CN108147269A - A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment - Google Patents

A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment Download PDF

Info

Publication number
CN108147269A
CN108147269A CN201711137615.9A CN201711137615A CN108147269A CN 108147269 A CN108147269 A CN 108147269A CN 201711137615 A CN201711137615 A CN 201711137615A CN 108147269 A CN108147269 A CN 108147269A
Authority
CN
China
Prior art keywords
complete set
set formula
formula equipment
guide rail
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711137615.9A
Other languages
Chinese (zh)
Inventor
王新鑫
李俊峰
何红梅
王毅
张清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711137615.9A priority Critical patent/CN108147269A/en
Publication of CN108147269A publication Critical patent/CN108147269A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment, including lateral deviation correction system, horizontally tracting system, guide rail, stent and large-scale complete set formula equipment, wherein described stent includes column and crossbeam, the crossbeam both ends are vertically provided with column, several stents are disposed on two closed slide lower ends, the large size complete set formula equipment is arranged on guide rail upper end, the lateral deviation correction system includes jack and correction frame, the correction frame includes frame bottom, left border and Right Border, the left border and Right Border are separately positioned at left and right sides of frame bottom, and left border height is more than Right Border, the Right Border is in insertion track channel steel when constructing, the jack is vertically welded on left border.Colliding with, rocking when lifting in place present invention effectively prevents large scale equipment, adjustment is difficult, preferably resolves the problem of large-scale complete set formula equipment is precisely in place.

Description

A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment
Technical field
The invention belongs to a kind of lifting of large scale equipment, installation technical field in place, more particularly to a kind of complete group of large size The integral hoisting positioning apparatus and installation method of box-like equipment.
Background technology
In technical field of building construction, with the raising of modern mechanicalization level and the gradual batch production of engineering-built, mould Block, the lifting installation of large-scale complete set formula equipment is increasing, these large-scale complete set formula equipment are since size is big, ton Position weight, it is non-dismountable, while easily limited by factors such as construction site, hanging device, tools in place, precisely in place very It is complicated and difficult.The lifting of large size complete set formula equipment mostly carries out factory using purlin vehicle existing in workshop or truck crane at present Lifting etc. outside room still, suffers from factors limitation, it is difficult to ensure lifting, precision in place, more in the construction process Person so that large-scale complete set formula equipment is lifted, can not be implemented in place, such as:
1. no installation purlin vehicle or the purlin vehicle of installation also do not put into operation and use in the equipment workshop to be disposed;
2. during equipment hoisting, being limited by construction site, large-scale jack lift cannot enter construction site or workshop binds Equipment can not be lifted by jack lift and is placed into workshop;
3. during equipment hoisting, workshop binds, purlin vehicle puts into operation in workshop, but purlin vehicle range be not achieved equipment set-point or It is the total weight of equipment considerably beyond the specified lifting tonnage of purlin vehicle.
It is most time and effort consuming, inefficient although there is other methods may be used for above-mentioned limiting factor, it can not The installation accuracy and equipment for ensureing equipment are not damaged, in addition, can also increase construction cost, are caused beyond construction contract and budget expense With etc. consequences.
Invention content
The technical problems to be solved by the invention are to provide a kind of integral hoisting of large-scale complete set formula equipment and fill in place It puts and installation method, solves in site operation without equipment purlin vehicle, purlin vehicle does not come into operation or lifting machine performance can not expire Sufficient equipment hoisting requirement and when being limited lifting machine by construction site and cannot be introduced into workshop inside processing, large-scale complete set formula The lifting problem in place of equipment.
The technical solution adopted by the present invention to solve the technical problems is:A kind of the whole of large-scale complete set formula equipment is provided Body lifts positioning apparatus, is set including lateral deviation correction system, horizontally tracting system, guide rail, stent and large-scale complete set formula Standby, wherein the stent includes column and crossbeam, the crossbeam both ends are vertically provided with column, and several stents are disposed on Two closed slide lower ends, the large size complete set formula equipment are arranged on guide rail upper end, and the lateral deviation correction system includes Jack and correction frame, the correction frame include frame bottom, left border and Right Border, the left border and Right Border point It is not arranged at left and right sides of frame bottom, and left border height is more than Right Border, the Right Border is used to be embedded in rail when constructing In road channel steel, the jack is vertically welded on left border, and the center of the piston rod of jack horizontally toward guide rail, institute It states horizontally tracting system and includes jack, the jack is mounted in large-scale complete set formula equipment, big for horizontally tracting, movement Type complete set formula equipment.
The further technical solution of the present invention is that the guide rail is zinc-plated material.
The further technical solution of the present invention is that the guide rail, column and crossbeam are channel steel, and groove steel rail surface It is smooth, without it is damaged, without rusty stain.
The further technical solution of the present invention is that the piston rod of the jack is equipped with rubber mount.
The further technical solution of the present invention is that the lateral deviation correction system is separately positioned on outside two closed slides Side, for correcting large-scale complete set formula equipment.
The further technical solution of the present invention is that the difference in height of the left border and Right Border is the bottom of jack Seat diameter dimension.
The further technical solution of the present invention is that the jack is arranged on a crossbeam of guide rail lower end, and jack The chain of extraction is tied in large-scale complete set formula equipment.
A kind of a kind of integral hoisting positioning apparatus installation method of large-scale complete set formula equipment, including with Lower step:
(a) several stents, are then arranged at intervals by the guide rail and stent made according to large-scale complete set formula equipment size In two closed slide lower ends, be fixed on workshop before, and guide rail it is good with the pre-production in workshop equipment mounting base level it is right It connects;
(b) large-scale complete set formula equipment is placed on guide rail, lateral deviation correction system is fixed on guide rail, adjusted Jack is saved, the shell for making jack that face paste be pushed to close large-scale complete set formula equipment, and intense adjustment, make large-scale complete set Formula equipment is aligned with guide rail, axis is parallel to guide rail;
(c) jack in horizontally tracting system is arranged on a crossbeam of guide rail lower end, and the chain that jack is drawn It ties in large-scale complete set formula equipment;
(d) after the large-scale complete set formula equipment movement of horizontally tracting system traction, lateral deviation correction system is with equipment position It puts variation and moves, when large-scale complete set formula equipment moving direction deviates guide rail, large-scale complete set is made by jack Formula equipment is aligned with guide rail, axis is parallel to guide rail;
(e) gradually large-scale complete set formula equipment is moved on on the basis of placement.
Advantageous effect
It is of the invention compared with existing lifting technology in place, present invention effectively prevents large scale equipment lifting knocking when in place It touches, rock, adjustment is difficult, preferably resolves the problem of large-scale complete set formula equipment is precisely in place, and described device Positioning accuracy depends on being pre-positioned for guide rail, and being detached from equipment precision influences, and positioning apparatus of the present invention makes simple, structure letter It is single, it is particularly suitable for the construction working of narrow and small place, substantially increases construction efficiency, ensure that construction safety and quality, keep away simultaneously Exempt from equipment appearance damage;And apparatus of the present invention making material derives from a wealth of sources, construction site can gather materials on the spot, simple in structure, system Make simplicity, readily removable to remove, material does not waste, recyclable recycling.
Description of the drawings
Fig. 1 corrects system structure side view for lateral deviation of the present invention.
Fig. 2 is lateral deviation correction system structure top view of the present invention.
Fig. 3 is the structure diagram of jack of the present invention.
Fig. 4 is the structure diagram of guide rail of the present invention and stent.
Fig. 5 is the structure top view of whole system of the present invention.
Fig. 6 is whole system of the present invention process operating diagram in place.
Specific embodiment
With reference to specific embodiment, the present invention is further explained.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, people in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
Embodiment 1
As shown in figures 1 to 6, a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment, is corrected including lateral deviation System, horizontally tracting system, guide rail 7, stent 8 and large-scale complete set formula equipment 11, wherein the stent 8 includes 9 He of column Crossbeam 10,10 both ends of crossbeam are vertically provided with column 9, and several stents 8 are disposed on two closed slides, 7 lower end, institute It states large-scale complete set formula equipment 11 and is arranged on 7 upper end of guide rail, the lateral deviation correction system includes jack 1 and correction frame 2, the correction frame 2 includes frame bottom 3, left border 4 and Right Border 5, and the left border 4 and Right Border 5 are set respectively In 3 left and right sides of frame bottom, and 4 height of left border is more than Right Border 5, and the Right Border 5 is used to be embedded in track when constructing In channel steel, the jack 1 is vertically welded on left border 4, and the center of the piston rod of jack 1 horizontally toward guide rail, The horizontally tracting system includes jack 6, and the jack 6 is mounted in large-scale complete set formula equipment 11, for horizontally tracting, Mobile large size complete set formula equipment 11.
The guide rail 7 is zinc-plated material, and the guide rail 7, column 9 and crossbeam 10 are channel steel, and groove steel rail surface light It is sliding, without it is damaged, without rusty stain.
The piston rod of the jack 1 is equipped with rubber mount, and it is flat that the lateral deviation correction system is separately positioned on two The outside of row guide rail 7, for correcting large-scale complete set formula equipment 11, the difference in height of the left border 4 and Right Border 5 is thousand The base diameter size on jin top 1.
The jack 6 is arranged on a crossbeam 10 of 7 lower end of guide rail, and jack 6 draw chain tie large size into It covers on combination device 11.
A kind of integral hoisting positioning apparatus installation method of large size complete set formula equipment, including following steps:
1st, according to the guide rail 7 and stent 8 of the making of large-scale 11 size of complete set formula equipment, then several stents 8 are spaced Before being arranged on two closed slides, 7 lower end, being fixed on workshop, and the equipment mounting base that guide rail 7 is good with the pre-production in workshop Level docking;
2nd, large-scale complete set formula equipment 11 is placed on guide rail 7, lateral deviation correction system is fixed on guide rail 7 On, jack 1 is adjusted, the shell for making jack 1 that face paste be pushed to close large-scale complete set formula equipment 11, and intense adjustment, make big Type complete set formula equipment 11 is aligned with guide rail 7, axis is parallel to guide rail 7;
3rd, the jack 6 in horizontally tracting system is arranged on a crossbeam 10 of 7 lower end of guide rail, and the extraction of jack 6 Chain is tied in large-scale complete set formula equipment 11;
4th, after the large-scale complete set formula equipment 11 of horizontally tracting system traction moves, lateral deviation correction system is with equipment position It puts variation and moves, when large-scale 11 moving direction of complete set formula equipment deviates guide rail 7, made by jack 1 large-scale complete Combination device 11 is aligned with guide rail 7, axis is parallel to guide rail 7;
5th, gradually large-scale complete set formula equipment 11 is moved on on the basis of placement.
In actual use,
After large-scale complete set formula equipment hoisting is placed on guide rail, horizontally tracting system is fixed on the crossbeam of guide rail, And draw chain and tie in equipment, what is utilized due to jack is wheel shaft principle, can play the role of labour-saving, when equipment protection is arranged After being applied to position, you can jack is driven to realize horizontally tracting and movement to large-scale complete set formula equipment by manpower;
When large-scale complete set formula equipment is fallen, and deviation occurs in direction on guide rail, mobile lateral deviation correction system is fixed Position is simultaneously fixed it on the orbit of guide rail that equipment occurs at deviation, is slowly adjusted jack, is made very heavy distal end chip and rubber soft The promotion face that pad is formed connects with device housings, then fine-tunes jack, gradual correcting device, it is achieved thereby that by just The direction correction of position equipment.
It treats after equipment mounting base construction, to first have to longitudinal center's coil holder according to mounted plant bottom case in workshop If, welding guide rail, and ensure that the center line of guide rail is overlapped with the center line of mounted equipment, and the lateral dimension of guide rail is not less than Equipment lateral dimension.

Claims (8)

1. a kind of integral hoisting positioning apparatus of large size complete set formula equipment, including lateral deviation correction system, horizontally tracting System, guide rail (7), stent (8) and large-scale complete set formula equipment (11), it is characterised in that:The stent (8) is including column (9) and crossbeam (10), crossbeam (10) both ends are vertically provided with column (9), and it is parallel that several stents (8) are disposed on two Guide rail (7) lower end, the large size complete set formula equipment (11) are arranged on guide rail (7) upper end, the lateral deviation correction system Including jack (1) and correction frame (2), the correction frame (2) includes frame bottom (3), left border (4) and Right Border (5), institute It states left border (4) and Right Border (5) is separately positioned at left and right sides of frame bottom (3), and left border (4) is highly more than right side Frame (5) is embedded in when the Right Border (5) is for constructing in track channel steel, and the jack (1) is vertically welded in left side On frame (4), and the center of the piston rod of jack (1) horizontally toward guide rail, the horizontally tracting system include jack (6), institute Jack (6) is stated on large-scale complete set formula equipment (11), for horizontally tracting, mobile large-scale complete set formula equipment (11)。
2. a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1, it is characterised in that: The guide rail (7) is zinc-plated material.
3. a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1, it is characterised in that: The guide rail (7), column (9) and crossbeam (10) are channel steel, and groove steel rail surface it is smooth, without it is damaged, without rusty stain.
4. a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1, it is characterised in that: The piston rod of the jack (1) is equipped with rubber mount.
5. a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1, it is characterised in that: The lateral deviation correction system is separately positioned on the outside of two closed slides (7), for correcting large-scale complete set formula equipment (11)。
6. a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1, it is characterised in that: The difference in height of the left border (4) and Right Border (5) is the base diameter size of jack (1).
7. a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1, it is characterised in that: The jack (6) is arranged on a crossbeam (10) of guide rail (7) lower end, and jack (6) draw chain tie large size into It covers on combination device (11).
8. a kind of a kind of integral hoisting positioning apparatus of large-scale complete set formula equipment according to claim 1 is square in place Method, it is characterised in that:Include the following steps:
(a) according to the guide rail (7) and stent (8) of the making of large-scale complete set formula equipment (11) size, then by several stents (8) Before being disposed on two closed slides (7) lower end, being fixed on workshop, and the equipment that guide rail (7) is good with the pre-production in workshop Mounting seat level is docked;
(b) large-scale complete set formula equipment (11) is positioned on guide rail (7), lateral deviation correction system is fixed on guide rail (7) on, jack (1) is adjusted, the shell for making jack (1) that face paste be pushed to close large-scale complete set formula equipment (11), and it is fine Adjustment, makes that large-scale complete set formula equipment (11) is aligned with guide rail (7), axis is parallel to guide rail (7);
(c) jack (6) in horizontally tracting system is arranged on a crossbeam (10) of guide rail (7) lower end, and jack (6) draws The chain gone out is tied on large-scale complete set formula equipment (11);
(d) after the large-scale complete set formula equipment (11) of horizontally tracting system traction is mobile, lateral deviation correction system is with equipment position It puts variation and moves, when large-scale complete set formula equipment (11) moving direction deviates guide rail (7), made greatly by jack (1) Type complete set formula equipment (11) is aligned with guide rail (7), axis is parallel to guide rail (7);
(e) gradually large-scale complete set formula equipment (11) is moved on on the basis of placement.
CN201711137615.9A 2017-11-16 2017-11-16 A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment Pending CN108147269A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711137615.9A CN108147269A (en) 2017-11-16 2017-11-16 A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711137615.9A CN108147269A (en) 2017-11-16 2017-11-16 A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment

Publications (1)

Publication Number Publication Date
CN108147269A true CN108147269A (en) 2018-06-12

Family

ID=62468906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711137615.9A Pending CN108147269A (en) 2017-11-16 2017-11-16 A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment

Country Status (1)

Country Link
CN (1) CN108147269A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2253901B1 (en) * 1975-01-03 1980-12-19 Compensation Ste Gle
CN102190249A (en) * 2010-03-17 2011-09-21 五冶集团上海有限公司 Method for hoisting equipment positioned at bottom of multilayer frame platform
CN202116986U (en) * 2011-05-25 2012-01-18 中铁电气化局集团有限公司 Pushing beam guiding and deviation rectifying device
CN203213623U (en) * 2013-04-26 2013-09-25 江苏沪宁钢机股份有限公司 Slide guiding and rectifying device
CN204266134U (en) * 2014-10-20 2015-04-15 武汉卡特工业股份有限公司 Heavy duty longspan steel truss girder walking type pushing device
CN106545172A (en) * 2016-11-10 2017-03-29 中冶建工集团有限公司 A kind of installation method of high-altitude long-span steel truss

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2253901B1 (en) * 1975-01-03 1980-12-19 Compensation Ste Gle
CN102190249A (en) * 2010-03-17 2011-09-21 五冶集团上海有限公司 Method for hoisting equipment positioned at bottom of multilayer frame platform
CN202116986U (en) * 2011-05-25 2012-01-18 中铁电气化局集团有限公司 Pushing beam guiding and deviation rectifying device
CN203213623U (en) * 2013-04-26 2013-09-25 江苏沪宁钢机股份有限公司 Slide guiding and rectifying device
CN204266134U (en) * 2014-10-20 2015-04-15 武汉卡特工业股份有限公司 Heavy duty longspan steel truss girder walking type pushing device
CN106545172A (en) * 2016-11-10 2017-03-29 中冶建工集团有限公司 A kind of installation method of high-altitude long-span steel truss

Similar Documents

Publication Publication Date Title
CN207434493U (en) A kind of integrated transverse moves conveyer
CN103255917A (en) Device and method for plane ectopic integral lifting construction capable of crossing vertical obstacles
CN105668456A (en) Rolling wheel type lifting car
CN206447282U (en) A kind of transfer robot of bar
CN206346764U (en) A kind of push mode section of jurisdiction fast unloading device
CN203781754U (en) Movable weight hoister
CN108455472A (en) Automatic change climbing mechanism
CN107900226A (en) The mold-change trolley of automobile production automatic production line
CN109112963B (en) Bridge hoisting equipment
CN208454374U (en) A kind of automation lifting body
CN206425719U (en) Automotive plate step conveying device
CN207090287U (en) A kind of building template staged feeding machine
CN108147269A (en) A kind of the integral hoisting positioning apparatus and installation method of large size complete set formula equipment
CN210559231U (en) Rail type lifting conveying device for container maintenance
CN208071104U (en) A kind of hoisting steel plate device
CN108298457A (en) Automatic jacking equipment
CN207288465U (en) A kind of tamping hammer trimming device
CN209853646U (en) Rubber pad transportation frame
CN207030397U (en) A kind of multipurpose hanger
CN203998076U (en) The continuous feeding, discharge device of a kind of leaf springs of car pay unit
CN206425344U (en) A kind of steel billet inspection rejects feeding skid
CN215055485U (en) Integrative device is collected and transports in reinforcing bar unloading
CN205219386U (en) Somersault cutting machine body curb plate hoisting device
CN203874738U (en) Automatic material proportioning device
CN204606915U (en) A kind of sandstone accepts conveyor lifting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180612

RJ01 Rejection of invention patent application after publication