A kind of cutting equipment for cable
Technical field
The present invention relates to a kind of cutting equipment more particularly to a kind of cutting equipments for cable.
Background technology
Cable:It is made of the conductor and outsourcing insulating protective layer of one or more mutually insulated, by electric power or information from one
Place is transferred to the conducting wire at another place.Typically by several or similar rope that several groups of conducting wires (every group at least two) are twisted
Cable, mutually insulated between every group of conducting wire, and be often twisted into around a center, entire outside is surrounded by the covering of high-insulation
Layer.Cable has interior energization, the feature of external insulation.
It needs cable length to be used different according to people, cable can generally be cut.In the prior art, using people
Work is cut, and manually cuts time-consuming and laborious, easily incised wound hand, inefficiency, therefore one kind is time saving and energy saving, is not easy to hurt there is an urgent need for researching and developing
Hand, the efficient cutting equipment for cable.
Invention content
(1) technical problems to be solved
The present invention is in order to overcome in the prior art, using artificial cutting, manually cut it is time-consuming and laborious, easily hurt hand, effect
The shortcomings that rate is low, the technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, be not easy to hurt hand, efficient be used for
The cutting equipment of cable.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a cutting equipments for cable, include behaviour
Make platform, stent, draft gear, top plate and cutter device, operation console top left is vertically-mounted by bolted connection to be had
Stent is equipped with draft gear at the top of the operation console on the right side of stent, and cradle top is horizontally installed with top by bolted connection
Plate, top plate right side are equipped with cutter device.
Preferably, draft gear includes the first motor, sliding rail, shaft, reel, sliding block, bracing wire, the first strut, thumb
Refer to cylinder and the 4th spring, the first motor is installed by bolted connection at the top of operation console and is horizontally installed with sliding rail,
Sliding block is slidably equipped on sliding rail, slider top is connected with the first strut, the first strut vertically by bolted connection
Top is equipped with thumb cylinder, is connected with shaft by shaft coupling on the front side output shaft of the first motor, is connected in shaft by key
The mode connect is connected with reel, and bracing wire is wound on reel, and end of pulling is connect with sliding block left side, sliding block right side and cunning
The 4th spring is connected in rail between right side.
Preferably, cutter device includes elevating lever, connecting plate, the first spring and cutter, and it is logical that first is provided on the right side of top plate
Hole is equipped with elevating lever in first through hole vertically, and horizontal connection has connecting plate by bolted connection on elevating lever top, connection
The first spring is connected between at the top of plate bottom and top plate, on elevating lever, elevating lever bottom end is connected with cuts the first spring wrap
Knife.
Preferably, driving device has been further included, driving device includes the first belt pulley, the second belt pulley, flat belt, turns
Disk and connecting rod, shaft front end are connected with the first belt pulley by way of part connection, and the first belt pulley is located on front side of reel,
Second belt pulley among top plate bottom is installed, flat belt, the second belt are connected between the second belt pulley and the first belt pulley
Wheel front side is pivotally equipped with turntable, and the second through-hole is provided on the top plate on the left of first through hole, and turntable is left with connecting plate bottom
Connecting rod is connected between side, connecting rod is located in the second through-hole, and one end of connecting rod passes through the inclined center of circle on front side of axis pin and turntable
Position is articulated and connected, and the connecting rod other end is articulated and connected by axis pin and connecting plate.
Preferably, further included guider, guider include the second strut, connection ring, the first adjustable arc block,
Second adjustable arc block and second spring, sliding rail top right end are connected with the second strut vertically by bolted connection, the
Two struts are located on the right side of sliding block, and the second strut top is connected with connection ring by bolted connection, and rear side is set in connection ring
There is the second adjustable arc block, the interior front side of connecting rod is equipped with the first adjustable arc block, the first adjustable arc block and the second adjustable arc
The lateral surface of block is evenly spaced between connection ring medial surface to be connected with second spring.
Preferably, third spring and movable block have been further included, third spring, third are connected in the middle part of the second strut left side
For spring by being connect in the middle part of welding manner and the second strut left side, third spring left end is connected with activity by welding manner
Block, movable block are located on the right side of the first strut.
Preferably, L-shaped connecting rod and guide sleeve have been further included, top plate bottom right is connected with L-shaped by bolted connection
Connecting rod, L-shaped connecting rod left end are connected with guide sleeve by bolted connection, and elevating lever is located in guide sleeve, and elevating lever is slided with guide sleeve
Dynamic cooperation.
Preferably, the first reinforcing rib has been further included, the first reinforcing rib is connected between stent right side and operation console top,
First reinforcing rib is located on the left of the first motor, and one end of the first reinforcing rib is bolted to be connect with operation console, and first strengthens
The other end of muscle is connect by bolted connection with stent.
Preferably, the second reinforcing rib has been further included, the second reinforcement is connected between top plate bottom left and stent right side
Muscle, the other end that one end of the second reinforcing rib is connected with the second reinforcing rib with stent by bolted connection are connected by bolt
The mode connect is connect with top plate, and the second reinforcing rib is located above the first reinforcing rib, and the second reinforcing rib is located on the left of the second belt pulley.
Operation principle:During using the present invention, one end of cable is fixed on the traction element of draft gear by operating personnel,
Then again so that draft gear trailing cable.Then cable can be cut by cutter device.
Because draft gear includes the first motor, sliding rail, shaft, reel, sliding block, bracing wire, the first strut, thumb gas
Cylinder and the 4th spring, operation console top are equipped with the first motor and are horizontally installed with sliding rail, sliding rail by bolted connection
On be slidably equipped with sliding block, slider top is connected with the first strut, the first strut top vertically by bolted connection
Thumb cylinder is installed, shaft is connected with by shaft coupling on the front side output shaft of the first motor, passes through key connection in shaft
Mode is connected with reel, and bracing wire is wound on reel, and end of pulling is connect with sliding block left side, in sliding block right side and sliding rail
The 4th spring is connected between right side, so that one end of cable is located in thumb cylinder, then controls thumb cylinder will
Cable clamps fixation, starts the first motor and rotates counterclockwise, and the first motor drives shaft to rotate counterclockwise, and shaft drives reel
It rotates counterclockwise, reel, which rotates counterclockwise, packs up bracing wire, and bracing wire pulls sliding block to be moved to the left, and the 4th spring is stretched.It is sliding
Block, which is moved to the left, drives thumb cylinder to be moved to the left, and is moved to the left so as to pull cable, when cable is moved to the left suitable position
Afterwards, the first motor is closed, operating personnel again cut cable by driving device.After the completion of cutting, thumb cylinder is controlled
Cable is unclamped, you can take cable away.Starting motor to rotate clockwise, reel rotates clockwise release bracing wire therewith,
Under the action of the 4th spring, sliding block moves right, and thumb cylinder is driven to move right, when thumb cylinder moves right suitable position
It postpones, closes the first motor, cable is cut convenient for next time.
Because cutter device includes elevating lever, connecting plate, the first spring and cutter, first through hole is provided on the right side of top plate,
Elevating lever is equipped in first through hole vertically, horizontal connection has connecting plate, connecting plate by bolted connection on elevating lever top
The first spring is connected between at the top of bottom and top plate, for the first spring wrap on elevating lever, elevating lever bottom end is connected with cutter,
So operating personnel press downwards connecting plate, and then elevating lever is driven to move down, so as to which cutter be driven to move down, the first bullet
Spring is compressed.Cutter moves down cutting cable.Connecting plate is unclamped, under the action of the first spring, connecting plate moves up band
Dynamic cutter moves up reset.
Because having further included driving device, driving device includes the first belt pulley, the second belt pulley, flat belt, turntable
And connecting rod, shaft front end are connected with the first belt pulley by way of part connection, the first belt pulley is located on front side of reel, top
Second belt pulley among plate bottom is installed, flat belt, the second belt pulley are connected between the second belt pulley and the first belt pulley
Front side is pivotally equipped with turntable, and the second through-hole, turntable and connecting plate bottom left are provided on the top plate on the left of first through hole
Between be connected with connecting rod, connecting rod is located in the second through-hole, and one end of connecting rod passes through axis pin and center of circle position partially on front side of turntable
Articulated connection is put, the connecting rod other end is articulated and connected by axis pin and connecting plate, so the first motor rotates counterclockwise, thumb gas
Cylinder pulls cable and is moved to the left, and shaft drives the first pulley rotation simultaneously, and the first belt pulley drives second by flat belt
Pulley rotation, and then connecting plate is driven to move down by connecting rod, after sliding block is moved to the left certain position, cutter will be to
Lower mobile cutting cable, is then shut off the first motor, cable is taken away.First motor rotates clockwise, and sliding block moves right, and turns
Disk causes connecting plate slowly to move up reset clockwise through connecting rod.So improve cutting efficiency so that operation is more
It is easy.
Because having further included guider, guider includes the second strut, connection ring, the first adjustable arc block,
Two adjustable arc blocks and second spring, right end is connected with the second strut vertically by bolted connection at the top of sliding rail, and second
Strut is located on the right side of sliding block, and the second strut top is connected with connection ring by bolted connection, and rear side is equipped in connection ring
Second adjustable arc block, the interior front side of connecting rod are equipped with the first adjustable arc block, the first adjustable arc block and the second adjustable arc block
Lateral surface it is evenly spaced between connection ring medial surface be connected with second spring, so by one end of cable pass through first
Between adjustable arc block and the second adjustable arc block, then clamped by thumb cylinder.Under the action of second spring, the first activity
Arc block and the second adjustable arc block will contact, and connection ring and thumb cylinder are in same horizontal line with cable holding always,
It may be such that thumb cylinder preferably pulls cable.The further working efficiency for improving the present invention.
Because having further included third spring and movable block, third spring, third bullet are connected in the middle part of the second strut left side
For spring by being connect in the middle part of welding manner and the second strut left side, third spring left end is connected with movable block by welding manner,
Movable block is located on the right side of the first strut, so under the action of the 4th spring, sliding block moves right, and the second strut will be with movable block
Contact, third spring play cushioning effect so that the second strut is not easy to strike the first strut, and the component of the present invention is protected
Shield.
Because having further included L-shaped connecting rod and guide sleeve, top plate bottom right is connected with L-shaped company by bolted connection
Bar, L-shaped connecting rod left end are connected with guide sleeve by bolted connection, and elevating lever is located in guide sleeve, and elevating lever is slided with guide sleeve
Cooperation, it is so moveable more steady so elevating lever is moved up or moved down in guide sleeve, improve safety and
Stability.
Because having further included the first reinforcing rib, the first reinforcing rib is connected between stent right side and operation console top, the
One reinforcing rib is located on the left of the first motor, and one end of the first reinforcing rib is bolted to be connect with operation console, the first reinforcing rib
The other end connect by bolted connection with stent, so the first reinforcing rib so that the position of stent is more firm, carry
High safety increases the service life of the present invention.
Because having further included the second reinforcing rib, the second reinforcing rib is connected between top plate bottom left and stent right side,
The other end that one end of second reinforcing rib is connected with the second reinforcing rib with stent by bolted connection is bolted
Mode connect with top plate, the second reinforcing rib is located above the first reinforcing rib, and the second reinforcing rib is located at the second belt pulley left side, institute
The position for causing top plate with the second reinforcing rib is more secured, improves safety, increases the service life of the present invention.
(3) advantageous effect
The present invention is by using the first motor as driving so that cable is cut, and cutting effect is good, is passed through and is oriented to dress
Put and be oriented to so that cable can be drawn well, achieved the effect that it is time saving and energy saving, be not easy to hurt hand, be efficient.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the main structure diagram of cutter device of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the third main structure diagram of the present invention.
Fig. 5 is the right side structural representation of guider of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Fig. 7 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing for:1- operation consoles, 2- stents, 3- draft gears, 4- top plates, 5- cutter devices, the first electricity of 31-
Machine, 32- sliding rails, 33- shafts, 34- reels, 35- sliding blocks, 36- bracing wires, the first struts of 37-, 38- thumb cylinders, 39- the 4th
Spring, 51- first through hole, 52- elevating levers, 53- connecting plates, the first springs of 54-, 55- cutters, 6- driving devices, the first skins of 61-
Belt wheel, the second belt pulleys of 62-, 63- flat belts, 64- turntables, 65- connecting rods, the second through-holes of 66-, 7- guiders, 71- second
Strut, 72- connection rings, 73- the first adjustable arc blocks, 74- the second adjustable arc blocks, 75- second springs, 8- third springs, 9-
Movable block, 10-L shape connecting rods, 11- guide sleeves, the first reinforcing ribs of 12-, the second reinforcing ribs of 13-.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of cutting equipment for cable as shown in figs. 1-7, includes operation console 1, stent 2, draft gear 3, top plate
4 and cutter device 5,1 top left of operation console is vertically-mounted by bolted connection stent 2, the operation on 2 right side of stent
1 top of platform is equipped with draft gear 3, and 2 top of stent is horizontally installed with top plate 4 by bolted connection, and 4 right side of top plate is equipped with
Cutter device 5.
Embodiment 2
A kind of cutting equipment for cable as shown in figs. 1-7, includes operation console 1, stent 2, draft gear 3, top plate
4 and cutter device 5,1 top left of operation console is vertically-mounted by bolted connection stent 2, the operation on 2 right side of stent
1 top of platform is equipped with draft gear 3, and 2 top of stent is horizontally installed with top plate 4 by bolted connection, and 4 right side of top plate is equipped with
Cutter device 5.
Draft gear 3 includes the first motor 31, sliding rail 32, shaft 33, reel 34, sliding block 35, bracing wire 36, first
Bar 37,38 and the 4th spring 39 of thumb cylinder, 1 top of operation console are equipped with the first motor 31 and water by bolted connection
Safety is equipped with sliding rail 32, and sliding block 35 is slidably equipped on sliding rail 32, and 35 top of sliding block connects vertically by bolted connection
The first strut 37 is connected to, 37 top of the first strut is equipped with thumb cylinder 38, passes through connection on the front side output shaft of the first motor 31
Axis device is connected with shaft 33, is connected with reel 34 in shaft 33 by way of key connection, bracing wire 36 is wound on reel 34,
36 end of bracing wire is connect with 35 left side of sliding block, and the 4th spring is connected between right side in 35 right side of sliding block and sliding rail 32
39。
Embodiment 3
A kind of cutting equipment for cable as shown in figs. 1-7, includes operation console 1, stent 2, draft gear 3, top plate
4 and cutter device 5,1 top left of operation console is vertically-mounted by bolted connection stent 2, the operation on 2 right side of stent
1 top of platform is equipped with draft gear 3, and 2 top of stent is horizontally installed with top plate 4 by bolted connection, and 4 right side of top plate is equipped with
Cutter device 5.
Draft gear 3 includes the first motor 31, sliding rail 32, shaft 33, reel 34, sliding block 35, bracing wire 36, first
Bar 37,38 and the 4th spring 39 of thumb cylinder, 1 top of operation console are equipped with the first motor 31 and water by bolted connection
Safety is equipped with sliding rail 32, and sliding block 35 is slidably equipped on sliding rail 32, and 35 top of sliding block connects vertically by bolted connection
The first strut 37 is connected to, 37 top of the first strut is equipped with thumb cylinder 38, passes through connection on the front side output shaft of the first motor 31
Axis device is connected with shaft 33, is connected with reel 34 in shaft 33 by way of key connection, bracing wire 36 is wound on reel 34,
36 end of bracing wire is connect with 35 left side of sliding block, and the 4th spring is connected between right side in 35 right side of sliding block and sliding rail 32
39。
Cutter device 5 includes elevating lever 52, connecting plate 53, the first spring 54 and cutter 55, and 4 right side of top plate is provided with first
Through-hole 51 is equipped with elevating lever 52 in first through hole 51 vertically, and horizontal connection has by bolted connection on elevating lever 52 top
Connecting plate 53,53 bottom of connecting plate and top plate are connected with the first spring 54 between 4 top, and the first spring 54 is wrapped in elevating lever 52
On, 52 bottom end of elevating lever is connected with cutter 55.
Embodiment 4
A kind of cutting equipment for cable as shown in figs. 1-7, includes operation console 1, stent 2, draft gear 3, top plate
4 and cutter device 5,1 top left of operation console is vertically-mounted by bolted connection stent 2, the operation on 2 right side of stent
1 top of platform is equipped with draft gear 3, and 2 top of stent is horizontally installed with top plate 4 by bolted connection, and 4 right side of top plate is equipped with
Cutter device 5.
Draft gear 3 includes the first motor 31, sliding rail 32, shaft 33, reel 34, sliding block 35, bracing wire 36, first
Bar 37,38 and the 4th spring 39 of thumb cylinder, 1 top of operation console are equipped with the first motor 31 and water by bolted connection
Safety is equipped with sliding rail 32, and sliding block 35 is slidably equipped on sliding rail 32, and 35 top of sliding block connects vertically by bolted connection
The first strut 37 is connected to, 37 top of the first strut is equipped with thumb cylinder 38, passes through connection on the front side output shaft of the first motor 31
Axis device is connected with shaft 33, is connected with reel 34 in shaft 33 by way of key connection, bracing wire 36 is wound on reel 34,
36 end of bracing wire is connect with 35 left side of sliding block, and the 4th spring is connected between right side in 35 right side of sliding block and sliding rail 32
39。
Cutter device 5 includes elevating lever 52, connecting plate 53, the first spring 54 and cutter 55, and 4 right side of top plate is provided with first
Through-hole 51 is equipped with elevating lever 52 in first through hole 51 vertically, and horizontal connection has by bolted connection on elevating lever 52 top
Connecting plate 53,53 bottom of connecting plate and top plate are connected with the first spring 54 between 4 top, and the first spring 54 is wrapped in elevating lever 52
On, 52 bottom end of elevating lever is connected with cutter 55.
Further included driving device 6, driving device 6 include the first belt pulley 61, the second belt pulley 62, flat belt 63,
Turntable 64 and connecting rod 65,33 front end of shaft are connected with the first belt pulley 61, the first belt pulley 61 by way of part connection
In 34 front side of reel, the second belt pulley 62 is installed among 4 bottom of top plate, between the second belt pulley 62 and the first belt pulley 61
Flat belt 63 is connected with, 62 front side of the second belt pulley is pivotally equipped with turntable 64, is opened on the top plate 4 in 51 left side of first through hole
There is the second through-hole 66, connecting rod 65 is connected between 53 bottom left of turntable 64 and connecting plate, connecting rod 65 is located at the second through-hole
In 66, one end of connecting rod 65 is articulated and connected by axis pin and 64 front side of turntable center location partially, and 65 other end of connecting rod passes through
Axis pin is articulated and connected with connecting plate 53.
Guider 7 is further included, guider 7 includes the second strut 71, connection ring 72, the first adjustable arc block
73rd, the second adjustable arc block 74 and second spring 75,32 top right end of sliding rail are connected with vertically by bolted connection
Two struts 71, the second strut 71 are located at 35 right side of sliding block, and 71 top of the second strut is connected with connection by bolted connection
Ring 72, rear side is equipped with the second adjustable arc block 74 in connection ring 72, and front side is equipped with the first adjustable arc block 73 in connecting rod 65, the
The evenly spaced connection between 72 medial surface of connection ring of the lateral surface of one adjustable arc block 73 and the second adjustable arc block 74
There is second spring 75.
Third spring 8 and movable block 9 have been further included, third spring 8, third bullet are connected in the middle part of 71 left side of the second strut
For spring 8 by being connect in the middle part of welding manner and 71 left side of the second strut, 8 left end of third spring is connected with activity by welding manner
Block 9, movable block 9 are located at 37 right side of the first strut.
L-shaped connecting rod 10 and guide sleeve 11 are further included, 4 bottom right of top plate is connected with L-shaped company by bolted connection
Bar 10,10 left end of L-shaped connecting rod are connected with guide sleeve 11 by bolted connection, and elevating lever 52 is located in guide sleeve 11, elevating lever
52 are slidably matched with guide sleeve 11.
The first reinforcing rib 12 has been further included, 2 right side of stent and operation console are connected with the first reinforcing rib 12 between 1 top,
First reinforcing rib 12 is located at 31 left side of the first motor, and one end of the first reinforcing rib 12 is bolted to be connect with operation console 1, the
The other end of one reinforcing rib 12 is connect by bolted connection with stent 2.
The second reinforcing rib 13 is further included, 4 bottom left of top plate and stent are connected with the second reinforcing rib between 2 right side
13, the other end that one end of the second reinforcing rib 13 is connected with the second reinforcing rib 13 with stent 2 by bolted connection passes through
Bolted mode is connect with top plate 4, and the second reinforcing rib 13 is located at the top of the first reinforcing rib 12, and the second reinforcing rib 13 is located at the
Two belt pulleys, 62 left side.
Operation principle:During using the present invention, one end of cable is fixed on the traction element of draft gear 3 by operating personnel
On, then again so that 3 trailing cable of draft gear.Then cable can be cut by cutter device 5.
Because draft gear 3 includes the first motor 31, sliding rail 32, shaft 33, reel 34, sliding block 35, bracing wire 36,
One strut 37,38 and the 4th spring 39 of thumb cylinder, 1 top of operation console are equipped with the first motor 31 by bolted connection
Be horizontally installed with sliding rail 32, sliding block 35 is slidably equipped on sliding rail 32,35 top of sliding block is erected by bolted connection
Direct-connected to be connected to the first strut 37,37 top of the first strut is equipped with thumb cylinder 38, leads on the front side output shaft of the first motor 31
It crosses shaft coupling and is connected with shaft 33, be connected with reel 34 in shaft 33 by way of key connection, drawing is wound on reel 34
Line 36,36 end of bracing wire are connect with 35 left side of sliding block, and the 4th is connected between right side in 35 right side of sliding block and sliding rail 32
Spring 39 so that one end of cable is located in thumb cylinder 38, then controls thumb cylinder 38 that cable is clamped fixation, opens
Dynamic first motor 31 rotates counterclockwise, and the first motor 31 drives shaft 33 to rotate counterclockwise, and shaft 33 drives 34 inverse time of reel
Needle rotates, and reel 34, which rotates counterclockwise, packs up bracing wire 36, and bracing wire 36 pulls sliding block 35 to be moved to the left, and the 4th spring 39 is drawn
It stretches.Sliding block 35, which is moved to the left, drives thumb cylinder 38 to be moved to the left, and is moved to the left so as to pull cable, when cable is moved to the left
After suitable position, the first motor 31 is closed, operating personnel again cut cable by driving device 6.After the completion of cutting, control
Thumb cylinder 38 processed unclamps cable, you can takes cable away.Start motor to rotate clockwise, reel 34 turns clockwise therewith
Dynamic to release bracing wire 36, under the action of the 4th spring 39, sliding block 35 moves right, and thumb cylinder 38 is driven to move right, when
Thumb cylinder 38 moves right after suitable position, closes the first motor 31, and cable is cut convenient for next time.
Because cutter device 5 includes elevating lever 52, connecting plate 53, the first spring 54 and cutter 55,4 right side of top plate is provided with
First through hole 51, is equipped with elevating lever 52 in first through hole 51 vertically, 52 top of elevating lever by bolted connection it is horizontal even
Connecting plate 53 is connected to, 53 bottom of connecting plate and top plate are connected with the first spring 54 between 4 top, and the first spring 54 is wrapped in lifting
On bar 52,52 bottom end of elevating lever is connected with cutter 55, so operating personnel press downwards connecting plate 53, and then drives elevating lever 52
It moves down, so as to which cutter 55 be driven to move down, the first spring 54 is compressed.Cutter 55 moves down cutting cable.It unclamps
Connecting plate 53, under the action of the first spring 54, connecting plate 53, which moves up, drives cutter 55 to move up reset.
Because having further included driving device 6, driving device 6 includes the first belt pulley 61, the second belt pulley 62, flat belt
63rd, turntable 64 and connecting rod 65,33 front end of shaft are connected with the first belt pulley 61, the first belt pulley 61 by way of part connection
Positioned at the front side of reel 34, the second belt pulley 62 is installed among 4 bottom of top plate, the second belt pulley 62 and the first belt pulley 61 it
Between be connected with flat belt 63,62 front side of the second belt pulley is pivotally equipped with turntable 64, on the top plate 4 in 51 left side of first through hole
The second through-hole 66 is provided with, connecting rod 65 is connected between 53 bottom left of turntable 64 and connecting plate, it is logical that connecting rod 65 is located at second
In hole 66, one end of connecting rod 65 is articulated and connected by axis pin and 64 front side of turntable center location partially, and 65 other end of connecting rod leads to
It crosses axis pin to be articulated and connected with connecting plate 53, so the first motor 31 rotates counterclockwise, thumb cylinder 38 pulls cable to moving to left
Dynamic, shaft 33 drives the first belt pulley 61 to rotate simultaneously, and the first belt pulley 61 drives 62 turns of the second belt pulley by flat belt 63
Dynamic, and then connecting plate 53 is driven to move down by connecting rod 65, after sliding block 35 is moved to the left certain position, cutter 55 will be to
Lower mobile cutting cable, is then shut off the first motor 31, cable is taken away.First motor 31 rotates clockwise, and sliding block 35 is to the right
Mobile, turntable 64 is clockwise through connecting rod 65 so that connecting plate 53 slowly moves up reset.Cutting efficiency so is improved,
So that the operation is more convenient.
Because having further included guider 7, guider 7 includes the second strut 71, connection ring 72, the first adjustable arc
Block 73, the second adjustable arc block 74 and second spring 75,32 top right end of sliding rail are connected with vertically by bolted connection
Second strut 71, the second strut 71 are located at 35 right side of sliding block, and 71 top of the second strut is connected with by bolted connection
Ring 72 is connect, rear side is equipped with the second adjustable arc block 74 in connection ring 72, and front side is equipped with the first adjustable arc block 73 in connecting rod 65,
The lateral surface of first adjustable arc block 73 and the second adjustable arc block 74 evenly spaced company between 72 medial surface of connection ring
Second spring 75 is connected to, so by one end of cable across the first adjustable arc block 73 and the second adjustable arc block 74, then
It is clamped by thumb cylinder 38.Under the action of second spring 75, the first adjustable arc block 73 and the second adjustable arc block 74 will
It is contacted, and connection ring 72 and thumb cylinder 38 are in same horizontal line with cable holding always, may be such that thumb cylinder 38 is more preferable
Drawing cable.The further working efficiency for improving the present invention.
Because having further included third spring 8 and movable block 9, third spring 8 is connected in the middle part of 71 left side of the second strut, the
By being connect in the middle part of welding manner and 71 left side of the second strut, 8 left end of third spring is connected with three springs 8 by welding manner
Movable block 9, movable block 9 are located at 37 right side of the first strut, so under the action of the 4th spring 39, sliding block 35 moves right, the
Two struts 71 will be contacted with movable block 9, and third spring 8 plays cushioning effect so that the second strut 71 is not easy to strike the first strut
37, the component of the present invention is protected.
Because having further included L-shaped connecting rod 10 and guide sleeve 11,4 bottom right of top plate is connected with L by bolted connection
Shape connecting rod 10,10 left end of L-shaped connecting rod are connected with guide sleeve 11 by bolted connection, and elevating lever 52 is located in guide sleeve 11, rise
Drop bar 52 is slidably matched with guide sleeve 11, so elevating lever 52 is moved up or is moved down in guide sleeve 11, it is so moveable
It is more steady, improve safety and stability.
Because having further included the first reinforcing rib 12,2 right side of stent and operation console are connected with the first reinforcing rib between 1 top
12, the first reinforcing rib 12 is located at 31 left side of the first motor, and one end of the first reinforcing rib 12 is bolted to be connected with operation console 1
It connects, the other end of the first reinforcing rib 12 is connect by bolted connection with stent 2, so the first reinforcing rib 12 is so that stent
2 position is more firm, improves safety, increases the service life of the present invention.
Because having further included the second reinforcing rib 13,4 bottom left of top plate and stent are connected with the second reinforcement between 2 right side
Muscle 13, the other end that one end of the second reinforcing rib 13 is connected with the second reinforcing rib 13 with stent 2 by bolted connection lead to
It crosses bolted mode to connect with top plate 4, the second reinforcing rib 13 is located at 12 top of the first reinforcing rib, and the second reinforcing rib 13 is located at
Second belt pulley, 62 left side, so the second reinforcing rib 13 so that the position of top plate 4 is more secured, improves safety, increases
The service life of the present invention.
Embodiment described above only expresses the preferred embodiment of the present invention, and description is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.