CN108131026A - A kind of installation method for the platform high-altitude floor that is widened - Google Patents
A kind of installation method for the platform high-altitude floor that is widened Download PDFInfo
- Publication number
- CN108131026A CN108131026A CN201711422814.4A CN201711422814A CN108131026A CN 108131026 A CN108131026 A CN 108131026A CN 201711422814 A CN201711422814 A CN 201711422814A CN 108131026 A CN108131026 A CN 108131026A
- Authority
- CN
- China
- Prior art keywords
- escape way
- bottom plate
- platform
- widened
- escape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G27/00—Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forklifts And Lifting Vehicles (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
A kind of installation method for the platform high-altitude floor that is widened, including step:1) several escape ways are made, each escape way includes bottom plate and the fence mounted on bottom plate both sides, the length direction of bottom plate upper edge escape way is welded with several lateral steps, the side that two fences are not connect with bottom plate is equidistantly welded with several railings, and the both ends of escape way are connected separately with top hook and bottom hook;2) escape way is sling using truck crane, top is hooked on to the tripod top for having installed cone section, bottom, which is hooked on, has installed in broadening platform outboard structure;3) remaining escape way is equidistantly uniformly installed along the circumferencial direction of cone section using the method in step 2);4) it is manually entered in escape way, hand steered fence is climbed to escape way, and the high-altitude floor for the platform that is widened is installed.Construction efficiency of the present invention is high, easy to operate, can effectively ensure that the safety of construction personnel, and after construction, fully meets the requirement of floor construction quality.
Description
Technical field
The present invention relates to steel construction indirect cool tower construction fields, are especially the platform high-altitude that is widened in a kind of steel construction indirect cool tower
The installation method of floor.
Background technology
The structure type and size of the steel construction indirect cool tower of our company's hot work in progress are as follows:Tower height 170m, tower outlet are outer
Diameter 84m, tower exit inside diameter 82m, tower bottom diameter 129.44m, cone section height 55m;Total 18 layers of number of plies, comprising 5 layers of cone section and
13 layers of straight section bore and one layer of broadening platform, every layer of each 36 triangle component are equipped between section and straight section;Reinforcing ring quantity accounts for 3 layers, position
Put respectively 90.08m, 125.16m, 160.23m, in the reinforcing ring at middle part, most heavy triangle component weighs about 4000kg.
Peripheral protective aluminium sheet is started setting up from the 4th layer of cone section, after arranging peripheral protective aluminium sheet entirely on the platform that is widened, single component weight
It measures as 9908kg;The stage+module absolute altitude that is widened is 35.95m, and lower support is arranged in 13.09m, and be widened platform structure and ground-angle
It is 29.6 °.
In the floor in installing above-mentioned broadening platform, no existing construction technology can refer to, therefore, in order to ensure that broadening is flat
The safe construction of floor and raising operating efficiency in platform, need to design a set of completely new arrangement and method for construction to complete broadening platform ribs
The installation of plate is fixed.
Invention content
The technical problem to be solved by the present invention is to provide a kind of installation method for the platform high-altitude floor that is widened, construction effect
Rate is high, can effectively ensure that the safety of construction personnel.
The technical solution of the present invention is to provide a kind of installation method for the platform high-altitude floor that is widened, including walking as follows
Suddenly:
1) several escape ways are made, each escape way includes bottom plate and the fence mounted on bottom plate both sides, bottom plate
The length direction of upper edge escape way is welded with several lateral steps, and the side that two fences are not connect with bottom plate is equidistantly welded
There are several railings, the both ends of escape way are connected separately with top hook and bottom hook;
2) escape way is sling using 25 tons of truck cranes, top is hooked on to the tripod top for having installed cone section,
Bottom, which is hooked on, has installed in broadening platform outboard structure;
3) remaining escape way is equidistantly uniformly installed along the circumferencial direction of cone section using the method in step 2);
4) it is manually entered in escape way, hand steered fence is climbed to escape way, to the high-altitude floor for the platform that is widened
It is installed.
After more than structure, compared with prior art, the installation method of present invention broadening platform high-altitude floor have with
Lower advantage:Then several escape ways are surrounded cone section by the present invention by making several escape ways in advance by truck crane
Circumference is equidistantly uniformly installed, and the hand steered fence of construction personnel is finally allowed to be climbed to escape way, to the high-altitude for the platform that is widened
Floor is installed;Due to escape way include bottom plate and the fence mounted on bottom plate both sides, and two fences not with bottom plate
The side of connection is equidistantly welded with several railings, and therefore, construction worker can be very safe in channel;The setting of escape way
The frequency of use of big machinery is eliminated, and then has saved great amount of cost;Construction worker can be flexibly movable in channel, improves
The convenience of operation, and then construction efficiency is accelerated, and after construction, it is fully able to the requirement for meeting floor construction quality.
Description of the drawings
Fig. 1 is the structure diagram of escape way in the present invention.
Specific embodiment
The installation method of present invention broadening platform high-altitude floor is made with reference to the accompanying drawings and detailed description further
It is described in detail:
As shown in Figure 1, in this embodiment, a kind of installation method for the platform high-altitude floor that is widened of the present invention, packet
Include following steps:
1) several escape ways are made, each escape way includes bottom plate 13 and the fence mounted on 13 both sides of bottom plate
14, the length direction of 13 upper edge escape way of bottom plate is welded with several lateral steps 12, and two fences 14 are not connect with bottom plate 13
Side be equidistantly welded with several railings 11, the both ends of escape way are connected separately with top hook 15 and bottom hook 10;
2) escape way is sling using 25 tons of truck cranes, top hook 15 is hooked on the tripod for having installed cone section
Portion, bottom hook 10, which is hooked on, have been installed in broadening platform outboard structure;
3) remaining escape way is equidistantly uniformly installed along the circumferencial direction of cone section using the method in step 2);
4) it is manually entered in escape way, hand steered fence 14 is climbed to escape way, to the high-altitude rib for the platform that is widened
Plate is installed.
Then several escape ways are surrounded cone section by the present invention by making several escape ways in advance by truck crane
Circumference is equidistantly uniformly installed, and the hand steered fence of construction personnel is finally allowed to be climbed to escape way, to the high-altitude for the platform that is widened
Floor is installed;Due to escape way include bottom plate and the fence mounted on bottom plate both sides, and two fences not with bottom plate
The side of connection is equidistantly welded with several railings, and therefore, construction worker can be very safe in channel;The setting of escape way
The frequency of use of big machinery is eliminated, and then has saved great amount of cost;Construction worker can be flexibly movable in channel, improves
The convenience of operation, and then construction efficiency is accelerated, and after construction, it is fully able to the requirement for meeting floor construction quality.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention
It encloses and is defined, under the premise of design spirit of the present invention is not departed from, those of ordinary skill in the art are to the technical side of the present invention
The various modifications and improvement that case is made, should all fall within the scope of protection of the present invention.
Claims (1)
1. a kind of installation method for the platform high-altitude floor that is widened, which is characterized in that include the following steps:
1) several escape ways are made, each escape way includes bottom plate (13) and the fence mounted on bottom plate (13) both sides
(14), the length direction of bottom plate (13) upper edge escape way is welded with several lateral steps (12), two fences (14) not with bottom
The side of plate (13) connection is equidistantly welded with several railings (11), and the both ends of escape way are connected separately with top hook (15)
(10) are linked up with bottom;
2) sling escape way using 25 tons of truck cranes, by top link up with (15) be hooked on installed cone section tripod top,
Bottom hook (10), which is hooked on, have been installed in broadening platform outboard structure;
3) remaining escape way is equidistantly uniformly installed along the circumferencial direction of cone section using the method in step 2);
4) it is manually entered in escape way, at the top of hand steered fence (14) climbing to escape way, to the high-altitude floor for the platform that is widened
It is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711422814.4A CN108131026A (en) | 2017-12-25 | 2017-12-25 | A kind of installation method for the platform high-altitude floor that is widened |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711422814.4A CN108131026A (en) | 2017-12-25 | 2017-12-25 | A kind of installation method for the platform high-altitude floor that is widened |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108131026A true CN108131026A (en) | 2018-06-08 |
Family
ID=62392437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711422814.4A Pending CN108131026A (en) | 2017-12-25 | 2017-12-25 | A kind of installation method for the platform high-altitude floor that is widened |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108131026A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284480A (en) * | 2019-06-28 | 2019-09-27 | 中船黄埔文冲船舶有限公司 | A kind of steelframe passageway |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202451040U (en) * | 2011-12-29 | 2012-09-26 | 中国葛洲坝集团股份有限公司 | Perpendicular high-altitude crawling ladder |
CN204040515U (en) * | 2014-03-14 | 2014-12-24 | 中国建筑第八工程局有限公司 | Cat ladder |
CN105239804A (en) * | 2015-09-01 | 2016-01-13 | 山东电力建设第一工程公司 | Assembly and lift-erecting method of indirect air-cooling system stretching platforms |
CN107328292A (en) * | 2017-08-15 | 2017-11-07 | 中国电力工程顾问集团西北电力设计院有限公司 | Gravity-flow ventilation dry cooling tower self-supporting broadening platform |
CN107476617A (en) * | 2017-10-16 | 2017-12-15 | 山东电力建设第工程公司 | A kind of indirect cool tower lifting broadening platform support and installation method |
-
2017
- 2017-12-25 CN CN201711422814.4A patent/CN108131026A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202451040U (en) * | 2011-12-29 | 2012-09-26 | 中国葛洲坝集团股份有限公司 | Perpendicular high-altitude crawling ladder |
CN204040515U (en) * | 2014-03-14 | 2014-12-24 | 中国建筑第八工程局有限公司 | Cat ladder |
CN105239804A (en) * | 2015-09-01 | 2016-01-13 | 山东电力建设第一工程公司 | Assembly and lift-erecting method of indirect air-cooling system stretching platforms |
CN107328292A (en) * | 2017-08-15 | 2017-11-07 | 中国电力工程顾问集团西北电力设计院有限公司 | Gravity-flow ventilation dry cooling tower self-supporting broadening platform |
CN107476617A (en) * | 2017-10-16 | 2017-12-15 | 山东电力建设第工程公司 | A kind of indirect cool tower lifting broadening platform support and installation method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284480A (en) * | 2019-06-28 | 2019-09-27 | 中船黄埔文冲船舶有限公司 | A kind of steelframe passageway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106927353B (en) | LNG storage tank tank inner tube pipe fitting method | |
CN104759856B (en) | Coke dry quenching boiler shell upper cone makes and installation method | |
CN105442866A (en) | Protective dismantle and assembly method for large-scale towering steel structures | |
CN104600611B (en) | A kind of disconnecting switch inspection platform of portable | |
CN108131026A (en) | A kind of installation method for the platform high-altitude floor that is widened | |
CN107178203A (en) | A kind of planar dimension and adjustable for height operating platform | |
KR101068229B1 (en) | Dismantled tower crane cargo handling system and cargo handling method using thereof | |
CN108118885B (en) | vertical moving type protection platform and application thereof in steel structure column butt joint construction | |
CN206308626U (en) | Operating platform for installing hanging basket at top of pier body of pier | |
CN101818563A (en) | Jack-up integral lifting mobile platform and using method | |
CN203437842U (en) | Pipeline welding platform | |
CN104030176B (en) | The equalizer bar of hoisting platform truss and hanging method thereof | |
CN204040442U (en) | Integral lifting type elevator shaft operating platform | |
CN207260556U (en) | A kind of high-altitude operations tool Hanging Basket | |
CN113565688B (en) | Using method of high-altitude flying bridge | |
CN208310158U (en) | Construction protection crosshead | |
CN102587276B (en) | Multifunctional operating vehicle for concrete anti-collision guardrail of bridge and construction method realized by aid of multifunctional operating vehicle | |
CN107081550B (en) | Draw and insert-type overhead welding platform and its installation method | |
CN206616460U (en) | A kind of adhesion type bridge maintenance nacelle device | |
CN209816664U (en) | Device for assisting in overhead reinforcement installation operation | |
CN207260642U (en) | Working at height floor hanger | |
WO2010013252A1 (en) | A modular canopy | |
CN211851622U (en) | Anti-falling assembled vertical ladder with conversion rest platform | |
CN209568968U (en) | A kind of safety climbing ladder for narrow deep basal pit | |
CN218205588U (en) | Safety elevator for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 230000 East Fozhang Road and North Tingyun Road Office Building, Hefei Economic and Technological Development Zone, Anhui Province Applicant after: China National Chemical Engineering Third Construction Co., Ltd. Address before: 232038 No. 98 Dongshan Road, Tianjiaan District, Huainan City, Anhui Province Applicant before: China National Chemical Engineering Third Construction Co., Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180608 |
|
RJ01 | Rejection of invention patent application after publication |