, due to upper tube socket heavier-weight during measurement, and in inclined direction, Upper tube socket easily collapses a phenomenon, and measurement error is caused to increase, and component is in heeling condition during measurement, has the larger safety hidden Suffer from.
Invention content
For the above-mentioned prior art, the present invention will provide a kind of for upper pipe seat of fuel component compression assembling and the dress measured It puts, to compress and assemble when solving the problems, such as upper pipe seat of fuel component assembling.
In order to solve the above-mentioned technical problem, the present invention is a kind of for upper pipe seat of fuel component compression assembling and the dress measured It puts, including support supplementary structure and compression tooling structure;
The support supplementary structure includes positioning disk, and adjusting screw rod, block plate, fabrication hole, location hole and positioning block;
Positioning disk and block plate are disc structure, and positioning disk is connected with block plate by adjusting screw rod;
3 threaded holes being triangularly arranged are processed on positioning disk, threaded hole coordinates with adjusting screw rod;
Positioning disk center is machined with location hole, and location hole is blind hole;
Positioning card is provided on positioning disk side, positioning card, which is directed toward on block plate direction, protrusion;
The multiple fabrication holes of remaining Space processing of positioning disk, fabrication hole are through-hole;
The compression tooling structure includes screw rod, and latch spoon positions ball, fixed pulling claw, movable pulling claw and standing screw;
Latch spoon is rod-like structure, and latch spoon center is threaded through-hole, and tapped through hole coordinates with screw rod;
Latch spoon lower end is connect with fixed pulling claw one end, and fixed pulling claw and latch spoon vertical connection, fixed pulling claw is rod-like structure, The fixed pulling claw other end is provided with 2 standing screws;
Latch spoon upper end is connect with movable pulling claw one end, and movable pulling claw is flexibly connected with latch spoon, and movable pulling claw is rod-like structure, The movable pulling claw other end is provided with 2 standing screws;
Fixed pulling claw and movable pulling claw are arranged on the homonymy of latch spoon;
Screw rod is provided with positioning ball with fixed pulling claw one end.
Further, when being compressed to upper tube socket, support supplementary structure is packed into from upper tube socket upper end first, adjustment is adjusted The length of screw rod, makes block plate resist the guiding pipe clamp pipe in tube socket, and the lifting lug of tube socket side is blocked in positioning;
Then 2 standing screws of fixed pulling claw free end setting are hooked to the fabrication hole of upper tube socket wing plate side, then will 2 standing screws of movable pulling claw free end setting hook the fabrication hole of tube socket wing plate opposite side, then positioning ball is put into and is determined In the location hole of position disk center processing, screw rod is rotated, the compression of tube socket in realization.
Further, which further includes V-type stent, tube socket supporting table, platform and supporting table guide rail;
Platform is arranged on machine-tool platform, is arranged in parallel 2 supporting table guide rails on platform, and tube socket supporting table is along supporting table guide rail It slides, V-type stent is set in tube socket supporting table, V-type stent is supporting upper tube socket.
Further, by the upper tube socket compressed together with support supplementary structure and compression tooling structure setting on V-type stent, Mobile compressed upper tube socket is slided by supporting table guide rail, makes it close to cluster component guide pipe nozzle, then by upper tube socket It is pushed into guide pipe, completes assembling.
Further, which further includes measurement baffle, auxiliary scale, main scale and measurement baffle guide rail;
It is additionally provided on platform and measures baffle guide rail, measure baffle guide rail with supporting table guide rail in same level, survey It measures baffle and is slided along baffle guide rail is measured, measuring baffle can fit closely with upper tube socket upper surface;
It measures and is provided with main scale on baffle, auxiliary scale is provided on main scale.
Further, after upper tube socket is completed to assemble, remove support supplementary structure and compression tooling structure, baffle will be measured and slided It moves to upper tube socket upper surface and fits closely, then coordinated by main scale and auxiliary scale, the linear measure longimetry in tube socket direction in completion.
The advantageous effect that technical solution provided in an embodiment of the present invention is brought is:
The present invention is a kind of for upper pipe seat of fuel component compression assembling and the device measured, and measuring device measures upper tube socket side Horizontality is in component during length, platform no longer needs to tilt, and reduces safe operation risk, and length component measures When, V-type stent can effectively be supported upper tube socket, avoid since tube socket upper when component the tilts head that collapses causes to measure baffle The phenomenon that cannot being fitted close with end face, increasing measurement error.
The present invention is a kind of to simplify operating process for upper pipe seat of fuel component compression assembling and the device measured, improves Reliability reduces security risk when length component measures.
Description of the drawings
Fig. 1 is that the present invention is a kind of for upper pipe seat of fuel component compression assembling and the schematic device measured;
Fig. 2 compresses schematic diagram for upper pipe seat of fuel component;
Fig. 3 is a kind of support supplementary structure schematic diagram of the present invention;
Fig. 4 is a kind of compression tooling structure diagram of the present invention;
Fig. 5 is a kind of measurement structural representation of the present invention;
In figure:1- machine-tool platforms, 2-V type stents, the upper tube sockets of 3-, 4- tube socket supporting tables, 5- platforms, 6- supporting table guide rails, 7- Support supplementary structure, 8- compression tooling structures, 9- measurement baffles, 10- auxiliary scales, 11- main scales, 12- measure baffle guide rail, and 701- is fixed Position disk, 702- adjusting screw rods, 703- block plates, 704- fabrication holes, 705- location holes, 706- positioning cards, 801- screw rods, 802- pawls Handle, 803- positioning balls, 804- fix pulling claw, 805- activity pulling claws, 806- standing screws.
Specific embodiment
It elaborates with reference to the accompanying drawings and detailed description to the present invention.
As shown in Figures 1 to 5, a kind of device for upper pipe seat of fuel component compression assembling and measurement of the present invention, including Support supplementary structure 7 and compression tooling structure 8;
The support supplementary structure 7 includes positioning disk 701, adjusting screw rod 702, block plate 703, fabrication hole 704, location hole 705 block 706 with positioning;
Positioning disk 701 and block plate 703 are disc structure, and positioning disk 701 and block plate 703 are connected by adjusting screw rod 702;
3 threaded holes being triangularly arranged are processed on positioning disk 701, threaded hole coordinates with adjusting screw rod 702;
701 center of positioning disk is machined with location hole 705, and location hole 705 is blind hole;
Positioning card 706 is provided on 701 side of positioning disk, positioning card has protrusion on 706 703 direction of direction block plate;
The multiple fabrication holes 704 of remaining Space processing of positioning disk 701, fabrication hole 704 are through-hole;
The compression tooling structure 8 includes screw rod 801, and latch spoon 802 positions ball 803, fixed pulling claw 804, movable pulling claw 805 and standing screw 806;
Latch spoon 802 is rod-like structure, and 802 center of latch spoon is threaded through-hole, and tapped through hole coordinates with screw rod 801;
802 lower end of latch spoon is connect with fixed 804 one end of pulling claw, fixed pulling claw 804 and 802 vertical connection of latch spoon, fixed to draw Pawl 804 is rod-like structure, and fixed 804 other end of pulling claw is provided with 2 standing screws 806;
802 upper end of latch spoon is connect with movable 805 one end of pulling claw, and movable pulling claw 805 is flexibly connected with latch spoon 802, and activity is drawn Pawl 805 is rod-like structure, and movable 805 other end of pulling claw is provided with 2 standing screws 806;
Fixed pulling claw 804 and movable pulling claw 805 are arranged on the homonymy of latch spoon 802;
Screw rod 801 is provided with positioning ball 803 with fixed 804 one end of pulling claw;
When being compressed to upper tube socket 3, support supplementary structure from upper 3 upper end of tube socket is packed into first, adjusts adjusting screw rod 702 length makes block plate 703 resist the guiding pipe clamp pipe in tube socket 3, prevents card pipe during compression from moving, causes spring distortion, Positioning card 706 blocks the lifting lug of 3 side of tube socket, prevents that the relatively upper tube socket 3 of supplementary structure is supported circumference occur in compression process Movement;
Then the technique for 2 standing screws 806 of fixed 804 free end of pulling claw setting being hooked into upper 3 wing plate side of tube socket Hole, then 2 standing screws 806 that movable 805 free end of pulling claw is set hook the fabrication hole of upper 3 wing plate opposite side of tube socket, then Ball 803 will be positioned to be put into the location hole 705 of 701 center of positioning disk processing, rotation screw rod 801, the compression of tube socket 3 in realization.
The present invention is a kind of for upper pipe seat of fuel component compression assembling and the device measured, further includes V-type stent 2, tube socket Supporting table 4, platform 5 and supporting table guide rail 6;
Platform 5 is arranged on machine-tool platform 1, and 2 supporting table guide rails 6 are arranged in parallel on platform 5, and tube socket supporting table 4 can be along branch Support platform guide rail 6 slides, and sets V-type stent 2 in tube socket supporting table 4, and V-type stent 2 is supporting upper tube socket 3;
The upper tube socket 3 compressed is arranged on together with support supplementary structure 7 and compression tooling structure 8 on V-type stent 2, profit It is slided to move compressed upper tube socket 3 with supporting table guide rail 6, makes it close to cluster component guide pipe nozzle, then by upper tube Seat 3 is pushed into guide pipe, completes assembling.
The present invention is a kind of for upper pipe seat of fuel component compression assembling and the device measured, further includes and measures baffle 9, auxiliary scale 10, main scale 11 and measure baffle guide rail 12;
It is additionally provided on platform 5 and measures baffle guide rail 12, measure baffle guide rail 12 with supporting table guide rail 6 in same level On, measuring baffle 9 can slide along baffle guide rail 12 is measured, and can be fitted closely with ensureing to measure baffle 9 with upper 3 upper surface of tube socket, To ensure measurement accuracy;
It measures and is provided with main scale 11 on baffle 9, auxiliary scale 10 is provided on main scale 11;
After upper tube socket 3 is completed to assemble, remove support supplementary structure 7 and compression tooling structure 8, baffle 9 will be measured and slided To being fitted closely with upper 3 upper surface of tube socket, then coordinated by main scale 11 and auxiliary scale 10, the length in 3 direction of tube socket is surveyed in completion Amount.

Claims (6)

  1. It is 1. a kind of for upper pipe seat of fuel component compression assembling and the device measured, which is characterized in that the device includes supporting auxiliary Help structure and compression tooling structure;
    The support supplementary structure includes positioning disk, and adjusting screw rod, block plate, fabrication hole, location hole and positioning block;
    Positioning disk and block plate are disc structure, and positioning disk is connected with block plate by adjusting screw rod;
    3 threaded holes being triangularly arranged are processed on positioning disk, threaded hole coordinates with adjusting screw rod;
    Positioning disk center is machined with location hole, and location hole is blind hole;
    Positioning card is provided on positioning disk side, positioning card, which is directed toward on block plate direction, protrusion;
    The multiple fabrication holes of remaining Space processing of positioning disk, fabrication hole are through-hole;
    The compression tooling structure includes screw rod, and latch spoon positions ball, fixed pulling claw, movable pulling claw and standing screw;
    Latch spoon is rod-like structure, and latch spoon center is threaded through-hole, and tapped through hole coordinates with screw rod;
    Latch spoon lower end is connect with fixed pulling claw one end, and fixed pulling claw and latch spoon vertical connection, fixed pulling claw is rod-like structure, fixed The pulling claw other end is provided with 2 standing screws;
    Latch spoon upper end is connect with movable pulling claw one end, and movable pulling claw is flexibly connected with latch spoon, and movable pulling claw is rod-like structure, movable The pulling claw other end is provided with 2 standing screws;
    Fixed pulling claw and movable pulling claw are arranged on the homonymy of latch spoon;
    Screw rod is provided with positioning ball with fixed pulling claw one end.
  2. 2. a kind of device for upper pipe seat of fuel component compression assembling and measurement according to claim 1, feature exist In, when being compressed to upper tube socket, support supplementary structure from upper tube socket upper end is packed into first, adjusts the length of adjusting screw rod, Block plate is made to resist the guiding pipe clamp pipe in tube socket, the lifting lug of tube socket side is blocked in positioning;
    Then 2 standing screws of fixed pulling claw free end setting are hooked to the fabrication hole of upper tube socket wing plate side, then will be movable 2 standing screws of pulling claw free end setting hook the fabrication hole of tube socket wing plate opposite side, then positioning ball is put into positioning disk In the location hole of center processing, screw rod is rotated, the compression of tube socket in realization.
  3. 3. a kind of device for upper pipe seat of fuel component compression assembling and measurement according to claim 1, feature exist In the device further includes V-type stent, tube socket supporting table, platform and supporting table guide rail;
    Platform is arranged on machine-tool platform, and 2 supporting table guide rails are arranged in parallel on platform, and tube socket supporting table is slided along supporting table guide rail It is dynamic, V-type stent is set in tube socket supporting table, and V-type stent is supporting upper tube socket.
  4. 4. a kind of device for upper pipe seat of fuel component compression assembling and measurement according to claim 3, feature exist In, by the upper tube socket compressed together with support supplementary structure and compression tooling structure setting on V-type stent, led by supporting table Rail slides mobile compressed upper tube socket, it is made then upper tube socket to be pushed into guide pipe close to cluster component guide pipe nozzle, Complete assembling.
  5. 5. a kind of device for upper pipe seat of fuel component compression assembling and measurement according to claim 3, feature exist In the device further includes measurement baffle, auxiliary scale, main scale and measurement baffle guide rail;
    It is additionally provided on platform and measures baffle guide rail, measure baffle guide rail with supporting table guide rail in same level, measurement gear Plate is slided along baffle guide rail is measured, and measuring baffle can fit closely with upper tube socket upper surface;
    It measures and is provided with main scale on baffle, auxiliary scale is provided on main scale.
  6. 6. a kind of device for upper pipe seat of fuel component compression assembling and measurement according to claim 5, feature exist In, after upper tube socket is completed to assemble, remove support supplementary structure and compression tooling structure, will measure barrier slides to upper tube socket Upper surface fits closely, and is then coordinated by main scale and auxiliary scale, the linear measure longimetry in tube socket direction in completion.
CN201611241449.2A 2016-12-29 2016-12-29 Device for compressing, assembling and measuring upper tube seat of fuel assembly Active CN108257696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611241449.2A CN108257696B (en) 2016-12-29 2016-12-29 Device for compressing, assembling and measuring upper tube seat of fuel assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611241449.2A CN108257696B (en) 2016-12-29 2016-12-29 Device for compressing, assembling and measuring upper tube seat of fuel assembly

Publications (2)

Publication Number Publication Date
CN108257696A true CN108257696A (en) 2018-07-06
CN108257696B CN108257696B (en) 2023-08-29

Family

ID=62719055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611241449.2A Active CN108257696B (en) 2016-12-29 2016-12-29 Device for compressing, assembling and measuring upper tube seat of fuel assembly

Country Status (1)

Country Link
CN (1) CN108257696B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4078967A (en) * 1976-07-26 1978-03-14 Combustion Engineering, Inc. Holddown device for nuclear fuel assembly
EP0189133A2 (en) * 1985-01-25 1986-07-30 Westinghouse Electric Corporation Apparatus and method for preassembling a top nozzle subassembly for a nuclear fuel assembly
US4620960A (en) * 1984-08-27 1986-11-04 Westinghouse Electric Corp. Method and apparatus for removably mounting a top nozzle on a nuclear reactor fuel assembly
CN86101874A (en) * 1985-03-25 1986-11-05 西屋电气公司 Link closely and dismantle the apparatus and method that the head tube nozzle subassembly is used from the fuel assembly that can re-assembly
EP0201753A1 (en) * 1985-05-01 1986-11-20 Westinghouse Electric Corporation Apparatus for applying and end plug to an end of a nuclear fuel rod tube
FR2693825A1 (en) * 1992-07-20 1994-01-21 Framatome Sa Nuclear fuel assembly with axial guide tubes - whose upper ends attach to a plate axially slidable inside upper sleeve to accommodate tube deformation
US5479464A (en) * 1994-08-30 1995-12-26 Westinghouse Electric Corporation Expandable top nozzle and device for securing same to a nuclear fuel assembly
WO2005071694A2 (en) * 2003-12-22 2005-08-04 Areva Np Core of a nuclear reactor cooled by pressurized water and core fuel assembly
CN204242596U (en) * 2014-11-13 2015-04-01 中科华核电技术研究院有限公司 Nuclear reactor core pressing assembly and fuel assembly for nuclear reactor
CN204613032U (en) * 2015-06-02 2015-09-02 中国核动力研究设计院 A kind of test unit measuring the distortion of reactor fuel assemblies base
CN205406100U (en) * 2015-12-31 2016-07-27 中核建中核燃料元件有限公司 Upper tube base backup pad
CN106141989A (en) * 2016-08-09 2016-11-23 中国人民解放军第五七二工厂 A kind of piston attaching/detaching apparatus in pressurized strut
CN206421830U (en) * 2016-12-29 2017-08-18 中核建中核燃料元件有限公司 A kind of device that assembling and measurement are compressed for upper pipe seat of fuel component

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4078967A (en) * 1976-07-26 1978-03-14 Combustion Engineering, Inc. Holddown device for nuclear fuel assembly
US4620960A (en) * 1984-08-27 1986-11-04 Westinghouse Electric Corp. Method and apparatus for removably mounting a top nozzle on a nuclear reactor fuel assembly
EP0189133A2 (en) * 1985-01-25 1986-07-30 Westinghouse Electric Corporation Apparatus and method for preassembling a top nozzle subassembly for a nuclear fuel assembly
CN86101874A (en) * 1985-03-25 1986-11-05 西屋电气公司 Link closely and dismantle the apparatus and method that the head tube nozzle subassembly is used from the fuel assembly that can re-assembly
EP0201753A1 (en) * 1985-05-01 1986-11-20 Westinghouse Electric Corporation Apparatus for applying and end plug to an end of a nuclear fuel rod tube
FR2693825A1 (en) * 1992-07-20 1994-01-21 Framatome Sa Nuclear fuel assembly with axial guide tubes - whose upper ends attach to a plate axially slidable inside upper sleeve to accommodate tube deformation
US5479464A (en) * 1994-08-30 1995-12-26 Westinghouse Electric Corporation Expandable top nozzle and device for securing same to a nuclear fuel assembly
WO2005071694A2 (en) * 2003-12-22 2005-08-04 Areva Np Core of a nuclear reactor cooled by pressurized water and core fuel assembly
CN204242596U (en) * 2014-11-13 2015-04-01 中科华核电技术研究院有限公司 Nuclear reactor core pressing assembly and fuel assembly for nuclear reactor
CN204613032U (en) * 2015-06-02 2015-09-02 中国核动力研究设计院 A kind of test unit measuring the distortion of reactor fuel assemblies base
CN205406100U (en) * 2015-12-31 2016-07-27 中核建中核燃料元件有限公司 Upper tube base backup pad
CN106141989A (en) * 2016-08-09 2016-11-23 中国人民解放军第五七二工厂 A kind of piston attaching/detaching apparatus in pressurized strut
CN206421830U (en) * 2016-12-29 2017-08-18 中核建中核燃料元件有限公司 A kind of device that assembling and measurement are compressed for upper pipe seat of fuel component

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张丽英 等: "TVS-2M燃料组件上管座制造技术研究", 中国核科学技术进展报告(第四卷)), pages 162 - 168 *
郭晓明 等: "VVER型核燃料市场多元化供应现状及启示", 行业观察, no. 6, pages 30 - 34 *

Also Published As

Publication number Publication date
CN108257696B (en) 2023-08-29

Similar Documents

Publication Publication Date Title
CN109990692B (en) Flatness detection device for building board machining
CN206073900U (en) A kind of cast blank flatness checking device of back of the body mode centering machining benchmark
CN105823392A (en) Automobile auxiliary frame installation point inspection tool
CN205642199U (en) Utensil is examined to car sub vehicle frame mounting point
CN105135971A (en) Movable spherical core comprehensive error detecting device supported by double vertical columns
CN209372035U (en) A kind of measurer for thickness
CN104034478B (en) The support arrangement that in centroid measurement, ball-and-socket, needling, plane combine
CN203116706U (en) Steel rail automatic leveling laser detection device
CN108344939B (en) Online ICT testing arrangement
CN207439363U (en) Piston face cylindricity detection device
CN209043524U (en) A kind of adjustment of tubular construction part quality center of mass and detection device
CN206421830U (en) A kind of device that assembling and measurement are compressed for upper pipe seat of fuel component
CN104676211B (en) A kind of layering adjustment type self-level(l)ing device
CN208458647U (en) A kind of automobile gear shifting box synchronizer gear ring conjunction gear chamfer detecting device
CN208458600U (en) A kind of multinomial one-shot measurement instrument of end surface of bearing ring
CN208384635U (en) A kind of TOF three-dimensional camera stereo calibration mould group
CN109406054A (en) A kind of adjustment of tubular construction part quality center of mass and detection device
CN108257696A (en) A kind of device for upper pipe seat of fuel component compression assembling and measurement
CN107525455A (en) A kind of instrument and detection method for being exclusively used in machine tool guideway Parallel testing
CN103644809A (en) Crankshaft stroke measurement device and method
CN203163693U (en) Workpiece specification automatic detection machine
CN106352841A (en) Flatness detecting device for elevator skirt panel
CN105486206A (en) Inner hole and outer diameter coaxiality detecting apparatus and method for spinning machine fake bearing
CN106289643B (en) The center of gravity measurement tooling of on-circular cross-section product
CN201897448U (en) Check tool for body-in-white sling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant