CN108196279A - Satellite clock correction based on real-time stream resolves and forecasting procedure - Google Patents

Satellite clock correction based on real-time stream resolves and forecasting procedure Download PDF

Info

Publication number
CN108196279A
CN108196279A CN201711412195.0A CN201711412195A CN108196279A CN 108196279 A CN108196279 A CN 108196279A CN 201711412195 A CN201711412195 A CN 201711412195A CN 108196279 A CN108196279 A CN 108196279A
Authority
CN
China
Prior art keywords
clock correction
real
data
clock
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711412195.0A
Other languages
Chinese (zh)
Other versions
CN108196279B (en
Inventor
翟伟
孙存光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Space Star Technology Co Ltd
Original Assignee
Space Star Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Space Star Technology Co Ltd filed Critical Space Star Technology Co Ltd
Priority to CN201711412195.0A priority Critical patent/CN108196279B/en
Publication of CN108196279A publication Critical patent/CN108196279A/en
Application granted granted Critical
Publication of CN108196279B publication Critical patent/CN108196279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/38Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
    • G01S19/39Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/40Correcting position, velocity or attitude
    • G01S19/41Differential correction, e.g. DGPS [differential GPS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The present invention provides satellite clock correction resolving and forecasting procedure based on real-time stream, including:Data prediction is carried out to the observation data of real-time stream;According to after data prediction pseudorange, carrier wave, carrier phase smoothed pseudorange observation, set up non-differential mode type and difference model between epoch, using several epoch troposphere parameter Estimations as prior information, carry out obtaining clock bias estimation information according to a preliminary estimate in real time;And using clock correction data acquisition base condition is broadcasted, the benchmark of clock bias estimation is constrained, with the clock correction data resolved again;The clock correction data and broadcast clock correction data resolved again to reading are stored respectively, obtain real-time resolving clock correction and broadcast clock correction and model parameter, and select broadcast clock correction corresponding with real-time prediction clock correction, the rough error of real-time clock (RTC) difference data is detected and rejected, fitting model using an order polynomial for the data of no rough error carries out clock correction forecast.The present invention has the characteristics that faster reaction speed, higher forecast precision.

Description

Satellite clock correction based on real-time stream resolves and forecasting procedure
Technical field
The invention belongs to the technical field of satellite application, be related to a kind of satellite clock correction based on real-time stream resolve and Forecasting procedure.
Background technology
Satellite-based augmentation system is mainly used for receiving CORS observation stations data, and it is poor to resolve generation through track, clock correction and ionosphere Divide correcting information and integrity information, upper note to GEO satellite carries out broadcasting for differential corrections by satellite, realizes and user is determined The enhancing of position precision and positioning integrity.Data processing centre is mainly used for receiving CORS stations GPS observation data, carries out in real time GPS precise orbit determinations, precise clock correction determine, region ionosphere modeling, and generate correction and integrity information, and information is sent Ground connecting station is given, while completes the operation, monitoring and maintenance of whole system.
GPS satellite-based augmentation systems include GPS precise orbit determinations software, precise clock correction determines that software, region ionosphere modeling are soft Part, integrity software.Data processing centre's GPS precise clock corrections determine software belong to GPS satellite-based augmentation systems precise clock correction it is true Order member, it is main to complete to resolve for the precise clock correction of GPS satellite-based augmentation systems and forecast function.
In Clock Bias real-time estimation, when the real time data of continuous operation base station is second-rate, estimation ginseng Real-time clock correction estimated accuracy can be caused relatively low there are correlation between number.In order to reduce the correlation between parameter, if using Dry epoch troposphere parameter Estimation can control the mistake of convection current layer parameter to initialize and can control DOP values as prior information Jump, improve satellite clock solution precision, can also avoid because between clock correction parameter and convection current layer parameter correlation it is relatively strong caused by Normal equation morbid state.Therefore, research is necessary with the prior-constrained real-time satellite clock bias estimation algorithm of troposphere.
Due to the influence of satellite clock self performance or external environment, satellite clock often generates rough error, data outage and phase Phenomena such as position saltus step.Especially in real-time satellite clock solution, the transformation of reference clock or datum station shortage of data are likely to Lead to the saltus step of real-time clock correction.Due to the tradition using sliding window in real time clock correction forecasting model be difficult to resist this clock correction it is different Often, therefore research is taken the satellite clock correction real-time prediction algorithm of phase hit into account and is necessary.
Invention content
Problems to be solved by the invention are that the saltus step of real-time clock correction how is resisted in real-time satellite clock solution, is taken into account The satellite clock correction real-time prediction of phase hit, to realize the raising of satellite clock solution precision.
Technological means for solving subject is to propose a kind of satellite clock correction resolving based on real-time stream and forecast side Method, this method can improve satellite clock solution precision, can also avoid due to correlation is relatively strong between clock correction parameter and convection current layer parameter Caused normal equation morbid state;The satellite clock correction real-time prediction algorithm for taking phase hit into account is proposed, is avoided in actually resolving, Abnormal phenomenon is resolved caused by clock correction saltus step.
Satellite clock correction the present invention is based on real-time stream resolves and forecasting procedure, includes the following steps:
Data prediction is carried out to the observation data of real-time stream, obtains the pseudorange after data prediction, carrier wave, phase Position smoothing pseudo range observation;
According to after the data prediction pseudorange, carrier wave, carrier phase smoothed pseudorange observation, set up and non-differential mode type and go through Difference model between member, using several epoch troposphere parameter Estimations as prior information, in real time to satellite clock correction and receiver clock Poor parameter, troposphere and fuzziness parameter carry out obtaining clock bias estimation information according to a preliminary estimate;And it utilizes and broadcasts clock correction data acquisition Base condition constrains the benchmark of clock bias estimation, in troposphere and fuzziness restriction on the parameters and clock correction reference data Constraint is lower to be resolved satellite clock correction again, with the clock correction data resolved again;
Foundation fits forecasting model, and distinguishes reading in the clock correction data resolved again and broadcast clock correction data Storage obtains real-time resolving clock correction and broadcast clock correction and model parameter, and selects broadcast clock corresponding with real-time prediction clock correction Difference as the real-time clock (RTC) difference data for fitting forecasting model and detects its rough error, the elimination of rough difference that will be detected, for The real-time clock (RTC) difference data of no rough error fits model using an order polynomial and carries out clock correction forecast.
Further, as a preferred technical solution of the present invention, to the observation number of real-time stream in the method Include the detection of observation data validity, real-time rough error and Detection of Cycle-slip, data observation quality testing according to data prediction is carried out.
Further, as a preferred technical solution of the present invention, joined in the method using several epoch tropospheres Number estimation includes as prior information:The precision of the epoch satellite clock solution is judged and after honouring according to the clock bias estimation information Fluid layer and fuzziness prior information, while repair the DOP values of current epoch troposphere and fuzziness.
Further, as a preferred technical solution of the present invention, using least square method to satellite in the method Clock correction and receiver clock-offsets parameter, troposphere and fuzziness parameter carry out according to a preliminary estimate.
Invention effect is, the advantages of the present invention over the prior art are that:(1) several epoch convection current layer parameters are used Estimation can control the mistake of convection current layer parameter to initialize and can control the jump of DOP values, improve clock correction as prior information Calculation accuracy, can also avoid because between clock correction parameter and convection current layer parameter correlation it is relatively strong caused by normal equation morbid state;(2) It using the satellite clock correction real-time prediction algorithm for taking phase hit into account, avoids in actually resolving, is resolved caused by clock correction saltus step different Often occur as.
Description of the drawings
Fig. 1 is the flow chart of the method for the present invention.
Fig. 2 is real time data pretreatment process figure of the present invention;
Fig. 3 is the flow chart of troposphere prior information constraints policy in the present invention;
Fig. 4 is the real-time satellite clock correction prediction algorithm that the present invention takes phase hit into account.
Fig. 5 European Area in January, 2015-clock correction calculation accuracy assessments in March under fixed reference station condition for the present invention Figure;
Fig. 6, which is that the present invention is based on the assessments of Global Regional clock correction calculation accuracy on January 3rd, 2016, to scheme.
Specific embodiment
Hereinafter, it is described in detail based on attached drawing for the present invention.
As shown in Figure 1, the present invention devises a kind of satellite clock correction resolving based on real-time stream and forecasting procedure, packet Include following steps:
Step 1 carries out data prediction to the real-time stream observation data received, after obtaining data prediction Pseudorange, carrier wave, carrier phase smoothed pseudorange observation.
Real time data pretreatment realizes the detection of observation data validity, real-time rough error and Detection of Cycle-slip, data observation matter Amount control.It implements flow as shown in Fig. 2, specific implementation situation is as follows:
(1) observation data validity detection:Whether detection data is complete, whether has corresponding orbital data etc.;
(2) real-time rough error and Detection of Cycle-slip:Real-time detection rough error and cycle slip, excluding gross error data, and indicate all hop counts According to;
(3) data observation quality control:The observation data at rejecting low clearance angle, every Correction of Errors are obtained with One-Point Location Access is according to observation noise and positioning accuracy and then the data of the low observation quality of rejecting;
(4) carrier phase smoothed pseudorange:According to all hop-informations of detection and carrier information smoothing pseudo range observation.
Step 2, using the pretreated pseudorange of real time data, carrier wave, carrier phase smoothed pseudorange observation, using non-differential mode Difference model calculates satellite clock correction in real time between type and epoch.It implements flow as shown in figure 3, specific implementation situation is as follows:
1. every Correction of Errors:Using model correction phase winding error, the variation of Satellite Phase center, earth tide Correction, the correction of oceanic load tide correction, earth rotation, relativistic effect equal error correcting method;
2. satellite clock correction is resolved in advance:Non- differential mode type and difference model between epoch are set up, to satellite clock correction and receiver clock-offsets Parameter, troposphere and fuzziness parameter carry out according to a preliminary estimate;
3. check and inherit information between epoch:According to survey station residual error equally accurate information, the larger observation data of cancelling noise And survey station, judge the precise manner of the epoch satellite clock solution according to clock bias estimation information, real-time detection fault message, by after Fluid layer and fuzziness prior information are honoured, while repairs the DOP values of current epoch troposphere and fuzziness to realize, using wide Clock correction data are broadcast, base condition is obtained, the benchmark of clock bias estimation is constrained;
4. satellite clock is resolved again under troposphere and fuzziness restriction on the parameters and the constraint of clock correction reference data Difference, to obtain reliable and stable clock correction data result.
In terms of Clock Bias real-time estimation, when the real time data for providing continuous operation base station is second-rate, Estimate that there are correlations between parameter, cause real-time clock correction estimated accuracy relatively low.In order to reduce the correlation between parameter, adopt By the use of several epoch troposphere parameter Estimations as prior information, convection current layer parameter prior information and corresponding random is made full use of Model can control the mistake of convection current layer parameter to initialize and can control the chattering of DOP values, prevent tropospheric error Accumulation improves satellite clock solution precision, can also avoid because between clock correction parameter and convection current layer parameter correlation it is relatively strong caused by Normal equation morbid state.Therefore, it is tackled key problems having the prior-constrained real-time satellite clock bias estimation algorithm of troposphere.
It is constrained by the prior information for introducing troposphere and fuzziness, BDS satellite clock corrections real-time estimation, which just has to stablize, to be connected Continue characteristic and with unbiased optimality.If the observation information by preceding k observational equation is with experienced expectationPosterior weight battle array ForTroposphere and fuzziness parameter Y dummy observation replace, following observational equation can be obtained:
Normal equation can be obtained using least square adjustment principle:
Clock correction parameter is eliminated to obtain:
It is apparent from,The factor arrays and constant term of respectively preceding k+1 epoch troposphere and fuzziness parameter Y Battle array, then have:
Formula (4) is the real-time clock correction parameter recursive least square estimation model with prior information.Troposphere priori It is information constrained mainly by inheriting troposphere prior information, while repair the tropospheric DOP values of current epoch to realize.
Succession for troposphere prior information obtains upper epoch troposphere prior information, if all survey stations first Data are all continuous, then directly inherit the prior information of a upper epoch.If restored after certain survey station data outages in the epoch, It then will appear new convection current layer parameter, search for its newest prior information forward, formed with the survey station of no data outage complete Prior information.In addition, due to it is indivedual at a distance of nearer survey stations can cause between convection current layer parameter and clock correction parameter correlation compared with By force, the DOP values of certain survey station convection current layer parameters will appear jump or fluctuation, and under normal circumstances between epoch DOP values change Change is stable.Abnormality detection and reparation for current epoch troposphere DOP values, search for forward several epoch convection current first Layer DOP values, fit linear model, forecast the DOP values of current epoch, so can CALCULATING PREDICTION value and actual value deviation with The ratio r atio of predicted value:
In formula, DOPpredFor predicted value, DOPcurrentFor actual value.If ratio is more than empirical value (0.3), using pre- DOP values are reported, otherwise use practical DOP values.
For the real-time resolving of GPS satellite clock correction, a kind of troposphere and fuzziness parameter prior information constraint shape are constructed The real-time recursive least square algorithm of formula.Under the constraint of troposphere prior information, the troposphere in real-time satellite clock bias estimation Parameter precision of inner coincidence is more steady.
Step 3, the forecasting model that fits that foundation is fitted using the satellite clock correction of real-time resolving, while take phase jump into account The influence of change, and then carry out real-time clock correction short-period forecast.Mainly include invalid clock correction and Detection of Gross Errors, clock correction forecasting model are intended It closes, phase hit detects and clock correction short-period forecast in real time.It implements flow as shown in figure 4, specific implementation situation is as follows:
1. foundation fits forecasting model, and real-time resolving clock correction data to reading and broadcast clock correction data are divided It does not store, obtains real-time resolving clock correction and broadcast clock correction and model parameter;
2. broadcast clock correction corresponding with real-time prediction clock correction is selected, as the real-time clock (RTC) difference data for fitting forecasting model And its rough error is detected, i.e., the rough error of the real-time clock (RTC) difference data for fitting forecasting model of acquisition is detected, and to reality Clock difference data also carries out the detection of rough error, by elimination of rough difference;
3. for no rough error data using an order polynomial fit model carry out clock correction forecast, deduct its periodic term with And starting point deviation obtains real-time prediction clock correction, and using model coefficient and forecast clock correction is fitted to broadcasting clock correction amendment, obtains most The result of whole real-time clock correction forecast.
In order to obtain high-precision satellite alert clock correction, different types of satellite clock is generally using different classes of multinomial Formula forecasting model.Since frequency drift characteristic of the Rb clocks than Cs clock becomes apparent, the former generally use quadratic polynomial model and the latter Satellite clock correction is then forecast using a multinomial model.In addition, automatically selecting the order of multinomial model, while consider the period Property trend term and starting point bias term can also further improve clock correction forecast precision.In this project, due to satellite clock itself property The influence of energy or the interference of external environment, satellite clock often generate rough error and data outage, and phase hit also occurs now and then. Especially in real-time satellite satellite clock solution, the transformation of reference clock or datum station shortage of data are likely to cause in real time The saltus step of satellite clock correction.Due to the tradition using sliding window, clock correction forecasting model is difficult to resist this clock correction exception in real time, because This has studied the satellite clock correction real-time prediction algorithm for taking phase hit into account.
When phase hit occurs for satellite clock correction, constant offset occurs for phase, and frequency and frequency drift characteristic do not change Become.Therefore, the mathematical model of description satellite clock correction phase hit can be expressed as:
In formula, t be time independent variable, y (t) be clock correction value, t0For phase hit moment, a occurs0Before phase hit Phase, a0' for the phase after phase hit, a1For frequency, a2For frequency drift, ε is clock correction noise.
According to model above, satellite clock correction sequence variation is steady before and after phase hit, while the magnitude of phase hit is long-range In the phase changing capacity of non-phase jumping moment adjacent epoch.When forecasting satellite clock correction using multinomial model, phase jump is encountered Become, then the fitting precision of satellite clock correction is poor, the forecast clock correction precision that cannot often stablize.Therefore, in real-time GPS satellite In clock correction forecast, reliable and stable forecast clock correction, designs a kind of GPS satellite in orbit not influenced by phase hit in order to obtain Clock correction real-time prediction algorithm is meaningful.
Based on the mathematical model of BDS satellite clock correction phase hits, by comparing the standard deviation of fitting data section residual error Automatically select an order polynomial or quadratic polynomial model, and take into account cyclically-varying trend term extraction and starting point it is inclined The correction of difference, while observation weight matrix is determined according to the distance from forecast epoch, obtain taking into account the BDS satellites of phase hit Clock correction forecasting model.
In formula, Δ a0For starting point correction for deflection, β parameter values are for 0 or 1 (when a fitting of a polynomial residual error standard deviation is small When quadratic polynomial fit standard difference, β 0;Conversely, 1) β is, All,The respectively amplitude of periodic term, angular speed, Phase.
Above formula is on the basis of satellite clock correction phase hit model, increases starting point correction for deflection, periodic term correction, one The new model that secondary or quadratic polynomial automatically selects.Although the model is not influenced by phase hit, it not can determine that Phase hit time of origin.Therefore, on the basis of the BDS satellite clock correction forecasting models of phase hit are taken into account, it is a kind of accurate to build The BDS real-time satellite clock correction prediction algorithms that moment occurs for detecting phase saltus step are very important.
According to the feature of GPS satellite clock correction phase hit, jumped with the fitting precision of clock correction to determine whether phase occurs Become, whether steadily saltus step is positioned with the phase data at phase hit both ends, then in conjunction with the GPS satellite for taking phase hit into account Clock correction forecasting model using recursive least square algorithm to clock correction real-time prediction, and then obtains one kind and takes phase hit detection into account GPS real-time satellite clock correction prediction algorithms.
The present invention can realize that satellite clock correction calculation accuracy is assessed to verify, spy enumerates embodiment and verified.This reality Example is applied to 20 survey station satellite clock solution accuracy evaluation of European Area, it is specific as follows:
Choose 2015, year day of year be 001~090 observation data, select European Area 20 be capable of providing high rate observation The monitoring station of data carries out verification experimental verification as experiment centre point, and site name is: BOR1、BRST、EBRE、GOPE、GRAS、 GRAZ、JOZ2、LAMA、MADR、 MATE、NICO、ONSA、PADO、POTS、RABT、SOFI、SPTO、TLSE、 VILL、WTZR BOR1 is selected to carry out the comparison of " second difference " with the subsequent precise clock corrections of COD (5s) as datum station, calculate its STD value, respectively GPS satellite satellite clock solution accuracy evaluation figure is as shown in Figure 5.
Under fixed reference station condition, the accuracy evaluation result of 20 survey station of European Area 90 days (ns) is:STD=0.155;
1) 100 survey station satellite clock solution accuracy evaluation of Global Regional
Since Global Regional range is wider, high rate observation data are capable of providing so uniformly choosing in the world 100 survey stations carry out verification experimental verification as experiment centre point, and site name is:abpo、 adis、algo、alic、amc2、areq、 bogt、bor1、brst、bshm、cas1、chur、coco、 conz、cord、cro1、leij、uclu、daej、darw、dav1、 dgav、drao、fair、faiv、 ganp、gmsd、godz、gold、gope、gras、graz、guam、hert、hob2、 hofn、 hrao、iisc、ispa、jog2、joz2、kat1、kely、kir0、kit3、 kokb、kokv、kour、lama、lhaz、lpgs、 mac1、mal2、mas1、mate、 maw1、mbar、mcm4、mgue、mizu、mobs、nico、ntus、ohi3、onsa、palv、 pdel、pie1、pimo、pol2、pots、quin、rabt、reyk、 rio2、sant、sofi、spt0、sthl、str2、suth、 sutm、sutv、tabv、tid1、 tidb、tlse、tow2、unb3、usud、vill、wtzr、xmis、yar3、yell、 ykro、 zamb、zim2、zwe2。
The real-time clock correction on January 3 days 3,1 day to 2016 January in 2016 is chosen as a result, with the subsequent precise clock corrections of COD (5s) carries out the comparison of " second difference ", calculates its STD value, on January 3rd, 2016 each GPS satellite satellite clock solution accuracy evaluation figure As shown in Figure 6.
The accuracy evaluation result of 100 survey station of Global Regional 3 days (ns) is:STD=0.231 (ns).
2) real-time clock correction short-period forecast accuracy evaluation.
0 point to 6 points of January 1 in 2015, real-time clock correction forecast, as a result see the table below:
[table 1] real-time clock correction forecast precision statistical form
Satellite G01 G02 G03 G04 G05 G06
Precision 0.021 0.025 ---- 0.017 0.015 0.012
Satellite G08 G09 G10 G11 G12 G13
Precision 0.011 ---- 0.024 0.015 0.014 0.026
Satellite G15 G16 G17 G18 G19 G20
Precision 0.014 0.0114 ---- 0.011 0.012 ----
Satellite G22 G23 G24 G25 G26 G27
Precision 0.011 0.044 0.016 0.009 0.021 0.011
Satellite G29 G30 G31 G32
Precision 0.010 0.018 0.011 0.017
As can be seen from the above table, it is averagely forecast using the satellite clock correction real-time prediction algorithm 10s clock correction for taking phase hit into account Precision is 0.016ns, and precision is higher.
By above-mentioned test result it can be found that satellite clock correction proposed by the present invention resolve and forecasting technique have it is higher Precision.
To sum up, the method for the present invention passes through to having the prior-constrained real-time satellite clock bias estimation algorithm of troposphere and taking into account The research of the satellite clock correction real-time prediction algorithm of phase hit, solves because of correlation between clock correction parameter and convection current layer parameter The problem of inaccurate compared with algorithm caused by normal equation morbid state caused by strong and clock correction abnormal phenomenon.This technology has faster Reaction speed, higher forecast precision.
It should be noted that described above is only the preferred embodiment of the present invention, it should be understood that for this field skill For art personnel, several changes and improvements can also be made under the premise of the technology of the present invention design is not departed from, these all include Within the scope of the present invention.

Claims (4)

1. the satellite clock correction based on real-time stream resolves and forecasting procedure, which is characterized in that includes the following steps:
Data prediction is carried out to the observation data of real-time stream, obtains pseudorange, carrier wave, smoothing pseudorange after data prediction Pseudo-range Observations;
According to after the data prediction pseudorange, carrier wave, carrier phase smoothed pseudorange observation, set up non-differential mode type and between epoch it is poor Sub-model, using several epoch troposphere parameter Estimations as prior information, in real time to satellite clock correction and receiver clock-offsets parameter, Troposphere and fuzziness parameter carry out obtaining clock bias estimation information according to a preliminary estimate;And it utilizes and broadcasts clock correction data acquisition datum strip Part constrains the benchmark of clock bias estimation, troposphere and fuzziness restriction on the parameters and clock correction reference data constraint under into Row resolves satellite clock correction again, with the clock correction data resolved again;
Foundation fits forecasting model, and is stored respectively to reading in the clock correction data resolved again and broadcast clock correction data, Real-time resolving clock correction and broadcast clock correction and model parameter are obtained, and selects broadcast clock correction corresponding with real-time prediction clock correction, is made To fit the real-time clock (RTC) difference data of forecasting model and its rough error being detected, the elimination of rough difference that will be detected, for no rough error Real-time clock (RTC) difference data using an order polynomial fit model carry out clock correction forecast.
2. the satellite clock correction according to claim 1 based on real-time stream resolves and forecasting procedure, which is characterized in that institute State in method to the observation data of real-time stream carry out data prediction include observation data validity detection, real-time rough error and Detection of Cycle-slip, data observation quality testing.
3. the satellite clock correction according to claim 1 based on real-time stream resolves and forecasting procedure, which is characterized in that institute It states in method and is included using several epoch troposphere parameter Estimations as prior information:Being judged according to the clock bias estimation information should The precision and succession troposphere and fuzziness prior information of epoch satellite clock solution, while repair current epoch troposphere and obscure The DOP values of degree.
4. the satellite clock correction according to claim 1 based on real-time stream resolves and forecasting procedure, which is characterized in that institute It states in method and satellite clock correction and receiver clock-offsets parameter, troposphere and fuzziness parameter is tentatively estimated using least square method Meter.
CN201711412195.0A 2017-12-23 2017-12-23 Satellite clock error calculating and forecasting method based on real-time data flow Active CN108196279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711412195.0A CN108196279B (en) 2017-12-23 2017-12-23 Satellite clock error calculating and forecasting method based on real-time data flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711412195.0A CN108196279B (en) 2017-12-23 2017-12-23 Satellite clock error calculating and forecasting method based on real-time data flow

Publications (2)

Publication Number Publication Date
CN108196279A true CN108196279A (en) 2018-06-22
CN108196279B CN108196279B (en) 2021-10-15

Family

ID=62583639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711412195.0A Active CN108196279B (en) 2017-12-23 2017-12-23 Satellite clock error calculating and forecasting method based on real-time data flow

Country Status (1)

Country Link
CN (1) CN108196279B (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109782313A (en) * 2019-01-17 2019-05-21 上海卫星工程研究所 Ground Static Precise Point Positioning data processing method
CN110376620A (en) * 2019-07-24 2019-10-25 广州中海达卫星导航技术股份有限公司 Real-time clock deviation forecasting procedure, device and computer equipment
CN110703280A (en) * 2019-10-25 2020-01-17 南京天际易达通信技术有限公司 Clock error estimation method for satellite navigation time service type receiver
CN111025341A (en) * 2019-11-22 2020-04-17 中国科学院上海天文台 Error refinement method for satellite orbit
CN111025346A (en) * 2019-11-18 2020-04-17 广州南方卫星导航仪器有限公司 Method for rapidly estimating clock error of GNSS precision satellite and storage medium
CN111045053A (en) * 2019-12-26 2020-04-21 广东星舆科技有限公司 Differential positioning method and system under VRS data interruption
CN111275090A (en) * 2020-01-16 2020-06-12 山东大学 Novel GNSS ultra-fast clock error forecasting method
CN111323796A (en) * 2020-03-18 2020-06-23 中国科学院国家空间科学中心 GNSS receiver high-sampling clock error resolving method
CN111368588A (en) * 2018-12-25 2020-07-03 天津大学 Tidal observation data preprocessing method based on Vondrak filtering
CN111478725A (en) * 2020-05-08 2020-07-31 中国人民解放军63921部队 Satellite clock error adjustment correction method based on inter-satellite link closed loop residual error detection
CN111812676A (en) * 2020-06-30 2020-10-23 东南大学 Real-time data stream interruption comprehensive compensation method based on broadcast ephemeris
CN112711044A (en) * 2020-12-09 2021-04-27 北方信息控制研究院集团有限公司 Method for forecasting satellite clock error in short time by combining ultra-fast ephemeris
WO2021082188A1 (en) * 2019-10-29 2021-05-06 中海北斗深圳导航技术有限公司 Global navigation satellite system real-time clock error evaluation algorithm
CN112787705A (en) * 2020-12-28 2021-05-11 中国科学院国家授时中心 Time service system and method
CN112987043A (en) * 2019-12-17 2021-06-18 千寻位置网络有限公司 Satellite clock error reference smoothing method and system thereof
CN113504557A (en) * 2021-06-22 2021-10-15 北京建筑大学 GPS inter-frequency clock error new forecasting method for real-time application
CN113740891A (en) * 2020-05-29 2021-12-03 华为技术有限公司 Method for determining position and speed of terminal equipment by using navigation satellite and electronic device
CN114002712A (en) * 2021-10-08 2022-02-01 中国科学院国家授时中心 GNSS real-time satellite clock error determination system and method based on data adaptive selection
CN114355410A (en) * 2021-12-15 2022-04-15 中国科学院国家授时中心 Satellite navigation real-time precise single-point positioning system and method based on parallel computing
CN114911306A (en) * 2022-03-21 2022-08-16 中海油田服务股份有限公司 Precision clock error forecasting method and device, computing equipment and storage medium
CN117111110A (en) * 2023-07-11 2023-11-24 武汉纺织大学 Satellite clock error data short-term forecasting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998681A (en) * 2012-12-13 2013-03-27 中国航天科工信息技术研究院 High-frequency clock error estimation method of satellite navigation system
CN103197326A (en) * 2013-03-25 2013-07-10 东南大学 Multi-constellation single base station receiver clock difference estimation method
CN104614741A (en) * 2015-01-23 2015-05-13 河海大学 Real-time precise satellite clock error estimation method not impacted by deviation of code frequency of GLONASS
EP2985631A1 (en) * 2014-08-14 2016-02-17 Trimble Navigation Limited Navigation satellite system positioning involving the generation of receiver-specific or receiver-type-specific correction information

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998681A (en) * 2012-12-13 2013-03-27 中国航天科工信息技术研究院 High-frequency clock error estimation method of satellite navigation system
CN103197326A (en) * 2013-03-25 2013-07-10 东南大学 Multi-constellation single base station receiver clock difference estimation method
EP2985631A1 (en) * 2014-08-14 2016-02-17 Trimble Navigation Limited Navigation satellite system positioning involving the generation of receiver-specific or receiver-type-specific correction information
CN104614741A (en) * 2015-01-23 2015-05-13 河海大学 Real-time precise satellite clock error estimation method not impacted by deviation of code frequency of GLONASS

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
MARKUS GLOCKER ET AL.: "Global precise multi-GNSS positioning with trimble centerpoint RTX", 《2012 6TH ESA WORKSHOP ON SATELLITE NAVIGATION TECHNOLOGIES (NAVITEC 2012) & EUROPEAN WORKSHOP ON GNSS SIGNALS AND SIGNAL PROCESSING》 *
付文举: "GNSS在轨卫星钟差特性分析及钟差预报研究", 《中国优秀硕士学位论文全文数据库 基础科学辑》 *
刘俊宏: "基于双差模型的北斗GEO/IGSO/MEO混合星座精密轨道和钟差确定", 《中国博士学位论文全文数据库 信息科技辑》 *
赵齐乐 等: "利用非差观测量估计北斗卫星实时精密钟差", 《武汉大学学报 信息科学版》 *
陈良 等: "北斗/GPS实时精密卫星钟差融合解算模型及精度分析", 《测绘学报》 *

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111368588A (en) * 2018-12-25 2020-07-03 天津大学 Tidal observation data preprocessing method based on Vondrak filtering
CN109782313A (en) * 2019-01-17 2019-05-21 上海卫星工程研究所 Ground Static Precise Point Positioning data processing method
CN110376620A (en) * 2019-07-24 2019-10-25 广州中海达卫星导航技术股份有限公司 Real-time clock deviation forecasting procedure, device and computer equipment
CN110376620B (en) * 2019-07-24 2022-03-04 广州中海达卫星导航技术股份有限公司 Real-time clock error forecasting method and device and computer equipment
CN110703280A (en) * 2019-10-25 2020-01-17 南京天际易达通信技术有限公司 Clock error estimation method for satellite navigation time service type receiver
WO2021082188A1 (en) * 2019-10-29 2021-05-06 中海北斗深圳导航技术有限公司 Global navigation satellite system real-time clock error evaluation algorithm
CN111025346A (en) * 2019-11-18 2020-04-17 广州南方卫星导航仪器有限公司 Method for rapidly estimating clock error of GNSS precision satellite and storage medium
CN111025341A (en) * 2019-11-22 2020-04-17 中国科学院上海天文台 Error refinement method for satellite orbit
CN111025341B (en) * 2019-11-22 2023-04-07 中国科学院上海天文台 Error refinement method for satellite orbit
CN112987043B (en) * 2019-12-17 2022-06-24 千寻位置网络有限公司 Satellite clock error reference smoothing method and system thereof
CN112987043A (en) * 2019-12-17 2021-06-18 千寻位置网络有限公司 Satellite clock error reference smoothing method and system thereof
CN111045053B (en) * 2019-12-26 2022-03-08 广东星舆科技有限公司 Differential positioning method and system under VRS data interruption
CN111045053A (en) * 2019-12-26 2020-04-21 广东星舆科技有限公司 Differential positioning method and system under VRS data interruption
CN111275090B (en) * 2020-01-16 2021-07-16 山东大学 GNSS ultra-fast clock error forecasting method
CN111275090A (en) * 2020-01-16 2020-06-12 山东大学 Novel GNSS ultra-fast clock error forecasting method
CN111323796B (en) * 2020-03-18 2021-11-09 中国科学院国家空间科学中心 GNSS receiver high-sampling clock error resolving method
CN111323796A (en) * 2020-03-18 2020-06-23 中国科学院国家空间科学中心 GNSS receiver high-sampling clock error resolving method
CN111478725A (en) * 2020-05-08 2020-07-31 中国人民解放军63921部队 Satellite clock error adjustment correction method based on inter-satellite link closed loop residual error detection
CN111478725B (en) * 2020-05-08 2021-11-23 中国人民解放军63921部队 Satellite clock difference adjustment correction method based on inter-satellite link closed residual error detection
CN113740891A (en) * 2020-05-29 2021-12-03 华为技术有限公司 Method for determining position and speed of terminal equipment by using navigation satellite and electronic device
CN111812676A (en) * 2020-06-30 2020-10-23 东南大学 Real-time data stream interruption comprehensive compensation method based on broadcast ephemeris
CN111812676B (en) * 2020-06-30 2022-02-15 东南大学 Real-time data stream interruption comprehensive compensation method based on broadcast ephemeris
CN112711044A (en) * 2020-12-09 2021-04-27 北方信息控制研究院集团有限公司 Method for forecasting satellite clock error in short time by combining ultra-fast ephemeris
CN112787705B (en) * 2020-12-28 2021-11-02 中国科学院国家授时中心 Time service system and method
CN112787705A (en) * 2020-12-28 2021-05-11 中国科学院国家授时中心 Time service system and method
CN113504557A (en) * 2021-06-22 2021-10-15 北京建筑大学 GPS inter-frequency clock error new forecasting method for real-time application
CN114002712A (en) * 2021-10-08 2022-02-01 中国科学院国家授时中心 GNSS real-time satellite clock error determination system and method based on data adaptive selection
CN114355410A (en) * 2021-12-15 2022-04-15 中国科学院国家授时中心 Satellite navigation real-time precise single-point positioning system and method based on parallel computing
CN114911306A (en) * 2022-03-21 2022-08-16 中海油田服务股份有限公司 Precision clock error forecasting method and device, computing equipment and storage medium
CN114911306B (en) * 2022-03-21 2024-05-07 中海油田服务股份有限公司 Precision clock error forecasting method, device, computing equipment and storage medium
CN117111110A (en) * 2023-07-11 2023-11-24 武汉纺织大学 Satellite clock error data short-term forecasting method
CN117111110B (en) * 2023-07-11 2024-03-08 武汉纺织大学 Satellite clock error data short-term forecasting method

Also Published As

Publication number Publication date
CN108196279B (en) 2021-10-15

Similar Documents

Publication Publication Date Title
CN108196279A (en) Satellite clock correction based on real-time stream resolves and forecasting procedure
CN106468774B (en) A kind of ephemeris star clock correction parameter and spacing wave integrity parameter method applied to satellite-based augmentation system
CN104714244B (en) A kind of multisystem dynamic PPP calculation methods based on robust adaptable Kalman filter
CN108107455A (en) A kind of satellite clock correction Real-time Forecasting Method based on phase hit
CN101802643B (en) Method for accuracy estimation of network based corrections for a satellite-aided positioning system
CN104614741B (en) Real-time precise satellite clock error estimation method not impacted by deviation of code frequency of GLONASS
Juan et al. Enhanced precise point positioning for GNSS users
Zhang et al. An improved robust adaptive Kalman filter for GNSS precise point positioning
CN102998681B (en) A kind of high-frequency clock error estimation method of satellite navigation system
CN108845340A (en) Localization method based on GNSS-RTK
CN105891860A (en) Error-separation-mode-based regional pseudo-range differential enhanced positioning method of GNSS
Sibthorpe et al. An evaluation of solar radiation pressure strategies for the GPS constellation
CN104597465A (en) Method for improving convergence speed of combined precise point positioning of GPS (Global Position System) and GLONASS
WO2021082188A1 (en) Global navigation satellite system real-time clock error evaluation algorithm
CN104459722B (en) A kind of integer ambiguity certificate authenticity method based on redundant obser ration part
CN106093967A (en) The ionosphere delay method for solving that a kind of pseudorange phase place is comprehensive
CN113568020A (en) Satellite navigation positioning error correction method and device considering hardware inter-frequency difference
CN114355418A (en) Beidou foundation enhancement system-based posterior data quality assessment method and system
MX2011005844A (en) A system and method of reference position determination.
CN111522032B (en) Optimization method and optimization device for Beidou third-generation system user integrity processing
CN114935770B (en) Method and device for accelerating precision single-point positioning convergence speed by multiple calendars
CN115902968A (en) PPP terminal positioning method based on Beidou third GEO broadcast enhancement information
CN104898144A (en) Whole-cycle ambiguity single epoch determining method for Beidou system reference station
CN102680989B (en) Positioning result filtering method and device
CN111478725A (en) Satellite clock error adjustment correction method based on inter-satellite link closed loop residual error detection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant