CN108178040A - Multiple elevator power failure emergency method, device, computer equipment and storage medium - Google Patents

Multiple elevator power failure emergency method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN108178040A
CN108178040A CN201711309162.3A CN201711309162A CN108178040A CN 108178040 A CN108178040 A CN 108178040A CN 201711309162 A CN201711309162 A CN 201711309162A CN 108178040 A CN108178040 A CN 108178040A
Authority
CN
China
Prior art keywords
elevator
storage device
energy storage
electricity
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711309162.3A
Other languages
Chinese (zh)
Other versions
CN108178040B (en
Inventor
陈�峰
王鹏
黄立明
仲兆峰
钟海峰
黄诗涌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Technology Guangzhou Co Ltd
Original Assignee
Hitachi Building Technology Guangzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Technology Guangzhou Co Ltd filed Critical Hitachi Building Technology Guangzhou Co Ltd
Priority to CN201711309162.3A priority Critical patent/CN108178040B/en
Publication of CN108178040A publication Critical patent/CN108178040A/en
Application granted granted Critical
Publication of CN108178040B publication Critical patent/CN108178040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/027Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions to permit passengers to leave an elevator car in case of failure, e.g. moving the car to a reference floor or unlocking the door

Landscapes

  • Elevator Control (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The present invention relates to a kind of multiple elevator power failure emergency method, device, computer equipment and storage mediums.A kind of multiple elevator power failure emergency method, includes the following steps:When abnormal electrical power supply, the status information of each elevator is acquired, obtains the information about power for the energy storage device that each elevator shares, according to the status information of each elevator and the information about power of energy storage device, it determines the running priority grade sequence of each elevator, is run according to each elevator of running priority grade sequential control.This programme is by acquiring the status information of each elevator, obtain the information about power for the energy storage device that each elevator shares, the running priority grade sequence of each elevator is determined according to the information about power of the status information of each elevator and energy storage device, is run according to each elevator of the running priority grade sequential control of elevator.This programme realizes the real-time Communication for Power with each elevator using a power failure cabinet, realizes that each elevator selects layer to stop automatically by controlling, the quantity of power failure cabinet used is few, realizes flexible configuration.

Description

Multiple elevator power failure emergency method, device, computer equipment and storage medium
Technical field
The present invention relates to elevator technology field, more particularly to a kind of multiple elevator power failure emergency method, device, computer Equipment and storage medium.
Background technology
With being continuously increased for skyscraper, elevator has become one of indispensable tool in people's life.But by In the unstable of line voltage, when blackout condition occurs in burst, elevator can be out of service, it may appear that elevator malfunction event is made Into very big security risk, the rescue apparatus during stoppage of power supply of elevator comes into being, and the power failure that elevator can be all configured in existing elevator is met an urgent need Device.
Existing elevator rescue apparatus during stoppage of power supply generally comprises battery, charging module, outage detection module, switching control mould Block, boost module, inverter module etc..Existing elevator rescue apparatus during stoppage of power supply situ configuration is all that a power failure cabinet matches one on the market Platform elevator control cabinet, when network voltage is abnormal, equal failure of breaking occurs, power failure cabinet switching control module is switched to battery powered Pattern disconnects network voltage input, is powered by battery by boost module, inverter module to elevator control cabinet, so as to fulfill stopping Under electrician's condition, lift car, which can be realized, steady to stop to stop nearby and opens car and left by passenger safety.This configuration The quantity of power failure cabinet that mode needs is more, and flexibility is poor.
Invention content
Based on this, it is necessary to the quantity of power failure cabinet needed for existing elevator rescue apparatus during stoppage of power supply configuration mode is more, The problem of flexibility is poor provides a kind of multiple elevator power failure emergency method, device, computer equipment and storage medium.
A kind of multiple elevator power failure emergency method, includes the following steps:
When abnormal electrical power supply, the status information of each elevator is acquired;
Obtain the information about power for the energy storage device that each elevator shares;
According to the status information of each elevator and the information about power of energy storage device, the running priority grade sequence of each elevator is determined;
According to each elevator operation of running priority grade sequential control.
In one of the embodiments, according to the status information of each elevator and the information about power of energy storage device, each electricity is determined The step of running priority grade sequence of ladder, includes:
The electricity of energy storage device according to needed for determining the status information of each elevator;
The electricity for the energy storage device that each elevator is shared and the electricity of required energy storage device are compared;
When the electricity for the energy storage device that each elevator shares is more than the electricity of required energy storage device, according to the state of each elevator The priority orders of information determine the running priority grade sequence of each elevator;
When the electricity for the energy storage device that each elevator shares is less than the electricity of required energy storage device, according to the state of each elevator Information determines each elevator operation institute electricity demand sequence, and the running priority of the determining each elevator of institute's electricity demand sequence is run according to each elevator Grade sequence.
The status information of each elevator includes number, child old man in car weight amount, car in one of the embodiments, Number of women accounting and traction acc power, the priority orders of the status information of each elevator are followed successively by number in car, Lao Ren little Child's number of women accounting, car weight amount, the number of units of traction acc power and elevator.
Determine that the operation of each elevator is excellent according to the priority orders of the status information of each elevator in one of the embodiments, The step of first grade sequence, includes:
According to the priority orders of the status information of each elevator, based on comparison principle step by step, the operation for calculating each elevator is excellent First grade sequence, makes elevator run to default specific flat bed.
The step of each elevator operation institute electricity demand sequence is determined according to the status information of each elevator in one of the embodiments, Suddenly include:
The number of plies is run needed for electricity and each elevator according to needed for the status information of each elevator determines each elevator operation individual layer;
The operation number of plies needed for electricity and each elevator according to needed for each elevator runs individual layer is to each elevator operation institute electricity demand Sequence obtains each elevator operation institute electricity demand sequence.
It is further included before the step of status information of acquisition elevator in one of the embodiments,:
The working condition of network voltage is monitored, when monitoring network voltage exception, output acquires the state letter of each elevator The instruction of breath.
A kind of multiple elevator rescue apparatus during stoppage of power supply includes:
Acquisition module, for when abnormal electrical power supply, acquiring the status information of each elevator;
Acquisition module, for obtaining the information about power for the energy storage device that each elevator shares;
Processing module determines the operation of each elevator for the status information according to each elevator and the information about power of energy storage device Priority orders;
Transmission module, for being run according to each elevator of running priority grade sequential control.
Multiple elevator rescue apparatus during stoppage of power supply further includes monitoring modular in one of the embodiments, and monitoring modular is used to supervise The working condition of network voltage is surveyed, when monitoring network voltage exception, the instruction of the status information of output acquisition elevator.
A kind of computer equipment, including processor and memory, memory is stored with computer program, computer program quilt When processor performs so that processor performs the step of multiple elevator power failure emergency method.
A kind of computer readable storage medium is stored with computer program, when computer program is executed by processor so that Processor performs the step of multiple elevator power failure emergency method.
Above-mentioned multiple elevator power failure emergency method, device, computer equipment and storage medium, by the shape for acquiring each elevator State information obtains the information about power for the energy storage device that each elevator shares, according to the status information of each elevator and the electricity of energy storage device Amount information determines the running priority grade sequence of each elevator, is run according to each elevator of the running priority grade sequential control of elevator.We Case realizes the real-time Communication for Power with each elevator using a power failure cabinet, realizes that each elevator selects layer to stop automatically by controlling, uses The quantity of power failure cabinet is few, realizes flexible configuration.
Description of the drawings
Fig. 1 is the flow chart of the one of embodiment of elevator power failure emergency method of the present invention;
Fig. 2 is the flow chart of the one of embodiment of elevator power failure emergency method of the present invention;
Fig. 3 is the structure diagram of the one of embodiment of elevator rescue apparatus during stoppage of power supply of the present invention;
Fig. 4 is the structure diagram of the one of embodiment of elevator rescue apparatus during stoppage of power supply of the present invention.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the object, technical solution and advantage for making the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, and It is not used in restriction the application.
As shown in Figure 1, in one embodiment, a kind of multiple elevator power failure emergency method includes the following steps:
S200:When abnormal electrical power supply, the status information of each elevator is acquired.
Specifically, network voltage is connected to power failure cabinet input terminal by air switch, the output of power failure cabinet terminates to elevator master Control cabinet input terminal, elevator control cabinet output termination traction machine.When network voltage power supply is normal, network voltage passes through in power failure cabinet Switching control module and elevator control cabinet and load directly forming circuit, system worked well.Abnormal electrical power supply refers to power grid electricity Pressure power supply goes wrong, and makes elevator power failure, and network voltage power supply goes wrong including the failures such as network voltage power-off, lacuna, hair During raw abnormal electrical power supply, power failure cabinet can cut off power grid current supply circuit, be carried out by the energy storage device of power failure cabinet to the multiple elevator of institute's band Power supply rescue.
Further, power failure cabinet can communicate with each elevator control cabinet, and when elevator power failure, each elevator control cabinet is first The status information of each elevator is acquired, power failure cabinet with each elevator control cabinet by being communicated to obtain the status information of each elevator.It examines Consider the maintenance to power failure cabinet working condition, other than acquiring the status information of each elevator, can also acquire energy storage device in real time Status information and operation working condition data, the frequency of use of power failure cabinet and failure frequency, at these data Reason and analysis, record power failure cabinet most probable problem in operation irregularity, convenient for improving the work of maintenance protection personnel Efficiency, the failure rate for reducing power failure cabinet.
S400:Obtain the information about power for the energy storage device that each elevator shares.
Specifically, energy storage device includes charging module and battery, charging module is taken by the dc bus after power grid rectification Electricity can select two-phase or three-phase to carry out rectification, and rectifier uses uncontrollable rectification or controlled rectification, be not limited to use and divide Vertical device or rectification module.The power unit of charging module uses flyback topologies, can also be required to select it according to power grade His pattern using high frequency transformer, reduces volume, and the direct current that 56V is exported after rectification charges the battery, according to the appearance of single battery Amount and the quantity of series connection, the direct current output of 56V are adjustable into the DC output voltage needed.Live part is divided into constant current punching and floats Two kinds of functions to be rushed, are divided by the voltage value for sampling charging current, the value after partial pressure is compared with two stage comparator, point Two kinds of working conditions of constant current punching or floating charge are not switched to, while have corresponding indicator light to indicate both charged states.
According under power failure, energy band carries the specification of elevator, the battery for continuing the electric time, continuing electrical distance and selecting different capabilities With the cell number of series connection as the battery in energy storage device, the battery in energy storage device can be lead-acid battery, but be not limited to lead Sour battery.
Further, energy storage device can select super capacitor to be powered.Super capacitor is short with the charging time, charge and discharge Often, the advantages that long lifespan, discharge current is big, power type super electricity can be selected according to working condition requirement and customer demand in electricity Hold and energy type super capacitor.
S600:According to the status information of each elevator and the information about power of energy storage device, the running priority grade of each elevator is determined Sequentially.
Specifically, power failure cabinet is calculated each elevator by analysis and runs individual layer first according to the status information of each elevator Required power and each elevator need to run the number of plies, and power and each elevator need to run the number of plies and calculate according to needed for each elevator runs individual layer Then each elevator institute electricity demand compares the summation of each elevator institute electricity demand with the electricity of energy storage device, when energy storage device Electricity is sufficient, when disclosure satisfy that the summation of each elevator institute electricity demand, according to the status information of each elevator preset in power failure cabinet Priority orders are ranked up each elevator, determine the running priority grade sequence of each elevator.When energy storage device not enough power supply with When supporting all elevator stable operations, each elevator is ranked up according to each elevator institute electricity demand number, determines the fortune of each elevator Row major grade sequence utilizes the electricity in energy storage device, the fortune for each elevator that reasonably sorts to the greatest extent in this way Row major grade sequence.
S800:According to each elevator operation of running priority grade sequential control.
Specifically, power failure cabinet communicates with elevator control cabinet, instructed accordingly to elevator according to running priority grade Sequential output Control cabinet, elevator control cabinet realize corresponding control function according to the instruction received.Switching control mould is further included in power failure cabinet Block, inverter module and boost module, they control each elevator to run with energy storage device collective effect.
Further, isolated form or non-isolation type topology can be selected in boost module, and high frequency can be used for isolated form topology Type or low frequency type, in the present embodiment power failure cabinet using isolated form low frequency scheme, but not limited to this kind topology.
Inverter module can be selected discrete device or IPM modules, the power tube in the present embodiment to open electric current bigger, can Three metal-oxide-semiconductors is selected to carry out parallel connection as a bridge arm, each bridge arm is designed with flowing unit, voltage regulation unit and absorb single Member, current balance type when guarantee bridge arm power tube is opened, does not allow the electric current that a single tube flows through excessive and burning out pipe leads to short circuit Or it opens by mistake logical.
Switching control module belongs to execution unit, performs handover operation, is divided into power failure cabinet powering mode and power grid power supply mould Formula.When network voltage exception, it can cut off power grid current supply circuit, be closed power failure cabinet current supply circuit, realize the rescue of power failure cabinet Function rests in the flat bed of needs with allowing elevator intelligent, opens car door, passenger safety is allowed to leave car.
Above-mentioned multiple elevator power failure emergency method by acquiring the status information of each elevator, obtains the storage that each elevator shares The information about power of energy device determines the running priority of each elevator according to the information about power of the status information of each elevator and energy storage device Grade sequence is run according to each elevator of the running priority grade sequential control of elevator.This programme is realized and each electricity using a power failure cabinet The real-time Communication for Power of ladder realizes that each elevator selects layer to stop automatically by controlling, and the quantity of power failure cabinet used is few, and realization is flexibly matched It puts.
S600 is determined according to the status information of each elevator and the information about power of energy storage device in one of the embodiments, The step of running priority grade sequence of each elevator, includes:
S620:The electricity of energy storage device according to needed for determining the status information of each elevator.
Specifically, power failure cabinet is calculated each elevator by analysis and runs individual layer first according to the status information of each elevator Required power and each elevator need to run the number of plies, and power and each elevator need to run the number of plies and calculate according to needed for each elevator runs individual layer Then the summation of each elevator institute electricity demand is added by each elevator institute electricity demand, obtain the electricity of required energy storage device.
S640:The electricity for the energy storage device that each elevator is shared and the electricity of required energy storage device are compared.
Specifically, power failure cabinet monitors the electricity of energy storage device in real time, when network voltage exception, power failure cabinet is started to work, The electricity of required energy storage device being calculated in the electricity and S620 of the energy storage device monitored is compared, by comparing As a result, come perform in next step operate.
S660:When the electricity for the energy storage device that each elevator shares is more than the electricity of required energy storage device, according to each elevator Status information priority orders determine each elevator running priority grade sequence.
Specifically, the electricity of energy storage device represents that electricity is sufficient at this time, can give institute more than the electricity of required energy storage device Some elevator supplies, according to the priority orders of the status information of each elevator determine each elevator running priority grade sequence after just Elevator can be made to run to specific flat bed successively according to this sequence.
S680:When the electricity for the energy storage device that each elevator shares is less than the electricity of required energy storage device, according to each elevator Status information determine each elevator operation institute electricity demand sequence, the fortune that institute's electricity demand sequence determines each elevator is run according to each elevator Row major grade sequence.
Specifically, the electricity of energy storage device represents not enough power supply at this time less than the electricity of required energy storage device, power failure cabinet is not Institute's electricity demand sequence can will be run according to each elevator at this time and determines that the running priority grade of each elevator is suitable to all elevator supplies Sequence makes elevator run to specific flat bed successively according still further to this sequence.
Further, power failure cabinet can run institute's electricity demand according to each elevator and obtain best point by calculating analysis at this time With mode.For example, when network voltage exception, tetra- elevator work of the control of power failure cabinet A, B, C, D, according to collected letter Breath A elevators institute electricity demand is that 15%, the B elevators institute electricity demand of electricity when energy storage device is full electric is electricity when energy storage device is full electric 23%, C elevator institute electricity demand are that 28%, the D elevators institute electricity demand of electricity when energy storage device is full electric is electricity when energy storage device is full electric The 20% of amount, at this time according to monitoring data, the 71% of electricity, passes through analysis meter when remaining electricity be full electric in energy storage device It calculates, remaining electricity can just make B elevators, C elevators and D elevators run to specific flat bed in energy storage device at this time, can be excellent First this three elevators are rescued in selection.
The status information of each elevator includes number, child old man in car weight amount, car in one of the embodiments, Number of women accounting and traction acc power, the priority orders of the status information of each elevator are followed successively by number in car, Lao Ren little Child's number of women accounting, car weight amount, the number of units of traction acc power and elevator.
Specifically, the life security of passenger is primary, have a power failure when rescuing in a state that elevator is controllable, first, protect It demonstrate,proves most passenger safeties and leaves car;Secondly, the principle based on protection child old man women, in the premise of equal patronage Under, preferentially rescue the ladder that they take;Then, the loading capacity of car only influences to rescue speed, the rescue of the light needs of loading capacity Time is short, and in the case that other conditions are identical, preferential rescue needs time short elevator;Then, the configuration one of traction acc power As can be more than nominal load, such as 120% nominal load, if elevator nominal load capacity 1000KG, traction machine bad working environments Under can take 1200KG to, so under not overweight working condition its priority be less than loading capacity.Finally, in energy storage device electricity When measuring enough ladder while completing primary complete rescue, it can select to run the quantity of ladder simultaneously.
S660 determines the fortune of each elevator according to the priority orders of the status information of each elevator in one of the embodiments, The step of row major grade sequence, includes:
S662:According to the priority orders of the status information of each elevator, based on comparison principle step by step, the fortune of each elevator is calculated Row major grade sequence, makes elevator run to default specific flat bed.
Specifically, other than being based on comparison principle step by step, it is also contemplated that the distribution of crowd evacuation circuit carries out specific Analysis calculate.It will be illustrated by way of example below, it is assumed that when network voltage exception, there is 1,2,3,4, No. 5 elevator needs to rescue It helps.No. 1 25 people of terraced carrying, child old man women account for 10 people, loading capacity 1000KG, traction acc power 22KW.No. 2 terraced carryings 20 People, child old man women account for 15 people, loading capacity 1000KG, traction acc power 22KW.No. 3 20 people of terraced carrying, child old man women Account for 10 people, loading capacity 1200KG, traction acc power 37KW.No. 4 20 people of terraced carrying, child old man women account for 10 people, loading capacity 1500KG, traction acc power 37KW.No. 5 20 people of terraced carrying, child old man women account for 10 people, loading capacity 1500KG, traction machine work( Rate 55KW.The top priority of rescue is to ensure that most passengers leave safely car within the shortest time.According to priority orders: The child's old man number of women of number -2 car weight of accounting -3 traction of the amount -4 elevator number of units of acc power -5 in 1 car, first Compare number in car, what number was most in car is No. 1 ladder, so No. 1 terraced operation order is 1, then because of No. 2 ladders, 3 Number ladder, No. 4 ladders, number is equal in No. 5 terraced cars, based on comparison principle step by step, continues child old man in each elevator of comparison Women's number accounting, child's old man women's number accounting in No. 2 ladders is most at this time, so No. 2 terraced operation orders are 2, similarly may be used It must be left the operation order of three elevators.The sequence that elevator operation can finally be obtained is followed successively by No. 1 ladder -- No. 2 ladders -- No. 3 ladders -- 4 Ladder -- No. 5 ladders.The considerations of so-called crowd evacuation circuit distribution, is calculated by analyzing, and is made each ascending for elevator or is dropped to default spy Fixed flat bed refers to, based on public arena crowd evacuation purpose, that floor be made to be conducive to crowd evacuation.For example No. 1 ladder is parked in 5 buildings Extra exit, then No. 2 ladders can be parked in the extra exit of 3 buildings or 6 buildings, other number ladder is analogized, avoid have a power failure rescue when crowd Generate it is intensive it is panic, the safety accidents such as trample.
S680 determines each elevator operation institute electricity demand sequence according to the status information of each elevator in one of the embodiments, The step of include:
S682:Operation needed for electricity and each elevator according to needed for the status information of each elevator determines each elevator operation individual layer The number of plies.
Specifically, number, car weight amount and traction acc power determine respectively in car in the status information of elevator Elevator operation individual layer institute electricity demand, then according to elevator at this time where floor determine elevator needed for run the number of plies.
S684:The operation number of plies is to needed for the operation of each elevator needed for electricity and each elevator according to needed for each elevator runs individual layer Electricity sorts, and obtains each elevator operation institute electricity demand sequence.
S200 is further included before acquiring the step of status information of elevator in one of the embodiments,:
S100:The working condition of network voltage is monitored, when monitoring network voltage exception, output acquires the shape of each elevator The instruction of state information.
Specifically, power failure cabinet can monitor the working condition of network voltage, when monitoring network voltage aberrant continuation 3 seconds, The contactor of power grid and the direct current supply circuit of elevator control cabinet is disconnected, is closed by inverter module to elevator control cabinet current supply circuit Contactor, output acquire the instruction of the status information of each elevator, are powered from power failure cabinet to each elevator control cabinet.Power failure cabinet is gone back simultaneously The on off state of internal each relay and contactor, various electric parameters of energy storage device etc. can be monitored.
Further, power failure cabinet can communicate with each elevator control cabinet because elevator control cabinet also have break down can Energy property, it is good to determine whether continuing to power by power failure cabinet by communicating with each elevator control cabinet.When power grid abnormal electrical power supply, open While dynamic power failure cabinet power supply, power failure cabinet sends out request run signal to each elevator control cabinet, if had a power failure in preset time Cabinet, which receives each elevator control cabinet, allows answer signal, then sets for electricity output count down time, starts output countdown, if It exports in count down time, power failure cabinet has received the shutdown answer signal of elevator control cabinet again, and elevator control cabinet is shut down and answered It answers signal and continues full 15S, then the cabinet that has a power failure stops the instruction that output acquires the status information of each elevator, and disconnects inverter module to electricity Then the contactor of terraced control cabinet current supply circuit recloses the contactor of power grid and the direct current supply circuit of elevator control cabinet.Have a power failure Cabinet is sent out to each elevator control cabinet in the request run signal predetermined time if confiscating allows answer signal, and power failure cabinet stops AC380 is exported, and disconnects contactor of the inverter module to elevator control cabinet current supply circuit, then recloses power grid and elevator master control The contactor of the direct current supply circuit of cabinet.This power failure cabinet judges that electric network fault is that (power grid is by having electricity to the one of power down by failing edge A process) judge to confirm rather than directly be confirmed by low and high level, it can greatly reduce the generation of power failure cabinet malfunction Rate.Wherein preset time oneself can be set as needed.
As shown in figure 3, in one embodiment, a kind of multiple elevator rescue apparatus during stoppage of power supply includes:
Acquisition module 100, for when abnormal electrical power supply, acquiring the status information of each elevator;
Acquisition module 200, for obtaining the information about power for the energy storage device that each elevator shares;
Processing module 300 determines each elevator for the status information according to each elevator and the information about power of energy storage device Running priority grade sequence;
Transmission module 400, for being run according to each elevator of running priority grade sequential control.
Specifically, when abnormal electrical power supply, acquisition module 100 acquires the status information of each elevator, and acquisition module 200 obtains respectively The information about power for the energy storage device that elevator shares, processing module 300 is according to the status information of each elevator and the electricity of energy storage device Information determines the running priority grade sequence of each elevator, and transmission module 400 is run according to each elevator of running priority grade sequential control.
Above-mentioned multiple elevator rescue apparatus during stoppage of power supply by acquiring the status information of each elevator, obtains the storage that each elevator shares The information about power of energy device determines the running priority of each elevator according to the information about power of the status information of each elevator and energy storage device Grade sequence is run according to each elevator of the running priority grade sequential control of elevator.This programme is realized and each electricity using a power failure cabinet The real-time Communication for Power of ladder realizes that each elevator selects layer to stop automatically by controlling, and the quantity of power failure cabinet used is few, and realization is flexibly matched It puts.
In one of the embodiments, as shown in figure 4, multiple elevator rescue apparatus during stoppage of power supply further includes monitoring modular 500, prison The working condition that module 500 is used to monitor network voltage is surveyed, when monitoring network voltage exception, the state of output acquisition elevator The instruction of information.
A kind of computer equipment, including processor and memory, memory is stored with computer program, computer program quilt When processor performs so that processor performs the step of multiple elevator power failure emergency method.
Computer equipment includes the processor, memory, network interface, input unit and the display that are connected by system bus Screen.Wherein, memory includes non-volatile memory medium and built-in storage.The non-volatile memory medium of the computer equipment is deposited Operating system is contained, can also be stored with computer program, when which is executed by processor, may be such that processor is realized The emergent method of multiple elevator power failure.Also computer program can be stored in the built-in storage, the computer program is by processor During execution, it may be such that processor performs the emergent method of multiple elevator power failure.The display screen of computer equipment can be liquid crystal Display screen or electric ink display screen, the input unit of computer equipment can be the touch layers covered on display screen, can also It is the button set on computer equipment shell, trace ball or Trackpad, can also be external keyboard, Trackpad or mouse Deng.It will be appreciated by those skilled in the art that above structure be only with the relevant part-structure of application scheme, form pair The restriction for the computer equipment that application scheme is applied thereon, specific computer equipment can include than shown in figure more More or less components either combines certain components or is arranged with different components.
The device that the multiple elevator power failure that the application provides in one of the embodiments, is met an urgent need can be implemented as a kind of meter The form of calculation machine program, computer program can be run on a computing device.Composition can be stored in the memory of computer equipment The multiple elevator has a power failure each program module of emergent device, for example, acquisition module shown in Fig. 3 100, acquisition module 200, Processing module 300 and transmission module 400.The computer program that each program module is formed causes processor to perform in this specification Step in the method that the multiple elevator power failure of each embodiment of the application of description is met an urgent need.
For example, computer equipment can pass through the acquisition module 100 in multiple elevator rescue apparatus during stoppage of power supply as shown in Figure 3 Perform step S200, acquisition module 200 performs step S400, processing module 300 performs step S600 and transmission module 400 performs Step S800.
The emergent computer equipment of above-mentioned multiple elevator power failure, by acquiring the status information of each elevator, obtains each elevator The information about power of shared energy storage device determines each elevator according to the information about power of the status information of each elevator and energy storage device Running priority grade sequence is run according to each elevator of the running priority grade sequential control of elevator.This programme is real using a power failure cabinet Now with the real-time Communication for Power of each elevator, realize that each elevator selects layer to stop automatically by controlling, the quantity of power failure cabinet used is few, realizes Flexible configuration.
A kind of computer readable storage medium is stored with computer program, when computer program is executed by processor so that Processor performs the step of multiple elevator power failure emergency method.
One of ordinary skill in the art will appreciate that it realizes complete in the emergent method of above-described embodiment multiple elevator power failure Portion or part flow are relevant hardware can be instructed to complete by computer program, and the program can be stored in one In non-volatile computer read/write memory medium, the program is when being executed, it may include as the power failure of above-mentioned multiple elevator is emergent The flow of each embodiment of method.Wherein, used in each embodiment provided herein to memory, storage, number According to any reference of library or other media, non-volatile and/or volatile memory may each comprise.Nonvolatile memory can wrap Include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include random access memory (RAM) or external cache.Make To illustrate rather than limiting to, RAM is available in many forms, such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) directly RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and Memory bus dynamic ram (RDRAM) etc..
The emergent computer readable storage medium of above-mentioned multiple elevator power failure, by acquiring the status information of each elevator, is obtained The information about power of energy storage device that each elevator shares is taken, is determined according to the information about power of the status information of each elevator and energy storage device The running priority grade sequence of each elevator, runs according to each elevator of the running priority grade sequential control of elevator.This programme uses one Power failure cabinet realizes the real-time Communication for Power with each elevator, realizes that each elevator selects layer to stop automatically by controlling, the number of power failure cabinet used Amount is few, realizes flexible configuration.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that those of ordinary skill in the art are come It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of multiple elevator power failure emergency method, which is characterized in that include the following steps:
When abnormal electrical power supply, the status information of each elevator is acquired;
Obtain the information about power of energy storage device that each elevator shares;
According to the status information of each elevator and the information about power of the energy storage device, the running priority of each elevator is determined Grade sequence;
According to each elevator operation of the running priority grade sequential control.
2. multiple elevator power failure emergency method according to claim 1, which is characterized in that described according to each elevator The step of information about power of status information and the energy storage device, the running priority grade sequence for determining each elevator, includes:
The electricity of energy storage device according to needed for determining the status information of each elevator;
The electricity of the electricity and the required energy storage device of the energy storage device that each elevator is shared is compared;
When electricity of the electricity of energy storage device that each elevator shares more than the required energy storage device, according to each institute The priority orders for stating the status information of elevator determine the running priority grade sequence of each elevator;
When electricity of the electricity of energy storage device that each elevator shares less than the required energy storage device, according to each institute The status information for stating elevator determines each elevator operation institute electricity demand sequence, is determined according to each elevator operation institute electricity demand sequence The running priority grade sequence of each elevator.
3. multiple elevator power failure emergency method according to claim 2, which is characterized in that the state of each elevator Information includes number, child's old man number of women accounting, the number of units of elevator and traction acc power in car weight amount, car, institute The priority orders for stating the status information of each elevator are followed successively by number in car, child's old man number of women accounting, car The number of units of loading capacity, traction acc power and elevator.
4. multiple elevator power failure emergency method according to claim 2, which is characterized in that described according to each elevator The priority orders of status information determine that the step of running priority grade sequence of each elevator includes:
According to the priority orders of the status information of each elevator, based on comparison principle step by step, the fortune of each elevator is calculated Row major grade sequence, makes the elevator run to default specific flat bed.
5. multiple elevator power failure emergency method according to claim 2, which is characterized in that described according to each elevator Status information determines that the step of each elevator operation institute's electricity demand sequence includes:
The number of plies is run needed for electricity and each elevator according to needed for the status information of each elevator determines each elevator operation individual layer;
The operation number of plies is to needed for the operation of each elevator needed for electricity and each elevator according to needed for each elevator operation individual layer Electricity sorts, and obtains each elevator operation institute electricity demand sequence.
6. multiple elevator power failure emergency method according to claim 1, which is characterized in that the state letter of the acquisition elevator It is further included before the step of breath:
The working condition of network voltage is monitored, when monitoring network voltage exception, output acquires the state letter of each elevator The instruction of breath.
7. a kind of multiple elevator rescue apparatus during stoppage of power supply, which is characterized in that including:
Acquisition module, for when abnormal electrical power supply, acquiring the status information of each elevator;
Acquisition module, for obtaining the information about power of energy storage device that each elevator shares;
Processing module determines each electricity for the status information according to each elevator and the information about power of the energy storage device The running priority grade sequence of ladder;
Transmission module, for being run according to each elevator of the running priority grade sequential control.
8. multiple elevator rescue apparatus during stoppage of power supply according to claim 7, which is characterized in that monitoring modular is further included, it is described Monitoring modular is used to monitor the working condition of network voltage, when monitoring network voltage exception, the state of output acquisition elevator The instruction of information.
9. a kind of computer equipment, including processor and memory, the memory is stored with computer program, the computer When program is performed by the processor so that the processor perform claim requires the step of any one of 1 to 6 the method.
10. a kind of computer readable storage medium is stored with computer program, when the computer program is executed by processor, So that the processor perform claim requires the step of any one of 1 to 6 the method.
CN201711309162.3A 2017-12-11 2017-12-11 power failure emergency method and device for multiple elevators, computer equipment and storage medium Active CN108178040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711309162.3A CN108178040B (en) 2017-12-11 2017-12-11 power failure emergency method and device for multiple elevators, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711309162.3A CN108178040B (en) 2017-12-11 2017-12-11 power failure emergency method and device for multiple elevators, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN108178040A true CN108178040A (en) 2018-06-19
CN108178040B CN108178040B (en) 2019-12-10

Family

ID=62545916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711309162.3A Active CN108178040B (en) 2017-12-11 2017-12-11 power failure emergency method and device for multiple elevators, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN108178040B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109713697A (en) * 2018-12-26 2019-05-03 深圳供电局有限公司 Micro-grid central controller and power distribution method thereof
CN110092259A (en) * 2019-05-17 2019-08-06 恒达富士电梯有限公司 A kind of emergency management and rescue method and device of elevator
CN111463891A (en) * 2020-04-14 2020-07-28 珠海格力电器股份有限公司 Power failure emergency method and device, electronic equipment and computer readable medium
CN114104882A (en) * 2021-11-24 2022-03-01 上海三菱电梯有限公司 Elevator group management system
WO2023284291A1 (en) * 2021-07-14 2023-01-19 日立楼宇技术(广州)有限公司 Elevator power failure emergency device, method and apparatus, and elevator
CN117394511A (en) * 2023-09-22 2024-01-12 深圳市瀚强科技股份有限公司 Elevator standby electricity distribution method and related device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020153A (en) * 2009-09-18 2011-04-20 东芝电梯株式会社 Elevator rescue operating system
CN102055039A (en) * 2009-11-04 2011-05-11 富士通株式会社 Electronic device and power source control device
US20130124000A1 (en) * 2010-07-23 2013-05-16 Sharp Kabushiki Kaisha Power control network system, power control method, and power controller
US20130229280A1 (en) * 2012-03-01 2013-09-05 Canon Kabushiki Kaisha Mobile information processing apparatus and its control method
CN103746592A (en) * 2013-12-31 2014-04-23 华为技术有限公司 Bidirectional inverting system and bidirectional inverting circuit
CN103863907A (en) * 2012-12-07 2014-06-18 东芝电梯株式会社 Electric power system of building equipped with elevator
CN103991766A (en) * 2013-02-18 2014-08-20 东芝电梯株式会社 Elevator with function of keeping moving during power off and control method for the same
CN104276460A (en) * 2013-07-05 2015-01-14 东芝电梯株式会社 Elevator system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102020153A (en) * 2009-09-18 2011-04-20 东芝电梯株式会社 Elevator rescue operating system
CN102055039A (en) * 2009-11-04 2011-05-11 富士通株式会社 Electronic device and power source control device
US20130124000A1 (en) * 2010-07-23 2013-05-16 Sharp Kabushiki Kaisha Power control network system, power control method, and power controller
US20130229280A1 (en) * 2012-03-01 2013-09-05 Canon Kabushiki Kaisha Mobile information processing apparatus and its control method
CN103296328A (en) * 2012-03-01 2013-09-11 佳能株式会社 Mobile information processing apparatus and its control method
CN103863907A (en) * 2012-12-07 2014-06-18 东芝电梯株式会社 Electric power system of building equipped with elevator
CN103991766A (en) * 2013-02-18 2014-08-20 东芝电梯株式会社 Elevator with function of keeping moving during power off and control method for the same
CN104276460A (en) * 2013-07-05 2015-01-14 东芝电梯株式会社 Elevator system
CN103746592A (en) * 2013-12-31 2014-04-23 华为技术有限公司 Bidirectional inverting system and bidirectional inverting circuit

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109713697A (en) * 2018-12-26 2019-05-03 深圳供电局有限公司 Micro-grid central controller and power distribution method thereof
CN110092259A (en) * 2019-05-17 2019-08-06 恒达富士电梯有限公司 A kind of emergency management and rescue method and device of elevator
CN110092259B (en) * 2019-05-17 2021-04-20 恒达富士电梯有限公司 Emergency rescue method and device for elevator
CN111463891A (en) * 2020-04-14 2020-07-28 珠海格力电器股份有限公司 Power failure emergency method and device, electronic equipment and computer readable medium
WO2023284291A1 (en) * 2021-07-14 2023-01-19 日立楼宇技术(广州)有限公司 Elevator power failure emergency device, method and apparatus, and elevator
CN114104882A (en) * 2021-11-24 2022-03-01 上海三菱电梯有限公司 Elevator group management system
CN114104882B (en) * 2021-11-24 2023-02-03 上海三菱电梯有限公司 Elevator group management system
CN117394511A (en) * 2023-09-22 2024-01-12 深圳市瀚强科技股份有限公司 Elevator standby electricity distribution method and related device

Also Published As

Publication number Publication date
CN108178040B (en) 2019-12-10

Similar Documents

Publication Publication Date Title
CN108178040A (en) Multiple elevator power failure emergency method, device, computer equipment and storage medium
CN110707804B (en) Energy storage and standby power device with online test function and test method
CN114050633B (en) Dynamic management and control method and device for lithium battery energy storage system and electronic equipment
CN101330224B (en) Uninterrupted power source
CN105680559B (en) A kind of transformer station direct current system
CN102176633B (en) Method and apparatus for providing uninterruptible power
CN108099636A (en) A kind of battery pack balancing and the apparatus and method of protection
CN103337869A (en) Novel battery energy-storage system and function integration designing method thereof
CN209009903U (en) Elevator power failure emergency rescue device
CN108767952A (en) A kind of off-board charging system to interconnect
CN103887834A (en) Storage battery set flexible equalization charging and discharging management rectification module, device and system
JPH11299275A (en) Power unit for elevator
CN109552096B (en) Charging terminal of intelligent charging station for electric automobile
CN103887862B (en) A kind of flexible management of charging and discharging rectification module, management tree device and system
CN109672175A (en) Power grid control method and device
CN111864889B (en) Uninterrupted emergency power supply system and power supply method for open-circuit protection of lead-acid storage battery pack
CN106602689B (en) System for preventing direct-current power supply bus from losing voltage and operation method thereof
CN114285057A (en) Mobile energy storage system and control method thereof
CN107768748A (en) Communication base station moves energy scheduling method and its scheduling system
CN207677504U (en) Communication base station moves energy source dispatch system
CN212269131U (en) Elevator outage fault monitoring system
CN116365671B (en) PCS test system and method of energy storage container, equipment and storage medium
CN106532930A (en) Intelligent monitoring system of static synchronous compensator
CN116513899A (en) Elevator power supply control method, system, computer equipment and storage medium
CN103171939B (en) Lift information processing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant