CN108166648A - A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction - Google Patents

A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction Download PDF

Info

Publication number
CN108166648A
CN108166648A CN201711497083.XA CN201711497083A CN108166648A CN 108166648 A CN108166648 A CN 108166648A CN 201711497083 A CN201711497083 A CN 201711497083A CN 108166648 A CN108166648 A CN 108166648A
Authority
CN
China
Prior art keywords
steel plate
concrete
shear wall
component
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711497083.XA
Other languages
Chinese (zh)
Inventor
王斐
李瑞锋
李翰林
李典
***
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711497083.XA priority Critical patent/CN108166648A/en
Publication of CN108166648A publication Critical patent/CN108166648A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of armor formula steel plate concrete shear wall, including five parts such as edge member, angle steel, flexible rubber ring, armored concrete steel plate and screw assemblies.The steel plate concrete shear wall can reduce middle steel plate out-of-plane deformation;Flexible rubber ring allows opposite movement occurs between concrete cover and steel plate, so as to reduce the tensile stress of concrete cover, prevents cover board premature breakdown from coming off;Reinforced concrete cover plate is assembled using piecemeal, easy to transportation and installation.The present invention also provides a kind of arrangement and method for construction of armor formula steel plate concrete shear wall, include the following steps:Frame is built, the installation of middle steel plate, prefabricated, the installation of concrete cover of concrete cover, is applied glass cement, is finally obtained armor formula steel plate concrete shear wall.A kind of armor formula steel plate concrete shear wall of the present invention solves the problems, such as that concrete cover crushes and comes off that reinforced concrete cover plate is assembled using piecemeal, easy to transportation and installation, has a extensive future.

Description

A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction
Technical field
The present invention relates to house architectural structure fields, and in particular to a kind of armor formula steel plate concrete shear wall.
Background technology
Steel plate shear wall structure is that the one kind for developing and growing up on thin webbed girder theoretical research foundation is embedded with frame Steel plate is the novel Lateral Resistant System of basic structural unit.Steel plate shear force wall has following good superior function:1. initial side Big to rigidity, Hysteresis Behavior is stablized, and energy dissipation capability is strong, and ductility is big, and the deformability resisted under cyclic load is good.2. pass through Improve its rigidity and ductility, realize the matching with outline border frame material, ductility, rigidity, can realize the dual purpose set up defences.3. steel The setting of steel plate is embedded in board wall can alleviate the Ductility Requirement in concrete frame joint area, reduce the rigid joint under severe earthquake action Earthquake reaction, while joint structure can be simplified, can realize structures with semi-rigid joints.It is relatively thin that 4. steel plate wall embeds steel plate, ratio of height to thickness Up to 250~500, the effective usable floor area in house can be increased.
Due in conventional steel plates shear wall, under horizontal loads, always with larger after non-thin plate buckling of putting more energy into Buckling sound, while generate larger out-of-plane deformation.This means that during larger wind load or geological process, there is noise production It is raw, influence the comfortable for living of building.Conventional steel plates shear wall relies primarily on, and the pulling force field formed after buckling is come the level of resisting Power, the pulling force field being anchored on frame can generate extra bending moment to side column, side bar, and increase pillar stablizes burden.It is meanwhile thin Steel plate shear force wall buckling under smaller shearing action, hysteretic loop have significant pinch, reduce the energy dissipation capacity of steel plate shear force wall.
By to combined steel plate shearing force wall the study found that it has the following problems:1. conventional combination steel plate shear force wall Reinforced concrete cover plate and embedded wallboard are completely be bonded, participate in having resisted a part of horizontal force when constraining wallboard, but due to Both steel plate and concrete slab deformation are filled out under large deformation, reinforced concrete cover plate easily occurs and bears larger tensile stress Situation squeezes outside the face of steel plate, concrete is caused constantly to be detached from steel plate in addition, loses the interior of concrete slab protection and fills out steel plate work With later stage performance is still degenerated for sheet metal wall.2. edge concrete cover will occur to squeeze to destroy.3. the destruction drop of concrete The low long-term behaviour and durability of structure.Above-mentioned reason causes cover board to exit work in advance, it is impossible to the thin steel of lasting constraint The buckling of plate, it is thin steel plate shear wall that combined steel plate wall is caused, which to be degenerated, and projected life is shorter.
Chinese invention patent CN 105692817 A, it is entitled:" a kind of combined steel plate shearing force wall structure ", discloses A kind of steel plate and concrete composite combined structure type steel plate shear wall structure.The shear wall structure although solve in fill out steel plate with Both concrete slabs deformation problem, avoiding concrete slab broken stripping problem from steel plate causes concrete to move back in advance Go out work, eventually lead to combined steel plate wall and degenerate for thin steel plate shear wall problem.But it has the disadvantage that:1. concrete slab is, What the frictional force generated by the inner surface of nut or elastic material and concrete slab mounting hole was fixed.This connection side Formula intensity is insufficient, inadequate to middle steel plate restraining force, it is impossible to effectively inhibit the bending deformation of steel plate.2. since armored concrete adds The presence of work and steel plate mismachining tolerance, it is small general that the more split bolt of number is disposably inserted into possibility in concrete slab simultaneously Rate event needs scene to carry out debugging allotment to concrete slab upper installing hole, takes time and effort.3. reinforced concrete cover plate volume Greatly, transport installation difficulty is big, seriously constrains the application range of this kind of shear wall.4. reinforced concrete cover plate volume is big, installation Kong Duo belonged to positioning between reinforced concrete cover plate and steel plate, when middle steel plate deforms, the elastic washer of installation is not Foot has offset steel plate deformed, and the right meeting stress of entire concrete cover times, which crushes, to come off.
Therefore, couple reliably with steel plate there is an urgent need to a kind of concrete cover at present, installation and transportation are convenient, concrete cover Stripping will not be crushed in advance, what concrete slab can be relatively moved with steel plate, the wide armor formula steel of industrialization prospect Board concrete shear wall.
Invention content
For overcome the deficiencies in the prior art, the present invention seeks to:A kind of armor formula steel plate concrete shear wall is provided.It should Steel plate concrete shear wall and the difference of conventional steel plates concrete shear force wall are:1. concrete cover is in being fixed by screws in Between on steel plate, firm and reliable connection can effectively prevent the bending deformation of steel plate;2. screw both ends are cased with elastic washer, padding It encloses in elastic range, allows concrete cover that the relative movement along surface of steel plate occurs with middle steel plate.3. concrete cover by The small block concrete of rectangle is spliced, easy to transportation and installation.In short, the steel plate concrete shear wall of this structure, to centre Steel plate has enough restraining forces, can inhibit the bending deformation of steel plate;Coagulation earth mulch can be effectively prevent to crush stripping simultaneously Occur;Concrete cover is small, light-weight;When reinforced concrete cover plate is with Interal fixation, mounting hole is not needed to boring, directly Installation, convenience and high-efficiency.
It is a further object of the present invention to provide a kind of arrangement and method for construction of armor formula steel plate concrete shear wall.
Technical solution is used by the present invention solves the above problems:
Armor formula steel plate concrete shear wall of the present invention includes:Edge member, angle steel, flexible rubber ring, concrete steel plate And five major part compositions such as screw assembly.Concrete steel plate is made of several reinforced concrete cover plates and middle steel plate.
Preferably, the size of reinforced concrete cover plate is 280mmX280mmX50mm.
Middle steel plate on entire shear wall is by 24 armored concrete front shroud components and 24 armored concrete rear covers Plate component covers.
Armored concrete front shroud component is made of armored concrete front shroud, rubber outer ring.
Armored concrete back shroud component is made of armored concrete back shroud, rubber outer ring.
The both ends of first vertical edge component respectively with the left end of first level edge member and the second horizontal edge component Left end be connected, the both ends of the second vertical edge component respectively with the right end of first level edge member and the second horizontal edge The right end of component is connected.
The most preferably scheme of edge member is I-steel.
Concrete steel plate is fixed in the region that four flat edge members surround, four ends of concrete steel plate respectively with Four edge members are connected.
The most preferably scheme connected between steel plate and edge member is:Interal fixation is back-to-back being placed by bolt On two angle steel, two angle steel are bolt-connected on edge member again.
The concrete steel plate includes steel plate, reinforced concrete cover plate component, screw assembly and elastic washer and forms.
Reinforced concrete cover plate component includes:Reinforced concrete cover plate and rubber outer ring.
Reinforced concrete cover plate includes:Armored concrete front shroud and armored concrete back shroud.Nothing is appointed in the two structure What difference, only preposition mounted in middle steel plate front, the latter is mounted in middle steel plate back.
The concrete steel plate, armored concrete front shroud and armored concrete back shroud are fixed on steel by screw assembly Plate both sides.
The optimal material selection of elastic washer is low elastic modulus material.
Steel plate is rectangular configuration, and specification is:1520mmX2000mmX10mm.
A kind of armor formula steel plate concrete shear wall includes:Edge member, angle steel, flexible rubber ring, concrete steel plate and spiral shell Five major parts such as screw assembly, arrangement and method for construction carry out according to the following steps:
(1)Frame is built.The both ends of first vertical edge component respectively with the left end of first level edge member and the second water The left end of flat edge member is connected, wherein the left end of the left end of first level edge member and the second horizontal edge component and The left side of one vertical edge component is concordant;The both ends of the second vertical edge component right end with first level edge member respectively And second the right end of horizontal edge component be connected, the wherein right end of first level edge member and the second horizontal edge component Right end is concordant with the right side of the second vertical edge component.The connection of above-mentioned component is using the Welding connection of docking penetration.Side Edge component selects the I-steel of 240X240X2000.
(2)Steel plate is installed.
1. the installation of outer edge angle steel.Four angle steel are fixed on to the outside for putting up frame inside casing by screw.
2. the installation of steel plate.Steel plate is put into and is put up among frame, and is adjacent at already installed four angle steel ends On face.
3. the installation of inward flange angle steel.Four angle steel are fixed on to the outside for putting up frame inside casing by screw.
4. the fixation of steel plate.Outer edge angle steel, steel plate and inward flange angle steel are fixed together by screw.
(3)Reinforced concrete cover plate it is prefabricated.
The preparation of reinforced concrete cover plate is compiled into the rectangular mesh of 70mmX70mm with the reinforcing bar of φ 10.
Concrete is equipped with according to C25 standards, casting concrete obtains 280mmX280mm reinforcing bars and mixes on the reinforcing bar of upper step establishment Solidifying earth mulch plate, while stepped hole 1 is reserved in reinforced concrete cover plate center, punch diameter phi 60mm, hole diameter φ 40mm step depths 30mm.Dry 5 days for use.
(4)The installation of concrete cover.
1. rubber outer ring is sleeved on four faces of reinforced concrete cover plate 50mmX280mm, then by two block concrete cover boards Steel plate both sides are individually positioned in, ensure that its horizontal sides is parallel to the ground, vertical edges are perpendicular to the ground.
2. installing elastic washer on 40 preformed holes of front shroud φ, then plain cushion is installed on 60 holes of φ;In back shroud φ 40 Elastic washer on hole is installed, then plain cushion is installed in φ 60.Screw is penetrated from arbitrary side in hole, screws on nut, and tighten, together When ensure the distance between any one reinforced concrete cover plate and middle steel plate in 1-3mm.
3. repeat step 1. -2., remaining 23 pieces of armored concrete front shrouds and 23 pieces of armored concrete back shrouds are pacified It is attached on middle steel plate.
(5)Apply glass cement.
The preformed hole of mounting screw component on front and rear cover plate is filled up far from steel plate side with glass cement, it is extra outside hole to scrape off Glass cement.After glass cement solidifies 1 day, steel plate concrete shear wall construction finishes.
The invention has the advantages that:
(1)Concrete cover is small, light-weight, preferred size 300mmX300mmX50mm.
(2)Only there are one mounting holes, and when reinforced concrete cover plate is with Interal fixation, mounting hole does not need to, with boring, directly pacify Dress, convenience and high-efficiency.
(3)Rubber outer ring is cased with around concrete cover, rubber outer ring and elastic washer produce when offsetting steel plate deformed together Raw stress, effect are more preferable.
(4)On the basis of existing modified combined steel plate shearing force wall, screw assembly is not involved in the transmission of shearing, improves and passes The force modes of system combined steel plate shearing force wall and modified combined steel plate shearing force wall, making can between steel plate and armoured concrete slab The relative displacement along surface of steel plate occurs, reduces the tensile stress of armoured concrete slab.
(5)Front and rear two block concretes cover board is pressed on intermediate steel plate by screw assembly.Steel plate and armoured concrete slab It will not be detached outside generating surface, armoured concrete slab can effectively constrain the out-of-plane deformation of steel plate shear wall structure so that steel plate is cut The hysteresis loop of power wall construction is more smooth, Hysteresis Behavior is more stablized, and so as to keep continuing energy dissipation capacity, improves concrete slab Long-term behaviour and durability.
(6)Screw assembly is subjected only to pulling force, while is not involved in shearing resistance, avoids the welding sequence of conventional bolt and steel plate edge thick Direction stress is spent, reduces the welding residual stress of steel plate.
(7)Reinforced concrete cover plate constrains steel plate out-of-plane deformation, changes the stress performance of steel plate, makes sheet metal pulling force The shearing mechanism of steel plate is converted to effect.So as to reduce the noise of wallboard, the hysteresis of steel plate shear force wall is significantly improved Performance.
(8)Combined steel plate shearing force wall has the advantages that conventional steel plates shear wall, relies primarily on steel plate and consumes energy, compares In concrete shear force wall, there is preferable anti-seismic performance.
(9)Due to the presence of reinforced concrete cover plate, the effects that fire prevention, heat preservation, sound insulation can be played, can reduce the later stage Workload reduces cost.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the reinforced concrete cover plate component diagram of the present invention.
Fig. 3 is the concrete steel plate schematic diagram of the present invention.
Fig. 4 is the steel plate of the present invention and edge member connection diagram.
Fig. 5 is the frame connection diagram of the present invention.
Fig. 6 is the middle steel plate of the present invention and frame scheme of installation.
Fig. 7 is two kinds of specification angle steel schematic diagrames of the present invention.
Wherein, 1 it is middle steel plate, 2 be reinforced concrete cover plate component, 3 be screw assembly, 4 be angle steel, 5 is edge structure Part, 6 for preceding concrete cover, 7 be rubber outer ring, 8 be rear concrete cover, 9 be nut, 10 be elastic washer, 11 be screw, 12 be plain washer, 13 is first level edge member, 14 is the second vertical edge component, 15 second horizontal edge components, 16 is First vertical edge component, 17 are glass cement.2-1 is reinforced concrete cover plate, 2-2 is elastic housing washer, 2-3 is reserved step Hole.
Specific embodiment
Below by specific embodiment, the present invention will be described, but the present invention is not limited thereto.
The present invention is described in further detail below in conjunction with the accompanying drawings:
Combined steel plate shearing force wall structure of the present invention includes:Edge member, angle steel, flexible rubber ring, concrete steel plate component And screw assembly.Specific construction scheme carries out according to the following steps:
(1)Frame is built.The both ends of first vertical edge component respectively with the left end of first level edge member and the second water The left end of flat edge member is connected, wherein the left end of the left end of first level edge member and the second horizontal edge component and The left side of one vertical edge component is concordant;The both ends of the second vertical edge component right end with first level edge member respectively And second the right end of horizontal edge component be connected, the wherein right end of first level edge member and the second horizontal edge component Right end is concordant with the right side of the second vertical edge component.The connection of above-mentioned component is using the Welding connection of docking penetration.Side Edge component selects 240X240X2000 I-steel.
The mounting hole of a diameter of φ 20 is provided on frame.Frame trepanning situation for convenience of description, if length is 2000mm Direction for X-axis, if the direction that length is 1520mm is Y-axis, if the direction that length is 240mm is Z axis.
Two rows of mounting holes are opened in the first vertical I-steel right end face, are looked over along X-axis negative direction, two row installation of left and right The distance of hole to two sides is 60mm, and each column is 7 mounting holes, and pitch of holes 300mm, 7 mounting holes are about frame Horizontal direction center line is symmetrical.
Two rows of mounting holes are opened in the second vertical I-steel left end face, are looked over along X-axis positive direction, two row installation of left and right The distance of hole to two sides is 60mm, and each column is 7 mounting holes, and 7 mounting holes are about frame horizontal direction center line Symmetrically.
Two rows of mounting holes are opened on end face on the downside of the first level I-steel, are looked over along Y-axis positive direction, front two rows installation The distance of hole to two sides is 60mm, and often row is 5 mounting holes, and 5 mounting holes are about frame vertical direction center line Symmetrically.
Two rows of mounting holes are opened on end face on the upside of the second horizontal I-steel, are looked over along Y-axis negative direction, front two rows installation The distance of hole to two sides is 60mm, and often row is 5 mounting holes, and 5 mounting holes are about frame vertical direction center line Symmetrically.
(2)Steel plate is installed
1. the installation of outer edge angle steel.Pass through turret head M20 screw assemblies(GB/T27-1988, M20X80 screw, φ 20 are stainless Steel plain cushion, M20 nuts)Two 115mmX120mmX2000mm angle steel and two 115mmX120mmX1280mm angle steel are fixed on It puts up on the outer edge of frame.
Mounting hole is provided on 115mmX120mmX2000mm angle steel.Trepanning situation for convenience of description, if length is The direction of 2000mm is X-axis, if the direction that length is 115mm is Y-axis, if the direction that length is 120mm is Z axis, and the angle of angle steel It is overlapped with X-axis.The mounting hole that 7 20 spacing of φ are 300mm is opened in 115mmX2000mm planes, 7 mounting holes are in angle steel Be centrosymmetric distribution in 115mmX2000mm planes;The installation that 13 20 spacing of φ are 150mm is opened in 120X2000 planes Hole, 13 mounting holes are centrosymmetric distribution in angle steel 120X2000 planes.
Mounting hole is provided on 115mmX120mmX1280mm angle steel.Trepanning situation for convenience of description, if length is The direction of 1280mm is X-axis, if the direction that length is 115 is Y-axis, if the direction that length is 120mm is Z axis, and the angle of angle steel and X Overlapping of axles.The mounting hole that 5 20 spacing of φ are 300mm is opened in 115X1280 planes, 5 mounting holes are put down in angle steel 115X1280 Be centrosymmetric distribution on face;The mounting hole that 9 20 spacing of φ are 150mm is opened in 120X1280 planes, 9 mounting holes are at angle Be centrosymmetric distribution in steel 120X1280 planes.
2. the installation of steel plate.1520mmX2000mmX10mm steel plates are put among the frame put up.For the ease of retouching Trepanning situation on steel plate is stated, if the direction that length is 1520mm is X-axis, if the direction that length is 2000mm is Y-axis, if length is The direction of 10mm is Z axis.Horizontal spacing is provided in advance on steel plate 1520mmX2000mm faces as 300mm, longitudinal pitch 300mm Reserved hole matrix, preformed hole are φ 20mm stepped hole step depth 30mm, and stepped hole is 4 along X-direction, is 6 along Y direction A, reserved hole matrix center line is overlapped with plate centre line.In terms of Z-direction, steel plate surrounding is also provided with a diameter of φ 20mm peaces Hole is filled, installation pitch of holes is 150mm, and the distance of mounting hole to side is 60mm, and the two rows along X-direction are 9 Mounting hole, the center line about Y direction is symmetrical, and the left and right two rows along Y direction are 13 mounting holes, about X-axis The center line in direction is symmetrical.
3. the installation of inward flange angle steel.Pass through turret head M20 screw assemblies(GB/T27-1988, M20X80 screw, φ 20 Stainless steel plain cushion and M20 nuts)By two 115mmX120mmX2000mm angle steel and two 115mmX120mmX1280mm angle steel It is fixed on the inward flange for putting up frame.The position that angle steel opens mounting hole is same(3)Middle angle steel.
4. the fixation of steel plate.Pass through turret head M20 screw assemblies(GB/T27-1988, M20X80 screw, 20 stainless steels of φ Plain cushion and M20 nuts)Outer edge angle steel, steel plate and inward flange angle steel are fixed together.
(3)Reinforced concrete cover plate it is prefabricated.
The preparation of reinforced concrete cover plate is compiled into the rectangular mesh of 70mmX70mm with the reinforcing bar of φ 10.
Concrete is equipped with according to C25 standards, casting concrete obtains 280mmX280mm reinforcing bars and mixes on the reinforcing bar of upper step establishment Solidifying earth mulch plate, while stepped hole 1 is reserved in reinforced concrete cover plate center, punch diameter phi 60mm, hole diameter, φ 40mm step depths 30mm.Dry 5 days for use.
(4)The installation of reinforced concrete cover plate.
1. rubber outer ring is sleeved on four faces of concrete cover 50mmX280mm, then two block concrete cover boards are distinguished Steel plate both sides are placed on, ensure that horizontal sides are parallel to the ground, vertical edges are perpendicular to the ground.
2. φ 40X20mm elastic washers are installed on pre- 40 holes of φ of front shroud(Shanghai Fu Qing rubber and plastics Science and Technology Ltd., φ 40X20mm, endoporus φ 20), then 20 stainless steel plain cushions of φ are installed on 60 holes of φ;φ is installed on 40 holes of back shroud φ 40X20mm elastic washers(Shanghai Fu Qing rubber and plastics Science and Technology Ltd., φ 40X20mm, endoporus φ 20), then installed on 60 holes of φ The rust steel plain cushions of φ 20.M20X80 screws are penetrated from arbitrary side in hole, screw on nut, and tighten, while ensure any one The distance between concrete cover and middle steel plate are in 1-3mm(Screw, nut and stainless steel gasket are chosen in the prosperous way fastening in Hebei Part Manufacturing Co., Ltd).
3. repeat step 1. -2., remaining 23 pieces of armored concrete front shrouds and 23 pieces of armored concrete back shrouds are filled Onto middle steel plate.
(5)Apply glass cement
Use glass cement(Shijiazhuang ornament materials Co., Ltd of prestige Bitsoft, 793 silicone weatherproof sealants)It will be installed on front and rear cover plate The preformed hole of screw assembly fills up, and scrapes off glass cement extra outside sky.After glass cement solidifies 1 day, steel plate concrete shear wall is applied Work finishes.
It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, Several improvements and modifications can also be made, these improvements and modifications also should be regarded as protection scope of the present invention.In the present embodiment not The available prior art of specific each component part is realized.

Claims (10)

1. a kind of armor formula steel plate concrete shear wall, which is characterized in that including edge member, angle steel, flexible rubber ring, concrete Five part such as steel plate and screw assembly.
2. a kind of armor formula steel plate concrete shear wall according to claim 1, which is characterized in that screw assembly is reinforcing bar Concrete front shroud, middle steel plate and armored concrete back shroud are fixed together.
3. a kind of armor formula steel plate concrete shear wall according to claim 1, which is characterized in that after installation is complete, appoint The distance between a reinforced concrete cover plate and middle steel plate anticipate in 1-3mm.
4. a kind of armor formula steel plate concrete shear wall according to claim 1, which is characterized in that concrete steel plate is by 24 Block armored concrete front shroud component, 1 piece of middle steel plate and 24 pieces of armored concrete back shroud component compositions.
5. armored concrete front shroud component according to claim 4, which is characterized in that armored concrete front shroud component By armored concrete front shroud, rubber outer ring is formed.
6. armored concrete back shroud component according to claim 4, which is characterized in that armored concrete back shroud component By armored concrete back shroud, rubber outer ring is formed.
7. armored concrete front shroud according to claim 5, which is characterized in that be reserved on armored concrete front shroud Mounting hole, mounting hole are stepped hole.
8. armored concrete back shroud according to claim 6, which is characterized in that be reserved on armored concrete back shroud Mounting hole, mounting hole are stepped hole.
A kind of 9. steel plate concrete shear wall structure according to claim 1, which is characterized in that four end difference of steel plate It is connect with 8 angle steel by screw fastener, angle steel is connect by screw fastener with edge member.
10. a kind of arrangement and method for construction for preparing a kind of armor formula steel plate concrete shear wall described in any one of claim 1-9, Include the following steps:
(1)Frame is built.
The both ends of the first vertical edge component left side with the left end of first level edge member and the second horizontal edge component respectively End is connected, wherein the left end and the first vertical edge component of the left end of first level edge member and the second horizontal edge component Left side it is concordant;The both ends of second vertical edge component respectively with the right end of first level edge member and the second horizontal edge The right end of component is connected, and the wherein right end of the right end of first level edge member and the second horizontal edge component is vertical with second The right side of edge member is concordant.The connection of above-mentioned component is using the Welding connection of docking penetration.Edge member is selected The I-steel of 240X240X2000.
(2)Steel plate is installed.
1. the installation of outer edge angle steel.Four angle steel are fixed on to the outside for putting up frame inside casing by screw.
2. the installation of steel plate.Steel plate is put into and is put up among frame, and is adjacent on already installed four angle steel end faces.
3. the installation of inward flange angle steel.Four angle steel are fixed on to the outside for putting up frame inside casing by screw.
4. the fixation of steel plate.Outer edge angle steel, steel plate and inward flange angle steel are fixed together by screw.
(3)Reinforced concrete cover plate it is prefabricated.
The preparation of reinforced concrete cover plate is compiled into the rectangular mesh of 70mmX70mm with the reinforcing bar of φ 10.
Concrete is equipped with according to C25 standards, casting concrete obtains 280mmX280mm armored concrete on the reinforcing bar of upper step establishment Cover board, while stepped hole 1 is reserved in reinforced concrete cover plate center, diameter macropores φ 60mm, hole diameter φ 40mm Step depth 30mm.Dry 5 days for use.
(4)The installation of concrete cover.
1. rubber outer ring is sleeved on four faces of reinforced concrete cover plate 50mmX280mm, then two block concrete cover boards are distinguished Steel plate both sides are placed on, ensure that horizontal sides are parallel to the ground, vertical edges are perpendicular to the ground.
2. installing elastic washer on 40 preformed holes of front shroud φ, then plain cushion is installed on 60 holes of φ;On 40 holes of back shroud φ Elastic washer is installed, then plain cushion is installed in φ 60.Screw is penetrated from arbitrary side in hole, nut is screwed on, and tighten, protects simultaneously The distance between any one reinforced concrete cover plate and middle steel plate are demonstrate,proved in 1-3mm.
3. repeat step 1. -2., remaining 23 pieces of armored concrete front shroud and 23 pieces of armored concrete front shroud are installed Onto middle steel plate.
(5)Apply glass cement.
The preformed hole of mounting screw component on front and rear cover plate far from steel plate side is filled up with glass cement, scrapes off glass extra outside hole Glass glue.After glass cement solidifies 1 day, steel plate concrete shear wall construction finishes.
CN201711497083.XA 2017-12-31 2017-12-31 A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction Pending CN108166648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711497083.XA CN108166648A (en) 2017-12-31 2017-12-31 A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711497083.XA CN108166648A (en) 2017-12-31 2017-12-31 A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction

Publications (1)

Publication Number Publication Date
CN108166648A true CN108166648A (en) 2018-06-15

Family

ID=62516882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711497083.XA Pending CN108166648A (en) 2017-12-31 2017-12-31 A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction

Country Status (1)

Country Link
CN (1) CN108166648A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4822433U (en) * 1971-07-20 1973-03-14
CN101126253A (en) * 2007-09-28 2008-02-20 清华大学 Partition block type sticking-free flection-proof steel plate shearing force wall
CN103382746A (en) * 2013-07-12 2013-11-06 谭平 Buckling restrained steel plate shear wall with out-plane deformation space
CN103397718A (en) * 2013-07-23 2013-11-20 广州大学 Buckling-restrained stiffened steel plate shear wall
CN103437456A (en) * 2013-08-08 2013-12-11 欧进萍 Anti-buckling oblique notching steel plate energy dissipation shear wall
CN106368349A (en) * 2015-07-23 2017-02-01 林旭川 Fabricated buckling-resistant steel plate damping wall capable of being combined in parallel flexibly
CN106592817A (en) * 2016-10-20 2017-04-26 西安建筑科技大学 Composite steel plate shear wall structure
CN107313540A (en) * 2017-07-24 2017-11-03 太原理工大学 The anti-buckling assembled combination beam of fire prevention and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4822433U (en) * 1971-07-20 1973-03-14
CN101126253A (en) * 2007-09-28 2008-02-20 清华大学 Partition block type sticking-free flection-proof steel plate shearing force wall
CN103382746A (en) * 2013-07-12 2013-11-06 谭平 Buckling restrained steel plate shear wall with out-plane deformation space
CN103397718A (en) * 2013-07-23 2013-11-20 广州大学 Buckling-restrained stiffened steel plate shear wall
CN103437456A (en) * 2013-08-08 2013-12-11 欧进萍 Anti-buckling oblique notching steel plate energy dissipation shear wall
CN106368349A (en) * 2015-07-23 2017-02-01 林旭川 Fabricated buckling-resistant steel plate damping wall capable of being combined in parallel flexibly
CN106592817A (en) * 2016-10-20 2017-04-26 西安建筑科技大学 Composite steel plate shear wall structure
CN107313540A (en) * 2017-07-24 2017-11-03 太原理工大学 The anti-buckling assembled combination beam of fire prevention and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
河南省土木建筑学会: "《土木建筑学术文库 第7卷》", 31 July 2007 *

Similar Documents

Publication Publication Date Title
CN204753896U (en) Multilayer assembled concrete panel structure system
CN104878948B (en) A kind of reinforcement means of rc-frame-beam hogging moment area
CN103883025B (en) Assembling type combination steel plate shear wall
TW201243133A (en) Wall module for construction of a structure and associated structure
CN109057014A (en) Self-resetting can assemble multistage joist steel frame after shake
CN206090949U (en) Combination steel sheet shear wall structure
KR100991497B1 (en) Integrated structure of reinforced concrete column and steel beam
CN106545110A (en) A kind of anti-buckling steel plate shear wall structure being easily assembled
CN107489212A (en) Exempt from the anti-shear buckling steel plate shear force wall of bearing capacity
CN107524251B (en) Prestress steel strip masonry faced wall
CN207739437U (en) A kind of prefabricated steel reinforced concrete shear wall structure
CN108589969B (en) Combined assembly type shear wall with vertical ECC energy consumption belt and manufacturing method thereof
CN205314283U (en) From reset structure beam slab connection structure
CN109057012A (en) Self-resetting can assemble multistage beam center pre-loaded support struts steel frame after shake
CN109024880A (en) Self-resetting can assemble multistage joist steel frame joint after shake
CN108179827A (en) A kind of piecemeal assembling steel plate concrete shear force wall and its arrangement and method for construction
CN109629711A (en) A kind of superposed type corrugated sheet steel wall Core Walls Structure-light gauge cold-formed steel shape composite wall structure
CN106436969B (en) A kind of side intersection of cracking is put more energy into profiled sheet shear wall
CN105735529B (en) A kind of stull formula steel frame steel plate shear wall structure being easily assembled
CN108166648A (en) A kind of armor formula steel plate concrete shear wall and its arrangement and method for construction
CN106592817A (en) Composite steel plate shear wall structure
CN110331799A (en) The trapezoidal corrugated plating shear wall of Low Yield Point Steel
CN207934185U (en) A kind of detachably prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN207277608U (en) Prestress steel strip masonry faced wall
CN108222325A (en) A kind of long-life steel plate concrete shear wall and its arrangement and method for construction

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180615