CN108155599A - The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line - Google Patents

The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line Download PDF

Info

Publication number
CN108155599A
CN108155599A CN201810154077.2A CN201810154077A CN108155599A CN 108155599 A CN108155599 A CN 108155599A CN 201810154077 A CN201810154077 A CN 201810154077A CN 108155599 A CN108155599 A CN 108155599A
Authority
CN
China
Prior art keywords
swing arm
rope
transmission line
snake
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810154077.2A
Other languages
Chinese (zh)
Other versions
CN108155599B (en
Inventor
李志宏
汪春凤
李承印
黄炜
杨晶
王泉
金浩
雷清然
鄂天龙
张富平
刘钊
李伟
祖金龙
王帆
张四江
黄迎珠
冯扬州
冯玉功
吕旭东
王泷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Gansu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Gansu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Gansu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810154077.2A priority Critical patent/CN108155599B/en
Publication of CN108155599A publication Critical patent/CN108155599A/en
Application granted granted Critical
Publication of CN108155599B publication Critical patent/CN108155599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Catching Or Destruction (AREA)

Abstract

The invention discloses the round-the-clock unfolding device of guide rope is crossed over above a kind of overhead transmission line, including supporting rod, secondary swing arm bar, snake saves swing arm, rotating device, stabiliser bar, it is stably connected with rope, connecting rope, pedestal, rotating device bottom is equipped with flange plate structure, supporting rod lower part is located in centre hole of base, the snake section swing arm is flexibly connected with secondary swing arm bar in end, the snake section swing arm is equipped with tie point, it is connected to tie point and post upper is equipped with connecting rope, the supporting rod is with stabiliser bar in middle part vertical connection, stabiliser bar is connected to by being stably connected with rope in snake section swing arm at both ends.The characteristics of this technology is invented is to realize that the unfoldings such as power transmission sequence spanning the transmission line road, highway, electric railway across rope, realize the purpose across unfolding overhead transmission line of power circuit.Crossing construction job safety risk can effectively be lowered, do not influence to be spanned the normal operation of object, realize maximization of economic benefit.

Description

The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line
Technical field
The present invention relates to overhead transmission line road technical field of construction, and in particular, to above a kind of overhead transmission line Across the round-the-clock unfolding device of guide rope.
Background technology
Aerial power transmission line construction will be often carried out in assuming across the overhead power circuit of different voltages grade, connection Road and highway high speed highway, electric railway and high-speed railway etc..In order to realize that reduction is spanned the operation of object and ensures safety The power circuit drag rope unfolding or recycling that will be crossed over after generally use is to being spanned the closing of object operation suspension are real after crossing over Put the operational method for putting wire construction to good use.Explore it is a kind of not to be spanned power circuit have a power failure, by iron electric railway stop transport, It is that particularly extra-high voltage is defeated during numerous electricity power engineerings are built not close and realize the device across spreading guiding rope highway Electric line engineering key technology urgently to be resolved hurrily.
The defects of prior art:
1. from the point of view of field investigation situation, across power circuit, highway, the railway in operation above overhead transmission line Deng using to set up metal, bamboo and wood across object both sides isostructural across frame body, being crossed on frame body by fixed rope Object overhung block device, protection are spanned application solutions economical operation.The safe operation of object is spanned generally for guarantee With crossing construction job safety, it will be spanned that power circuit has a power failure, will be spanned highway pause closing, will to be spanned railway temporary After stopping by after manually rope is rolled over to is spanned the top of object, packed up at its both ends leave be spanned above object after be fixed on Recovery is spanned the operation of object after the safe distance for keeping certain to being spanned object on across frame body.The program is to being spanned object fortune Certain economic loss is built into, has certain difficulty and time restriction in object manually browsing to be spanned.
2. it is to be crossed by the rope of an artificial piece diameter 8-12mm of throwing across after object to be spanned spreading guiding rope above object, Above artificial both ends lift-off to leap object of hauling.It is long that this work shifts to an earlier date time, using tool is more, labor intensive It is more, working efficiency is low.
3. transmit the preliminary leading rope that light-weight diameter is not more than 5 millimeters using remotely pilotless Aircraft Air, it is existing not Guide rope is easy to fall off across on object, there are security risks when leaping across object into relaxed state when sufficient, and primary rope is passed through people The method of work stretching carries out gradual transition 8-16 millimeters of ropes, and the activity duration is long, effect is low and labor intensive is more, and flow is complicated Deng.
Invention content
The object of the present invention is to developing one kind quickly can be spanned unfolding above object or recycle guide rope (cable Deng) and be spanned normal operation not hachure is various, have quick unfolding (recycling) not only can guarantee object being spanned safe operation but also It can guarantee job safety and a kind of time saving, mechanical device in labour-saving, which is not limited by Active workings and space, in frame from now on Empty power transmission line construction is spanned object safety and economic operation across field guarantee with a wide range of applications and safe and efficient A kind of device has generalization and practicability.
The purpose of the present invention is what is realized using following technical scheme:It is complete across guide rope above a kind of overhead transmission line Weather unfolds device, including supporting rod, secondary swing arm bar, the swing arm of snake section, rotating device, stabiliser bar, is stably connected with rope, connection Rope, pedestal, the snake section swing arm are connected with each other by hollow circular-tube in end, and rotating device bottom is equipped with flange plate structure, Profit is fixed by bolts to across on frame body, and ring flange base center is equipped with hole, and the supporting rod and secondary swing arm bar lead to by four It connects, supporting rod lower part is located in centre hole of base, and the snake section swing arm is flexibly connected with secondary swing arm bar in end, and snake section swing arm can It is rotated relative to tie point, the snake section swing arm is equipped with tie point, is connected to tie point and post upper is equipped with connecting rope, institute Supporting rod and stabiliser bar are stated in middle part vertical connection, the stabiliser bar is longitudinally disposed flat perpendicular to supporting rod and secondary swing arm bar place Face, the vertical equity stabiliser bar are connected to by being stably connected with rope in snake section swing arm at both ends.
Preferably, the swing arm of snake section is connected with each other using insulating epoxy glass fibre hollow circular-tube in end, Insulation tube end, which is inlayed, is fixed with aluminum-magnesium alloy material connecting pin, and groove and flange, adjacent vacant are respectively equipped on the connecting pin Heart pipe is connected with each other by being set on the groove of end with flange.
Preferably, the length of the hollow circular-tube is 4.5 meters~9 meters.
Preferably, it is corresponding on the groove and flange of the connecting pin to be respectively equipped with rotational positioning pin eyelet I and positioning Pin eyelet II.
Beneficial effects of the present invention:
The characteristics of this technology is invented is to realize the exhibitions such as power transmission sequence spanning the transmission line road, highway, electric railway It puts across rope, realizes the purpose across unfolding overhead transmission line of power circuit.Crossing construction operation peace can effectively be lowered Full blast danger does not influence to be spanned the normal operation of object, realizes maximization of economic benefit.
Description of the drawings
It further illustrates with reference to the accompanying drawings and detailed description:
Fig. 1 is across the structure diagram of the round-the-clock unfolding device of guide rope above overhead transmission line of the present invention.
Fig. 2 is the structure diagram of the ring flange pedestal of the present invention.
Fig. 3 is that the snake of the present invention saves the structure diagram of swing arm connection.
Fig. 4 is to save the right catenary of swing arm across the snake of the round-the-clock unfolding device of guide rope above overhead transmission line of the present invention The structure diagram of condition.
Fig. 5 is to save swing arm by right pendency across the snake of the round-the-clock unfolding device of guide rope above overhead transmission line of the present invention Situation is raised up to Realize procedure chart.
Fig. 6 is to be transmitted above overhead transmission line of the present invention across the artificial rotary swinging arm of the round-the-clock unfolding device of guide rope The schematic diagram of rope.
Fig. 7 be overhead transmission line of the present invention above across guide rope it is round-the-clock unfolding device swing arm completion across by across Transition rope schematic diagram is transmitted more after object process.
Specific embodiment
As shown in figs. 1-7, the invention discloses a kind of overhead transmission line tops to cross over the round-the-clock unfolding device of guide rope, Including supporting rod 1, secondary swing arm bar 3, the swing arm 4 of snake section, rotating device, stabiliser bar 2, rope 5, connecting rope 6, pedestal 7 are stably connected with, The snake section swing arm 4 is connected with each other by hollow circular-tube in end, and rotating device bottom is equipped with flange plate structure, utilizes bolt It is fixed on across on frame body, ring flange base center is equipped with hole, and the supporting rod 1 is connected by four-way with secondary swing arm bar 3, supported 1 lower part of bar is located in centre hole of base, and the snake section swing arm 4 is flexibly connected with secondary swing arm bar 3 in end, and snake section swing arm 4 can phase Tie point is rotated, the snake section swing arm 4 is equipped with tie point, is connected to tie point and 1 upper end of supporting rod is equipped with connecting rope 6, In middle part vertical connection, the stabiliser bar 2 is longitudinally disposed perpendicular to supporting rod and secondary swing arm bar 3 for the supporting rod 1 and stabiliser bar 2 Place plane, the vertical equity stabiliser bar are connected to by being stably connected with rope 5 in snake section swing arm 4 at both ends.
Snake section swing arm 4 is connected with each other using insulating epoxy glass fibre hollow circular-tube in end, in insulation tube End, which is inlayed, is fixed with aluminum-magnesium alloy material connecting pin, and groove and flange, adjacent hollow pipe are respectively equipped on the connecting pin It is connected with each other by the groove A and flange B that are set on end.
Key point of the present invention is that solution power transmission sequence is fast reliable across various barrier spreading conducting wire construction safeties A kind of guide rope transmits or the apparatus system of recycling.The device is not spanned live line in power transmission line construction, maintenance field Road is spanned the limitations such as electric railway, highway and can realize the operation for not influencing to be spanned object safety, ensures across operation Quick leap is realized in personal safety, which is with a wide range of applications and practical value.
1st, rotating device
Rotating device bottom uses flange plate structure made of aviation aluminum alloy material (LY12), as C is put at position in Fig. 1 Big figure, profit are fixed by bolts to across on frame body, supporting rod 1 and secondary swing arm bar 3, are combined embedded flange by four-way and are tried to get to the heart of a matter seat In.
In Fig. 2,8 be four-way, and 9 be shop bolt, and 10 be ring flange pedestal, and 11 be ring flange mounting hole.
2nd, snake section swing arm
Snake regulating device uses 4.5 meters~9 meters fixed length of insulating epoxy glass fibre hollow circular-tube material, the end often saved The concave-convex slot connection for being fixed on insulation tube end is inlayed with almag (LC4) material.Slot is divided into groove A and flange B knots The flange B of the groove A and the other end of structure and each free one end are connected with each other, and rotational positioning pin is utilized after flange B is inserted into A slots Hole for nailing hole 1 connect after, by the nylon withdrawal line in swing arm by snake save swing arm from pendency situation, after being gradually retracted into Realize, Positioning in slot A slots, which is cut, is inserted into pin after hole for nailing hole 2 overlaps and fixes so that the length that swing arm is horizontal is to meet quilt Subject to the distance needed across object width.
3rd, rope is transmitted
G points fix the high intensity Di Nima ropes of an a diameter of 8-16, the other end in swing arm most end point link At swing arm C-terminal, rope is slightly tightened parallel along swing arm bar.Swing arm bridge body level is revolved by manpower at secondary swing arm DC Turn across above object being spanned body so that G points arrival in swing arm end is spanned in the other end crossing frame of object span requirement, by people Work receives to tighten the transmission realized across rope (CG) after releasing from G points after transmitting rope.(principle is identical during dismounting).
Above overhead transmission line of the present invention the characteristics of unfolding device round-the-clock across guide rope:
1. being crossed in broad power transmission line construction and being applied to all kinds of leaps in field, not by landform, it is spanned object attribute The characteristic that limits, be protected from weather influences and can effectively be constructed at night.
2. the device, which has, to be quickly spanned unfolding above object and recycle guiding rope, there is crossing construction operation Efficient, the characteristics of safety coefficient is high.
3. the crossover device have it is easy to operate, using light aircraft aluminum material (LY12) have intensity it is high, it is light-weight, It is easy to operate to be used as swing arm supporting rack and swivel mount.
4. snake section swing arm is made of hollow glass Steel material center of circle pipe.In assembling process using scale snake save principle into Row Fold-Combined.According to be spanned object length determine installation snake section length reach requirement after, using drawstring pack up snake pole utilize Positioning pin lock lives snake pole into horizontality, and it is wide more than object is spanned (across swing arm) that a root long arm is linked to be after installing successively Degree, it is parallel with across swing arm by the rope tightening that 8-16 millimeters of a diameter is fixed across the end of swing arm and root.It is filling Base portion in putting sets a kind of fixed rotary shaft to apply smaller external force by manpower and pushes attached primary school's arm 360 ゜ rotations of progress, It will cross and be spanned above object across swing arm, one end arrival other side's crosses on frame body, is taken off by the artificial connection rope on frame body From swing arm, haul and complete across rope unfolding above object or the overall process of recycling,
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify to the technical solution recorded in foregoing embodiments or carry out equivalent replacement to which part technical characteristic. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (4)

1. the round-the-clock unfolding device of guide rope is crossed over above a kind of overhead transmission line, which is characterized in that including supporting rod, secondary pendulum Armed lever, rotating device, stabiliser bar, is stably connected with rope, connecting rope, pedestal at the swing arm of snake section, and the snake saves swing arm by hollow circular-tube It is connected with each other in end, rotating device bottom is equipped with flange plate structure, and profit is fixed by bolts to across on frame body, ring flange Base center is equipped with hole, and the supporting rod is connected with secondary swing arm bar by four-way, and supporting rod lower part is located in centre hole of base, institute It states snake section swing arm to be flexibly connected in end with secondary swing arm bar, snake section swing arm can be rotated relative to tie point, be set in the snake section swing arm Have tie point, be connected to tie point and post upper and be equipped with connecting rope, the supporting rod and stabiliser bar in middle part vertical connection, The stabiliser bar is longitudinally disposed to be passed through perpendicular to supporting rod and plane, the vertical equity stabiliser bar where secondary swing arm bar at both ends Rope is stably connected with to be connected in snake section swing arm.
2. the round-the-clock unfolding device of guide rope is crossed over above overhead transmission line according to claim 1, which is characterized in that Snake section swing arm is connected with each other using insulating epoxy glass fibre hollow circular-tube in end, is inlayed in insulation tube end solid Surely there is aluminum-magnesium alloy material connecting pin, groove and flange are respectively equipped on the connecting pin, adjacent hollow pipe is by being set on end The groove in portion is connected with each other with flange.
3. the round-the-clock unfolding device of guide rope is crossed over above overhead transmission line according to claim 2, which is characterized in that The length of the hollow circular-tube is 4.5 meters~9 meters.
4. across the round-the-clock unfolding device of guide rope, the connecting pin above overhead transmission line according to claim 2 Groove and flange on corresponding be respectively equipped with rotational positioning pin eyelet I and shop bolt eyelet II.
CN201810154077.2A 2018-02-22 2018-02-22 All-weather spreading device for crossing guide rope above overhead transmission line Active CN108155599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810154077.2A CN108155599B (en) 2018-02-22 2018-02-22 All-weather spreading device for crossing guide rope above overhead transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810154077.2A CN108155599B (en) 2018-02-22 2018-02-22 All-weather spreading device for crossing guide rope above overhead transmission line

Publications (2)

Publication Number Publication Date
CN108155599A true CN108155599A (en) 2018-06-12
CN108155599B CN108155599B (en) 2024-05-31

Family

ID=62458944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810154077.2A Active CN108155599B (en) 2018-02-22 2018-02-22 All-weather spreading device for crossing guide rope above overhead transmission line

Country Status (1)

Country Link
CN (1) CN108155599B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9607049D0 (en) * 1996-04-03 1996-06-05 Bicc Plc Method of replacing conductor
JP2005333789A (en) * 2004-05-20 2005-12-02 Kawakita Electrical Construction Engineering Co Ltd Construction method of hanging sheave type line shifting by forming net
CN203967625U (en) * 2014-07-14 2014-11-26 国网上海市电力公司 A kind of overhead facility crossing frame
CN104577871A (en) * 2014-12-11 2015-04-29 江苏省电力公司常州供电公司 Portable power transmission overhead line crossing construction device
CN105552776A (en) * 2015-12-30 2016-05-04 国网山西省电力公司 Novel construction method crossing high-speed rail without interruption
CN105625795A (en) * 2016-03-23 2016-06-01 国家电网公司 Adjustable leading rope spreading arm frame
CN205985947U (en) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 Tower of london bridge type transmission line leap system that does not have a power failure
CN107394678A (en) * 2017-06-27 2017-11-24 国家电网公司 A kind of telescopic arm block crossing frame
CN208284910U (en) * 2018-02-22 2018-12-25 国网甘肃省电力公司经济技术研究院 The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9607049D0 (en) * 1996-04-03 1996-06-05 Bicc Plc Method of replacing conductor
JP2005333789A (en) * 2004-05-20 2005-12-02 Kawakita Electrical Construction Engineering Co Ltd Construction method of hanging sheave type line shifting by forming net
CN203967625U (en) * 2014-07-14 2014-11-26 国网上海市电力公司 A kind of overhead facility crossing frame
CN104577871A (en) * 2014-12-11 2015-04-29 江苏省电力公司常州供电公司 Portable power transmission overhead line crossing construction device
CN105552776A (en) * 2015-12-30 2016-05-04 国网山西省电力公司 Novel construction method crossing high-speed rail without interruption
CN105625795A (en) * 2016-03-23 2016-06-01 国家电网公司 Adjustable leading rope spreading arm frame
CN205985947U (en) * 2016-07-01 2017-02-22 浙江浙电经济技术研究院 Tower of london bridge type transmission line leap system that does not have a power failure
CN107394678A (en) * 2017-06-27 2017-11-24 国家电网公司 A kind of telescopic arm block crossing frame
CN208284910U (en) * 2018-02-22 2018-12-25 国网甘肃省电力公司经济技术研究院 The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line

Also Published As

Publication number Publication date
CN108155599B (en) 2024-05-31

Similar Documents

Publication Publication Date Title
CN203645249U (en) Hook-net-plane-type charged crossing device
CN107792790A (en) Installation and application for the aerial cableway of mountain region construction material transport
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN108512115B (en) Screen sealing system crossing power line by auxiliary cross arm and mounting and dismounting method thereof
CN102064493A (en) Method for paying off overhead transmission line by unmanned helicopter
CN103227431A (en) Method for replacing insulator chains in 220 kV long-span high tower in live working
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN102185265B (en) Construction method for replacing cross arm of 35kV line linear rod
KR101972405B1 (en) Tension measuring method for transmission line isotope method and its apparatus
CN106099757A (en) A kind of transmission line insulator crosses over crane span structure and construction technology thereof
CN208284910U (en) The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line
CN209016296U (en) A kind of aerial earth wire Portable ground rod
CN103236656A (en) Column suspension type crossing structure and operating method thereof
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN108155599A (en) The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line
CN201118145Y (en) Powerline aerial spanning device
CN206287856U (en) A kind of new OCS Messenger Wire suspended structure
CN108360907B (en) 10kV line dual-power hand-in-hand connection structure and installation and use method thereof
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN107654106B (en) Electric power pylon column foot replacing options
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN208308334U (en) A kind of lifting auxiliary threader
CN212392644U (en) Device for inhibiting icing galloping of overhead transmission line
CN104682268A (en) Method for constructing compact double-loop overhead line by adoption of flying powered parachute
CN220934744U (en) Wire screen sealing protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant