CN108149572A - Rib steel reinforced floorings - Google Patents

Rib steel reinforced floorings Download PDF

Info

Publication number
CN108149572A
CN108149572A CN201810097647.9A CN201810097647A CN108149572A CN 108149572 A CN108149572 A CN 108149572A CN 201810097647 A CN201810097647 A CN 201810097647A CN 108149572 A CN108149572 A CN 108149572A
Authority
CN
China
Prior art keywords
bridge
floorings
top plate
steel reinforced
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810097647.9A
Other languages
Chinese (zh)
Inventor
卢国林
上管兴
任亮
徐昭陵
王磊
张贵明
黄艺辉
曹馨月
石珏胜
梁晓东
郑辉
谢鸿
项超群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810097647.9A priority Critical patent/CN108149572A/en
Publication of CN108149572A publication Critical patent/CN108149572A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Rib steel reinforced floorings disclosed by the invention, including main structure body, the main structure body is by top plate, bottom plate and the multigroup rib composition being set between the top plate and bottom plate, and the middle partition board of vertical type is additionally provided between the top plate and bottom plate, both bridge weight had been mitigated, load carrying capacity of bridge is improved again, extend the bridge inspection and maintenance period, save bridge operation expense, it is suitble to using factorial praluction, reduce cost, quality is more guaranteed, solve problem of fatigue damage of the orthotropic plate under overload vehicle effect, and it is bridge maintenance and strengthening most efficient method, the particularly maintenance and reinforcement of Steel Bridge Deck, the effect of off-load can be played, and improve the class of loading of old bridge, the bridge of Mid and minor spans can be directly set up with rib steel reinforced floorings, speed of application is faster, cost is lower.

Description

Rib steel reinforced floorings
Technical field
The present invention relates to floorings design field more particularly to a kind of rib steel reinforced floorings.
Background technology
The beam body part of highway or Urban Bridge includes girder construction part and bridge deck, and girder construction is main stress structure Part, the beam body of Short/Medium Span Bridge have cored slab, T-shaped beam, box-girder etc., the beam body of Longspan Bridge have concrete boxlike beam, Orthotropic plate steel box-girder, Steel Truss Beam etc..Bridge deck includes deck paving, drain hole, railing etc..The current communications and transportation in China It is busy, it is mainly manifested in that flow is big, overload vehicle is more, overload capacity is big, a series of problems is brought to highway and Urban Bridge, wherein head What it is when its punching is bridge deck pavement, often close traffic is wanted to be safeguarded, some bridges even half a year will safeguard once, both increase Add running cost, and seriously affect normal traffic.Either girder construction problem or the problem of bridge deck pavement, finally The bridge floor of deck paving damage layer, particularly Longspan Bridge will be caused to destroy to protrude the most, not finding one kind so far has The technical measures of effect can mitigate beam body weight and improve the bearing capacity of bridge.
Invention content
The purpose of the present invention is to provide a kind of rib steel reinforced floorings, are examined according to wheel diameters, actual loading situation Consider, directly bear wheel load by two ribs, make panel and rib entirety stress, it is anti-under wheel load effect to weaken floorings Multiple deflection deformation achievees the purpose that extend floorings service life, effectively solves above-mentioned technical problem.
Effectively to solve above-mentioned technical problem, the technical solution that the present invention takes is as follows:
Rib steel reinforced floorings, including main structure body, the main structure body is by top plate, bottom plate and is set to the top plate and bottom Multigroup rib composition between plate, and the middle partition board of vertical type is additionally provided between the top plate and bottom plate.
Particularly, the main structure body end face is additionally provided with endplate.
Particularly, the top plate is equipped with permeable hole, and the permeable hole penetrates the top plate, and connects the top plate and bottom Cavity between plate.
Particularly, the main structure body is equipped with high-strength bolt mounting hole, and the high-strength bolt mounting hole is symmetricly set on institute It states on top plate and bottom plate.
Particularly, the bottom plate lower floor setting glue sand and steel bridge deck of the main structure body, and after being fixed by high-strength bolt Form Steel Bridge Deck rib steel reinforced floorings glue stud structure.
Beneficial effects of the present invention are:Rib steel reinforced floorings provided by the invention had not only mitigated bridge weight, but also have improved bridge Bearing capacity extends the bridge inspection and maintenance period, saves bridge operation expense, is suitble to, using being factory produced, reduce cost, quality more It is guaranteed, problem of fatigue damage of the orthotropic plate under overload vehicle effect is solved, and be the most effective side of bridge maintenance and strengthening The maintenance and reinforcement of method, particularly Steel Bridge Deck, can play the effect of off-load, and improve the class of loading of old bridge, can be directly with close rib Formula floorings set up the bridge of Mid and minor spans, speed of application faster, cost it is lower, be suitable for setting up suspension bridge and be applied to construction or rob Danger, can be used for national defence war material storage.Can on top layer panel indwelling permeable hole, make rainwater from rib steel reinforced floorings It flows away in cavity, applies to road deck, reduce road maintenance frequency, reduce running cost, it is permeable to be laid with ultra-thin pitch cooperation, Rigid flexible system porous pavement new technology can be started.Road deck can also directly be applied to, become rigid pavement.
The present invention is described in detail below in conjunction with the accompanying drawings.
Description of the drawings
Fig. 1 is the cross-sectional configuration schematic diagram of rib steel reinforced floorings of the present invention;
Fig. 2 is the longitudinal plane structure schematic diagram of rib steel reinforced floorings of the present invention;
Fig. 3 is the structural representation of rib steel reinforced floorings composition Steel Bridge Deck rib steel reinforced floorings glue stud structure of the present invention Figure.
Specific embodiment
Embodiment 1:
Referring to Fig. 1-3, rib steel reinforced floorings disclosed in the present embodiment, including main structure body, the main structure body is by top plate 1st, bottom plate 2 and the multigroup rib 3 being set between the top plate 1 and bottom plate 2 form, and be additionally provided between the top plate 1 and bottom plate 2 The middle partition board 4 of vertical type.
The main structure body end face is additionally provided with endplate 5.The top plate 1 is equipped with permeable hole 6, and the permeable hole 6 penetrates The top plate 1, and connect the cavity between the top plate 1 and bottom plate 2.The main structure body is equipped with high-strength bolt mounting hole 7, institute High-strength bolt mounting hole 7 is stated to be symmetricly set on the top plate 1 and bottom plate 2.2 lower floor of the bottom plate setting glue sand of the main structure body 8 and steel bridge deck 9, and pass through after high-strength bolt 10 is fixed and form Steel Bridge Deck rib steel reinforced floorings glue stud structure.
Applicant states that person of ordinary skill in the field is on the basis of above-described embodiment, by above-described embodiment Step, it is combined with the technical solution of Summary, so as to generate new method and the present invention record scope it One, the application no longer enumerates the other embodiment of these steps to make specification concise.
The technology path that the prior art is different from the present embodiment is:
The present embodiment structure had not only mitigated bridge weight, but also improved load carrying capacity of bridge, extended the bridge inspection and maintenance period, saved bridge Beam running cost is suitble to using being factory produced, and it is more guaranteed to reduce cost, quality, solves orthotropic plate and makees in overload vehicle Problem of fatigue damage under, and be the maintenance and reinforcement of bridge maintenance and strengthening most efficient method, particularly Steel Bridge Deck, it can play The effect of off-load, and the class of loading of old bridge is improved, the bridge of Mid and minor spans, construction speed can be directly set up with rib steel reinforced floorings Degree faster, cost it is lower, be suitable for setting up suspension bridge and be applied to construction or speedily carry out rescue work, can be used for national defence war material storage.It can The indwelling permeable hole on top layer panel, makes rainwater flow away from the cavity of rib steel reinforced floorings, applies to road deck, reduces road Road frequency of maintenance reduces running cost, and it is permeable to be laid with the cooperation of ultra-thin pitch, can start rigid flexible system porous pavement new technology. Road deck can directly be applied to, become rigid pavement.
Core technology principle is as described below:
The construction technology of structure in itself uses the rigid metal die of super large, and special perfusion is mechanically injected concrete, misplaces Seam is stayed, steel wire replaces regular reinforcement, and rib steel reinforced floorings are connect by high-strength bolt with steel plate, between rib steel reinforced floorings and steel plate Special glue is applied, for old Steel Bridge Deck maintenance and reinforcement, permeable hole is stayed in top surface, sets built-in fitting and preformed hole, reactive powder can be used Filling concrete can also be used normal concrete perfusion, can also be combined by the two.
The another statement of applicant, the present invention illustrate the implementation method of the present invention and apparatus structure by above-described embodiment, But the invention is not limited in the above embodiments, that is, do not mean that the present invention has to rely on the above method and structure could be real It applies.Person of ordinary skill in the field is it will be clearly understood that any improvement in the present invention, to implementation method selected by the present invention etc. Effect replacement and the addition of step, the selection of concrete mode etc., all fall within protection scope of the present invention and the open scope.
Present invention is not limited to the embodiments described above, all to realize the present invention using structure similar to the present invention and its method All embodiments of purpose are within the scope of the present invention.

Claims (5)

1. rib steel reinforced floorings, which is characterized in that including main structure body, the main structure body is by top plate, bottom plate and is set to institute Multigroup rib composition between top plate and bottom plate is stated, and the middle partition board of vertical type is additionally provided between the top plate and bottom plate.
2. rib steel reinforced floorings according to claim 1, which is characterized in that the main structure body end face be additionally provided with end every Plate.
3. rib steel reinforced floorings according to claim 1, which is characterized in that the top plate is equipped with permeable hole, described Water hole penetrates the top plate, and connects the cavity between the top plate and bottom plate.
4. rib steel reinforced floorings according to claim 1, which is characterized in that the main structure body is fixed equipped with high-strength bolt Hole, the high-strength bolt mounting hole are symmetricly set on the top plate and bottom plate.
5. rib steel reinforced floorings according to claim 1, which is characterized in that the bottom plate lower floor setting glue of the main structure body Sand and steel bridge deck, and form Steel Bridge Deck rib steel reinforced floorings glue stud structure after being fixed by high-strength bolt.
CN201810097647.9A 2018-01-31 2018-01-31 Rib steel reinforced floorings Pending CN108149572A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810097647.9A CN108149572A (en) 2018-01-31 2018-01-31 Rib steel reinforced floorings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810097647.9A CN108149572A (en) 2018-01-31 2018-01-31 Rib steel reinforced floorings

Publications (1)

Publication Number Publication Date
CN108149572A true CN108149572A (en) 2018-06-12

Family

ID=62459253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810097647.9A Pending CN108149572A (en) 2018-01-31 2018-01-31 Rib steel reinforced floorings

Country Status (1)

Country Link
CN (1) CN108149572A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577194A (en) * 2019-01-23 2019-04-05 福州大学 The ultra-high performance concrete precast hollow floorings and its construction method of a kind of band rib in length and breadth

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314935A (en) * 2008-07-17 2008-12-03 南京工业大学 Composite material bridge deck
CN102286945A (en) * 2011-08-24 2011-12-21 石家庄铁道大学 External pre-stressed anchoring device for concrete bridge body and rapid strengthening method
CN203307725U (en) * 2013-06-08 2013-11-27 南京工业大学 Sandwich bridge deck with reinforcing parts and composite material orthogonal grid structure
CN205711781U (en) * 2016-03-14 2016-11-23 中铁大桥局集团有限公司 A kind of steel structural bridge panel for Bridge repair and reinforcement
CN206815181U (en) * 2017-05-24 2017-12-29 北京城建七建设工程有限公司 A kind of drainage arrangement of steel box-girder overpass
CN208415099U (en) * 2018-01-31 2019-01-22 卢国林 Rib steel reinforced floorings

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101314935A (en) * 2008-07-17 2008-12-03 南京工业大学 Composite material bridge deck
CN102286945A (en) * 2011-08-24 2011-12-21 石家庄铁道大学 External pre-stressed anchoring device for concrete bridge body and rapid strengthening method
CN203307725U (en) * 2013-06-08 2013-11-27 南京工业大学 Sandwich bridge deck with reinforcing parts and composite material orthogonal grid structure
CN205711781U (en) * 2016-03-14 2016-11-23 中铁大桥局集团有限公司 A kind of steel structural bridge panel for Bridge repair and reinforcement
CN206815181U (en) * 2017-05-24 2017-12-29 北京城建七建设工程有限公司 A kind of drainage arrangement of steel box-girder overpass
CN208415099U (en) * 2018-01-31 2019-01-22 卢国林 Rib steel reinforced floorings

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577194A (en) * 2019-01-23 2019-04-05 福州大学 The ultra-high performance concrete precast hollow floorings and its construction method of a kind of band rib in length and breadth

Similar Documents

Publication Publication Date Title
CN107100065B (en) A kind of compound section steel box girder and its method of construction for high-speed railway
CN206418384U (en) A kind of few girder composite beam bridge of use Prefabricated composite floorings
CN105544373B (en) A kind of steel case Combined concrete girder and construction method for long-span cablestayed bridges
CN100464026C (en) Girder-exchange construction method for existing railway bridge by successively incremeantal launching framework process
CN203729193U (en) Low tower stay cable reinforced T-type rigid framework system with suspension beams
CN101613997A (en) A kind of method for widening steel-concrete combination
CN102296546A (en) Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof
CN106120532A (en) A kind of novel prefabricated assembled steel concrete composite beam bridge superstructure and processing technology thereof
CN213038218U (en) Predictive continuous rigid frame bridge capable of supplementing tensioning prestress
CN101644032A (en) Beam-removing rib-increasing strengthening construction technology of highway bridge
CN104831627A (en) Bridge deck slab longitudinal unequal strength steel-concrete composite structure bridge and construction method thereof
CN101550674A (en) Bridge of steel truss-concrete and construction method thereof
CN101550769A (en) Movable trestle
CN105297641A (en) Highway T beam diaphragm plate prestress reinforcing structure and working method for reinforcement using reinforcing structure
CN105951537A (en) Rib column distributed turnout foundation structure of middle-low speed magnetic levitation low-arranged line
CN101298756A (en) Technique for widening concrete box girder without increasing foot stall steel component
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN206916603U (en) A kind of transverse prestress I-shaped box-beam structure
CN110644361A (en) Steel-concrete composite beam bridge deck
CN208668250U (en) The good Mid and minor spans steel plate combination beam of cracking resistance
CN202194081U (en) Hinge joint disease treatment structure of hollow slab bridge
CN207959496U (en) Self-control energy consumption pre-stressed prefabricated frame structure
CN208415099U (en) Rib steel reinforced floorings
CN108149572A (en) Rib steel reinforced floorings
CN209397518U (en) A kind of Hollow Slab Beam Bridge transverse prestress friction plate ruggedized construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination