CN108222480A CN201711346271.2A CN201711346271A CN108222480A CN 108222480 A CN108222480 A CN 108222480A CN 201711346271 A CN201711346271 A CN 201711346271A CN 108222480 A CN108222480 A CN 108222480A
Authority
CN
China
Prior art keywords
truss
main couple
steel
main
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711346271.2A
Other languages
Chinese (zh)
Other versions
CN108222480B (en
Inventor
曹万林
张元�
边瑾靓
刘苹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201711346271.2A priority Critical patent/CN108222480B/en
Publication of CN108222480A publication Critical patent/CN108222480A/en
Application granted granted Critical
Publication of CN108222480B publication Critical patent/CN108222480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of high-altitude overhanging main truss posture steel mould base construction platform, belongs to construction engineering technical field, which includes main couple, and jack truss, rod piece, splice plate and high-strength bolt are safeguarded in edge.Compared with prior art, this stage+module mode is simple, applied widely, and safety stock is high, and deflection is small, and steel using amount is few, and comprehensive cost is relatively low.In the construction process, most loads on platform are passed to concrete column by main couple by respective nodes construction measure, and small part load is passed to beams of concrete by jack truss by respective nodes construction measure.This platform relies on lower two layers of concrete structure to support, and undertakes the various loads that construction platform is transmitted to, makes support construction more secured, deflection smaller.Suitable for building for high-altitude overhanging construction platform.

Description

A kind of high-altitude overhanging main truss posture steel mould base construction platform
Technical field
The invention belongs to construction engineering technical fields, are related to a kind of high-altitude overhanging main truss posture steel mould base construction platform.
Background technology
Recently as China's expanding economy, high level, high-rise building are more and more, and architectural image also makes rapid progress. Many high-rise, high-rise buildings, in order to protrude elevation of building moulding and expand top using space, occur being permitted in design More high-altitude overhanging cast-in-place concrete structures, wherein being no lack of there are the very big structure of some overhanging spans, this is to natively comparing danger The work progress of danger proposes higher requirement.
Suspended structure at high altitude load is larger, to construction when mould bases support platform bearing capacity, rigidity and stability It is it is required that very high.In addition it is again working at height, this requires in the construction process, entire mould bases support platform has absolute safety Reliability.The traditional construction method of such engineering is roughly divided into following two:(1) landing high-altitude full framing is set up, i.e., by ground After the roof reinforcement of lower room, full hall fastener type steel pipe formwork-support is set up to desired height of constructing.For high where cantilevered structure For the higher engineering of degree, such method material requested dosage is very big, and construction dismounting is complicated, and stability is difficult to ensure that, because This is not suitable for suspended structure at high altitude.(2) the overhanging support system being made of overhanging type steel beam and diagonal brace.Although the method relatively on A kind of method is improved, but is only suitable for the smaller structure of cantilever span, and longer for overhanging, larger structure of conducting oneself with dignity is similary It is inapplicable.
Based on this, the present invention proposes a kind of high-altitude overhanging main truss posture steel mould base construction platform, has high capacity, just Degree is big, easy for assemble or unload, applied widely, and safety stock is high, and steel using amount is few, comprehensive lower-cost advantage, particularly suitable In corner, there are the skyscrapers of suspended structure at high altitude.
Invention content
The present invention provides a kind of high-altitude overhanging main truss posture steel mould base construction platform, to solve in high-rise, high-rise building In, set up long the problem of overhanging cast-in-place concrete structure construction platform.
To achieve the above object, the present invention adopts the following technical scheme that:A kind of high-altitude overhanging main truss posture steel mould base construction Platform, the platform include:Rod piece (3), splice plate (4) and high-strength bolt (5) are safeguarded in main couple (1), jack truss (2), edge.
The main couple be two Pin intersect main couple, material selection intensity be Q345 H profile steel, welding or rolling and Into sectional dimension should as needed be calculated determining by technical staff.Each truss structure include top boom, lower boom, perpendicular web member and Diagonal web member, truss depth are the floor height of concrete structure on the middle and senior level of constructing, and angle is kept between chord member and diagonal web member, adjacent web members At about 45 degree, make truss stress more reasonable.Simultaneously main couple web member design in, should make as possible more web member be in by Tension state avoids generating the stable problem of steel construction.
The main couple is the main bearing member of entire formwork system, not only undertakes itself and the lotus from body It carries, while undertakes the load that jack truss around is transmitted to, and deliver load to concrete structure.
The jack truss material selection intensity is the H profile steel of Q345, welds or rolls, sectional dimension should be by technology Personnel calculate determine as needed.Jack truss equally includes top boom, lower boom, perpendicular web member and diagonal brace.Intersecting in main couple The jack truss in portion is known as cross beam truss, and chord member one end is connected with main couple, the other end by respective nodes construction measure with Concrete structured beam is connected.A cross beam truss load part passes to concrete structured beam, and another part passes to master Truss.Intersecting the jack truss outside main couple, one end is connected with main couple, and the other end, will load thereon similar to pure overhanging Pass to main couple.
Safeguard that rod piece for H profile steel, is welded or rolled, sectional dimension should be as needed by technical staff in the edge It is determined with detailing requiments.Edge safeguards that rod piece is arranged on the outermost edge of entire truss, main to play contact and maintenance, usually Stress is smaller, and in order to mitigate dead weight and saving steel, section is usually less than the rod piece of main couple and jack truss.
The splice plate and high-strength bolt is the connecting elements of entire truss, and splice plate is rectangular steel plates, including upper and lower The splice plate on the edge of a wing and web splice plate;High-strength bolt material should be 45# steel or steel alloy, and intensity rank should be 10.9 grades or more Height, quantity, position, diameter and length should be determined by calculating and detailing requiments.
During two crossing rod piece connections, typically main stressed member is continuous, is disconnected with respect to secondary member.Secondary member It is welded when one small part is prefabricated in the factory with main rod piece, remaining part passes through splice plate and high-strength bolt and weldering in lifting Socket part point connection.
Compared with prior art, a kind of high-altitude overhanging main truss posture steel mould base construction platform of the present invention, suitable for for high-altitude There is the cast-in-place concrete structure erection construction platform of overhanging in corner, have the advantage that:
(1) bearing capacity is big, and safety stock is high.By the space steel mould base that height is floor height, entire mould bases is made to become one Space-load system rather than single rod piece stress substantially increase the bearing capacity of construction supporting platform.
(2) rigidity is big, and deflection is small.Entire formwork system each rod piece in loading process connects each other, and compatible deformation adds There are many spaces again to erect the presence of web member and diagonal web member, for independent rod piece, substantially increase entire Construction Support The rigidity of platform, so as to which its deflection is reduced to minimum, so as to ensure that the required precision of construction to greatest extent.
(3) it is easy for assemble or unload.Entire truss is used by the way of prefabrication, on-site consolidation between each truss rod The connection mode of high-strength bolt, avoids high-altitude wet work, it is ensured that quality of connection.
Description of the drawings
Fig. 1 is a kind of three-dimensional effect diagram of high-altitude overhanging main truss posture steel mould base construction platform.
Fig. 2 is main couple elevation in a kind of high-altitude overhanging main truss posture steel mould base construction platform.
Fig. 3 is two rod piece assembly node stereogram of truss in a kind of high-altitude overhanging main truss posture steel mould base construction platform.
Specific embodiment
Below in conjunction with the accompanying drawings and example, the specific embodiment of the present invention is described in further detail.Following instance is used In illustrating the present invention, but be not limited to the scope of the present invention.
In this example, the sectional dimensions of all rod pieces, splicing board size, high-strength bolt model need technical staff according to Practical Project is determined by calculating with detailing requiments.In addition it is designing in installation process, ensureing platform pricncipal rafter upper table Face is conducive to the progress of construction in later period in identical height level.
As shown in Figs. 1-3, a kind of high-altitude overhanging main truss posture steel mould base construction platform, construction method are as follows:
The first step when concrete structure construction is to respective storey, wherein will be hung to desired height by a Pin main couples, pass through Corresponding node connection measure is connected with concrete column.For example, it is desired to the High Large Cantilever concrete structure poured is in n-th layer building Height where plate, then, entire construction platform needs are built in (n-1)th layer of entire space.That is space steel mould base winds up Bar and the concrete column phase anchor connection at (n-1)th layer of floor height, the concrete column at lower boom and the n-th -2 layers floor height Phase anchor connection, entire mould bases height are floor height.
The segmentation of another Pin main couples is hung at desired height, passes through splice plate, high-strength bolt and reserved by second step Two Pin main couples are bolted by hole, and guarantee has enough bonding strengths.
Third walks, and after two Pin main couple rigging outs, re-segmenting lifts jack truss.Jack truss and main couple, jack truss It is equally connect between jack truss with high-strength bolt, and ensures bonding strength.Part jack truss is needed through corresponding node structure Make measure and beams of concrete anchor connection.
Edge after primary and secondary truss rigging out, is safeguarded that rod piece is hung to desired height, with main couple or secondary purlin by the 4th step Spliced between frame by high-strength bolt.
Whether the 5th step after entire space steel mould base rigging out, reaches requirement, Ran Hou with instrument detection installation accuracy I-steel or steel plate etc. are completely spread on pricncipal rafter, finds out a complete plane, the bottom surface as entire construction platform.

Claims (6)

1. a kind of high-altitude overhanging main truss posture steel mould base construction platform, it is characterised in that:The platform includes main couple (1), secondary purlin Rod piece (3), splice plate (4) and high-strength bolt (5) are safeguarded in frame (2), edge;Main couple (1) by being connected with concrete structure column, Jack truss (2) is connected by joint structure measure with concrete structured beam;Bar is safeguarded at main couple (1), jack truss (2) and edge It is connected between each rod piece by splice plate (4) and high-strength bolt (5) in part (3), so as to which each section is spliced into an entirety Space steel mould base forms space-load system;The overhanging direction of main couple (1) should respectively with the concrete knot of its anchor connection The length direction of the structure column back rest is consistent.
2. a kind of high-altitude overhanging main truss posture steel mould base construction platform according to claim 1, it is characterised in that:Described Main couple (1) is the main couple that two Pin intersect, and material selection intensity is the H profile steel of Q345, welds or rolls;Every Pin purlins Frame includes top boom, lower boom, perpendicular web member and diagonal web member, and truss depth is the floor height of concrete structure on the middle and senior level of constructing, chord member Angle is maintained at 45 degree between diagonal web member and adjacent web members;The main couple that two Pin intersect passes through splice plate (4) and high-strength spiral shell Bolt (5) connects.
3. a kind of high-altitude overhanging main truss posture steel mould base construction platform according to claim 1, it is characterised in that:Described The material selection intensity of jack truss (2) is the H profile steel of Q345, welds or rolls;Jack truss (2) includes top boom, lower edge Bar, perpendicular web member and diagonal brace;Be known as cross beam truss in the jack truss intersected inside main couple, chord member one end by splice plate with And high-strength bolt is connected with main couple, the other end is connected with concrete structured beam;Intersecting the jack truss outside main couple, one end It is connected with main couple, the other end is pure overhanging, will pass to main couple by load thereon.
4. a kind of high-altitude overhanging main truss posture steel mould base construction platform according to claim 1, it is characterised in that:Described Safeguard that rod piece (3) for H profile steel, is welded or rolled in edge;Safeguard that rod piece (3) is arranged on the ragged edge of entire truss in edge Edge is connect with main couple (1) and jack truss (2) by splice plate (4) and high-strength bolt (5).
5. a kind of high-altitude overhanging main truss posture steel mould base construction platform according to claim 1, it is characterised in that:Described Splice plate (4) and high-strength bolt (5) are the connecting elements of entire truss, and splice plate is rectangular steel plates, includes the spelling of upper lower flange Fishplate bar and web splice plate, thickness are no less than the thickness of institute's connecting plate part;High-strength bolt material should be 45# steel or steel alloy, by force Degree rank should be 10.9 grades or higher.
6. a kind of high-altitude overhanging main truss posture steel mould base construction platform according to claim 1, it is characterised in that:It is constructing In after all member erections, the upper surface of top boom should be at same level height;And above completely spread I-steel or Steel plate finds out a complete plane, the bottom surface as entire construction platform.
CN201711346271.2A 2017-12-15 2017-12-15 High-altitude cantilever main truss type steel formwork construction platform Active CN108222480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711346271.2A CN108222480B (en) 2017-12-15 2017-12-15 High-altitude cantilever main truss type steel formwork construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711346271.2A CN108222480B (en) 2017-12-15 2017-12-15 High-altitude cantilever main truss type steel formwork construction platform

Publications (2)

Publication Number Publication Date
CN108222480A true CN108222480A (en) 2018-06-29
CN108222480B CN108222480B (en) 2024-02-02

Family

ID=62649603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711346271.2A Active CN108222480B (en) 2017-12-15 2017-12-15 High-altitude cantilever main truss type steel formwork construction platform

Country Status (1)

Country Link
CN (1) CN108222480B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049235A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 High-altitude large-span cantilever structure construction platform and method
CN113463966A (en) * 2021-07-06 2021-10-01 中国电力工程顾问集团西北电力设计院有限公司 Lattice tower type wire outlet structure
CN114541733A (en) * 2022-02-28 2022-05-27 重庆建工集团股份有限公司 Pre-assembled operating platform
CN115450314A (en) * 2022-11-11 2022-12-09 中国建筑设计研究院有限公司 Hollow cantilever structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005009231A (en) * 2003-06-20 2005-01-13 Shimizu Corp Method of constructing steel structure
CN101205763A (en) * 2007-07-31 2008-06-25 广厦建设集团有限责任公司 Construction method for building formwork platform with bailey truss
CN201874233U (en) * 2010-10-29 2011-06-22 中建三局建设工程股份有限公司 Modular integral jacking steel platform formwork system with few support points at low position
CN102661034A (en) * 2012-05-30 2012-09-12 中建一局集团第三建筑有限公司 Steel pipe fastener truss platform system and construction method thereof
CN104989092A (en) * 2015-05-28 2015-10-21 杭州江润科技有限公司 Construction method of high-altitude overhang superposition type steel truss bearing platform
CN206053285U (en) * 2016-08-23 2017-03-29 中建八局第三建设有限公司 A kind of modular assembly of high-altitude overlength is encorbelmented steel platform
CN207633734U (en) * 2017-12-15 2018-07-20 北京工业大学 A kind of high-altitude overhanging main truss posture steel mould base operation platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005009231A (en) * 2003-06-20 2005-01-13 Shimizu Corp Method of constructing steel structure
CN101205763A (en) * 2007-07-31 2008-06-25 广厦建设集团有限责任公司 Construction method for building formwork platform with bailey truss
CN201874233U (en) * 2010-10-29 2011-06-22 中建三局建设工程股份有限公司 Modular integral jacking steel platform formwork system with few support points at low position
CN102661034A (en) * 2012-05-30 2012-09-12 中建一局集团第三建筑有限公司 Steel pipe fastener truss platform system and construction method thereof
CN104989092A (en) * 2015-05-28 2015-10-21 杭州江润科技有限公司 Construction method of high-altitude overhang superposition type steel truss bearing platform
CN206053285U (en) * 2016-08-23 2017-03-29 中建八局第三建设有限公司 A kind of modular assembly of high-altitude overlength is encorbelmented steel platform
CN207633734U (en) * 2017-12-15 2018-07-20 北京工业大学 A kind of high-altitude overhanging main truss posture steel mould base operation platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049235A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 High-altitude large-span cantilever structure construction platform and method
CN113463966A (en) * 2021-07-06 2021-10-01 中国电力工程顾问集团西北电力设计院有限公司 Lattice tower type wire outlet structure
CN114541733A (en) * 2022-02-28 2022-05-27 重庆建工集团股份有限公司 Pre-assembled operating platform
CN115450314A (en) * 2022-11-11 2022-12-09 中国建筑设计研究院有限公司 Hollow cantilever structure

Also Published As

Publication number Publication date
CN108222480B (en) 2024-02-02

Similar Documents

Publication Publication Date Title
CN108222480A (en) A kind of high-altitude overhanging main truss posture steel mould base construction platform
CN106677336A (en) Connecting joint structure of square concrete filled steel tubular column and I-shaped section steel beam
CN207633734U (en) A kind of high-altitude overhanging main truss posture steel mould base operation platform
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN107386447A (en) A kind of assembled Mixed Architecture suitable for high residential building
CN111411724A (en) Steel beam-concrete composite floor slab combined assembly system
CN109424072A (en) The connecting node and construction method of spacer bar concrete column on a kind of girder steel
CN106759909A (en) Bearing structure system and its construction method are hung up under one kind
Zhou et al. Hysteretic behavior and design considerations of staggered truss framing systems
CN109653517B (en) Multidirectional unloading system and construction method for assembling steel corridor by using same
CN110847648A (en) Construction method of multi-storey factory building
CN216740047U (en) Overhead tool type steel platform with high altitude and large span
CN113494148B (en) Large-span conversion truss-shear wall structure and construction process
CN114134995A (en) Frame core tube rigid-connection floor beam structure system and construction method
CN207144179U (en) The connecting node of spacer bar concrete column on a kind of girder steel
CN113737942A (en) Fully-bolted assembled steel structure and construction method thereof
CN107965055B (en) Connecting node of H-shaped steel beam and steel reinforced concrete beam and manufacturing method
CN112575948A (en) Truss string beam and cantilever truss combined roof truss and construction method
CN217232352U (en) Large-span assembled combined arch heavy roof structure
Thirugnanam et al. Experimental Investigation on Steel Concrete Composite Floor Slab
CN111335459A (en) Prefabricated hinged frame supporting system
CN219864053U (en) Cantilever hanging pull type detachable concrete formwork platform
Mi et al. Seismic design and experimental testing of precast tolerance concrete shear wall subject to cyclic load
CN112095798B (en) Super high-rise double-layer super large cantilever steel structure
CN219826285U (en) Supporting system for building jacket storey-adding transformation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant