CN108214936A - A kind of building monitoring device installation grooving apparatus - Google Patents

A kind of building monitoring device installation grooving apparatus Download PDF

Info

Publication number
CN108214936A
CN108214936A CN201711453121.1A CN201711453121A CN108214936A CN 108214936 A CN108214936 A CN 108214936A CN 201711453121 A CN201711453121 A CN 201711453121A CN 108214936 A CN108214936 A CN 108214936A
Authority
CN
China
Prior art keywords
frame
saw blade
riser
pipeline
compression cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711453121.1A
Other languages
Chinese (zh)
Other versions
CN108214936B (en
Inventor
魏学林
易宇情
陈思蓉
吴义锖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Mingzhu Construction Supervision Consulting Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711453121.1A priority Critical patent/CN108214936B/en
Publication of CN108214936A publication Critical patent/CN108214936A/en
Application granted granted Critical
Publication of CN108214936B publication Critical patent/CN108214936B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/02Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
    • B28D1/04Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with circular or cylindrical saw-blades or saw-discs
    • B28D1/045Sawing grooves in walls; sawing stones from rocks; sawing machines movable on the stones to be cut
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/02Accessories specially adapted for use with machines or devices of the preceding groups for removing or laying dust, e.g. by spraying liquids; for cooling work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Sawing (AREA)

Abstract

The present invention relates to a kind of grooving apparatus more particularly to a kind of building monitoring device installation grooving apparatus.The technical problem to be solved in the present invention is to provide a kind of time saving and energy saving, fluting neatly, the dust occurred during energy cross-notching is purged, the building monitoring device installation grooving apparatus without influencing ambient enviroment.The present invention provides such a building monitoring device installation grooving apparatus, include riser etc.;Opening is provided in the middle part of riser, riser right flank middle part is equipped with frame, mobile device is equipped in frame, cutting machine is connected in mobile device, saw blade is connected on cutting machine, saw blade is located in opening.The present invention passes through dust-extraction unit, the dust of appearance can be carried out siphoning away removing, without influencing ambient enviroment, and by water injector, water can be sprayed on saw blade, and cooled down to saw blade, make saw blade lifetime more long, it is neat to have reached time saving and energy saving, fluting, can cross-notching when the dust that occurs be purged, the effect without influencing ambient enviroment.

Description

A kind of building monitoring device installation grooving apparatus
Technical field
The present invention relates to a kind of grooving apparatus more particularly to a kind of building monitoring device installation grooving apparatus.
Background technology
Building is the general name of building and structures, be people in order to meet social life needs, utilize grasped object Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.
It during building monitoring, can be all monitored with monitoring device, and be typically all to slot on metope, then by monitoring device It is put into slot, and people is on metope when being slotted, it is time-consuming and laborious, fluting is irregular, easily there are a large amount of dusts, and then influence week Collarette border, thus there is an urgent need for research and development it is a kind of it is time saving and energy saving, fluting is neat, can cross-notching when the dust that occurs be purged, without shadow Ring the building monitoring device installation grooving apparatus of ambient enviroment.
Invention content
(1)Technical problems to be solved
The present invention in order to overcome people when being slotted on metope, it is time-consuming and laborious, fluting it is irregular, easily there are a large amount of dusts, into And the shortcomings that influencing ambient enviroment, the technical problem to be solved in the present invention is to provide a kind of time saving and energy saving, flutings neatly, can be split The dust occurred during slot is purged, the building monitoring device installation grooving apparatus without influencing ambient enviroment.
(2)Technical solution
Monitoring device installation grooving apparatus is built in order to solve the above technical problem, the present invention provides such a, including There are riser, handle, frame, cutting machine, saw blade, the first button, the second button, mobile device and dust-extraction unit, opened in the middle part of riser There is opening, riser right flank middle part is equipped with frame, mobile device is equipped in frame, cutting machine is connected in mobile device, cuts Saw blade is connected on cutting mill, saw blade is located in opening, and frame right lower part is equipped with dust-extraction unit, the upper and lower both sides pair in riser right side Title formula is equipped with handle, and right flank middle part is equipped with the first button in the handle of top, and the first button has circuit with mobile device It connects, right flank middle part is equipped with the second button in the handle of lower section, and the second button has circuit to connect with cutting machine.
Preferably, mobile device includes sliding rail, sliding block, bearing block, screw, the first motor and connecting plate, frame inner top Sliding rail is all horizontally installed in the middle part of middle part and bottom, sliding rail is equipped with the sliding block coordinated with it, and sliding block is slidably matched with sliding rail, on Connecting plate is installed, connecting plate top is provided with threaded hole, connecting plate left side middle part and cutting machine between in the middle part of lower two side slide medial surfaces Connection, frame right top is Embedded to be equipped with bearing block, and screw is equipped in bearing block, and screw is located in threaded hole and it Cooperation, riser right side upper level are equipped with the first motor, and the first motor has circuit to connect with the first button, the first motor Output shaft is connect by shaft coupling with screw left end.
Preferably, dust-extraction unit includes framework, the second motor, bull stick, turntable, connecting rod, link block, pipeline, the first work Plug, the first check valve, sweep-up pipe, fixed block and suction nozzle, connecting plate left side lower part are equipped with fixed block, the installation of fixed block left side There is a suction nozzle, suction nozzle is located at saw blade lower right, and what right side lower part was symmetrical in frame is equipped with link block, upper and lower both sides link block Pipeline is installed, on the right side of base of frame, pipeline lower part is equipped with the first check valve, is set in pipeline for pipeline lower part between left side There is first piston, be slidably matched in first piston and pipeline, first piston crown center rotary type is connected with connecting rod, and pipeline is left Upper lateral part is connected with sweep-up pipe, is connected in sweep-up pipe and pipeline, sweep-up pipe tail end is connect with suction nozzle, is connected in sweep-up pipe and suction nozzle Logical, frame mid portion is provided with guide hole, and frame external right side face lower part is equipped with framework, and framework external right side face upper level is equipped with second Motor, the output shaft of the second motor are connected with bull stick by shaft coupling, and bull stick tail end is located at through framework right upper portion in guide hole, Bull stick tail end is equipped with turntable, and turntable left side eccentric position is connect with connecting rod top rotary type.
Preferably, transmission device and water injector have been further included, transmission device includes worm screw, worm gear, installing plate and convex Wheel, frame external right side face lower part are equipped with installing plate, and installing plate right end is equipped with cam, and cam trailing flank center location is equipped with Worm gear, worm gear are located on rear side of cam, and worm screw is equipped in the middle part of bull stick, and worm screw is located above worm gear, worm and wheel engagement.
Preferably, water injector include compression cylinder, second piston, motion bar, baffle, spring, drinking-water pipe, outlet pipe, Nozzle and the second check valve, frame external right side face lower part are equipped with compression cylinder, and compression cylinder is located at below installing plate, compression cylinder bottom Left side is connected with drinking-water pipe, is connected in drinking-water pipe and compression cylinder, and compression cylinder lower right side is connected with outlet pipe, outlet pipe and compression Connect in cylinder, the second check valve be designed on outlet pipe and drinking-water pipe, be equipped with second piston in compression cylinder, at the top of second piston in Between motion bar is installed, motion bar top is equipped with baffle through compression cylinder crown center, and baffle is located at below cam to be connect with it It touches, is connected with spring between baffle bottom and the outer top of compression cylinder, on motion bar, riser leading flank top is equipped with spring pocket Nozzle, nozzle are located above saw blade, and outlet pipe tail end is connect with nozzle, are connected in outlet pipe and nozzle.
Preferably, collection frame and web plate have been further included, collection frame, the collection frame left and right sides are installed on the right side of frame outer bottom Lower part is all provided with through-hole, and through-hole is arranged symmetrically, and middle part is horizontally installed with web plate in collection frame, connects in pipeline bottom end and collection frame It is logical.
Preferably, idler wheel has been further included, riser left side is evenly spaced to be equipped with idler wheel.
Operation principle:The personnel of being operated first hold two side grips up and down, you can riser is driven to be contacted with slotting position, then press Dynamic second button, cutting machine are activated, and then cutting machine drives saw blade rotation, you can press the first button, and then mobile device Be activated, mobile device drives cutting machine to be moved to the left bar, and cutting machine, which is moved to the left, drives saw blade to be moved to the left, and then saw blade with Metope contact is located in metope, unclamps the first button, and mobile device stops operating, and restarts dust-extraction unit, dust-extraction unit is split Slot be occur dust siphon away removing, operating personnel can push riser to be moved on slotting position, so saw blade to metope into Row fluting.After the completion of metope fluting, dust-extraction unit is closed, you can unclamp the second button, and then cutting machine stops operating, you can The first button is pressed again, and then mobile device drives saw blade to move right recovery to original position by cutting machine, unclamps first and presses Button, operating personnel can put down riser from metope, and monitoring device is put into progress safety in slot.
Because mobile device includes sliding rail, sliding block, bearing block, screw, the first motor and connecting plate, frame inner top middle part With being all horizontally installed with sliding rail in the middle part of bottom, sliding rail is equipped with the sliding block coordinated with it, and sliding block is slidably matched with sliding rail, and upper and lower two Connecting plate is installed between in the middle part of side slide medial surface, connecting plate top is provided with threaded hole, is connect in the middle part of connecting plate left side with cutting machine, Frame right top is Embedded to be equipped with bearing block, and screw is equipped in bearing block, and screw is located in threaded hole and coordinates with it, Riser right side upper level is equipped with the first motor, and the first motor has circuit to connect with the first button, the output of the first motor Axis is connect by shaft coupling with screw left end, and when saw blade rotates, operating personnel can press the first button, and then the first motor Reversion, the first motor reversal drive screw reversion, and screw reversion drives connecting plate to be moved to the left by threaded hole, and connecting plate is moved to the left Saw blade is driven to be moved to the left by cutting machine, saw blade, which is moved to the left, to be contacted with metope in metope, the first button of release, and first Motor stop reverse, the i.e. removable riser of operating personnel drive saw blade movement to slot metope.After the completion of metope fluting, The first button can be pressed again, and then the first motor rotates forward, and saw blade is driven to move right recovery to original position, unclamp first and press Button, the first motor stop rotating forward.
Because dust-extraction unit include framework, the second motor, bull stick, turntable, connecting rod, link block, pipeline, first piston, First check valve, sweep-up pipe, fixed block and suction nozzle, connecting plate left side lower part are equipped with fixed block, and fixed block left side is equipped with Suction nozzle, suction nozzle are located at saw blade lower right, and what right side lower part was symmetrical in frame is equipped with link block, and upper and lower both sides link block is left Pipeline is installed, on the right side of base of frame, pipeline lower part is equipped with the first check valve, is equipped in pipeline for pipeline lower part between side It is slidably matched in first piston, first piston and pipeline, first piston crown center rotary type is connected with connecting rod, pipeline left side Top is connected with sweep-up pipe, is connected in sweep-up pipe and pipeline, and sweep-up pipe tail end is connect with suction nozzle, is connected in sweep-up pipe and suction nozzle, Frame mid portion is provided with guide hole, and frame external right side face lower part is equipped with framework, and framework external right side face upper level is equipped with the second electricity Machine, the output shaft of the second motor are connected with bull stick by shaft coupling, and bull stick tail end is located at through framework right upper portion in guide hole, turn Bar tail end is equipped with turntable, and turntable left side eccentric position is connect with connecting rod top rotary type, and being operated first personnel will be outside pipeline Treatment box is connect, when saw blade is when slotting to metope, you can start the rotation of the second motor, the rotation of the second motor drives bull stick to turn Dynamic, bar rotation drives turntable rotation, and turntable rotation is moved up and down by connecting rod drive first piston, when first piston is to moving up When dynamic, first piston is sucked the dust occurred in grooving process in sweep-up pipe by suction nozzle, and then the dust row in sweep-up pipe Enter in pipeline, when first piston moves down, first piston will carry out processing discharge in the dust push-in treatment box in pipeline. After the completion of slotting on metope, you can close the second motor.In this way, it can prevent dust from influencing ambient enviroment.
Because having further included transmission device and water injector, transmission device includes worm screw, worm gear, installing plate and cam, Frame external right side face lower part is equipped with installing plate, and installing plate right end is equipped with cam, and cam trailing flank center location is equipped with snail Wheel, worm gear are located on rear side of cam, and worm screw is equipped in the middle part of bull stick, and worm screw is located above worm gear, worm and wheel engagement, when second During electric motor starting, bar rotation drives worm screw to rotate simultaneously, and worm screw rotation drives worm gear rotation, and worm gear rotation band moving cam turns It is dynamic, cam rotation driving water injector running, and then water is sprayed on saw blade and metope by water injector, and then makes saw blade more Good slots to metope, simultaneously, moreover it is possible to cool down to saw blade.After the completion of metope fluting, when the second motor is closed, into And cam stops operating, water injector stops operating.
Because water injector includes compression cylinder, second piston, motion bar, baffle, spring, drinking-water pipe, outlet pipe, nozzle With the second check valve, frame external right side face lower part is equipped with compression cylinder, and compression cylinder is located at below installing plate, compression cylinder bottom left It is connected with drinking-water pipe, connect in drinking-water pipe and compression cylinder, compression cylinder lower right side is connected with outlet pipe, in outlet pipe and compression cylinder The second check valve is designed on connection, outlet pipe and drinking-water pipe, second piston, second piston crown center peace are equipped in compression cylinder Equipped with motion bar, motion bar top is equipped with baffle through compression cylinder crown center, and baffle, which is located at below cam, to be in contact with it, and is kept off Spring is connected between plate bottom and the outer top of compression cylinder, for spring pocket on motion bar, riser leading flank top is equipped with nozzle, Nozzle is located above saw blade, and outlet pipe tail end is connect with nozzle, is connected in outlet pipe and nozzle, is operated first personnel by drinking-water pipe External water source, when the second electric motor starting, because of the effect of spring, cam rotation drives baffle to move up and down, and baffle moves up and down Motion bar is driven to move up and down, motion bar, which moves up and down, drives second piston to move up and down, when second piston moves up, the Water is pumped into compression cylinder by two pistons by drinking-water pipe, and when second piston moves down, second piston is by the water in compression cylinder It is pushed into outlet pipe, and then the water in outlet pipe is sprayed by nozzle, water is sprayed on saw blade and metope, and makes saw blade more preferable To metope slot, simultaneously, moreover it is possible to cool down to saw blade.After the completion of metope fluting, the second motor is closed, and then water stops Only spray.In this way, can make that the service life of saw blade is more long, and fluting effect is more preferable.
Collection frame is installed because having further included collection frame and web plate, on the right side of frame outer bottom, at left and right sides of collection frame under Portion is all provided with through-hole, and through-hole is arranged symmetrically, and middle part is horizontally installed with web plate in collection frame, connects in pipeline bottom end and collection frame Logical, when first piston releases the dust in pipeline, dust is discharged into collection frame, and then dust is contacted with web plate, and Web plate is filtered the impurity in dust, and the dust after filtering is discharged by through-hole.In this way, dust discharge shadow again can be prevented Ring ambient enviroment.
Because having further included idler wheel, riser left side is evenly spaced to be equipped with idler wheel, when operating personnel move the present apparatus When slotting on metope, idler wheel is contacted with metope, and then idler wheel is more convenient operating personnel, smoothly makes the present apparatus on metope It is mobile.
(3)Advantageous effect
The present invention can carry out siphoning away removing, without influencing ambient enviroment, and pass through water spray by dust-extraction unit to the dust of appearance Water can be sprayed on saw blade by device, and be cooled down to saw blade, make saw blade lifetime more long, reach time saving and energy saving, fluting Neatly, the dust occurred during energy cross-notching is purged, the effect without influencing ambient enviroment.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Label in attached drawing for:1- risers, 2- openings, 3- handles, 4- frames, 5- cutting machines, 6- saw blades, 7- first are pressed Button, the second buttons of 8-, 9- mobile devices, 91- sliding rails, 92- sliding blocks, 93- bearing blocks, 94- screws, 95- threaded holes, 96- first Motor, 97- connecting plates, 10- dust-extraction units, 101- frameworks, the second motors of 102-, 103- bull sticks, 104- guide holes, 105- turntables, 106- connecting rods, 107- link blocks, 108- pipelines, 109- first pistons, the first check valves of 1010-, 1011- sweep-up pipes, 1012- are solid Determine block, 1013- suction nozzles, 11- transmission devices, 111- worm screws, 112- worm gears, 113- installing plates, 114- cams, 12- water injectors, 121- compression cylinders, 122- second pistons, 123- motion bars, 124- baffles, 125- springs, 126- drinking-water pipes, 127- outlet pipes, 128- nozzles, the second check valves of 129-, 13- collection frames, 14- through-holes, 15- web plates, 16- idler wheels.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of building monitoring device installation grooving apparatus, as shown in Figs 1-4, includes riser 1, handle 3, frame 4, cutting machine 5th, saw blade 6, the first button 7, the second button 8, mobile device 9 and dust-extraction unit 10,1 middle part of riser are provided with opening 2, and riser 1 is right Frame 4 in the middle part of side is installed, mobile device 9 is equipped in frame 4, cutting machine 5 is connected in mobile device 9, connects on cutting machine 5 Saw blade 6 is connected to, saw blade 6 is located in opening 2, and 4 lower right side of frame is equipped with dust-extraction unit 10, the upper and lower both sides pair in 1 right side of riser Title formula is equipped with handle 3, and right flank middle part is equipped with the first button 7 in top handle 3, and the first button 7 has with mobile device 9 Circuit connects, and right flank middle part is equipped with the second button 8 in lower section handle 3, and the second button 8 has circuit to connect with cutting machine 5.
Embodiment 2
A kind of building monitoring device installation grooving apparatus, as shown in Figs 1-4, includes riser 1, handle 3, frame 4, cutting machine 5th, saw blade 6, the first button 7, the second button 8, mobile device 9 and dust-extraction unit 10,1 middle part of riser are provided with opening 2, and riser 1 is right Frame 4 in the middle part of side is installed, mobile device 9 is equipped in frame 4, cutting machine 5 is connected in mobile device 9, connects on cutting machine 5 Saw blade 6 is connected to, saw blade 6 is located in opening 2, and 4 lower right side of frame is equipped with dust-extraction unit 10, the upper and lower both sides pair in 1 right side of riser Title formula is equipped with handle 3, and right flank middle part is equipped with the first button 7 in top handle 3, and the first button 7 has with mobile device 9 Circuit connects, and right flank middle part is equipped with the second button 8 in lower section handle 3, and the second button 8 has circuit to connect with cutting machine 5.
Mobile device 9 includes sliding rail 91, sliding block 92, bearing block 93, screw 94, the first motor 96 and connecting plate 97, frame 4 All be horizontally installed with sliding rail 91 in the middle part of in the middle part of inner top and bottom, sliding rail 91 is equipped with the sliding block 92 coordinated with it, sliding block 92 with Sliding rail 91 is slidably matched, and is equipped with connecting plate 97 between upper and lower two side slides, 92 medial surface middle part, 97 top of connecting plate is provided with threaded hole 95,97 left side of connecting plate middle part is connect with cutting machine 5, and 4 right upper portion of frame is Embedded to be equipped with bearing block 93, bearing block 93 Screw 94 is inside installed, screw 94 is located in threaded hole 95 and coordinates with it, and 1 right side upper level of riser is equipped with the first motor 96, the first motor 96 has circuit to connect with the first button 7, and the output shaft of the first motor 96 is connected by shaft coupling and 94 left end of screw It connects.
Embodiment 3
A kind of building monitoring device installation grooving apparatus, as shown in Figs 1-4, includes riser 1, handle 3, frame 4, cutting machine 5th, saw blade 6, the first button 7, the second button 8, mobile device 9 and dust-extraction unit 10,1 middle part of riser are provided with opening 2, and riser 1 is right Frame 4 in the middle part of side is installed, mobile device 9 is equipped in frame 4, cutting machine 5 is connected in mobile device 9, connects on cutting machine 5 Saw blade 6 is connected to, saw blade 6 is located in opening 2, and 4 lower right side of frame is equipped with dust-extraction unit 10, the upper and lower both sides pair in 1 right side of riser Title formula is equipped with handle 3, and right flank middle part is equipped with the first button 7 in top handle 3, and the first button 7 has with mobile device 9 Circuit connects, and right flank middle part is equipped with the second button 8 in lower section handle 3, and the second button 8 has circuit to connect with cutting machine 5.
Mobile device 9 includes sliding rail 91, sliding block 92, bearing block 93, screw 94, the first motor 96 and connecting plate 97, frame 4 All be horizontally installed with sliding rail 91 in the middle part of in the middle part of inner top and bottom, sliding rail 91 is equipped with the sliding block 92 coordinated with it, sliding block 92 with Sliding rail 91 is slidably matched, and is equipped with connecting plate 97 between upper and lower two side slides, 92 medial surface middle part, 97 top of connecting plate is provided with threaded hole 95,97 left side of connecting plate middle part is connect with cutting machine 5, and 4 right upper portion of frame is Embedded to be equipped with bearing block 93, bearing block 93 Screw 94 is inside installed, screw 94 is located in threaded hole 95 and coordinates with it, and 1 right side upper level of riser is equipped with the first motor 96, the first motor 96 has circuit to connect with the first button 7, and the output shaft of the first motor 96 is connected by shaft coupling and 94 left end of screw It connects.
Dust-extraction unit 10 includes framework 101, the second motor 102, bull stick 103, turntable 105, connecting rod 106, link block 107th, pipeline 108, first piston 109, the first check valve 1010, sweep-up pipe 1011, fixed block 1012 and suction nozzle 1013, connecting plate 97 Left side lower part is equipped with fixed block 1012, and 1012 left side of fixed block is equipped with suction nozzle 1013, and it is right that suction nozzle 1013 is located at saw blade 6 Lower section, what right side lower part was symmetrical in frame 4 is equipped with link block 107, is installed between upper and lower 107 left side of both sides link block There is pipeline 108,4 bottom right of frame is run through in 108 lower part of pipeline, and 108 lower part of pipeline is equipped with the first check valve 1010, pipeline 108 It is interior to be equipped with first piston 109, it is slidably matched in first piston 109 and pipeline 108,109 crown center rotary type of first piston Connecting rod 106 is connected with, 108 left upper portion of pipeline is connected with sweep-up pipe 1011, is connected in sweep-up pipe 1011 and pipeline 108, dust suction 1011 tail end of pipe is connect with suction nozzle 1013, is connected in sweep-up pipe 1011 and suction nozzle 1013, and 4 middle part of frame is provided with guide hole 104, frame 4 external right side faces lower part are equipped with framework 101, and 101 external right side face upper level of framework is equipped with the second motor 102, the second motor 102 output shaft is connected with bull stick 103 by shaft coupling, and 103 tail end of bull stick is located at guide hole 104 through 101 right upper portion of framework Interior, 103 tail end of bull stick is equipped with turntable 105, and 105 left side eccentric position of turntable is connect with 106 top rotary type of connecting rod.
Embodiment 4
A kind of building monitoring device installation grooving apparatus, as shown in Figs 1-4, includes riser 1, handle 3, frame 4, cutting machine 5th, saw blade 6, the first button 7, the second button 8, mobile device 9 and dust-extraction unit 10,1 middle part of riser are provided with opening 2, and riser 1 is right Frame 4 in the middle part of side is installed, mobile device 9 is equipped in frame 4, cutting machine 5 is connected in mobile device 9, connects on cutting machine 5 Saw blade 6 is connected to, saw blade 6 is located in opening 2, and 4 lower right side of frame is equipped with dust-extraction unit 10, the upper and lower both sides pair in 1 right side of riser Title formula is equipped with handle 3, and right flank middle part is equipped with the first button 7 in top handle 3, and the first button 7 has with mobile device 9 Circuit connects, and right flank middle part is equipped with the second button 8 in lower section handle 3, and the second button 8 has circuit to connect with cutting machine 5.
Mobile device 9 includes sliding rail 91, sliding block 92, bearing block 93, screw 94, the first motor 96 and connecting plate 97, frame 4 All be horizontally installed with sliding rail 91 in the middle part of in the middle part of inner top and bottom, sliding rail 91 is equipped with the sliding block 92 coordinated with it, sliding block 92 with Sliding rail 91 is slidably matched, and is equipped with connecting plate 97 between upper and lower two side slides, 92 medial surface middle part, 97 top of connecting plate is provided with threaded hole 95,97 left side of connecting plate middle part is connect with cutting machine 5, and 4 right upper portion of frame is Embedded to be equipped with bearing block 93, bearing block 93 Screw 94 is inside installed, screw 94 is located in threaded hole 95 and coordinates with it, and 1 right side upper level of riser is equipped with the first motor 96, the first motor 96 has circuit to connect with the first button 7, and the output shaft of the first motor 96 is connected by shaft coupling and 94 left end of screw It connects.
Dust-extraction unit 10 includes framework 101, the second motor 102, bull stick 103, turntable 105, connecting rod 106, link block 107th, pipeline 108, first piston 109, the first check valve 1010, sweep-up pipe 1011, fixed block 1012 and suction nozzle 1013, connecting plate 97 Left side lower part is equipped with fixed block 1012, and 1012 left side of fixed block is equipped with suction nozzle 1013, and it is right that suction nozzle 1013 is located at saw blade 6 Lower section, what right side lower part was symmetrical in frame 4 is equipped with link block 107, is installed between upper and lower 107 left side of both sides link block There is pipeline 108,4 bottom right of frame is run through in 108 lower part of pipeline, and 108 lower part of pipeline is equipped with the first check valve 1010, pipeline 108 It is interior to be equipped with first piston 109, it is slidably matched in first piston 109 and pipeline 108,109 crown center rotary type of first piston Connecting rod 106 is connected with, 108 left upper portion of pipeline is connected with sweep-up pipe 1011, is connected in sweep-up pipe 1011 and pipeline 108, dust suction 1011 tail end of pipe is connect with suction nozzle 1013, is connected in sweep-up pipe 1011 and suction nozzle 1013, and 4 middle part of frame is provided with guide hole 104, frame 4 external right side faces lower part are equipped with framework 101, and 101 external right side face upper level of framework is equipped with the second motor 102, the second motor 102 output shaft is connected with bull stick 103 by shaft coupling, and 103 tail end of bull stick is located at guide hole 104 through 101 right upper portion of framework Interior, 103 tail end of bull stick is equipped with turntable 105, and 105 left side eccentric position of turntable is connect with 106 top rotary type of connecting rod.
Transmission device 11 and water injector 12 are further included, transmission device 11 includes worm screw 111, worm gear 112, installing plate 113 and cam 114,4 external right side face lower part of frame installing plate 113 is installed, 113 right end of installing plate is equipped with cam 114, cam 114 trailing flank center locations are equipped with worm gear 112, and worm gear 112 is located at 114 rear side of cam, and 103 middle part of bull stick is equipped with worm screw 111, worm screw 111 is located at 112 top of worm gear, and worm screw 111 engages with worm gear 112.
Water injector 12 includes compression cylinder 121, second piston 122, motion bar 123, baffle 124, spring 125, draws water Pipe 126, outlet pipe 127,128 and second check valve 129 of nozzle, 4 external right side face lower part of frame are equipped with compression cylinder 121, compression Cylinder 121 is located at 113 lower section of installing plate, and 121 bottom left of compression cylinder is connected with drinking-water pipe 126, drinking-water pipe 126 and compression cylinder 121 Interior connection, 121 lower right side of compression cylinder are connected with outlet pipe 127, are connected in outlet pipe 127 and compression cylinder 121, outlet pipe 127 With being designed with the second check valve 129 on drinking-water pipe 126, it is equipped with second piston 122 in compression cylinder 121, in 122 top of second piston Between motion bar 123 is installed, 123 top of motion bar is equipped with baffle 124 through 121 crown center of compression cylinder, and baffle 124 is located at 114 lower section of cam is in contact with it, and is connected with spring 125 between 124 bottom of baffle and the outer top of compression cylinder 121, spring 125 is sleeved on On motion bar 123,1 leading flank top of riser is equipped with nozzle 128, and nozzle 128 is located at 6 top of saw blade, 127 tail end of outlet pipe with Nozzle 128 connects, and is connected in outlet pipe 127 and nozzle 128.
Collection frame 13 and web plate 15 have been further included, collection frame 13, collection frame 13 or so two are installed on the right side of 4 outer bottom of frame Side lower part is all provided with through-hole 14, and through-hole 14 is arranged symmetrically, and middle part is horizontally installed with web plate 15,108 bottom of pipeline in collection frame 13 It is connected in end and collection frame 13.
Idler wheel 16 is further included, 1 left side of riser is evenly spaced to be equipped with idler wheel 16.
Operation principle:The personnel of being operated first hold two side grips 3 up and down, you can and riser 1 is driven to be contacted with slotting position, then The second button 8 is pressed, cutting machine 5 is activated, and then cutting machine 5 drives saw blade 6 to rotate, you can presses the first button 7, Jin Eryi Dynamic device 9 is activated, and mobile device 9 drives cutting machine 5 to be moved to the left bar, and cutting machine 5, which is moved to the left, drives saw blade 6 to moving to left It is dynamic, and then saw blade 6 is contacted with metope in metope, unclamps the first button 7, mobile device 9 stops operating, and restarts dedusting dress 10 are put, 10 cross-notching of dust-extraction unit is that the dust occurred siphons away removing, and operating personnel can push riser 1 to be moved up in slotting position It is dynamic, and then saw blade 6 slots to metope.After the completion of metope fluting, dust-extraction unit 10 is closed, you can the second button 8 is unclamped, And then cutting machine 5 stops operating, you can press the first button 7 again, and then mobile device 9 by cutting machine 5 drive saw blade 6 to Recovery is moved right to original position, unclamps the first button 7, riser 1 from metope can be put down, monitoring device is put by operating personnel Safety is carried out in slot.
Because mobile device 9 includes sliding rail 91, sliding block 92, bearing block 93, screw 94, the first motor 96 and connecting plate 97, Sliding rail 91 is all horizontally installed in the middle part of 4 inner top of frame and in the middle part of bottom, sliding rail 91 is equipped with the sliding block 92 coordinated with it, sliding block 92 are slidably matched with sliding rail 91, are equipped with connecting plate 97 between upper and lower two side slides, 92 medial surface middle part, 97 top of connecting plate is provided with spiral shell Pit 95,97 left side of connecting plate middle part are connect with cutting machine 5, and 4 right upper portion of frame is Embedded to be equipped with bearing block 93, bearing Screw 94 is installed, screw 94 is located in threaded hole 95 and coordinates with it, and 1 right side upper level of riser is equipped with first in seat 93 Motor 96, the first motor 96 have circuit to connect with the first button 7, and the output shaft of the first motor 96 is left by shaft coupling and screw 94 End connection, when saw blade 6 rotates, operating personnel can press the first button 7, and then the first motor 96 inverts, the first motor 96 Reversion drives screw 94 to invert, and the reversion of screw 94 drives connecting plate 97 to be moved to the left by threaded hole 95, and connecting plate 97 is moved to the left logical Crossing cutting machine 5 drives saw blade 6 to be moved to the left, and saw blade 6, which is moved to the left, to be contacted with metope in metope, unclamps the first button 7, the One motor, 96 stop reverse, the i.e. removable riser 1 of operating personnel drive saw blade 6 to move and slot to metope.When metope is slotted After the completion, you can press the first button 7 again, and then the first motor 96 rotates forward, and saw blade 6 is driven to move right and is restored to original Position, unclamps the first button 7, and the first motor 96 stops rotating forward.
Because dust-extraction unit 10 includes framework 101, the second motor 102, bull stick 103, turntable 105, connecting rod 106, connection Block 107, pipeline 108, first piston 109, the first check valve 1010, sweep-up pipe 1011, fixed block 1012 and suction nozzle 1013, connecting plate 97 left sides lower part are equipped with fixed block 1012, and 1012 left side of fixed block is equipped with suction nozzle 1013, and suction nozzle 1013 is located at saw blade 6 Lower right, what right side lower part was symmetrical in frame 4 is equipped with link block 107, pacifies between upper and lower 107 left side of both sides link block Equipped with pipeline 108,4 bottom right of frame is run through in 108 lower part of pipeline, and 108 lower part of pipeline is equipped with the first check valve 1010, pipeline First piston 109 is equipped in 108, is slidably matched in first piston 109 and pipeline 108,109 crown center rotary type of first piston Be connected with connecting rod 106,108 left upper portion of pipeline is connected with sweep-up pipe 1011, connect in sweep-up pipe 1011 and pipeline 108, suction 1011 tail end of dirt pipe is connect with suction nozzle 1013, is connected in sweep-up pipe 1011 and suction nozzle 1013, and 4 middle part of frame is provided with guide hole 104, frame 4 external right side face lower part of frame is equipped with framework 101, and 101 external right side face upper level of framework is equipped with the second motor 102, the second electricity The output shaft of machine 102 is connected with bull stick 103 by shaft coupling, and 103 tail end of bull stick is located at guide hole through 101 right upper portion of framework In 104,103 tail end of bull stick is equipped with turntable 105, and 105 left side eccentric position of turntable is connect with 106 top rotary type of connecting rod, Personnel are operated first by 108 external treatment box of pipeline, when saw blade 6 is when slotting to metope, you can start the second motor 102 Rotation, the rotation of the second motor 102 drive bull stick 103 to rotate, and the rotation of bull stick 103 drives turntable 105 to rotate, and the rotation of turntable 105 is logical Crossing connecting rod 106 drives first piston 109 to move up and down, and when first piston 109 moves up, first piston 109 passes through suction nozzle 1013 suck the dust occurred in grooving process in sweep-up pipe 1011, and then the dust in sweep-up pipe 1011 is discharged into pipeline 108 Interior, when first piston 109 moves down, first piston 109 will carry out processing row in the dust push-in treatment box in pipeline 108 Go out.After the completion of slotting on metope, you can close the second motor 102.In this way, it can prevent dust from influencing ambient enviroment.
Because having further included transmission device 11 and water injector 12, transmission device 11 includes worm screw 111, worm gear 112, peace Loading board 113 and cam 114,4 external right side face lower part of frame are equipped with installing plate 113, and 113 right end of installing plate is equipped with cam 114, 114 trailing flank center location of cam is equipped with worm gear 112, and worm gear 112 is located at 114 rear side of cam, and 103 middle part of bull stick is equipped with snail Bar 111, worm screw 111 are located at 112 top of worm gear, and worm screw 111 engages with worm gear 112, when the second motor 102 starts, bull stick 103 Rotation drives worm screw 111 to rotate simultaneously, and the rotation of worm screw 111 drives worm gear 112 to rotate, rotation 114 turns of the moving cam of band of worm gear 112 Dynamic, the rotation driving water injector 12 of cam 114 operates, and then water is sprayed on saw blade 6 and metope by water injector 12, and then Saw blade 6 is made preferably to slot to metope, simultaneously, moreover it is possible to cool down to saw blade 6.After the completion of metope fluting, the second electricity When machine 102 is closed, and then cam 114 stops operating, and water injector 12 stops operating.
Because water injector 12 include compression cylinder 121, second piston 122, motion bar 123, baffle 124, spring 125, Drinking-water pipe 126, outlet pipe 127,128 and second check valve 129 of nozzle, 4 external right side face lower part of frame are equipped with compression cylinder 121, Compression cylinder 121 is located at 113 lower section of installing plate, and 121 bottom left of compression cylinder is connected with drinking-water pipe 126, drinking-water pipe 126 and compression cylinder It is connected in 121,121 lower right side of compression cylinder is connected with outlet pipe 127, is connected in outlet pipe 127 and compression cylinder 121, outlet pipe 127, with being designed with the second check valve 129 on drinking-water pipe 126, are equipped with second piston 122, second piston 122 is pushed up in compression cylinder 121 Motion bar 123 is installed, 123 top of motion bar is equipped with baffle 124, baffle 124 through 121 crown center of compression cylinder among portion It is in contact with it positioned at 114 lower section of cam, spring 125, spring 125 is connected between 124 bottom of baffle and the outer top of compression cylinder 121 It is sleeved on motion bar 123,1 leading flank top of riser is equipped with nozzle 128, and nozzle 128 is located at 6 top of saw blade, 127 tail of outlet pipe End is connect with nozzle 128, and outlet pipe 127 and nozzle 128 are interior to be connected, and is operated first personnel by 126 external water source of drinking-water pipe, when the When two motors 102 start, because of the effect of spring 125, the rotation of cam 114 drives baffle 124 to move up and down, and is moved down on baffle 124 Dynamic that motion bar 123 is driven to move up and down, motion bar 123, which moves up and down, drives second piston 122 to move up and down, and works as second piston 122 when moving up, and water is pumped into compression cylinder 121 by second piston 122 by drinking-water pipe 126, when second piston 122 is to moving down When dynamic, the water in compression cylinder 121 is pushed into outlet pipe 127 by second piston 122, and then the water in outlet pipe 127 passes through nozzle 128 spray, and water is sprayed on saw blade 6 and metope, and make saw blade 6 preferably to metope fluting, simultaneously, moreover it is possible to saw blade 6 into Row cooling.After the completion of metope fluting, the second motor 102 is closed, and then water stops spraying.In this way, the use of saw blade 6 can be made Service life is more long, and fluting effect is more preferable.
Because having further included collection frame 13 and web plate 15, collection frame 13 is installed on the right side of 4 outer bottom of frame, collection frame 13 is left Right two side lower parts are all provided with through-hole 14, and through-hole 14 is arranged symmetrically, and middle part is horizontally installed with web plate 15, pipeline in collection frame 13 It is connected in 108 bottom ends and collection frame 13, when first piston 109 releases the dust in pipeline 108, dust is discharged into collection In frame 13, and then dust is contacted with web plate 15, and web plate 15 is filtered the impurity in dust, and the dust after filtering passes through logical It discharges in hole 14.In this way, it can prevent dust discharge from influencing ambient enviroment again.
Because having further included idler wheel 16,1 left side of riser is evenly spaced to be equipped with idler wheel 16, when operating personnel move this When slotting on metope, idler wheel 16 contacts device with metope, and then idler wheel 16 is more convenient operating personnel, smoothly makes the present apparatus It is moved on metope.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of building monitoring device installation grooving apparatus, which is characterized in that include riser(1), handle(3), frame (4), cutting machine(5), saw blade(6), the first button(7), the second button(8), mobile device(9)And dust-extraction unit(10), riser (1)Middle part is provided with opening(2), riser(1)Right flank middle part is equipped with frame(4), frame(4)It is interior to be equipped with mobile device(9), move Dynamic device(9)On be connected with cutting machine(5), cutting machine(5)On be connected with saw blade(6), saw blade(6)Positioned at opening(2)It is interior, frame (4)Lower right side is equipped with dust-extraction unit(10), riser(1)Bilateral type is equipped with handle above and below right side(3), top handle Hand(3)Interior right flank middle part is equipped with the first button(7), the first button(7)With mobile device(9)There are circuit connection, lower section handle Hand(3)Interior right flank middle part is equipped with the second button(8), the second button(8)With cutting machine(5)There is circuit connection.
A kind of 2. building monitoring device installation grooving apparatus according to claim 1, which is characterized in that mobile device (9)Include sliding rail(91), sliding block(92), bearing block(93), screw(94), the first motor(96)And connecting plate(97), frame(4) Sliding rail is all horizontally installed in the middle part of inner top and in the middle part of bottom(91), sliding rail(91)It is equipped with the sliding block coordinated with it(92), it is sliding Block(92)With sliding rail(91)It is slidably matched, upper and lower two side slide(92)Connecting plate is installed between in the middle part of medial surface(97), connecting plate (97)Top is provided with threaded hole(95), connecting plate(97)Left side middle part and cutting machine(5)Connection, frame(4)Right upper portion is embedded in Formula is equipped with bearing block(93), bearing block(93)Screw is inside installed(94), screw(94)Positioned at threaded hole(95)It is interior and its Cooperation, riser(1)Right side upper level is equipped with the first motor(96), the first motor(96)With the first button(7)There is circuit Connection, the first motor(96)Output shaft pass through shaft coupling and screw(94)Left end connects.
A kind of 3. building monitoring device installation grooving apparatus according to claim 2, which is characterized in that dust-extraction unit (10)Include framework(101), the second motor(102), bull stick(103), turntable(105), connecting rod(106), link block(107)、 Pipeline(108), first piston(109), the first check valve(1010), sweep-up pipe(1011), fixed block(1012)And suction nozzle (1013), connecting plate(97)Left side lower part is equipped with fixed block(1012), fixed block(1012)Left side is equipped with suction nozzle (1013), suction nozzle(1013)Positioned at saw blade(6)Lower right, frame(4)Interior right side lower part symmetrical expression is equipped with link block (107), upper and lower both sides link block(107)Pipeline is installed between left side(108), pipeline(108)Frame is run through in lower part(4)Bottom On the right side of portion, pipeline(108)Lower part is equipped with the first check valve(1010), pipeline(108)It is interior to be equipped with first piston(109), first lives Plug(109)With pipeline(108)Inside it is slidably matched, first piston(109)Crown center rotary type is connected with connecting rod(106), pipe Road(108)Left upper portion is connected with sweep-up pipe(1011), sweep-up pipe(1011)With pipeline(108)Interior connection, sweep-up pipe(1011) Tail end and suction nozzle(1013)Connection, sweep-up pipe(1011)With suction nozzle(1013)Interior connection, frame(4)Middle part is provided with guide hole(104), Frame(4)External right side face lower part is equipped with framework(101), framework(101)External right side face upper level is equipped with the second motor (102), the second motor(102)Output shaft bull stick is connected with by shaft coupling(103), bull stick(103)Tail end runs through framework (101)Right upper portion is located at guide hole(104)It is interior, bull stick(103)Tail end is equipped with turntable(105), turntable(105)Left side is eccentric Position and connecting rod(106)Top rotary type connection.
4. a kind of building monitoring device installation grooving apparatus according to claim 3, which is characterized in that further included biography Dynamic device(11)And water injector(12), transmission device(11)Include worm screw(111), worm gear(112), installing plate(113)With Cam(114), frame(4)External right side face lower part is equipped with installing plate(113), installing plate(113)Right end is equipped with cam (114), cam(114)Trailing flank center location is equipped with worm gear(112), worm gear(112)Positioned at cam(114)Rear side, bull stick (103)Middle part is equipped with worm screw(111), worm screw(111)Positioned at worm gear(112)Top, worm screw(111)With worm gear(112)Engagement.
A kind of 5. building monitoring device installation grooving apparatus according to claim 4, which is characterized in that water injector (12)Include compression cylinder(121), second piston(122), motion bar(123), baffle(124), spring(125), drinking-water pipe (126), outlet pipe(127), nozzle(128)With the second check valve(129), frame(4)External right side face lower part is equipped with compression cylinder (121), compression cylinder(121)Positioned at installing plate(113)Lower section, compression cylinder(121)Bottom left is connected with drinking-water pipe(126), take out Water pipe(126)With compression cylinder(121)Interior connection, compression cylinder(121)Lower right side is connected with outlet pipe(127), outlet pipe(127) With compression cylinder(121)Interior connection, outlet pipe(127)With drinking-water pipe(126)On be designed with the second check valve(129), compression cylinder (121)It is interior to be equipped with second piston(122), second piston(122)Crown center is equipped with motion bar(123), motion bar(123)Top End is through compression cylinder(121)Crown center is equipped with baffle(124), baffle(124)Positioned at cam(114)Lower section is in contact with it, Baffle(124)Bottom and compression cylinder(121)Spring is connected between outer top(125), spring(125)It is sleeved on motion bar(123) On, riser(1)Leading flank top is equipped with nozzle(128), nozzle(128)Positioned at saw blade(6)Top, outlet pipe(127)Tail end With nozzle(128)Connection, outlet pipe(127)With nozzle(128)Interior connection.
6. a kind of building monitoring device installation grooving apparatus according to claim 5, which is characterized in that further included receipts Collect frame(13)And web plate(15), frame(4)Collection frame is installed on the right side of outer bottom(13), collection frame(13)Left and right sides lower part is all It is provided with through-hole(14), through-hole(14)It is arranged symmetrically, collection frame(13)Interior middle part is horizontally installed with web plate(15), pipeline(108) Bottom end and collection frame(13)Interior connection.
7. a kind of building monitoring device installation grooving apparatus according to claim 6, which is characterized in that further included rolling Wheel(16), riser(1)Left side is evenly spaced to be equipped with idler wheel(16).
CN201711453121.1A 2017-12-28 2017-12-28 Grooving apparatus is used in a kind of installation of building monitoring device Active CN108214936B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711453121.1A CN108214936B (en) 2017-12-28 2017-12-28 Grooving apparatus is used in a kind of installation of building monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711453121.1A CN108214936B (en) 2017-12-28 2017-12-28 Grooving apparatus is used in a kind of installation of building monitoring device

Publications (2)

Publication Number Publication Date
CN108214936A true CN108214936A (en) 2018-06-29
CN108214936B CN108214936B (en) 2019-08-06

Family

ID=62649299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711453121.1A Active CN108214936B (en) 2017-12-28 2017-12-28 Grooving apparatus is used in a kind of installation of building monitoring device

Country Status (1)

Country Link
CN (1) CN108214936B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881457A (en) * 2019-01-29 2019-06-14 刘皑君 A kind of soaking type household clothing intelligence dryer with dust removal and filtration function
CN112663464A (en) * 2020-12-10 2021-04-16 周兴文 Water-saving and dust-raising-preventing joint cutting device for road
CN113417492A (en) * 2021-07-14 2021-09-21 宋燕燕 Concrete floor slotting device for demolishing building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3434071A1 (en) * 1984-09-17 1986-03-27 Artur Dr.H.C. 7244 Waldachtal Fischer Apparatus for sucking off bore dust
CN204263369U (en) * 2014-10-31 2015-04-15 天下石仓(天津)有限公司 Stone plate is cross direction slotting machine used
CN205552905U (en) * 2016-03-21 2016-09-07 孟如苗 Automatic groover of ceramic tile
CN205704769U (en) * 2016-04-22 2016-11-23 丁黎明 A kind of building brick high efficiency cutter sweep
US20170320237A1 (en) * 2010-12-07 2017-11-09 Sky Climber Field Services, Llc Method and system of utilizing a work tool on a suspended work platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3434071A1 (en) * 1984-09-17 1986-03-27 Artur Dr.H.C. 7244 Waldachtal Fischer Apparatus for sucking off bore dust
US20170320237A1 (en) * 2010-12-07 2017-11-09 Sky Climber Field Services, Llc Method and system of utilizing a work tool on a suspended work platform
CN204263369U (en) * 2014-10-31 2015-04-15 天下石仓(天津)有限公司 Stone plate is cross direction slotting machine used
CN205552905U (en) * 2016-03-21 2016-09-07 孟如苗 Automatic groover of ceramic tile
CN205704769U (en) * 2016-04-22 2016-11-23 丁黎明 A kind of building brick high efficiency cutter sweep

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881457A (en) * 2019-01-29 2019-06-14 刘皑君 A kind of soaking type household clothing intelligence dryer with dust removal and filtration function
CN112663464A (en) * 2020-12-10 2021-04-16 周兴文 Water-saving and dust-raising-preventing joint cutting device for road
CN113417492A (en) * 2021-07-14 2021-09-21 宋燕燕 Concrete floor slotting device for demolishing building

Also Published As

Publication number Publication date
CN108214936B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
CN108214936A (en) A kind of building monitoring device installation grooving apparatus
CN212147055U (en) Stone material processing cutting device that prevents dust
CN105538028A (en) Automatic dust collection device for working table of numerically-controlled cutting machining center
CN111282920A (en) Clean device in textile fabric surface of environmental protection
CN109227969A (en) A kind of decoration cutting marble grinding device
CN108032445A (en) Flooring puncher is used in a kind of high security building water pipe installation
CN110124771A (en) A kind of finishing plastic garbage high-efficient treatment device
CN108838872B (en) Timber grinding device
CN114833649B (en) Bearing inner race equipment of polishing for spinning machine
CN210256275U (en) Cutting equipment is used in latex glove production
CN214323543U (en) Acrylic plate cuts and uses protector
CN108556151A (en) A kind of ceramic tile cutting machine
CN208836918U (en) Cleaning device is used in a kind of processing of pork
CN109397386A (en) A kind of construction site board cutting machine
CN112588033A (en) Waste gas treatment prevents stifled device
CN209903383U (en) Furniture production is with processingequipment who has automatic clearance saw-dust function
CN115837625A (en) Plate deburring equipment and using method thereof
CN109227213A (en) Cutting machine slag cleaning device
CN113600928A (en) Table bed for processing furniture board and processing method thereof
CN108177091A (en) A kind of metal oxide layer eliminating equipment
CN211388265U (en) Portable self-adaptation pipe diameter inner chamber burnishing device of metal seamless pipe
CN211660894U (en) Environment-friendly five metals stamping die
CN108655806B (en) Operation panel of quick clean petroleum pipeline processing sweeps
CN220462364U (en) Scrap iron cleaning device for milling machine
CN221338027U (en) Cleaning and recycling mechanism for prebaked anode carbon blocks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190712

Address after: 266000 9-storey 1-6 axis of Yuyuan Building Area A, 71 Hong Kong West Road, Shinan District, Qingdao City, Shandong Province

Applicant after: Qingdao Pearl Construction Supervision Co.,Ltd.

Address before: 341000 School of Architecture and Surveying Engineering, Jiangxi University of Technology, 156 Hakka Avenue, Zhanggong District, Ganzhou City, Jiangxi Province

Applicant before: Wu Yiqiang

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 9th Floor, Axis 1-6, Area A, Yuyuan Building, No. 71 Hong Kong West Road, Shinan District, Qingdao City, Shandong Province, 266000

Patentee after: Qingdao Mingzhu Construction Supervision Consulting Co.,Ltd.

Country or region after: China

Address before: 9th Floor, Axis 1-6, Area A, Yuyuan Building, No. 71 Hong Kong West Road, Shinan District, Qingdao City, Shandong Province, 266000

Patentee before: Qingdao Pearl Construction Supervision Co.,Ltd.

Country or region before: China