CN108221555B - A kind of method for paving of garden path structure - Google Patents
A kind of method for paving of garden path structure Download PDFInfo
- Publication number
- CN108221555B CN108221555B CN201810031391.1A CN201810031391A CN108221555B CN 108221555 B CN108221555 B CN 108221555B CN 201810031391 A CN201810031391 A CN 201810031391A CN 108221555 B CN108221555 B CN 108221555B
- Authority
- CN
- China
- Prior art keywords
- mixture
- stone
- foundation
- foundation pit
- foundation stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Cultivation Of Plants (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of method for paving of garden path structure, it clears up rubbish comprising steps of S1. planning road;S2. road is excavated, excavation obtains foundation pit;S3. porous stone is cut and obtains foundation stone after grooving, and obtain stone particle in cutting and fluting;S4. fertilizer, soil, water are mixed, obtains mixture one, mixture one is laid on hole bottom;S5. it is laid with foundation stone;S6. stone particle, seed, soil, water are mixed, obtains mixture two, mixture two is laid in foundation pit;S7. germination is checked;The invention has the advantages that the soil in mixture one and mixture two enters in the hole of stone particle and foundation stone, the root of plant is promoted to grow into the hole of stone particle and foundation stone, played a protective role to the root of plant;Stone particle is not susceptible to deformation, and stone particle is fixed by the root of plant and is not easy stress and moves, and sink after preventing people from stepping on mixture two.
Description
Technical field
The present invention relates to the method for paving of road structure, in particular to a kind of method for paving of garden path structure.
Background technique
In certain region application engineering technology and artistic media, pass through transformation landform, plantation trees flowers and plants, constructing architecture
Beautiful natural environment and condition of strolling about or have a rest, are known as gardens made of creating with approach such as arrangement garden roads.Generally mating formation in gardens has
Road is walked for people, but since current garden path is mated formation unreasonable, the plant root whisker undergrowth of near roads, is easy because of people
It tramples and dead, causes near roads soil bareness, one is detrimental to beauty, second is that exposed soil is after the rainy day absorbs moisture
It can become muddy, foot can fall into soil after stepping on soil, easily cause people and fall down.
Notification number is that the Chinese patent of CN106400653A discloses a kind of method for paving on landscape garden road, including following step
Rapid: (1) the construction coordinate grid drawn according to design drawing carries out mark fixed point, the sideline in place is released on the ground of place;
(2) cut-fill transition is carried out to the landform in place, excavation construction, the new ground gone out to excavation and filling flattens, according to the slope of setting
Degree evidence carries out place to look for slope, confirms floor drain outlet position;(3) base layer construction is carried out on the roadbed after leveling, is constructed
Sequence is followed successively by rammed earth, the rubble that paves, road roller pressure stabilizing, throwing charge, compacting, spreading calking;(4) in the base of completion
Unwrapping wire is pinpointed on layer, every 100cm is a little that according to designed elevation, central pile and skirt piles are put in sideline, in dry base after review
On spread a layer weight than cement and mortar for 1:3, prepare, pour in proportion, compacted concrete, top surface is struck off, garden road 10-
15m reserves expansion joint, and expansion joint size is 1-3cm, after the completion of concrete topping, with film covering curing 7 days;(5) concrete
After surface layer conserves, dry cement mortar screeding layer is spread, marble plate is carried out and overlays, alignment T-joining, jolt ramming mortar,
Marble plate is started, checks that mortar surface matches with slabstone bottom, sprinkles water and sprinkle water again mud powder in mortar surface, marble slab
Block alignment paving;(6) it after paving is completed for 24 hours, after checking marble panel surface without fracture, hollowing, is crammed with dilute cement paint brush seam
Full, dry cloth is cleaned.
The road surface that this method is mated formation is solid, but the root of plant can not protrude into the bottom on the road surface, so that near the road surface
Vegetation growth state it is bad, be easy after people tramples dead, cause near roads soil bareness, exposed soil is inhaled in the rainy day
Become muddy after receiving moisture, people's foot can be fallen into soil after stepping on muddy soil, and to extract foot, people can be exerted oneself with another foot
Road is trampled, gravity center instability is be easy to cause and falls down, there is security risk, have much room for improvement.
Summary of the invention
In view of the deficienciess of the prior art, technical purpose of the invention is to provide a kind of mating formation for garden path structure
Method, have the advantages that people's walking be not easy to fall down on road, safety coefficient it is high.
Technical purpose of the invention has the technical scheme that
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 1:2:1 is mixed with weight ratio by fertilizer, soil, water, obtains mixture one, mixture one is laid with
At the hole bottom of foundation pit, laying depth 3cm;
S5. foundation stone is laid in the foundation pit for being equipped with mixture one, the surface of the one of 30cm*50cm of foundation stone is close to mixed
Foundation stone slightly sink after closing the upper surface of material one, the surface of two 40cm*50cm of foundation stone perpendicular to foundation pit length direction, two
The distance between a adjacent foundation stone is 10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, seed, soil, water, obtains mixture two, will mix
It closes material two to be laid in foundation pit, laying depth 35cm makes mixture two full of the gap between foundation stone;
S7. check whether seed germinates after three days, and in the multiple seeds of region shallow embedding that do not germinate, then again by mixture two
Upper surface arrange it is smooth.
By using above-mentioned technical proposal, foundation stone is laid in foundation pit again after the hole bottom layer overlay mixture one of foundation pit
With mixture two, foundation stone and stone particle are covered with hole, and the hole inside foundation stone and stone particle grows into for the root of plant,
And during stone particle is mixed with soil and water, part soil is entered in the hole of stone particle, gives plant root whisker
Offer condition and nutrient be provided, and foundation stone also have during being contacted with mixture one and mixture two part soil and fertilizer into
Enter in the hole of foundation stone, grow into offer condition and nutrient to plant root whisker, keep the vegetation growth state of near roads good, and works as
After plant root whisker is grown into the hole of foundation stone and stone particle, plant root whisker improve connected between foundation stone and stone particle it is steady
Qualitative, the vibration for preventing people from generating in walking on foundation stone loosens foundation stone and stone particle;
The cauline leaf of plant is covered near foundation stone after plant germination, and when people's foot is fallen in outside foundation stone, mixture two plays people's foot
To supporting role, stone particle is wherein contained in mixture two, the intensity of stone particle is larger and the Young's modulus of stone particle
Higher, people's foot is not easy to fall into mixture two, and stone particle plays protection to the root of plant, prevents people's foot from trampling destruction and plants
The root of object, the hole in stone particle, which makes plant root whisker always, can touch sufficient air, further play guarantor to plant
Shield effect, and plant root whisker can stablize stone particle and soil, prevent people's foot from falling into mixture two, reduction people falls down general
Rate;
Foundation stone opens up fluted, and combination between foundation stone is stronger after mixture two enters groove, reduces people in base
The probability that the vibration generated when walking on stone loosens foundation stone and stone particle, and groove increases mixture two and foundation stone
Between contact area, the root of plant can preferably in conjunction with foundation stone, increase connected between foundation stone and mixture two it is steady
It is qualitative.
The height of foundation stone be 40cm, and foundation depth be 35cm, after foundation stone is layed in foundation pit, due to mixture one compared with
Be it is wet, foundation stone can sink 2-3cm, therefore foundation stone can be higher than two 2-3cm of mixture, when people's foot falls in foundation stone upper surface close to base
It is not easy to be in contact with mixture two when the edge of stone, to play a protective role to the plant for being grown on mixture two, reduce
Trample the probability that the phenomenon that directly destroying plant stem-leaf occurs.
The present invention is further arranged to: further including that step S8 checks that the upper surface of mixture two whether there is gap, and makes
With soil blind.
By using above-mentioned technical proposal, due to plant germination during can break mixture two and stretch out mixture two
Upper surface, may lead during plant is broken ground hair two Local Cracking of mixture, make surface using soil blind
It is more smooth, and enhance the stability of mixture two.
The present invention is further arranged to: it further include checking whether the upper surface of mixture two is exposed after step S9 15 days,
And turf is laid in exposed region.
By using above-mentioned technical proposal, there may be part earth's surface not covered by the cauline leaf of plant, in exposed mixture
Two upper surface, which is laid with turf, can guarantee that the mixture two of all areas has plant growth, to realize plant to all areas
Mixture two stabilization, mixture two can also play a protective role to plant.
The present invention is further arranged to: mixture one being laid on to the method at the hole bottom of foundation pit are as follows: a. will be mixed in the S4
Close the hole bottom that material one is uniformly poured on foundation pit;B. the plate of the similar width of length and foundation pit is placed in the upper surface of mixture one;
C. plate is moved horizontally along the length direction of foundation pit, keeps the upper surface of mixture one more smooth.
By using above-mentioned technical proposal, the length direction using plate along foundation pit stirs mixture one, mixes
The upper surface for closing material one becomes more smooth, and the thickness of mixture one is more uniform, and fertilizer is enable uniformly to divide in each region
Cloth promotes to be uniformly distributed when plant root growth.
The present invention is further arranged to: the method being laid on foundation stone in the S5 in foundation pit are as follows: a. is small by two diameters
In in the groove that the bar of 2cm is respectively clamped into two, foundation stone;B. foundation stone is driven slowly to be put into foundation pit after two tight foundation stones of bar cramp;c.
Two bars are taken out from two grooves after adjusting the position of foundation stone.
By using above-mentioned technical proposal, mixture one can be squeezed after being put into foundation pit due to foundation stone, is taken by two bar cramps
Foundation stone is placed after foundation stone, foundation stone can be moved to behind the top of full cock position and be put into foundation pit along vertical direction, prevents from placing ground
Mixture one near point is extruded.
The present invention is further arranged to: the fertilizer is the mixture of plant ash and fishbone dust, according to weight ratio, vegetation
Ash: fishbone dust=1:1.
By using above-mentioned technical proposal, plant ash and fishbone dust are rich in multi mineral prime element, and contain in fishbone dust
P elements can promote plant establishment, and contain potassium element in plant ash, and root system of plant, cauline leaf can be made more flourishing, promote plant
Growth.
The present invention is further arranged to: the seed is the seed of vetiver.
By using above-mentioned technical proposal, the root of vetiver is longer, may extend in stone particle and foundation stone, enhances stone
The stability of block particle and foundation stone, and vetiver is heat-resisting cold-resistant, drought-enduring waterlogging, is not easy death due to temperature, humidity are severe.
The present invention is further arranged to: seed in the step S6 carried out again after first impregnating for 24 hours in water using.
By using above-mentioned technical proposal, seed is placed in warm water and is pre-processed, promote germination, reduces seed hair
The time required to bud and increase percentage of seedgermination, to reduce the workload of step S7.
In conclusion the invention has the following advantages:
1, nutrient is provided for plant by mixture one, plant is made to keep good upgrowth situation, mixture one and mixing
Soil in material two enters in the hole of stone particle and foundation stone, and the root of plant is promoted to grow into the hole of stone particle and foundation stone
In, it plays a protective role to the root of plant;
2, it is connected between raising stone particle and foundation stone after the root of plant is grown into the hole of stone particle and foundation stone
Stability sink to prevent people from stepping on two rear feet of mixture, promotes safety, and can prevent between mixture two and foundation stone
There is gap and cause foundation stone mobile, prevents people from walking on foundation stone shakiness;
3, the Young's modulus of stone particle is larger, makes one foot and steps on stone behind the upper surface of mixture two in mixture two
Particle is not susceptible to deformation, and stone particle is fixed by the root of plant and is not easy stress and moves, to prevent people from stepping on
Upper two rear feet of mixture is sunk, and safety is promoted.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of foundation stone of the invention;
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 0.5:0.5:2:1 is mixed with weight ratio by plant ash, fishbone dust, soil, water, obtains mixture one,
Mixture one is laid on to the hole bottom of foundation pit, laying depth 3cm and uniformly toppling over mixture one into foundation pit;
S5. it is laid with foundation stone in the foundation pit for being equipped with mixture one, carry foundation stone and foundation stone is placed in foundation pit, foundation stone
Foundation stone slightly sink after the upper surface of mixture one is close on the surface of one of 30cm*50cm, two 40cm*50cm of foundation stone
Surface perpendicular to foundation pit length direction, the distance between two adjacent foundation stones be 10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, cus-cus grass seed, soil, water, obtains mixture
Two, mixture two is laid in foundation pit, laying depth 35cm, makes mixture two full of the gap between foundation stone;
S7. check whether cus-cus grass seed germinates after three days, and in the multiple cus-cus grass seeds of region shallow embedding of not germinateing, then
The upper surface of mixture two is arranged again smooth.
Embodiment two:
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 0.5:0.5:2:1 is mixed with weight ratio by plant ash, fishbone dust, soil, water, obtains mixture one,
Mixture one is laid on to the hole bottom of foundation pit, laying depth 3cm and uniformly toppling over mixture one into foundation pit;
S5. it is laid with foundation stone in the foundation pit for being equipped with mixture one, carry foundation stone and foundation stone is placed in foundation pit, foundation stone
Foundation stone slightly sink after the upper surface of mixture one is close on the surface of one of 30cm*50cm, two 40cm*50cm of foundation stone
Surface perpendicular to foundation pit length direction, the distance between two adjacent foundation stones be 10cm;
S6. after cus-cus grass seed being impregnated for 24 hours in water, by stone particle, cus-cus grass seed, soil, water with weight ratio
It is mixed for 2:1:2:1, obtains mixture two, mixture two is laid in foundation pit, laying depth 35cm makes mixture
Two full of the gap between foundation stone;
S7. check whether cus-cus grass seed germinates after three days, and in the multiple cus-cus grass seeds of region shallow embedding of not germinateing, then
The upper surface of mixture two is arranged again smooth;
S8. it checks that the upper surface of mixture two whether there is gap, and uses soil blind.
Embodiment three:
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 1:2:1 is mixed with weight ratio by fertilizer, soil, water, mixture one is obtained, by equal into foundation pit
The even hole bottom toppled over mixture one and mixture one is laid on to foundation pit, laying depth 3cm;
S5. it is laid with foundation stone in the foundation pit for being equipped with mixture one, carry foundation stone and foundation stone is placed in foundation pit, foundation stone
Foundation stone slightly sink after the upper surface of mixture one is close on the surface of one of 30cm*50cm, two 40cm*50cm of foundation stone
Surface perpendicular to foundation pit length direction, the distance between two adjacent foundation stones be 10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, seed, soil, water, obtains mixture two, will mix
It closes material two to be laid in foundation pit, laying depth 35cm makes mixture two full of the gap between foundation stone;
S7. check whether seed germinates after three days, and in the multiple seeds of region shallow embedding that do not germinate, then again by mixture two
Upper surface arrange it is smooth;
S8. it checks that the upper surface of mixture two whether there is gap, and uses soil blind;
S9. check whether the upper surface of mixture two is exposed after 15 days, and be laid with turf in exposed region.
Example IV:
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 0.5:0.5:2:1 is mixed with weight ratio by plant ash, fishbone dust, soil, water, obtains mixture one,
Mixture one is laid on to the hole bottom of foundation pit, mixture one is uniformly poured on the hole bottom of foundation pit, so by laying depth 3cm first
The plate of the similar width of length and foundation pit is placed in the upper surface of mixture one afterwards, then is moved along the length direction level of foundation pit
Dynamic plate, keeps the upper surface of mixture one more smooth;
S5. it is laid with foundation stone in the foundation pit for being equipped with mixture one, carry foundation stone and foundation stone is placed in foundation pit, foundation stone
Foundation stone slightly sink after the upper surface of mixture one is close on the surface of one of 30cm*50cm, two 40cm*50cm of foundation stone
Surface perpendicular to foundation pit length direction, the distance between two adjacent foundation stones be 10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, cus-cus grass seed, soil, water, obtains mixture
Two, mixture two is laid in foundation pit, laying depth 35cm, makes mixture two full of the gap between foundation stone;
S7. check whether cus-cus grass seed germinates after three days, and in the multiple cus-cus grass seeds of region shallow embedding of not germinateing, then
The upper surface of mixture two is arranged again smooth;
S8. it checks that the upper surface of mixture two whether there is gap, and uses soil blind;
S9. check whether the upper surface of mixture two is exposed after 15 days, and be laid with turf in exposed region.
Embodiment five:
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 0.5:0.5:2:1 is mixed with weight ratio by plant ash, fishbone dust, soil, water, obtains mixture one,
Mixture one is laid on to the hole bottom of foundation pit, mixture one is uniformly poured on the hole bottom of foundation pit, so by laying depth 3cm first
The plate of the similar width of length and foundation pit is placed in the upper surface of mixture one afterwards, then is moved along the length direction level of foundation pit
Dynamic plate, keeps the upper surface of mixture one more smooth;
S5. it is laid with foundation stone in the foundation pit for being equipped with mixture one, the bar by two diameters less than 2cm is respectively clamped into foundation stone
It in two grooves, drives foundation stone to be slowly put into foundation pit after two tight foundation stones of bar cramp, adjusts two behind the position of foundation stone
Bar takes out from two grooves, and foundation stone is slight after the upper surface of mixture one is close on the surface of the one of 30cm*50cm of foundation stone
It sink, perpendicular to the length direction of foundation pit, the distance between two adjacent foundation stones are for the surface of two 40cm*50cm of foundation stone
10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, cus-cus grass seed, soil, water, obtains mixture
Two, mixture two is laid in foundation pit, laying depth 35cm, makes mixture two full of the gap between foundation stone;
S7. check whether cus-cus grass seed germinates after three days, and in the multiple cus-cus grass seeds of region shallow embedding of not germinateing, then
The upper surface of mixture two is arranged again smooth;
S8. it checks that the upper surface of mixture two whether there is gap, and uses soil blind;
S9. check whether the upper surface of mixture two is exposed after 15 days, and be laid with turf in exposed region.
Embodiment six:
A kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. the length and width for planning garden path, clears up the place surface for the road that needs to mat formation, and removes stone
And Other Waste, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil excavated
Storage is stand-by;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover
It is distributed on the surface of two 40cm*50cm of rectangular block equipped with groove, table of the groove from a 30cm*40cm of rectangular block
Face is penetrated through to the surface of another 30cm*40cm, and the cross section of groove is the square of 2cm*2cm, is obtained after rectangular block grooving
Foundation stone, and stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 0.5:0.5:2:1 is mixed with weight ratio by plant ash, fishbone dust, soil, water, obtains mixture one,
Mixture one is laid on to the hole bottom of foundation pit, mixture one is uniformly poured on the hole bottom of foundation pit, so by laying depth 3cm first
The plate of the similar width of length and foundation pit is placed in the upper surface of mixture one afterwards, then is moved along the length direction level of foundation pit
Dynamic plate, keeps the upper surface of mixture one more smooth;
S5. it is laid with foundation stone in the foundation pit for being equipped with mixture one, the bar by two diameters less than 2cm is respectively clamped into foundation stone
It in two grooves, drives foundation stone to be slowly put into foundation pit after two tight foundation stones of bar cramp, adjusts two behind the position of foundation stone
Bar takes out from two grooves, and foundation stone is slight after the upper surface of mixture one is close on the surface of the one of 30cm*50cm of foundation stone
It sink, perpendicular to the length direction of foundation pit, the distance between two adjacent foundation stones are for the surface of two 40cm*50cm of foundation stone
10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, carpetgrass seed, soil, water, is mixed
Material two, mixture two is laid in foundation pit, laying depth 35cm, makes mixture two full of the gap between foundation stone;
S7. check whether carpetgrass seed germinates after three days, and in the multiple carpetgrass seeds of region shallow embedding of not germinateing,
Then the upper surface of mixture two is arranged again smooth;
S8. it checks that the upper surface of mixture two whether there is gap, and uses soil blind;
S9. check whether the upper surface of mixture two is exposed after 15 days, and be laid with turf in exposed region.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (8)
1. a kind of method for paving of garden path structure, which is characterized in that comprising steps of
S1. plan garden path length and width, the place surface for the road that needs to mat formation is cleared up, remove stone and its
His rubbish, and by the plant transplanting for road of mating formation to other places;
S2. the road mated formation to needs excavates, excavating depth 35cm, and excavation obtains foundation pit, the soil storage excavated
For use;
S3., porous stone is cut into the rectangular block of multiple 30cm*40cm*50cm using cutting machine, reuses groover in square
It is distributed on the surface of two 40cm*50cm of shape block equipped with groove, groove is passed through from the surface of a 30cm*40cm of rectangular block
The surface of another 30cm*40cm is passed to, the cross section of groove is the square of 2cm*2cm, foundation stone is obtained after rectangular block grooving,
And stone particle is obtained in cutting and fluting, it collects foundation stone and the storage of stone particle is stand-by;
S4. it is that 1:2:1 is mixed with weight ratio by fertilizer, soil, water, obtains mixture one, mixture one is laid on base
The hole bottom in hole, laying depth 3cm;
S5. foundation stone is laid in the foundation pit for being equipped with mixture one, mixture is close on the surface of the one of 30cm*50cm of foundation stone
Foundation stone slightly sink behind one upper surface, length direction of the surface of two 40cm*50cm of foundation stone perpendicular to foundation pit, two phases
The distance between adjacent foundation stone is 10cm;
S6. it is that 2:1:2:1 is mixed with weight ratio by stone particle, seed, soil, water, mixture two is obtained, by mixture
Two are laid in foundation pit, laying depth 35cm, make mixture two full of the gap between foundation stone;
S7. check whether seed germinates after three days, and in the multiple seeds of region shallow embedding that do not germinate, then again by the upper of mixture two
Surface dressing is smooth.
2. the method for paving of a kind of garden path structure according to claim 1, it is characterized in that: further including that step S8 is checked
The upper surface of mixture two whether there is gap, and use soil blind.
3. the method for paving of a kind of garden path structure according to claim 2, it is characterized in that: further including step S9 15
Check whether the upper surface of mixture two is exposed after it, and is laid with turf in exposed region.
4. the method for paving of a kind of garden path structure according to claim 1, it is characterized in that: by mixture in the S4
One method for being laid on the hole bottom of foundation pit are as follows: mixture one is uniformly poured on the hole bottom of foundation pit by a.;B. in the upper table of mixture one
Place the plate of the similar width of length and foundation pit in face;C. plate is moved horizontally along the length direction of foundation pit, makes mixture one
Upper surface it is more smooth.
5. the method for paving of a kind of garden path structure according to claim 1, it is characterized in that: spreading foundation stone in the S5
The method being located in foundation pit are as follows: bar of a. by two diameters less than 2cm is respectively clamped into two, foundation stone grooves;B. two bar cramps
Foundation stone is driven slowly to be put into foundation pit after tight foundation stone;C. two bars are taken out from two grooves after adjusting the position of foundation stone.
6. the method for paving of a kind of garden path structure according to claim 1, it is characterized in that: the fertilizer is plant ash
With the mixture of fishbone dust, according to weight ratio, plant ash: fishbone dust=1:1.
7. the method for paving of a kind of garden path structure according to claim 1, it is characterized in that: the seed is vetiver
Seed.
8. the method for paving of a kind of garden path structure according to claim 7, it is characterized in that: the kind in the step S6
It is sub first impregnate for 24 hours in water after carry out again using.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810031391.1A CN108221555B (en) | 2018-01-12 | 2018-01-12 | A kind of method for paving of garden path structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810031391.1A CN108221555B (en) | 2018-01-12 | 2018-01-12 | A kind of method for paving of garden path structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108221555A CN108221555A (en) | 2018-06-29 |
CN108221555B true CN108221555B (en) | 2019-11-19 |
Family
ID=62641125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810031391.1A Active CN108221555B (en) | 2018-01-12 | 2018-01-12 | A kind of method for paving of garden path structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108221555B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0174755A1 (en) * | 1984-08-25 | 1986-03-19 | Nottinghamshire County Council | Pedestrian, vehicular, or sports playing surfaces and underlays/shock pads |
KR20080079448A (en) * | 2007-02-27 | 2008-09-01 | 임학순 | Grass block |
CN103362132A (en) * | 2013-07-26 | 2013-10-23 | 六蜂王(石狮)环保建材有限公司 | Construction method of cast-in-site planting concrete revetment |
CN103650838A (en) * | 2013-10-18 | 2014-03-26 | 北京东方利禾景观设计有限公司 | Method for planting sand culture cool season type layered lawn |
CN105463967A (en) * | 2015-11-19 | 2016-04-06 | 中建七局第二建筑有限公司 | Water-permeable wear-resistant garden path and construction method thereof |
CN106400653A (en) * | 2016-10-31 | 2017-02-15 | 安徽汇顿电子科技有限公司 | Paving method for landscape garden road |
-
2018
- 2018-01-12 CN CN201810031391.1A patent/CN108221555B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0174755A1 (en) * | 1984-08-25 | 1986-03-19 | Nottinghamshire County Council | Pedestrian, vehicular, or sports playing surfaces and underlays/shock pads |
KR20080079448A (en) * | 2007-02-27 | 2008-09-01 | 임학순 | Grass block |
CN103362132A (en) * | 2013-07-26 | 2013-10-23 | 六蜂王(石狮)环保建材有限公司 | Construction method of cast-in-site planting concrete revetment |
CN103650838A (en) * | 2013-10-18 | 2014-03-26 | 北京东方利禾景观设计有限公司 | Method for planting sand culture cool season type layered lawn |
CN105463967A (en) * | 2015-11-19 | 2016-04-06 | 中建七局第二建筑有限公司 | Water-permeable wear-resistant garden path and construction method thereof |
CN106400653A (en) * | 2016-10-31 | 2017-02-15 | 安徽汇顿电子科技有限公司 | Paving method for landscape garden road |
Also Published As
Publication number | Publication date |
---|---|
CN108221555A (en) | 2018-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105484275B (en) | Reinforced anchoring ecological restoration system for high and steep slag-discarding side slope of wind power plant in mountainous area | |
CN103774679B (en) | A kind of method of rock slope linked network | |
CN106869146A (en) | A kind of careless blanket ecoscape slope protection system and construction method | |
CN108221861A (en) | A kind of ecological slope protection structure to prevent erosion and its construction method | |
CN109403267A (en) | A kind of cast-in-place green concrete of nutrition hole type and its construction method | |
CN109235365A (en) | A kind of self-locking ecological revetment brick construction method | |
CN207159737U (en) | The prefabricated permeable parking bit architecture of outdoor grass planting | |
CN110800415A (en) | Ecological treatment method in Qinba mountain land remediation engineering | |
CN106717963A (en) | A kind of construction method of lawn water-saving structure | |
CN105052487B (en) | The structures and methods of sports turf are built using building waste | |
CN113774934A (en) | Ecological restoration method for coal gangue slag slope | |
CN108221555B (en) | A kind of method for paving of garden path structure | |
JP2006262701A (en) | Construction method of environmental greening for controlling root zone | |
CN110409465A (en) | A kind of Soft Rock Slope novel ecological environmental-protection construction method | |
CN110184874A (en) | A kind of garden landscape road and its construction technology | |
KR102354156B1 (en) | Artificial Garden Landscaping Method | |
CN206591533U (en) | Careless blanket ecoscape slope protection system | |
JP2007029045A (en) | Weed growth restraining method and material | |
JP4232960B2 (en) | Embedded solidified layer greening method | |
KR101525942B1 (en) | Method for slope reinforcement construction using the ground improvement product | |
JP5270748B2 (en) | Planting base structure | |
CN111593747A (en) | Permanent side slope ecological concrete pouring process | |
KR100872483B1 (en) | Revegetation Pots for revegetating rock slopes | |
KR100353010B1 (en) | A method for constructing environmental blocks for permeating rainwater into verges of a paved road | |
CN114215081B (en) | Ecological restoration construction method for surface mine side slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |