CN108179729A - A kind of Novel rubber dam body - Google Patents

A kind of Novel rubber dam body Download PDF

Info

Publication number
CN108179729A
CN108179729A CN201711217365.XA CN201711217365A CN108179729A CN 108179729 A CN108179729 A CN 108179729A CN 201711217365 A CN201711217365 A CN 201711217365A CN 108179729 A CN108179729 A CN 108179729A
Authority
CN
China
Prior art keywords
dam
bolt
rubberized fabric
sleeved
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711217365.XA
Other languages
Chinese (zh)
Other versions
CN108179729B (en
Inventor
李书华
陈松
卞春耕
祝华威
蔡勋星
赵庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Haiyan
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711217365.XA priority Critical patent/CN108179729B/en
Publication of CN108179729A publication Critical patent/CN108179729A/en
Application granted granted Critical
Publication of CN108179729B publication Critical patent/CN108179729B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/005Deformable barrages or barrages consisting of permanently deformable elements, e.g. inflatable, with flexible walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Barrages (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of Novel rubber dam bodies, the dam foundation, rubberized fabric and the Dun Qiang being disposed on the dam foundation including being located at riverbed lower concrete structure, the Dun Qiang both sides and the dam foundation are embedded with several bolts, the rubberized fabric is fixed on by sealing hold-down mechanism on the dam foundation and Dun Qiang, and the sealing hold-down mechanism includes the rubber gasket being sleeved on bolt, is pressed on rubberized fabric and the compression cylinder being sleeved on bolt and the nut linked with bolt thread.The dam body bolt of the present invention easily compresses, and stress distribution is uniform, and sealing effect is good, the Novel rubber dam body of dam bag not easy damaged, particularly suitable for the rubber dam dam body more than 7 meters or more heights of dam.

Description

A kind of Novel rubber dam body
Technical field
The invention belongs to water conservancy project building technical fields, and in particular to a kind of Novel rubber dam body.
Background technology
Rubber dam project is a kind of novel water retaining structure, will using the adhesive plaster that rubber and fiber synthesize as dam bag, It is anchored on dam bottom plate, forms the flexible water retaining structure of closing.Because of its structure novel, lifting is convenient, social benefit is apparent, pipe Manage the advantages that facilitating, be widely used in controlling flood, irrigate, town and country water supply, hydroelectric generation, the numerous areas such as beautify the environment.Rubber Water-filling is opened in dam bag, and dam bag bears the external and internal pressure of water, be engineering water blocking operation main body, the anchoring to rubber dam bag, both There is good leakproofness, it is solid and reliable again, can just rubber dam be made to play the role of water blocking in this way, it is ensured that normal operation.
In the prior art, to the anchoring of rubber dam bag, using bolt clip plate anchoring process.Particular by pre-buried spiral shell Punched steel plate and dam bag are pressed abd fixed on dam bottom plate by bolt.This method, stress distribution is uneven at anchorage of rubber dam bag, easy damaged Dam bag;For high dam(More than specification)5 meters or more of height of dam, the anchoring of dam bag, since dam bagging is thicker, bolt is not easy to press Tightly, sealing effect is poor, and during by strong water impact, serious leakage phenomenon easily occurs in dam bag;Dam bag is washed away by flow, easily by water Floating material in stream is hung, pricks, scratches equivalent damage, although can also be continuing with by repairing, this is only interim measure, reliable Property cannot ensure, and reduce the service life of rubber dam, dam bag is needed to change for serious breakage, need to be whole by the water of interception It bleeds off, loss is huge, and increases maintenance cost.Rubber dam realizes the storage on dam by adjusting the height of dam bag in use Water, the high high adjustment of dam bag are realized by the water filling into dam bag or draining.During the adjustment of dam bag height, the end of dam bag Friction is generated between portion and pier wall, easily by dam bag end wear, causes dam bag that can not use.
Invention content
To solve drawbacks described above of the existing technology, the purpose of the present invention is to provide a kind of bolts easily to compress, should Power is evenly distributed, and sealing effect is good, the inflatable Novel rubber dam body of dam bag not easy damaged, particularly suitable for more than 7 meters or more The rubber dam dam body of height of dam.
In order to achieve the above objectives, the present invention uses following technical scheme:
A kind of Novel rubber dam body, including being located at the dam foundation of riverbed lower concrete structure, rubberized fabric and being disposed on dam Dun Qiang on base, the Dun Qiang both sides and the dam foundation are embedded with several bolts, and the rubberized fabric is consolidated by sealing hold-down mechanism It is scheduled on the dam foundation and Dun Qiang, the sealing hold-down mechanism includes the rubber gasket being sleeved on bolt, is pressed on rubberized fabric simultaneously The compression cylinder being sleeved on bolt and the nut being connect with bolt thread.
It is circular compression cylinder that the compression cylinder, which is vertical section,.
Described compression cylinder one end is equipped with groove, and another one end for compressing cylinder is equipped with the convex block with groove match, Segmentation press fitting is easy to operate, and the lower surface that cylinder is compressed both after being easily installed and crimping is located at same horizontal line, and docking compresses Sealing effect is good afterwards, will not stay some gaps.
The Dun Qiang is equipped with to be sleeved on the arc rubber seal on bolt.
The Dun Qiang is equipped with the curved tablet for compressing rubberized fabric.
Spring pad is equipped between the nut and curved tablet.
Spring pad is equipped between the nut and compression cylinder.
Nut, which is equipped with, on the dam foundation and Dun Qiang puts loosening pressed mechanism.
The nut puts loosening pressed mechanism and includes being arranged on the spanner that is sleeved on nut, including be arranged on the dam foundation with The cylinder of the hinged one end open of the dam foundation, the cylinder is interior to be equipped with piston, and the piston rod of the piston is hinged with spanner by axis, The piston rod is equipped with strip groove, and teeth are equipped in the strip groove, are equipped in the cylinder matched with teeth Pawl.
The cylinder body bottom is equipped with bleeder pipe, and the bleeder pipe is connect with the gas outlet on the dam foundation by high-pressure air pipe, let out Tracheae is in communication with the outside across the dam foundation.
The cylinder body bottom is equipped with pine hair and switchs, after the contact of piston and pine hair switch, contact compression Song Fakai It closes connection alarm to power on, the formation of rubber dam operator on duty piston is reminded to arrive, i.e., piston can not move.
Meanwhile cylinder body bottom is equipped with caulking gum body, pine hair switch is arranged on caulking gum body, is when there is above-mentioned condition On the one hand piston plays sealing function on the other hand rubber bodies, will not gas leakage by the sealing channel blockage in rubber bodies.
A kind of seal construction method of Novel rubber dam body, includes the following steps,
1)Dust on the dam foundation and Dun Qiang is cleaned out, arc rubber gasket, the dam foundation two are set on the bolt of Dun Qiang both sides Rectangular rubber gasket is set on the bolt of side;
2)Moving trolley is placed on to one end of the dam foundation, rubberized fabric is placed in moving trolley, rubberized fabric one end is inwardly wound Curved tablet is sleeved on the bolt on Dun Qiang by rear enclosure on pier wall screw, is tightened nut and is compressed curved tablet, while will take Rubberized fabric in trolley both sides, which is inwardly wound, to be sleeved on the bolt of the dam foundation, will be compressed cylinder and is sleeved on bolt, and tightening nut will press Tight cylinder compresses, and moving trolley moves forward at this time, and the rubberized fabric of moving trolley both sides is inwardly wound to the bolt for being sleeved on the dam foundation On, cylinder will be compressed and be sleeved on bolt, steps be repeated alternatively until and the both sides of rubberized fabric are fully pressed against on the dam foundation, rubberized fabric end Portion is pressed on Dun Qiang;
3)Repeat step 2)Rubberized fabric between pier wall is installed;Hinged hermatic door is equipped on Dun Qiang, hermatic door is convenient Trolley passes through, while solenoid valve is equipped on hermatic door, convenient for detecting the rubber dam leakproofness between single pier wall.
The rubber dam construction method of the present invention is received the inside of the two of the rubberized fabric lateral dam foundations, while rubberized fabric both ends It inwardly receives, and passes through sealing compression and the surrounding of rubberized fabric is fixed on the dam foundation and Dun Qiang, sealing hold-down mechanism is located at rubberized fabric It in bag, while is inflated in the rubber cloth bag of the present invention, not water-filling, without water in rubber cloth bag, while external water cannot enter Bag in, sealing hold-down mechanism will not corrosion, service life is long, and sealing effect is good.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the Dun Qiang of the present invention and the attachment structure schematic diagram of rubberized fabric;
Fig. 3 is the rubberized fabric both sides of the present invention and the attachment structure schematic diagram of the dam foundation;
Fig. 4 is the compression cylinder structure diagram of the present invention;
The nut that Fig. 5 is the present invention puts loosening pressed mechanism structure schematic diagram;
Fig. 6 is the moving trolley structure diagram of the present invention.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Embodiment one:As shown in figures 1 to 6, a kind of Novel rubber dam body, including being located at riverbed lower concrete structure The dam foundation 2, rubberized fabric 3 and the pier wall 1 being disposed on the dam foundation, the Dun Qiang both sides and the dam foundation are embedded with several bolts 6, The rubberized fabric is fixed on by sealing hold-down mechanism on the dam foundation and Dun Qiang, and the sealing hold-down mechanism includes being sleeved on bolt Rubber gasket 10, be pressed on rubberized fabric and the compression cylinder being sleeved on bolt and the nut 7 being connect with bolt thread.
The compression cylinder is that vertical section is circular compression cylinder 8.
Described compression cylinder one end is equipped with groove, and another one end for compressing cylinder is equipped with the convex block with groove match, Segmentation press fitting is easy to operate, and the lower surface that cylinder is compressed both after being easily installed and crimping is located at same horizontal line, and docking compresses Sealing effect is good afterwards, will not stay some gaps.
The Dun Qiang is equipped with to be sleeved on the arc rubber seal on bolt.
The Dun Qiang is equipped with the curved tablet 4 for compressing rubberized fabric.
Spring pad is equipped between the nut and curved tablet.
Spring pad is equipped between the nut and compression cylinder.
Nut, which is equipped with, on the dam foundation and Dun Qiang puts loosening pressed mechanism.
The nut puts loosening pressed mechanism and includes being arranged on the spanner being sleeved on nut and be arranged on the dam foundation and dam The cylinder 14 of the hinged one end open of base, the cylinder is interior to be equipped with piston 13, and piston rod and the spanner of the piston pass through axis 11 Hinged, the piston rod 17 is equipped with strip groove 22, and teeth 15 are equipped in the strip groove, is equipped in the cylinder and tooth The matched pawl 16 of tooth.
Supporting positive cover 18 is equipped in the cylinder.
The cylinder body bottom is equipped with pine hair and switchs, after the contact of piston and pine hair switch, contact compression Song Fakai It closes connection alarm to power on, the formation of rubber dam operator on duty piston is reminded to arrive, i.e., not filling in can not move.
When the air pressure in rubber cloth bag is more than the air pressure in cylinder, piston movement drives piston rod movement band wrench by spiral shell Mother tightens, while pawl plays the role of preventing nut from loosening.The gas filled in cloth bag is more, and air pressure is bigger, and rubber cloth bag needs The better tightness wanted, therefore nut cannot more loosen, while cloth bag, under the action of hydraulic pressure, the air pressure in cloth bag increases, Piston driving spanner compresses nut.
The Dun Qiang is equipped with hinged hermatic door 5, and solenoid valve 9 is set on the hermatic door, and gas can only be from a sealing It is inflated in rubber cloth bag to another, the rubber cloth bag between pier wall can form single seal, in inflation, by electromagnetism Valve is opened, and seven rubber cloth bag air pressures are consistent, close solenoid valve, solenoid valve stuffiness at this time, and each rubber cloth bag can be formed Single seal is equipped with baroceptor 21 in each rubber cloth bag, after some rubber cloth bag gas leakage, air pressure sensing Device 21 transmits information to detection backstage, overhauls in time, what is more important by solenoid valve 9 can control one of one end or Multiple rubber cloth bag air pressures are less than the other end, discharge water convenient for rubber dam side, and it is strong that rubber dam adjusts the ability that discharges water.
A kind of seal construction method of Novel rubber dam body, includes the following steps,
4)Dust on the dam foundation and Dun Qiang is cleaned out, arc rubber gasket, the dam foundation two are set on the bolt of Dun Qiang both sides Rectangular rubber gasket is set on the bolt of side;
5)Moving trolley is placed on to one end of the dam foundation, rubberized fabric is placed in moving trolley, rubberized fabric one end is inwardly wound Curved tablet is sleeved on the bolt on Dun Qiang by rear enclosure on pier wall screw, is tightened nut and is compressed curved tablet, while will take Rubberized fabric in trolley both sides, which is inwardly wound, to be sleeved on the bolt of the dam foundation, will be compressed cylinder and is sleeved on bolt, and tightening nut will press Tight cylinder compresses, and moving trolley moves forward at this time, and the rubberized fabric of moving trolley both sides is inwardly wound to the bolt for being sleeved on the dam foundation On, cylinder will be compressed and be sleeved on bolt, steps be repeated alternatively until and the both sides of rubberized fabric are fully pressed against on the dam foundation, rubberized fabric end Portion is pressed on Dun Qiang;
6)Repeat step 2)Rubberized fabric between pier wall is installed;Hinged hermatic door is equipped on Dun Qiang, hermatic door is convenient Trolley passes through, while solenoid valve is equipped on hermatic door, convenient for detecting the rubber dam leakproofness between single pier wall.
The moving trolley 52 includes the Universal self-locking idler wheel 51 being arranged under car body and two that are arranged on car body two corners Rolling element 50, the intermediate rolling element of moving trolley top centre setting reduce frictional force, and driving motor driving can be used in trolley Driving wheel rotation drives moving trolley movement, mobile to save labour conveniently.
The vertical section of the rolling element is ellipse, reduces the abrasion to rubberized fabric.
The rubber dam construction method of the present invention is received the inside of the two of the rubberized fabric lateral dam foundations, while rubberized fabric both ends It inwardly receives, and passes through sealing compression and the surrounding of rubberized fabric is fixed on the dam foundation and Dun Qiang, sealing hold-down mechanism is located at rubberized fabric It in bag, while is inflated in the rubber cloth bag of the present invention, not water-filling, without water in rubber cloth bag, while external water cannot enter Bag in, sealing hold-down mechanism will not corrosion, service life is long, and sealing effect is good.
Embodiment two:As shown in figures 1 to 6, a kind of Novel rubber dam body, including being located at riverbed lower concrete structure The dam foundation 2, rubberized fabric 3 and the pier wall 1 being disposed on the dam foundation, the Dun Qiang both sides and the dam foundation are embedded with several bolts 6, The rubberized fabric is fixed on by sealing hold-down mechanism on the dam foundation and Dun Qiang, and the sealing hold-down mechanism includes being sleeved on bolt Rubber gasket 10, be pressed on rubberized fabric and the compression cylinder being sleeved on bolt and the nut 7 being connect with bolt thread.
The compression cylinder is that vertical section is circular compression cylinder 8.
Described compression cylinder one end is equipped with groove, and another one end for compressing cylinder is equipped with the convex block with groove match, Segmentation press fitting is easy to operate, and the lower surface that cylinder is compressed both after being easily installed and crimping is located at same horizontal line, and docking compresses Sealing effect is good afterwards, will not stay some gaps.
The Dun Qiang is equipped with to be sleeved on the arc rubber seal on bolt.
The Dun Qiang is equipped with the curved tablet 4 for compressing rubberized fabric.
Spring pad is equipped between the nut and curved tablet.
Spring pad is equipped between the nut and compression cylinder.
Nut, which is equipped with, on the dam foundation and Dun Qiang puts loosening pressed mechanism.
The nut puts loosening pressed mechanism and includes being arranged on the spanner being sleeved on nut and be arranged on the dam foundation and dam The cylinder 14 of the hinged one end open of base, the cylinder is interior to be equipped with piston 13, and piston rod and the spanner of the piston pass through axis 11 Hinged, the piston rod 17 is equipped with strip groove 22, and teeth 15 are equipped in the strip groove, is equipped in the cylinder and tooth The matched pawl 16 of tooth.
The cylinder body bottom is equipped with bleeder pipe 12, and the bleeder pipe is connect by high-pressure air pipe with the gas outlet on the dam foundation, Gas outlet is in communication with the outside across the dam foundation.
Supporting positive cover 18 is equipped in the cylinder.
The cylinder body bottom is equipped with pine hair and switchs, after the contact of piston and pine hair switch, contact compression Song Fakai It closes connection alarm to power on, the formation of rubber dam operator on duty piston is reminded to arrive, i.e., not filling in can not move.
Meanwhile cylinder body bottom is equipped with caulking gum body 19, pine hair switch 20 is arranged on caulking gum body, when the above-mentioned shape of appearance Condition is that on the one hand piston plays sealing function on the other hand rubber bodies, will not gas leakage by the sealing channel blockage in rubber bodies.
When the air pressure in rubber cloth bag is more than the air pressure in cylinder, piston movement drives piston rod movement band wrench by spiral shell Mother tightens, while pawl plays the role of preventing nut from loosening.The gas filled in cloth bag is more, and air pressure is bigger, and rubber cloth bag needs The better tightness wanted, therefore nut cannot more loosen, while cloth bag, under the action of hydraulic pressure, the air pressure in cloth bag increases, Piston driving spanner compresses nut.Gas in the cylinder of embodiment 2 can be discharged into discouraged after piston compression by bleeder pipe Pipe, and then be discharged into outside cloth bag by gas outlet, gas outlet is connected across the dam foundation with outside air, and high-pressure air pipe can be to pass through rubber Cloth, the week of high-pressure air pipe surveys to be tightly connected with rubberized fabric, and the gap that gas will not be between high-pressure air pipe and cloth bag passes through, in this way Gas in cylinder is the same can to discharge cloth bag, and without the installation gas outlet that drills on the dam foundation again, cost of investment is low.The dam foundation is equipped with Limited post for stopping spanner, prevents pressure from crossing senior general's nut and twists stripped thread.Bolt is equipped with screw hole, and screw hole is equipped with and prevents The spiral shell disk that spanner skids off, spiral shell disk include screw rod and are arranged on screw rod to stop the disk body of spanner.
The Dun Qiang is equipped with hinged hermatic door 5, and solenoid valve 9 is set on the hermatic door, and gas can only be from a sealing It is inflated in rubber cloth bag to another, the rubber cloth bag between pier wall can form single seal, in inflation, by electromagnetism Valve is opened, and seven rubber cloth bag air pressures are consistent, close solenoid valve, solenoid valve stuffiness at this time, and each rubber cloth bag can be formed Single seal is equipped with baroceptor 21 in each rubber cloth bag, after some rubber cloth bag gas leakage, air pressure sensing Device 21 transmits information to detection backstage, overhauls in time, what is more important by solenoid valve 9 can control one of one end or Multiple rubber cloth bag air pressures are less than the other end, discharge water convenient for rubber dam side, and it is strong that rubber dam adjusts the ability that discharges water.
A kind of seal construction method of Novel rubber dam body, includes the following steps,
7)Dust on the dam foundation and Dun Qiang is cleaned out, arc rubber gasket, the dam foundation two are set on the bolt of Dun Qiang both sides Rectangular rubber gasket is set on the bolt of side;
8)Moving trolley is placed on to one end of the dam foundation, rubberized fabric is placed in moving trolley, rubberized fabric one end is inwardly wound Curved tablet is sleeved on the bolt on Dun Qiang by rear enclosure on pier wall screw, is tightened nut and is compressed curved tablet, while will take Rubberized fabric in trolley both sides, which is inwardly wound, to be sleeved on the bolt of the dam foundation, will be compressed cylinder and is sleeved on bolt, and tightening nut will press Tight cylinder compresses, and moving trolley moves forward at this time, and the rubberized fabric of moving trolley both sides is inwardly wound to the bolt for being sleeved on the dam foundation On, cylinder will be compressed and be sleeved on bolt, steps be repeated alternatively until and the both sides of rubberized fabric are fully pressed against on the dam foundation, rubberized fabric end Portion is pressed on Dun Qiang;
9)Repeat step 2)Rubberized fabric between pier wall is installed;Hinged hermatic door is equipped on Dun Qiang, hermatic door is convenient Trolley passes through, while solenoid valve is equipped on hermatic door, convenient for detecting the rubber dam leakproofness between single pier wall.
The rubber dam construction method of the present invention is received the inside of the two of the rubberized fabric lateral dam foundations, while rubberized fabric both ends It inwardly receives, and passes through sealing compression and the surrounding of rubberized fabric is fixed on the dam foundation and Dun Qiang, sealing hold-down mechanism is located at rubberized fabric It in bag, while is inflated in the rubber cloth bag of the present invention, not water-filling, without water in rubber cloth bag, while external water cannot enter Bag in, sealing hold-down mechanism will not corrosion, service life is long, and sealing effect is good.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, this field is common Other modifications or equivalent replacement that technical staff makes technical scheme of the present invention, without departing from technical solution of the present invention Spirit and scope, be intended to be within the scope of the claims of the invention.

Claims (10)

1. a kind of Novel rubber dam body, including being located at the dam foundation of riverbed lower concrete structure, rubberized fabric and being disposed on Dun Qiang on the dam foundation, the Dun Qiang both sides and the dam foundation are embedded with several bolts, it is characterised in that:The rubberized fabric passes through close Envelope hold-down mechanism is fixed on the dam foundation and Dun Qiang, and the sealing hold-down mechanism includes the rubber gasket being sleeved on bolt, pressure On rubberized fabric and it is sleeved on the compression cylinder on bolt and the nut being connect with bolt thread.
2. Novel rubber dam body as described in claim 1, it is characterised in that:It is circular that the compression cylinder, which is vertical section, Compress cylinder.
3. Novel rubber dam body as claimed in claim 2, it is characterised in that:Described compression cylinder one end is equipped with groove, Another one end for compressing cylinder is equipped with the convex block with groove match.
4. Novel rubber dam body as claimed in claim 3, it is characterised in that:The Dun Qiang is equipped with to be sleeved on bolt On arc rubber seal.
5. Novel rubber dam body as claimed in claim 4, it is characterised in that:The Dun Qiang is equipped with to compress rubberized fabric Curved tablet.
6. Novel rubber dam body as claimed in claim 5, it is characterised in that:Spring is equipped between the nut and curved tablet Pad.
7. Novel rubber dam body as claimed in claim 6, it is characterised in that:Bullet is equipped between the nut and compression cylinder Spring pad.
8. a kind of seal construction method of Novel rubber dam body, it is characterised in that:Include the following steps,
1)Dust on the dam foundation and Dun Qiang is cleaned out, arc rubber gasket, the dam foundation two are set on the bolt of Dun Qiang both sides Rectangular rubber gasket is set on the bolt of side;
2)Moving trolley is placed on to one end of the dam foundation, rubberized fabric is placed in moving trolley, rubberized fabric one end is inwardly wound Curved tablet is sleeved on the bolt on Dun Qiang by rear enclosure on the bolt of Dun Qiang, is tightened nut and is compressed curved tablet, simultaneously will The inside winding of rubberized fabric for riding over trolley both sides is sleeved on the bolt of the dam foundation, will be compressed cylinder and is sleeved on bolt, tightening nut will It compresses cylinder to compress, moving trolley moves forward at this time, and the rubberized fabric of moving trolley both sides is inwardly wound to the spiral shell for being sleeved on the dam foundation On bolt, cylinder will be compressed and be sleeved on bolt, cylinder compression will be compressed by tightening nut, steps be repeated alternatively until the two of rubberized fabric Side is fully pressed against on the dam foundation, and rubberized fabric end is pressed on Dun Qiang;
3)Repeat step 2)Rubberized fabric between pier wall is installed.
9. a kind of seal construction method of Novel rubber dam body as claimed in claim 8, it is characterised in that:The movement is small Vehicle includes the Universal self-locking idler wheel being arranged under car body and two rolling elements for being arranged on vehicle body upper portion.
10. a kind of seal construction method of Novel rubber dam body as claimed in claim 9, it is characterised in that:The rolling The vertical section of body is ellipse.
CN201711217365.XA 2017-11-28 2017-11-28 Sealing construction method for rubber dam body Expired - Fee Related CN108179729B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711217365.XA CN108179729B (en) 2017-11-28 2017-11-28 Sealing construction method for rubber dam body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711217365.XA CN108179729B (en) 2017-11-28 2017-11-28 Sealing construction method for rubber dam body

Publications (2)

Publication Number Publication Date
CN108179729A true CN108179729A (en) 2018-06-19
CN108179729B CN108179729B (en) 2021-07-09

Family

ID=62545444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711217365.XA Expired - Fee Related CN108179729B (en) 2017-11-28 2017-11-28 Sealing construction method for rubber dam body

Country Status (1)

Country Link
CN (1) CN108179729B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104059A (en) * 2018-01-09 2018-06-01 高祎轩 A kind of barrage
CN110485380A (en) * 2019-09-06 2019-11-22 黄芳 A kind of river channel ecology improvement air bag regulating barrage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11200347A (en) * 1998-01-13 1999-07-27 Bridgestone Corp Rubber dam
CN2512819Y (en) * 2001-12-14 2002-09-25 沈阳普利司通有限公司 Dock and breakwater sinkbox seam deforming sealing device
CN101063304A (en) * 2006-04-28 2007-10-31 株式会社裕一技研 Flexible plate rubber dam
CN202416264U (en) * 2012-01-08 2012-09-05 何琦 Rubber dam
CN204282041U (en) * 2014-10-21 2015-04-22 扬州市三诚机械制造有限公司 Universal fabric guide roll
CN207537959U (en) * 2017-11-16 2018-06-26 陈松 A kind of rubber dam dam body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11200347A (en) * 1998-01-13 1999-07-27 Bridgestone Corp Rubber dam
CN2512819Y (en) * 2001-12-14 2002-09-25 沈阳普利司通有限公司 Dock and breakwater sinkbox seam deforming sealing device
CN101063304A (en) * 2006-04-28 2007-10-31 株式会社裕一技研 Flexible plate rubber dam
CN202416264U (en) * 2012-01-08 2012-09-05 何琦 Rubber dam
CN204282041U (en) * 2014-10-21 2015-04-22 扬州市三诚机械制造有限公司 Universal fabric guide roll
CN207537959U (en) * 2017-11-16 2018-06-26 陈松 A kind of rubber dam dam body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104059A (en) * 2018-01-09 2018-06-01 高祎轩 A kind of barrage
CN110485380A (en) * 2019-09-06 2019-11-22 黄芳 A kind of river channel ecology improvement air bag regulating barrage

Also Published As

Publication number Publication date
CN108179729B (en) 2021-07-09

Similar Documents

Publication Publication Date Title
CN103074870B (en) Novel rubber dam body
CN108179729A (en) A kind of Novel rubber dam body
CN207537959U (en) A kind of rubber dam dam body
CN109594903A (en) One kind can store inflatable waterwall
CN108252270A (en) A kind of barrage construction trolley and rapid constructing method
CN108457244A (en) A kind of special work car, rubber dam and rubber dam construction method
CN108104059A (en) A kind of barrage
CN108330906A (en) A kind of rubber dam construction moving trolley, rubber dam and construction method
CN108360455A (en) A kind of device, rubber dam and construction method sprawled convenient for rubber dam cloth
CN208235461U (en) A kind of water gate sealing device
CN207018558U (en) Automatically cleaning bidirectional compensating cinder valve
CN211596667U (en) Honeycomb type rubber air bag
CN108612204B (en) Inflatable waterproof sealing device
CN208204321U (en) A kind of petroleum pipeline hole for robbing temporary plugging mechanism
CN109162252B (en) Sea filling unit capable of adjusting internal water pressure
CN109440742B (en) Sand flushing brake device
CN2450265Y (en) Pneumatic hose water stopping device
CN221032755U (en) Pneumatic shield-shaped gate for coal mine main roadway
CN2266269Y (en) Agricultural water absorption pipe
CN201817857U (en) Dual-seal fire hydrant
CN215136357U (en) Fire pump adapter with high sealing performance
CN113818553B (en) Intelligent control efficient sealing hydraulic rotary weir gate
CN110409561A (en) A kind of pneumatic type underground water closing pumping and filling device
WO2021212607A1 (en) Movable double-cavity water blocking dam
CN215172411U (en) Self-sealing stop valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Haiyan

Inventor after: Cai Xunxing

Inventor after: Zhao Qing

Inventor after: Cao Yong

Inventor after: Zhang Ruihai

Inventor after: Liu Yang

Inventor after: Bao Ruchao

Inventor after: Li Shuhua

Inventor after: Chen Song

Inventor after: Bian Chungeng

Inventor after: Zhu Huawei

Inventor before: Li Shuhua

Inventor before: Chen Song

Inventor before: Bian Chungeng

Inventor before: Zhu Huawei

Inventor before: Cai Xunxing

Inventor before: Zhao Qing

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20210623

Address after: 461200 houhezhai village, Zhangqiao Township, Yanling County, Xuchang City, Henan Province

Applicant after: Liu Haiyan

Address before: 473000 Baihe rubber dam management office, No. 39 Binhe Road, Henan, Nanyang, Nanyang

Applicant before: Li Shuhua

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210709

CF01 Termination of patent right due to non-payment of annual fee