CN108181446A - A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device - Google Patents

A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device Download PDF

Info

Publication number
CN108181446A
CN108181446A CN201810085478.7A CN201810085478A CN108181446A CN 108181446 A CN108181446 A CN 108181446A CN 201810085478 A CN201810085478 A CN 201810085478A CN 108181446 A CN108181446 A CN 108181446A
Authority
CN
China
Prior art keywords
ponding
simulation
tunnel
frozen
thawed cycled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810085478.7A
Other languages
Chinese (zh)
Inventor
郑尚峰
张慧玲
范胜利
朱勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201810085478.7A priority Critical patent/CN108181446A/en
Publication of CN108181446A publication Critical patent/CN108181446A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Analytical Chemistry (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Remote Sensing (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device, to provide relatively reliable test data steadily in the long term for the design in permafrost region tunnel, construction and operation phase, so as to better ensure that the safety of permafrost region tunnel structure and economy.Including main body chamber, environmental chamber, detection device and Frozen-thawed cycled simulation system;The environmental chamber is set in main body chamber, the setting of tunnel lining structure model is positioned in environmental chamber, the local flooding simulation device in lining cutting behind is set on tunnel lining structure model outer wall, and the local flooding simulation device in lining cutting behind feeds pipeline by ponding and is connected with hanging on the ponding device for supplying on main body experiment box outer wall;In filling country rock simulation material outside tunnel lining structure model in the environmental chamber;The component of the detection device is embedded in country rock simulation material, is pasted on the inside and outside wall of tunnel lining structure model;The host of the Frozen-thawed cycled simulation system is set to outside main body chamber, and air-supply arrangement is set to the top of main body chamber side wall.

Description

A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect simulation, monitoring behind Device
Technical field
The present invention relates to traffic tunnel design with building field of engineering technology, more particularly to a kind of permafrost region tunnel-liner back of the body Local ponding Frozen-thawed cycled effect simulation, monitoring device afterwards.
Background technology
With the rise of the Belt and Road strategy, permafrost region tunnel quantity is more and more, runs phase freezing damage in tunnel problem It is more universal.Permafrost region tunnel operation phase freeze injury problem main forms hang ice, ditch for tunnel-liner frost heave cracking, infiltration Freeze.Lining cutting frost heave cracking can cause tunnel durability, safety seriously to reduce, and active time is drastically reduced;Infiltration extension ice, Ditch frozen problem makes accumulated ice in tunnel serious, and headroom reduces, and can not drive a vehicle.Achievement in research thinks lining cutting behind both at home and abroad at present Repeatedly Frozen-thawed cycled process is one of principal element for causing operation phase freezing damage in tunnel problem to local ponding.
People serve as a contrast tunnel under tunnel-liner behind different ponding positions, ponding magnitude and repeated freeze-thaw cycle action condition Block structure stress feature, failure mode shortage are understood in depth, and tunnel-liner behind ponding alimentation mechanism is still not clear.Pass through Establish tunnel-liner local ponding Frozen-thawed cycled effect simulation behind, monitoring device carries out tunnel-liner local ponding freeze thawing behind Tunnel structure mechanical characteristic model test under cycling condition obtains tunnel lining structure in different ponding positions, ponding with analysis The stress characteristic of tunnel lining structure, failure mode and tunnel-liner behind ponding under the conditions of magnitude and freezing-thawing cycles Recharge Mechanism, to improving permafrost region structure design of tunnel system;Optimize permafrost region tunnel structure guarded drainage, thermal retardation form;To freeze Native area's tunnel structure problem provides test data, has a very important significance.
Existing domestic and foreign scholars study in terms of studying permafrost region tunnel structure, and the method mainly used has theory deduction, number It is worth simulation, laboratory test etc..Wherein, theory deduction, method of numerical simulation are mainly in country rock Frost heaving mechanism, frost heave sheet The research of the contents such as structure model, permafrost region country rock distribution law of temperature field, for the local ponding Frozen-thawed cycled in tunnel-liner behind Research also not system, comprehensively in terms of effect.Often assumed condition limits excessive theory deduction research means, and correlated variables changes Change can cause derivation result can not explicit expression, as a result also excessively idealize, it is limited to practice of construction directive significance;Numerical simulation Although relatively reducing calculation amount, save and calculate the time, simulation process is to be based on theory, can not be with reality there are analog result The deficiency that situation matches.Indoor model test is that tunnel scene is carried out reduced scale real simulation, has and coincide with actual conditions Degree is high, it is at low cost the characteristics of, be to study the ideal research method of permafrost region tunnel structure.
Frost heave is made under the mainly fixed moisture content wall rock condition of existing permafrost region tunnel structure frost heave action simulation system With simulation system, by adjusting country rock material moisture content, frost heave action is for tunnel under the conditions of realizing different surrounding rock grade, moisture content The influence of road structure only accounts for specific country rock moisture content by not freezing to freezing shadow of the single process of frost heave for tunnel structure It rings.Existing method and system can not consider seasonal frozen soil region tunnel commonly used in permafrost area vcehicular tunnel and railway tunnel Road and is integrally frozen by the cyclic process of Tunnel Lining Cracks development and change under the influence of frost heave ringing repeatedly compared to country rock Bulk value, local ponding position frost heave action magnitude is larger behind for lining cutting, and frost heave load assignment is uneven, is more easy to make liner structure Generate stress concentration phenomenon, cause tunnel-liner local location crack, damage of lining form also with actual tunnel failure mode compared with It is identical.
Invention content
The technical problems to be solved by the invention are to provide a kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled behind Effect simulation, monitoring device, with more preferable simulation difference hydrogeologic condition and including seasonal frozen soil region, permafrost area Different surrounding rock rank realizes under different hydrogeologic conditions tunnel-liner different ponding positions, ponding magnitude and anti-behind During multiple Frozen-thawed cycled effect, the simulation of tunnel-liner stress characteristic, failure mode, design, construction and fortune for permafrost region tunnel Battalion's phase provides relatively reliable test data steadily in the long term, so as to better ensure that the safety of permafrost region tunnel structure and economy Property.
Technical method is as follows used by the present invention solves above-mentioned technical problem:
A kind of permafrost region tunnel part ponding Frozen-thawed cycled effect simulation of the present invention, monitoring device, it is characterized in that:Including Main body chamber, environmental chamber, detection device and Frozen-thawed cycled simulation system;The environmental chamber is set to main body experiment In case, the setting of tunnel lining structure model is positioned in environmental chamber, lining cutting is set to carry on the back on tunnel lining structure model outer wall Local flooding simulation device afterwards, local flooding simulation device feeds pipeline by ponding and hangs on main body chamber behind for lining cutting Ponding device for supplying on outer wall is connected;In filling country rock simulation material outside tunnel lining structure model in the environmental chamber Material;The component of the detection device is embedded in country rock simulation material, is pasted on the inside and outside wall of tunnel lining structure model On;The host of the Frozen-thawed cycled simulation system is set to outside main body chamber, and air-supply arrangement is set to main body chamber side The top of wall.
The beneficial effects are mainly as follows following aspects:
(1) experimental rig can realize simulation varying environment temperature, different freezing-thawing cycles, different permafrost region types, Under the conditions of different tunnel cross-section forms and size, tunnel-liner behind ponding is into ice frost heave action to tunnel lining structure stress spy Sign, failure mode.By adjusting high/low temperature difference and ascending, descending in Frozen-thawed cycled simulation system in Frozen-thawed cycled environment simulator Warm cycle-index, to realize above-mentioned simulation.
(2) it according to the different ponding positions in lining cutting behind, water accumulating volume and ponding distribution form, using high intensity sponge, makes Tunnel-liner behind flooding simulation material, to realize lining cutting different ponding positions, water accumulating volume and ponding distribution form condition behind Under, influence of the ponding into ice frost heave action to tunnel-liner stress characteristic, failure mode.
(3) different surrounding rock grade, difference can be simulated by changing the match ratio of country rock simulation material in main body chamber Under the conditions of moisture content, influence of the tunnel-liner behind ponding into ice frost heave action to tunnel-liner stress characteristic, failure mode.
(4) by adjusting the cooperation of tunnel-liner simulation material when shape, different tunnel-liner section shapes can be simulated Under the conditions of formula, different tunnel cross-section sizes, different strength of lining, tunnel-liner behind ponding is into ice frost heave action to tunnel-liner The influence of stress characteristic, failure mode.
Description of the drawings
This specification includes following three width attached drawing:
Fig. 1 is a kind of permafrost region tunnel-liner of the present invention local ponding Frozen-thawed cycled effect simulation, monitoring device behind Front view;
Fig. 2 is a kind of permafrost region tunnel-liner of the present invention local ponding Frozen-thawed cycled effect simulation, monitoring device behind Left view;
Fig. 3 is a kind of permafrost region tunnel-liner of the present invention local ponding Frozen-thawed cycled effect simulation, monitoring device behind Vertical view.
Critical piece and corresponding label are shown in figure:Main body chamber 1, environmental chamber 2, air-supply arrangement 3, freeze thawing Circulating analog system 4, tunnel lining structure simulation material 5, local water collecting device 6, ponding supply pipeline 7 are closed behind for lining cutting Door 8, ponding device for supplying 9, environmental chamber monitoring component 10, main body chamber monitoring component 11, country rock simulation material 12。
Specific embodiment
The present invention is further described With reference to embodiment, specific embodiment be to the principle of the invention into One step illustrates, does not limit the invention in any way, and is protected with the same or like technology of the present invention without departing from the present invention Range.
With reference to Fig. 1, Fig. 2 and Fig. 3, a kind of permafrost region tunnel part ponding Frozen-thawed cycled effect simulation of the invention, monitoring Device includes main body chamber 1, environmental chamber 2, detection device and Frozen-thawed cycled simulation system 4.The environmental chamber 2 is set It is placed in main body chamber 1, the setting of tunnel lining structure model 5 is positioned in environmental chamber 2, tunnel lining structure model 5 Lining cutting local flooding simulation device 6 behind is set on outer wall, and local flooding simulation device 6 feeds pipeline by ponding behind for lining cutting 7 are connected with hanging on the ponding device for supplying 9 on 1 outer wall of main body chamber.In tunnel-liner knot in the environmental chamber 2 Country rock simulation material 12 is loaded outside structure model 5.The component of the detection device is embedded in country rock simulation material 12, is pasted on On the inside and outside wall of tunnel lining structure model 5.The host of the Frozen-thawed cycled simulation system 4 is set to outside main body chamber 1, Its air-supply arrangement 3 is set to the top of 1 side wall of main body chamber.
Different materials may be selected in the country rock simulation material 12 and match ratio simulates different Grades of Surrounding Rock, country rock simulation Material 12 includes gypsum, water, quartz sand and blanc fixe etc..It is allocated as being loaded at least twice per mono- layer of 15cm during filling, often Interlayer shaving after secondary filling, avoids being layered, and then manually vibrate 20 unit weights that country rock simulation material 12 is made to reach demand It is required that.
Different tunnel cross-section sizes may be used in the tunnel-liner model 5 and different materials cooperation makes.It may be selected Different tunnel cross-section sizes and material mix proportion simulate different Tunnel structures, size, including the shape of a hoof, circle, stalk Shape, light section, middle section, big cross section, extra-large cross-section etc..The making material of tunnel-liner model 5 includes gypsum, water, quartz sand Deng according to the shape for mold being poured into after certain match ratio mix demand being made.
Local flooding simulation device 6 is made of high intensity sponge behind for the lining cutting, and outside tunnel lining structure model 5 Wall fits closely, to realize the simulation of simulation tunnel-liner behind different ponding positions, ponding magnitude.And product is fixed in its center 7 end of water supply tube road, 7 outside package thermal insulation material of ponding supply pipeline.
The ponding device for supplying 9 is made of electronics water monitoring device, water tank, make-up pipe, is supervised by electronics water It surveys device and records water situation of change in water tank automatically, ponding alimentation process is monitored to realize.
With reference to Fig. 1, the main body chamber 1 is welded to form by steel plate, and box top is consolidated with box body bolt, facilitates folding Load country rock simulation material 12, tunnel-liner simulation material 5, lining cutting behind water collecting device 6.Box top is by test monitoring, product Water supply demand opens up through-hole 11, and make-up pipe, monitoring cable is facilitated to draw.On 2 inner wall of environmental chamber and bottom wall The insulating layer of certain Baidu is set, openable sealed door 8 is set on the side wall of side.
The host of the Frozen-thawed cycled simulation system 4 is made of large-scale program control type high/low temperature air conditioner and control system. Program and heating and cooling cycle-index are controlled by the high/low temperature for setting host, heated up, are dropped as required by air-supply arrangement 3 Warm process.
The monitoring device includes earth pressure gauge, temperature detecting sensor, strain rosette, numerical control displacement acquisition instrument, electronic water Measure monitoring device, static strain Acquisition Instrument or dynamic collecting instrument.12 inside of country rock simulation material carries out soil pressure by monitoring scheme The arrangement of power meter, temperature sensor carries out strain rosette on 5 inner wall of tunnel-liner model, outer wall by monitoring scheme, numerical control displacement is adopted Collect the arrangement of instrument.
By main body chamber 1, country rock simulation material 12, tunnel-liner model 5, lining cutting, local ponding fills behind as desired Put 6, ponding supply pipeline 7, ponding device for supplying water tank 9 after setting completed, the host of setting Frozen-thawed cycled simulation system 4 Program is controlled, air-supply arrangement 3 is started to work.As 2 temperature of environmental chamber reduces, local water collecting device 6 is formed behind for lining cutting Ponding is acted on into ice process, tunnel lining structure simulation material 5 by local ponding frost-heave force;And then with environmental chamber 2 Temperature gradually rises, and local ponding disappears into ice position frost heave action behind for lining cutting, and the water in ponding device for supplying water tank 9 leads to It crosses ponding and feeds pipeline 7 to lining cutting local water collecting device flowing behind, generate ponding supply phenomenon;When 2 temperature of environmental chamber When reducing again, local 6 frost heave action of water collecting device occurs again behind for lining cutting, so on circulate, ultimately forms freeze thawing The local ponding position frost heave action in lining cutting behind under ringing.
It compared with the conventional method can more preferable simulation difference hydrogeologic condition and including frost zone compared with, the present invention Area, the different surrounding rock rank in permafrost area, realize under different hydrogeologic conditions tunnel-liner behind different ponding positions, When ponding magnitude and repeated freeze-thaw cycle act on, the simulation of tunnel-liner stress characteristic, failure mode is permafrost region tunnel That designs, constructs and run the phase provides relatively reliable test data steadily in the long term, so as to better ensure that permafrost region tunnel knot The safety and economy of structure.
The above only explains through diagrams, and a kind of permafrost region tunnel-liner of the present invention behind make by local ponding Frozen-thawed cycled With simulation, some principles of monitoring device, it is not intended to the present invention being confined to shown and the concrete structure and applicable model In enclosing, thus it is every it is possible that the corresponding modification being utilized and equivalent, belong to the apllied the scope of the claims of the present invention.

Claims (9)

1. a kind of permafrost region tunnel part ponding Frozen-thawed cycled effect simulation, monitoring device, it is characterized in that:Including main body chamber (1), environmental chamber (2), detection device and Frozen-thawed cycled simulation system (4);The environmental chamber (2) is set to main body examination In tryoff (1), tunnel lining structure model (5) setting is positioned in environmental chamber (2), and tunnel lining structure model (5) is outside Lining cutting local flooding simulation device (6) behind is set on wall, and local flooding simulation device (6) passes through product water supply tube behind for lining cutting Road (7) is connected with hanging on the ponding device for supplying (9) on main body chamber (1) outer wall;In the environmental chamber (2) in Tunnel lining structure model (5) loads country rock simulation material (12) outside;The component of the detection device is embedded in country rock simulation In material (12), it is pasted on the inside and outside wall of tunnel lining structure model (5);The host of the Frozen-thawed cycled simulation system (4) It is set to main body chamber (1) outside, air-supply arrangement (3) is set to the top of main body chamber (1) side wall.
2. a kind of permafrost region tunnel part as described in claim 1 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The country rock simulation material (12) simulates different Grades of Surrounding Rock, country rock simulation material with different materials and match ratio (12) including gypsum, water, quartz sand and blanc fixe;It is allocated as being loaded at least twice per mono- layer of 15cm during filling, fill out every time Interlayer shaving after dress avoids being layered, and the unit weight that then manually vibrating 20 times makes country rock simulation material (12) reach demand is wanted It asks.
3. a kind of permafrost region tunnel part as described in claim 1 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The tunnel-liner model (5) is made of different tunnel cross-section sizes and different materials cooperation.
4. a kind of permafrost region tunnel part as described in claim 1 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:Local flooding simulation device (6) is made of high intensity sponge behind for the lining cutting, with tunnel lining structure model (5) outside Wall fits closely, and fixes ponding supply pipeline (7) water outlet in its center, package thermal insulating material outside ponding supply pipeline (7) Material.
5. a kind of permafrost region tunnel part as claimed in claim 5 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The ponding device for supplying (9) is made of electronics water monitoring device, water tank, make-up pipe, is filled by electronics water quantity monitoring Water situation of change in automatic record water tank is put, ponding alimentation process is monitored to realize.
6. a kind of permafrost region tunnel part as claimed in claim 5 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The main body chamber (1) is welded to form by steel plate, and box top is consolidated with box body bolt, and folding is facilitated to load country rock mould Intend material (12), tunnel-liner simulation material (5), lining cutting behind water collecting device (6);Box top is mended by test monitoring, ponding Through-hole (11) is opened up to demand, make-up pipe, monitoring cable is facilitated to draw.
7. a kind of permafrost region tunnel part as claimed in claim 5 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The insulating layer of certain Baidu is respectively provided on environmental chamber (2) inner wall and bottom wall, is set on the side wall of side openable Sealed door (8).
8. a kind of permafrost region tunnel part as described in claim 1 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The host of the Frozen-thawed cycled simulation system (4) is made of large-scale program control type high/low temperature air conditioner and control system.
9. a kind of permafrost region tunnel part as described in claim 1 ponding Frozen-thawed cycled effect simulation, monitoring device, feature It is:The monitoring device includes earth pressure gauge, temperature detecting sensor, strain rosette, numerical control displacement acquisition instrument, electronics water quantity monitoring Device, static strain Acquisition Instrument or dynamic collecting instrument.
CN201810085478.7A 2018-01-29 2018-01-29 A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device Pending CN108181446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810085478.7A CN108181446A (en) 2018-01-29 2018-01-29 A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810085478.7A CN108181446A (en) 2018-01-29 2018-01-29 A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device

Publications (1)

Publication Number Publication Date
CN108181446A true CN108181446A (en) 2018-06-19

Family

ID=62551604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810085478.7A Pending CN108181446A (en) 2018-01-29 2018-01-29 A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device

Country Status (1)

Country Link
CN (1) CN108181446A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109724865A (en) * 2019-02-26 2019-05-07 中铁二院工程集团有限责任公司 Tunnel-liner water pressure monitoring STS system test set and test method
CN111983193A (en) * 2020-08-26 2020-11-24 西南交通大学 High ground temperature country rock tunnel structure analogue test device
CN113532903A (en) * 2021-08-20 2021-10-22 中铁隧道局集团有限公司 Freezing and thawing cycle environment cold region tunnel simulation test platform
CN114184635A (en) * 2021-12-21 2022-03-15 河北交通职业技术学院 Seasonal frozen soil area tunnel frozen-expansion force simulation test device and use method thereof
CN114858847A (en) * 2022-04-16 2022-08-05 西南交通大学 Test device and method for simulating frost heaving induced crack development process of lining structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101923085A (en) * 2010-07-06 2010-12-22 中交第二公路勘察设计研究院有限公司 Multifunctional road soil roadbed freezing and thawing circulating test device
CN102879552A (en) * 2012-10-31 2013-01-16 河海大学 Freeze thawing and frost heaving model test device and testing method thereof
CN103245771A (en) * 2013-04-27 2013-08-14 同济大学 Device and method for testing surrounding effect model by using artificial ground freezing method
CN104597222A (en) * 2015-01-13 2015-05-06 河南大学 Large frozen soil model test system with moisturizing function and frost heaving test function
CN208476921U (en) * 2018-01-29 2019-02-05 中铁二院工程集团有限责任公司 A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101923085A (en) * 2010-07-06 2010-12-22 中交第二公路勘察设计研究院有限公司 Multifunctional road soil roadbed freezing and thawing circulating test device
CN102879552A (en) * 2012-10-31 2013-01-16 河海大学 Freeze thawing and frost heaving model test device and testing method thereof
CN103245771A (en) * 2013-04-27 2013-08-14 同济大学 Device and method for testing surrounding effect model by using artificial ground freezing method
CN104597222A (en) * 2015-01-13 2015-05-06 河南大学 Large frozen soil model test system with moisturizing function and frost heaving test function
CN208476921U (en) * 2018-01-29 2019-02-05 中铁二院工程集团有限责任公司 A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕康成等: ""寒冷地区隧道衬砌壁后冻融及其影响分析"", 《现代隧道技术》, vol. 49, no. 5, pages 29 - 33 *
董宇苍: ""隧道衬砌冻胀力学行为研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, no. 2, pages 23 - 67 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109724865A (en) * 2019-02-26 2019-05-07 中铁二院工程集团有限责任公司 Tunnel-liner water pressure monitoring STS system test set and test method
CN109724865B (en) * 2019-02-26 2023-09-22 中铁二院工程集团有限责任公司 Tunnel lining water pressure monitoring system test device and test method
CN111983193A (en) * 2020-08-26 2020-11-24 西南交通大学 High ground temperature country rock tunnel structure analogue test device
CN113532903A (en) * 2021-08-20 2021-10-22 中铁隧道局集团有限公司 Freezing and thawing cycle environment cold region tunnel simulation test platform
CN114184635A (en) * 2021-12-21 2022-03-15 河北交通职业技术学院 Seasonal frozen soil area tunnel frozen-expansion force simulation test device and use method thereof
CN114184635B (en) * 2021-12-21 2023-09-08 河北交通职业技术学院 Seasonal frozen soil area tunnel frost heaving force simulation test device and application method thereof
CN114858847A (en) * 2022-04-16 2022-08-05 西南交通大学 Test device and method for simulating frost heaving induced crack development process of lining structure
CN114858847B (en) * 2022-04-16 2023-08-08 西南交通大学 Test device and method for simulating development process of frost heaving induced cracks of lining structure

Similar Documents

Publication Publication Date Title
CN108181446A (en) A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device
CN208476921U (en) A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device
CN205826656U (en) A kind of frozen soil freeze thawing laboratory testing rig
CN104596852B (en) A kind of Rock And Soil temperature control Dynamic Characteristics Test method
CN109283215B (en) Method for measuring and calculating frost heaving force of tunnel surrounding rock in cold region after repeated freeze-thaw damage
CN202562912U (en) Layered temperature controlling soil freezing and thawing cycle test device
CN105300876B (en) Self-balancing type buried pipeline and soil body interaction experimental rig
CN104597222A (en) Large frozen soil model test system with moisturizing function and frost heaving test function
CN104749205A (en) Water thermal force comprehensive testing system and method of soil body freezing process
CN105784935B (en) A kind of multi-functional ice-melt snow pavement test device and evaluation method
CN108195723A (en) A kind of osmotic grouting pilot system and method for reinforcing loose gravelly soil
Pacovský et al. Saturation development in the bentonite barrier of the Mock-Up-CZ geotechnical experiment
CN205374425U (en) Multi -functional ice -melt snow road surface test device
CN104133052B (en) A kind of Temperature Controlling of Mass Concrete effect overall process evaluation method
CN105986582B (en) Forced ramming reinforcing difference level of ground water ground indoor model device and test method
CN107515232A (en) A kind of roadbed freezing and thawing circulating test device
CN108693019A (en) Liquid-heat-stress coupling acts on roadbed bridge response to forced vibration device and method
CN101464238A (en) Testing machine for mechanical parameter of roadbed material in freezing and thawing cycle
CN107328917A (en) The simulation system and experimental method of face stability are excavated for regulating and controlling frozen soil tunnel
CN104215655B (en) A kind of frozen soil three-dimensional heat conducting coefficient measurement device and method
Lu et al. Experimental investigation on frost heave characteristics of saturated clay soil under different stress levels and temperature gradients
CN116087472A (en) Tunnel portal side slope physical simulation test device and method under complex environment coupling effect
Mao et al. Experimental study of soil water migration in freezing process
CN109723025B (en) Underground structure boundary seepage test device and using method thereof
CN110333138A (en) It is a kind of for studying the experimental rig of ice and dam body interaction under low temperature environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180619