CN108163140A CN201711424008.0A CN201711424008A CN108163140A CN 108163140 A CN108163140 A CN 108163140A CN 201711424008 A CN201711424008 A CN 201711424008A CN 108163140 A CN108163140 A CN 108163140A
Authority
CN
China
Prior art keywords
bottom plate
ship
segmentation
floor
jigsaw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711424008.0A
Other languages
Chinese (zh)
Other versions
CN108163140B (en
Inventor
姜甲志
高雯雯
韩松标
王辉辉
王小宁
陈曙东
司昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201711424008.0A priority Critical patent/CN108163140B/en
Publication of CN108163140A publication Critical patent/CN108163140A/en
Application granted granted Critical
Publication of CN108163140B publication Critical patent/CN108163140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of methods of construction of width type segmentation, belong to shipbuilding technical field.This method includes the following steps:Step 1, bottom plate is divided into the first bottom plate and the second bottom plate, step 2, build the first bottom plate and the second bottom plate respectively on moulding bed, step 3, installation component forms the first segmentation on the first bottom plate, framework on the second bottom plate is installed and forms the second segmentation, step 4, the precision of first bottom plate and the second bottom plate is measured and controlled, step 5, flat fillet weld in first segmentation and the second segmentation and fillet welding in the vertical position are welded, step 6, first segmentation and the second segmentation close up forming width type segmentation, step 7, 180 degree is turned over into width type segmentation, and it freezes to the fillet weld in the flat position in width type segmentation.In this method, width type segmentation is divided into the first segmentation and the second segmentation, and the two is built with tire, can effectively reduce and upwarp phenomenon because of what bottom plate caused by welding and outside plate occurred.

Description

A kind of method of construction of width type segmentation
Technical field
The invention belongs to shipbuilding technical field, more particularly to a kind of method of construction of width type segmentation.
Background technology
Width type is segmented the bottom section for referring to ship bow stern, at the bow stern both ends of ship, the change width of ship It is obvious, and width type segmentation in, port and starboard be in same segmentation, the installation of floor and stringers is more Closely, welding density is larger, and the stressing conditions of segmentation are complicated, because the outside plate line style of width type segmentation is larger, is needed in welding Use CO2Carry out manual welding, more than reason cause welding after width type be segmented deformation it is larger, bottom plate and outside plate easily generate Larger accuracy error, the both ends of bottom plate and the both sides of outside plate easily upwarp, and cause in the subsequent ship closure stage It is difficult to close up assembling, as shown in Figure 1, solid line a is the width type segmentation vertical section exterior contour in design in Fig. 1, in Fig. 1 Dotted line b is to be segmented vertical section exterior contour using width type during conventional construction method.In order to which be smoothed out ship closes up assembling, It needs to repair width type segmentation, expends the more time, seriously affected the progress of shipbuilding, therefore width type point The construction one of section is directly subordinate to an important difficult point during shipbuilding.
Invention content
For the deficiencies in the prior art, the present invention proposes a kind of method of construction of width type segmentation, for solving The problem of certainly existing width type segmentation is difficult to build.
A kind of method of construction of width type segmentation, includes the following steps:
Step 1: the bottom plate that width type is segmented is divided by the first bottom plate and the second bottom plate, first bottom according to existing plate stitch The line of demarcation of plate and the second bottom plate is a weld seam nearest away from hull center line on bottom plate;
Step 2: making moulding bed, the first bottom plate jigsaw is laid on moulding bed, the first bottom plate jigsaw is fixed on moulding bed, to the Gap between one bottom plate jigsaw carries out tack welding and forms the first bottom plate, the second bottom plate jigsaw is laid on moulding bed, by the second bottom Plate jigsaw is fixed on moulding bed, and the gap between the second bottom plate jigsaw carries out tack welding and forms the second bottom plate;
Step 3: installing the first floor on the first bottom plate, the first floor is from close in the erection sequence of ship left and right directions One lateral topside of hull center line is gradually installed, and tack welding is carried out between the first bottom plate and the first floor, on the first bottom plate First side stringers is installed, tack welding is carried out between the first side stringers and the first bottom plate, to the first side stringers and the first floor it Between carry out tack welding, the first outside plate jigsaw is installed in the top of the first side stringers and the first floor, the first outside plate jigsaw exists The erection sequence of ship left and right directions is gradually installed from the lateral topside close to hull center line, to the first outside plate jigsaw it Between carry out tack welding formed the first outside plate, carry out tack welding between the first outside plate jigsaw and the first floor, to the first outside plate spell Tack welding is carried out between plate and the first side stringers, the first segmentation is formed, the second floor is installed on the second bottom plate, the second floor exists The erection sequence of ship left and right directions is gradually installed from close to one lateral topside of hull center line, to the second bottom plate and the second rib Tack welding is carried out between plate, on the second bottom plate install in stringers and the second side stringers, between centering stringers and the second bottom plate into Row tack welding carries out tack welding between centering stringers and the second floor, positioned between the second side stringers and the second bottom plate Weldering, carries out tack welding between the second side stringers and the second floor, pacifies in the top of middle stringers, the second side stringers and the second floor The second outside plate jigsaw is filled, the second outside plate jigsaw is from close to the one of hull center line in the erection sequence of ship left and right directions Lateral topside is gradually installed, and is carried out tack welding between the second outside plate jigsaw and middle stringers, is carried out between the second outside plate jigsaw Tack welding forms the second outside plate, and tack welding is carried out between the second outside plate jigsaw and the second floor, to the second outside plate jigsaw and the Tack welding is carried out between two side stringers, forms the second segmentation;
Step 4: the levelness of the first bottom plate and the second bottom plate is examined, if the levelness deviation at four angles of the first bottom plate is more than 10 Millimeter, then the levelness of the first bottom plate is unqualified, needs to repair the first bottom plate, if the levelness at first four angles of bottom plate Deviation is no more than 10 millimeters, then the levelness of the first bottom plate is qualified, the levelness of the second bottom plate is examined, if four angles of the second bottom plate Levelness deviation more than 10 millimeters, then the levelness of the second bottom plate is unqualified, needs to repair the second bottom plate, if second The levelness deviation at four angles of bottom plate is no more than 10 millimeters, then the levelness of the second bottom plate is qualified;
Step 5: to first segmentation in fillet weld in the flat position and fillet weld in the vertical position freeze, to second segmentation in fillet weld in the flat position and Fillet weld in the vertical position freezes;
Step 6: the first segmentation and the second segmentation are closed up, the weld seam between the first bottom plate and the second bottom plate is burnt Weldering, the weld seam between the first floor and the second bottom plate is freezed, the weld seam between the first floor and middle stringers is burnt Weldering, the weld seam between the first floor and the second outside plate is freezed, and the weld seam between the first outside plate and the second outside plate is carried out It freezes, forms width type segmentation;
Step 7 by width type sectional turn-over 180 degree, freezes to the fillet weld in the flat position after turn in width type segmentation, overall with Type sectional construction finishes.
Preferably, in the step 3, the width type for being in ship fore body is segmented, first floor is in ship bow The erection sequence in stern direction is installed successively from the stern direction of ship to the fore body direction of ship, and the first outside plate jigsaw exists The erection sequence in ship bow stern direction is installed successively from the stern direction of ship to the fore body direction of ship, second floor Erection sequence in ship bow stern direction is installed successively from the stern direction of ship to the fore body direction of ship, outside described second Erection sequence of the plate jigsaw in ship bow stern direction is installed successively from the stern direction of ship to the fore body direction of ship, for Width type segmentation in ship stern, erection sequence of first floor in ship bow stern direction is from the fore body side of ship It is installed successively to the stern direction of ship, erection sequence of the first outside plate jigsaw in ship bow stern direction is from ship Fore body direction is installed successively to the stern direction of ship, and erection sequence of second floor in ship bow stern direction is from ship Fore body direction installed successively to the stern direction of ship, erection sequence of the second outside plate jigsaw in ship bow stern direction is It is installed successively from the fore body direction of ship to the stern direction of ship.
Preferably, in the step 2 and step 3, the standard of the tack welding is every 300-500 millimeters of butt welding seam welds Connect 30-50 millimeters.
Preferably, in the step 2 and step 3, the one of foot welding height when the height of the tack welding is normal welding Half.
Preferably, in the step 3, the coplanar degree tolerance of bow stern section of first segmentation and the second segmentation is both needed to control System is within 5 millimeters.
Preferably, in the step 3, the groove gap of the weld seam between first floor need to control 16 millimeters with Interior, the groove gap of the weld seam between second floor need to be controlled within 16 millimeters, between the first outside plate jigsaw The groove gap of weld seam need to be controlled within 16 millimeters, and the groove gap of the weld seam between the second outside plate jigsaw need to control Within 16 millimeters.
Preferably, in the step 5, during freezing to the fillet weld in the flat position in the first segmentation and fillet weld in the vertical position, Must use total powerstation to monitoring position measured in real time, and by the coordinate and model that monitor position monitoring position coordinate into Row matching is compared, and the monitoring position refers to intersection between the first segment end portion component and component, in the second segmentation Fillet weld in the flat position and during fillet weld in the vertical position freezed, total powerstation must be used to measure monitoring position in real time, and will supervise The coordinate that position is monitored in coordinate and model that location is put carries out matching comparison, and the monitoring position refers to the second segment end portion Intersection between component and component while monitoring position is measured in real time using total powerstation, also needs to use total powerstation Reference point is measured, the reference point refers to the friendship of the second segment end portion hull center line and the second bottom plate Molded Line Point.
The three-dimensional coordinate of the reference point measured is matched in model, the three-dimensional coordinate for monitoring position is then matched to mould The model coordinate of monitoring position is obtained in type, the theoretical coordinate that position is monitored in the model coordinate and model that monitor position is carried out Compare, if monitoring position model coordinate and model in monitoring position theoretical coordinate between offset more than 10 millimeters, The deformation for then monitoring position is larger, needs to carry out reparation repairing at error to building.
Preferably, it in the step 7, during the fillet weld in the flat position in being segmented to width type freezes, must use complete Instrument of standing measures monitoring position in real time, and the coordinate that position is monitored in the coordinate and model that monitor position is carried out matching ratio Compared with the monitoring position refers to intersection between width type segment end portion component and component, is utilizing total powerstation to monitoring position It puts while measured in real time, also needs to measure reference point using total powerstation, the reference point refers to width type The intersection point of subsection part hull center line and the second bottom plate Molded Line.
The three-dimensional coordinate of the reference point measured is matched in model, the three-dimensional coordinate for monitoring position is then matched to mould The model coordinate of monitoring position is obtained in type, the theoretical coordinate that position is monitored in the model coordinate and model that monitor position is carried out Compare, if monitoring position model coordinate and model in monitoring position theoretical coordinate between offset more than 10 millimeters, The deformation for then monitoring position is larger, needs to carry out reparation repairing at error to building.
While being measured in real time commissure using total powerstation, also need using total powerstation to the first segmentation and second Segmentation measures, and the three-dimensional coordinate in the three-dimensional coordinate and model that measure is compared, if the three of the commissure measured For offset in dimension coordinate and model between the three-dimensional coordinate of commissure more than 10 millimeters, then commissure deformation is larger, needs pair It builds and carries out reparation repairing at error.
The beneficial effects of the invention are as follows:Width type is divided into the first segmentation and the second segmentation, the first segmentation by the present invention It is built with the second segmentation with tire, the component being easily installed in the first segmentation and the second segmentation, convenient for the first segmentation of control and second Precision between segmentation after the completion of building the first segmentation and the second segmentation respectively closes up, forms width type segmentation again, can To effectively reduce because bottom plate and outside plate caused by welding upwarp, the build guality of ship is improved, reduce overall with The patch work amount of type segmentation improves the efficiency of construction of width type segmentation.
Description of the drawings
Fig. 1 is the deformation schematic diagram that the vertical section that width type is segmented when being built using conventional method occurs.
Fig. 2 is the vertical section structure schematic diagram of the first segmentation in the method for construction that width type of the present invention is segmented.
Fig. 3 is the vertical section structure schematic diagram of the second segmentation in the method for construction that width type of the present invention is segmented.
Fig. 4 is the first segmentation and the vertical section structure before the second segment folding in the method for construction that width type of the present invention is segmented Schematic diagram.
Fig. 5 is the first segmentation and the vertical section structure after the second segment folding in the method for construction that width type of the present invention is segmented Schematic diagram.
In Fig. 2 to Fig. 5:1 is the first bottom plate, and 2 be the second bottom plate, and 3 be moulding bed, and 4 be the first floor, and 5 be the first side stringers, 6 be the first outside plate, and 7 be the second floor, and 8 be middle stringers, and 9 be the second side stringers, and 10 be the second outside plate.
Specific embodiment
It is done further come the method for construction being segmented to width type of the present invention with specific case study on implementation below in conjunction with the accompanying drawings It elaborates, in the hope of being more fully apparent from expresses the structure feature and concrete application of the present invention, but cannot this be limited with this The protection domain of invention.
Embodiment:A kind of method of construction of width type segmentation, as shown in Figures 2 to 5, includes the following steps:
Step 1: the bottom plate that width type is segmented is divided by the first bottom plate 1 and the second bottom plate 2 according to existing plate stitch, described first The line of demarcation of 1 and second bottom plate 2 of bottom plate is a weld seam nearest away from hull center line on bottom plate;
Step 2: making moulding bed 3, the first bottom plate jigsaw is laid on moulding bed, the first bottom plate jigsaw is fixed on moulding bed 3, it is right Gap between first bottom plate jigsaw carries out tack welding and forms the first bottom plate 1, the second bottom plate jigsaw is laid on moulding bed, by second Bottom plate jigsaw is fixed on moulding bed 3, and the gap between the second bottom plate jigsaw carries out tack welding and forms the second bottom plate 2;
Step 3: install the first floor 4 on the first bottom plate 1, the first floor 4 the erection sequence of ship left and right directions be from by Nearly one lateral topside of hull center line is gradually installed, and tack welding is carried out between the first bottom plate 1 and the first floor 4, at the first bottom First side stringers 5 on plate 1 is installed, tack welding is carried out between the first side stringers 5 and the first bottom plate 1, to the first side stringers 5 and Carry out tack welding between one floor 4, the top of the first side stringers 5 and the first floor 4 install the first outside plate jigsaw, described first Outside plate jigsaw in the erection sequence of ship left and right directions is gradually installed from the lateral topside close to hull center line, to first Tack welding is carried out between outside plate jigsaw and forms the first outside plate 6, tack welding is carried out between the first outside plate jigsaw and the first floor 4, Tack welding is carried out between the first outside plate jigsaw and the first side stringers 5, the first segmentation is formed, second is installed on the second bottom plate 2 Floor 7, the second floor 7 in the erection sequence of ship left and right directions are gradually installed from close to one lateral topside of hull center line, Tack welding is carried out between the second bottom plate 2 and the second floor 7, stringers 8 and the second side stringers 9 in being installed on the second bottom plate 2 are right Tack welding is carried out between middle 8 and second bottom plate 2 of stringers, tack welding is carried out between 8 and second floor 7 of centering stringers, to the second side Tack welding is carried out between 9 and second bottom plate 2 of stringers, tack welding is carried out between 9 and second floor 7 of the second side stringers, is indulged in Purlin 8, the second outside plate jigsaw of top installation of 9 and second floor 7 of the second side stringers, the second outside plate jigsaw is in ship right and left To erection sequence be gradually to be installed from the lateral topside close to hull center line, to the second outside plate jigsaw and middle stringers 8 it Between carry out tack welding, between the second outside plate jigsaw carry out tack welding formed the second outside plate 10, to the second outside plate jigsaw and second Tack welding is carried out between floor 7, tack welding is carried out between the second outside plate jigsaw and the second side stringers 9, forms the second segmentation;
Step 4: the levelness of the first bottom plate 1 and the second bottom plate 2 is examined, if the levelness deviation at 1 four angles of the first bottom plate is more than 10 millimeters, then the levelness of the first bottom plate 1 is unqualified, needs to repair the first bottom plate 1, if 1 four angles of the first bottom plate Levelness deviation is no more than 10 millimeters, then the levelness of the first bottom plate 1 is qualified, the levelness of the second bottom plate 2 is examined, if the second bottom The levelness deviation at 2 four angles of plate is more than 10 millimeters, then the levelness of the second bottom plate 2 is unqualified, needs to carry out the second bottom plate 2 It repairs, if the levelness deviation at 2 four angles of the second bottom plate is no more than 10 millimeters, the levelness of the second bottom plate 2 is qualified;
Step 5: to first segmentation in fillet weld in the flat position and fillet weld in the vertical position freeze, to second segmentation in fillet weld in the flat position and Fillet weld in the vertical position freezes;
Step 6: the first segmentation and the second segmentation are closed up, the weld seam between the first bottom plate 1 and the second bottom plate 2 is carried out It freezes, the weld seam between the first floor 4 and the second bottom plate 2 is freezed, by the weld seam between the first floor 4 and middle stringers 8 Freeze, the weld seam between the first floor 4 and the second outside plate 10 freezed, by the first outside plate 6 and the second outside plate 10 it Between weld seam freeze, formed width type segmentation;
Step 7 by width type sectional turn-over 180 degree, freezes to the fillet weld in the flat position after turn in width type segmentation, overall with Type sectional construction finishes.
In the step 2, when the first bottom plate jigsaw and the second bottom plate jigsaw are fixed on moulding bed, tack welding is selected Mode is fixed.
In the step 3, the width type for being in ship fore body is segmented, first floor 4 is in ship bow stern direction Erection sequence be to be installed successively from the stern direction of ship to the fore body direction of ship, the first outside plate jigsaw is in ship bow The erection sequence in stern direction is installed successively from the stern direction of ship to the fore body direction of ship, and second floor 7 is in ship The erection sequence in oceangoing ship bow stern direction is installed successively from the stern direction of ship to the fore body direction of ship, and second outside plate is spelled Erection sequence of the plate in ship bow stern direction is installed successively from the stern direction of ship to the fore body direction of ship, for being in The width type segmentation of ship stern, erection sequence of first floor 4 in ship bow stern direction is from the fore body direction of ship It is installed successively to the stern direction of ship, erection sequence of the first outside plate jigsaw in ship bow stern direction is the bow from ship Portion direction is installed successively to the stern direction of ship, and erection sequence of second floor 7 in ship bow stern direction is from ship Fore body direction installed successively to the stern direction of ship, erection sequence of the second outside plate jigsaw in ship bow stern direction is It is installed successively from the fore body direction of ship to the stern direction of ship.
In the step 2 and step 3, the standard of the tack welding is every 300-500 millimeters of butt welding seam welding 30-50 Millimeter.
In the step 2 and step 3, the half of foot welding height when the height of the tack welding is normal welding.
In the step 3, the coplanar degree tolerance of the bow stern section of first segmentation and the second segmentation is both needed to control 5 Within millimeter.
In the step 3, the groove gap of the weld seam between first floor 4 need to be controlled within 16 millimeters, described The groove gap of weld seam between second floor 7 need to be controlled within 16 millimeters, the weld seam between the first outside plate jigsaw Groove gap need to be controlled within 16 millimeters, and the groove gap of the weld seam between the second outside plate jigsaw need to be controlled at 16 millimeters Within.
In the step 5, during freezing to the fillet weld in the flat position in the first segmentation and fillet weld in the vertical position, it must use Total powerstation measures monitoring position in real time, and the coordinate for monitoring position is matched with monitoring the coordinate of position in model Compare, the monitoring position refers to intersection between the first segment end portion component and component, to the straight angle in the second segmentation During weld seam and fillet weld in the vertical position are freezed, total powerstation must be used to measure, and position will be monitored monitoring position in real time Coordinate and model in the coordinate of monitoring position carry out matching comparison, the monitoring position refer to the second segment end portion component with Intersection between component while being measured in real time monitoring position using total powerstation, is also needed using total powerstation to reference Point measures, and the reference point refers to the intersection point of 2 Molded Line of the second segment end portion hull center line and the second bottom plate.
The three-dimensional coordinate of the reference point measured is matched in model, the three-dimensional coordinate for monitoring position is then matched to mould The model coordinate of monitoring position is obtained in type, the theoretical coordinate that position is monitored in the model coordinate and model that monitor position is carried out Compare, if monitoring position model coordinate and model in monitoring position theoretical coordinate between offset more than 10 millimeters, The deformation for then monitoring position is larger, needs to carry out reparation repairing at error to building.
In the step 7, during the fillet weld in the flat position in being segmented to width type freezes, total powerstation pair must be used Monitoring position is measured in real time, and the coordinate that position is monitored in the coordinate and model that monitor position is carried out matching comparison, institute It states monitoring position and refers to intersection between width type segment end portion component and component, monitoring position is being carried out using total powerstation While measurement in real time, also need to measure reference point using total powerstation, the reference point refers to width type subsection part The intersection point of hull center line and the second bottom plate Molded Line.
The three-dimensional coordinate of the reference point measured is matched in model, the three-dimensional coordinate for monitoring position is then matched to mould The model coordinate of monitoring position is obtained in type, the theoretical coordinate that position is monitored in the model coordinate and model that monitor position is carried out Compare, if monitoring position model coordinate and model in monitoring position theoretical coordinate between offset more than 10 millimeters, The deformation for then monitoring position is larger, needs to carry out reparation repairing at error to building.
In the step 7, during the flat fillet weld in being segmented to width type is freezed, it should be noted welder on a left side The number of the side of a ship and starboard need to be evenly arranged.
In the present embodiment, when examining the levelness of the first bottom plate 1 and the second bottom plate 2, level meter can be used to the first bottom The levelness of 1 and second bottom plate 2 of plate measures.
In the present embodiment, the line of demarcation of the first bottom plate 1 and the second bottom plate 2 is in hull center line close to the first bottom plate 1 Side, so middle stringers 8 is mounted on the second bottom plate 2.
In the present embodiment, width type segmentation is divided into the first segmentation and the second segmentation, and first is segmented and second point Section with tire build, first segmentation and second segmentation building course in begin to control first segmentation between structural relation and Size relationship, and will be because welding the stress deformation generated during the first segmentation of construction and second are segmented with regard to carrying out Finishing, generated stress deformation when being segmented the first segmentation and the second segment folding for width type so as to effectively reduce, Simultaneously first segmentation be segmented with the second segment folding into width type when, can also easily adjust again two be segmented Levelness so as to improve the precision of width type segmentation, reduces the repairing amount of width type segmentation, so as to preferably ensure Shipbuilding quality.
In the present embodiment, the line of demarcation of the first bottom plate 1 and the second bottom plate 2 is a weld seam near hull center line, This weld seam just has existed in the existing Ship Design stage, needs not move through in addition the first bottom plate 1 of design and the second bottom plate 2 Line of demarcation, therefore the first bottom plate jigsaw, the second bottom plate jigsaw, the first floor 4, the second floor 7, the first outside plate jigsaw and second The size of outside plate jigsaw does not need to redesign, so as to reduce the workload of design phase.In the present embodiment, the first segmentation It is built with the second segmentation with tire, just the first segmentation of control and the second segmentation during the first segmentation and the second segmentation is built Between structural relation and size relationship, convenient for effectively control the first segmentation and second be segmented construction precision, convenient for first segmentation With closing up for the second segmentation.
Described model is in three dimensional analysis software in the present embodiment(" the ship of the Chinese Shipbuilding Co., Ltd's exploitation in Shanghai east Product three-dimensional design system ")The middle threedimensional model for establishing body section, the size and actual hull of each component in the threedimensional model In each component size it is identical.

Claims (5)

1. a kind of method of construction of width type segmentation, which is characterized in that this method includes the following steps:
Step 1: the bottom plate that width type is segmented is divided by the first bottom plate according to existing plate stitch(1)With the second bottom plate(2), it is described First bottom plate(1)With the second bottom plate(2)Line of demarcation be a weld seam nearest away from hull center line on bottom plate;
Step 2: make moulding bed(3), in moulding bed(3)The first bottom plate jigsaw of upper laying, moulding bed is fixed on by the first bottom plate jigsaw (3)On, the gap between the first bottom plate jigsaw carries out tack welding and forms the first bottom plate(1), in moulding bed(3)The second bottom of upper laying Second bottom plate jigsaw is fixed on moulding bed by plate jigsaw(3)On, gap between the second bottom plate jigsaw carries out tack welding and forms the Two bottom plates(2);
Step 3: in the first bottom plate(1)The first floor of upper installation(4), the first floor(4)In the erection sequence of ship left and right directions It is gradually to be installed from close to one lateral topside of hull center line, to the first bottom plate(1)With the first floor(4)Between positioned Weldering, in the first bottom plate(1)The first side stringers of upper installation(5), to the first side stringers(5)With the first bottom plate(1)Between positioned Weldering, to the first side stringers(5)With the first floor(4)Between carry out tack welding, in the first side stringers(5)With the first floor(4)'s The first outside plate jigsaw is installed in top, and the first outside plate jigsaw is from close to hull center in the erection sequence of ship left and right directions One lateral topside of line is gradually installed, and tack welding is carried out between the first outside plate jigsaw and forms the first outside plate(6), to the first outside plate Jigsaw and the first floor(4)Between carry out tack welding, to the first outside plate jigsaw and the first side stringers(5)Between carry out tack welding, The first segmentation is formed, in the second bottom plate(2)The second floor of upper installation(7), the second floor(7)It is suitable in the installation of ship left and right directions Sequence is gradually installed from close to one lateral topside of hull center line, to the second bottom plate(2)With the second floor(7)Between positioned Weldering, in the second bottom plate(2)Stringers in upper installation(8)With the second side stringers(9), centering stringers(8)With the second bottom plate(2)Between into Row tack welding, centering stringers(8)With the second floor(7)Between carry out tack welding, to the second side stringers(9)With the second bottom plate(2) Between carry out tack welding, to the second side stringers(9)With the second floor(7)Between carry out tack welding, in middle stringers(8), the second side Stringers(9)With the second floor(7)Top install the second outside plate jigsaw, the second outside plate jigsaw is in the peace of ship left and right directions Dress sequence is gradually installed from the lateral topside close to hull center line, to the second outside plate jigsaw and middle stringers(8)Between into Row tack welding carries out tack welding the second outside plate of formation between the second outside plate jigsaw(10), to the second outside plate jigsaw and the second rib Plate(7)Between carry out tack welding, to the second outside plate jigsaw and the second side stringers(9)Between carry out tack welding, form the second segmentation;
Step 4: examine the first bottom plate(1)With the second bottom plate(2)Levelness, if the first bottom plate(1)The levelness at four angles is inclined Difference is more than 10 millimeters, then the first bottom plate(1)Levelness it is unqualified, need to the first bottom plate(1)It is repaired, if the first bottom plate (1)The levelness deviation at four angles is no more than 10 millimeters, then the first bottom plate(1)Levelness it is qualified, examine the second bottom plate(2)'s Levelness, if the second bottom plate(2)The levelness deviation at four angles is more than 10 millimeters, then the second bottom plate(2)Levelness it is unqualified, It needs to the second bottom plate(2)It is repaired, if the second bottom plate(2)The levelness deviation at four angles is no more than 10 millimeters, then and second Bottom plate(2)Levelness it is qualified;
Step 5: to first segmentation in fillet weld in the flat position and fillet weld in the vertical position freeze, to second segmentation in fillet weld in the flat position and Fillet weld in the vertical position freezes;
Step 6: the first segmentation and the second segmentation are closed up, by the first bottom plate(1)With the second bottom plate(2)Between weld seam It freezes, by the first floor(4)With the second bottom plate(2)Between weld seam freeze, by the first floor(4)With middle stringers (8)Between weld seam freeze, by the first floor(4)With the second outside plate(10)Between weld seam freeze, will be outside first Plate(6)With the second outside plate(10)Between weld seam freeze, formed width type segmentation;
Step 7 by width type sectional turn-over 180 degree, freezes to the fillet weld in the flat position after turn in width type segmentation, overall with Type sectional construction finishes.
2. the method for construction of a kind of width type segmentation according to claim 1, which is characterized in that right in the step 3 In the width type segmentation in ship fore body, first floor(4)Erection sequence in ship bow stern direction is from ship Stern direction is installed successively to the fore body direction of ship, erection sequence of the first outside plate jigsaw in ship bow stern direction be from The stern direction of ship is installed successively to the fore body direction of ship, second floor(7)Installation in ship bow stern direction is suitable Sequence is installed successively from the stern direction of ship to the fore body direction of ship, and the second outside plate jigsaw is in ship bow stern direction Erection sequence is installed successively from the stern direction of ship to the fore body direction of ship, for being in the width type point of ship stern Section, first floor(4)Erection sequence in ship bow stern direction is the stern direction from the fore body direction of ship to ship It installs successively, erection sequence of the first outside plate jigsaw in ship bow stern direction is the stern from the fore body direction of ship to ship Portion is installed in direction successively, second floor(7)Erection sequence in ship bow stern direction is from the fore body direction of ship to ship The stern direction of oceangoing ship is installed successively, and erection sequence of the second outside plate jigsaw in ship bow stern direction is from the fore body side of ship It is installed successively to the stern direction of ship.
3. the method for construction of a kind of width type segmentation according to claim 1, which is characterized in that the step 2 and step In three, the standard of the tack welding is every 300-500 millimeters of 30-50 millimeters of butt welding seam welding.
4. a kind of method of construction of width type segmentation according to claim 1, which is characterized in that in the step 3, institute The coplanar degree tolerance for stating the bow stern section of the first segmentation and the second segmentation is both needed to control within 5 millimeters.
5. a kind of method of construction of width type segmentation according to claim 1, which is characterized in that in the step 3, institute State the first floor(4)Between the groove gap of weld seam need to control within 16 millimeters, second floor(7)Between weld seam Groove gap need to control within 16 millimeters, the groove gap of the weld seam between the first outside plate jigsaw need to be controlled in 16 millis Within rice, the groove gap of the weld seam between the second outside plate jigsaw need to be controlled within 16 millimeters.
CN201711424008.0A 2017-12-25 2017-12-25 A kind of method of construction of width type segmentation Active CN108163140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711424008.0A CN108163140B (en) 2017-12-25 2017-12-25 A kind of method of construction of width type segmentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711424008.0A CN108163140B (en) 2017-12-25 2017-12-25 A kind of method of construction of width type segmentation

Publications (2)

Publication Number Publication Date
CN108163140A true CN108163140A (en) 2018-06-15
CN108163140B CN108163140B (en) 2019-10-15

Family

ID=62520622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711424008.0A Active CN108163140B (en) 2017-12-25 2017-12-25 A kind of method of construction of width type segmentation

Country Status (1)

Country Link
CN (1) CN108163140B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110789678A (en) * 2019-09-25 2020-02-14 沪东中华造船(集团)有限公司 Method for butt joint assembly of bottom sections of chemical ship
CN110937079A (en) * 2019-10-24 2020-03-31 上海江南长兴造船有限责任公司 Double-layer bottom box position precision control method for large container ship
CN115092348A (en) * 2022-07-05 2022-09-23 上海外高桥造船有限公司 Large-scale cruise ship bow side-pushing segmented construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101544268A (en) * 2009-05-05 2009-09-30 沪东中华造船(集团)有限公司 Method for half-breadth double-span total assembling and building in shipbuilding
CN104743059A (en) * 2015-03-25 2015-07-01 沪东中华造船(集团)有限公司 Method for ship body annular multi-block pre-correction
CN104908885A (en) * 2015-06-30 2015-09-16 沪东中华造船(集团)有限公司 Overall manufacture method for forecastle bulwark of ship
CN105882891A (en) * 2015-09-18 2016-08-24 上海江南长兴重工有限责任公司 Section construction method of hatch coaming and ship side
CN107399412A (en) * 2016-05-19 2017-11-28 烟台中集来福士海洋工程有限公司 MOPU method of construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101544268A (en) * 2009-05-05 2009-09-30 沪东中华造船(集团)有限公司 Method for half-breadth double-span total assembling and building in shipbuilding
CN104743059A (en) * 2015-03-25 2015-07-01 沪东中华造船(集团)有限公司 Method for ship body annular multi-block pre-correction
CN104908885A (en) * 2015-06-30 2015-09-16 沪东中华造船(集团)有限公司 Overall manufacture method for forecastle bulwark of ship
CN105882891A (en) * 2015-09-18 2016-08-24 上海江南长兴重工有限责任公司 Section construction method of hatch coaming and ship side
CN107399412A (en) * 2016-05-19 2017-11-28 烟台中集来福士海洋工程有限公司 MOPU method of construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110789678A (en) * 2019-09-25 2020-02-14 沪东中华造船(集团)有限公司 Method for butt joint assembly of bottom sections of chemical ship
CN110937079A (en) * 2019-10-24 2020-03-31 上海江南长兴造船有限责任公司 Double-layer bottom box position precision control method for large container ship
CN115092348A (en) * 2022-07-05 2022-09-23 上海外高桥造船有限公司 Large-scale cruise ship bow side-pushing segmented construction process
CN115092348B (en) * 2022-07-05 2023-07-04 上海外高桥造船有限公司 Large-scale mail wheel bow side pushing sectional construction process

Also Published As

Publication number Publication date
CN108163140B (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN111532379B (en) Ship anchor platform structure and processing method thereof
CN108163140A (en) A kind of method of construction of width type segmentation
CN102407921B (en) Mounting method for sectional inversely hung rudder arm
WO2017121315A1 (en) Construction method for building truss and floor slab
CN107498269B (en) A kind of large-scale ship reception chamber manufacturing method suitable for dry type ship compartment room
CN103625603B (en) A kind of ship hull plate relative contour anchor recess setting-out manufacture method
CN108177730A (en) A kind of integrated method of construction of topside segmentation
CN106354934B (en) A kind of Material Stiffened Panel Damage Tolerance Analysis method solved based on finite element analysis
CN102874379B (en) Manufacture method of offshore riprap leveling ship
CN107499454A (en) A kind of control method of the ship body segment carrying precision based on OTS
CN107905182B (en) Large span gates of segmental shape installation accuracy control method
CN106041295A (en) Welding control method and device
CN110877674B (en) Positioning process of double rudder horn on subsection
CN101464428B (en) Supersonic inspection method for profiled bar overwelded hole welding joint
CN110667799A (en) Three-dimensional measurement data precision evaluation method based on hull segmented structure
CN113911284A (en) Precision control method for assembling and carrying P-type total sections on chemical ship
CN205977242U (en) Be used for two lining platform truck end steel limit waterstop anchor clamps in tunnel
CN108202846A (en) A kind of secondary localization method to lie up of ship
CN113714748B (en) Manufacturing method of large wind tunnel contraction section
CN107323610A (en) Main engine bed, the installation method in gear block block stage
CN104908886B (en) A kind of installation method of ship energy saving fin keel
CN113928504A (en) Shaft-rudder integrated sectional construction process
CN112918634B (en) Precision control method for ship anchoring system structure
CN110877681A (en) Large-span deck flatness control process
CN113148058A (en) Process for installing and positioning double-rudder sleeve and tail casting in segmented construction stage

Legal Events

Date Code Title Description