CN108131012A - A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method - Google Patents

A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method Download PDF

Info

Publication number
CN108131012A
CN108131012A CN201711433875.0A CN201711433875A CN108131012A CN 108131012 A CN108131012 A CN 108131012A CN 201711433875 A CN201711433875 A CN 201711433875A CN 108131012 A CN108131012 A CN 108131012A
Authority
CN
China
Prior art keywords
wall
installation
water conservancy
concrete
conservancy diversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711433875.0A
Other languages
Chinese (zh)
Inventor
冯钧
熊文涛
王少华
黄明星
何晓明
李群宝
路闯
余金巧
石磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd, China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201711433875.0A priority Critical patent/CN108131012A/en
Publication of CN108131012A publication Critical patent/CN108131012A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method, includes the following steps:1)Template is processed according to design standard;2)Bottom slab concreting operation is carried out after handling the walls concrete dabbing poured in advance, then traveling centering platform is utilized to carry out wall steel bar and model sheetinstallat;3)Concrete wall is carried out in concrete blinding to pour;4)After pouring completion, treat that concrete strength carries out form removable after reaching final strength.Using the above method so that speed of application faster, it is more efficient, effectively reduce wall cycle period, improve construction speed, save construction human cost.

Description

A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method
Technical field
The present invention relates to wall form installation field, particularly a kind of ultralong thin walled water conservancy diversion wall model sheetinstallat side Method.
Background technology
In current building trade, reinforced concrete structure still occupies industry leading position, concrete blinding field It innovates technologies and brand-new technique, has far-reaching influence for the development of entire industry, in China now using the most general Time template system be " fastener type steel pipe support plywood form combined system ", be primarily directed to daily engineering construction, The template integrally installs, overall pulling down, long construction period, and the disposable material that puts into is more, and is applied for super high thin wall type training wall In work, the safety set up about rack template system is even more a problem.
Invention content
The technical problems to be solved by the invention are to provide a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method, ensure that Construction quality, it is cost-effective, site operation progress is accelerated, by site operation practice summary, can be saved using this method Cycle period is removed and set up to form assembly system, saves cost of labor.
In order to solve the above technical problems, the technical solution adopted in the present invention is:A kind of ultralong thin walled water conservancy diversion wall form Installation method includes the following steps:
1)Template is processed according to design standard;
2)Bottom slab concreting operation is carried out after handling the walls concrete dabbing poured in advance, then utilizes traveling centering platform Carry out wall steel bar and model sheetinstallat;
3)Concrete wall is carried out in concrete blinding to pour;
4)After pouring completion, treat that concrete strength carries out form removable after reaching final strength.
2nd, a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 1, it is characterised in that:It is described Step 2)In, complete to carry out successively after bottom slab concreting lateral treatment of construction joints, wall steel bar installation, the installation of wall end mould and Wall side form is installed.
In preferred scheme, the lateral treatment of construction joints operation is specially:Construction to the concrete wall poured Seam carries out dabbing processing.
In preferred scheme, the wall steel bar installation exercise is specially:Wall steel bar is arrived according to the primary binding of design Top, wall steel bar are installed according to design.
In preferred scheme, the wall end mould installation specifically includes following steps:
I, construction joints end mould installation:
(1)Wall steel bar presses longitudinal reinforcement spacing trepanning after installation is complete, by the first steel plate net stencil;
(2)Then the first steel plate net stencil insertion longitudinal reinforcement is installed;
(3)First expanded metal lath is after installation is complete, then is abound in expanded metal lath side as perpendicular rib by the use of first lumps of wood;
(4)It is connect using the first connector as cross rib with the first double flute steel of wall side form.
II, expansion joints Side Template installation:
Expansion joint end mould uses glued board, sealing installation synchronouss with end template, by filler plate and glued board using waterstop to divide Secant is divided to two sections of installations, the specific steps are:
(1)Filler plate is first installed, then glued board is installed outside filler plate;
(2)Waterstop after installation is complete for half filler plate and glued board is installed, then the other half filler plate and gluing are installed again Plate;
(3)Second expanded metal lath is after installation is complete, then is abound with behind glued board as perpendicular rib by the use of second lumps of wood;
(4)It is connect using the second connector as cross rib with the second double flute steel of wall side form.
In preferred scheme, first expanded metal lath and the second expanded metal lath use Hy-Rib expanded metal laths.
In preferred scheme, the wall side form uses Split form, in assembled place that wall side form assembly is complete Side form lifting installation exercise is carried out using tower crane into rear, the specific steps are:
1)Two pieces of opposite templates are first shifted to an earlier date to the tie rod hole for being drilled with according to design and being passed through for pull rod;
2)The template of side is first installed, and is fixed, the cone cap and pull rod of template both sides are worn into fix stably;
3)The template of opposite side is installed to relative position, adjusts pull rod, and template bearing diagonal is set by expansion bolt fixation It puts on prefabricated concrete precast block.
In preferred scheme, the step 3)In, concrete wall pumps placement layer by layer using day, is no more than per layer thickness 30cm, the time interval that pours between layers must not exceed the concrete initial set time.
In preferred scheme, the step 4)In, after striking job is completed, rested using sprayer or using round brush Uniformly sprinkling is applied on metope shield agent SETSEALAW.
In preferred scheme, in the wall steel bar installation exercise, complete to carry out mobile foot hand after reinforcement installation The piecewise symmetrical piecemeal movement of frame, specific steps include:
1)Before movable Scaffold, the diagonal brace of both sides is removed first, utilizes the No.1 foot hand of trolley successively mobile wall both sides Frame is to next position in storehouse;
2)It is mobile in place after, using in two layback steel wire rope of wall, will be connected between wall steel bar and scaffold;
3)It repeats the above steps, carries out subsequent scaffold movement operation;
4)After completing scaffold movement, it is segmented symmetrical progress model sheetinstallat operation.
A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method provided by the present invention, by using the above method so that Speed of application faster, it is more efficient, effectively reduce wall cycle period, improve construction speed, save construction human cost.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the traveling centering structure diagram of the present invention.
Fig. 2 is the traveling centering moving process schematic diagram of the present invention.
Fig. 3-4 is scaffold support structure diagram in Fig. 2 of the invention.
Fig. 5-6 is the construction joint end mould scheme of installation of the present invention.
Fig. 7-8 is the expansion joint end mould scheme of installation of the present invention.
Fig. 9 is the side form scheme of installation of the present invention.
In figure:Steel wire rope 2-1, diagonal brace 2-2, montant 2-3, the first expanded metal lath 3-1, the first lumps of wood 3-2, the first connector 3- 3, the first double flute steel 3-4, glued board 4-1, waterstop 4-2, filler plate 4-3, the second lumps of wood 4-4, the second connector 4-5, second Double flute steel 4-6, the second expanded metal lath 4-7, bearing diagonal 5-1, concrete precast block 5-2, expansion bolt 5-3, pull rod 5-4, cone cap 5- 5。
Specific embodiment
Embodiment 1:
In Fig. 1, a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method includes the following steps:
1)Template is processed according to design standard;
2)Bottom slab concreting operation is carried out after handling the walls concrete dabbing poured in advance, then utilizes traveling centering platform Carry out wall steel bar and model sheetinstallat;
3)Concrete wall is carried out in concrete blinding to pour;
4)After pouring completion, treat that concrete strength carries out form removable after reaching final strength.
In preferred scheme, the step 2)In, it completes to carry out lateral treatment of construction joints, wall successively after bottom slab concreting Body reinforcement installation, the installation of wall end mould and the installation of wall side form.
Embodiment 2:
On the basis of embodiment 1, the lateral treatment of construction joints operation is specially:Construction to the concrete wall poured Seam carries out dabbing processing.
Embodiment 3:
On the basis of embodiment 1, the wall steel bar installation exercise is specially:Wall steel bar is arrived according to the primary binding of design Top, wall steel bar are installed according to design.
Embodiment 4:
If Fig. 5-8 is on the basis of embodiment 1, the wall end mould installation specifically includes following steps:
I, construction joints end mould installation:
(1)Wall steel bar presses longitudinal reinforcement spacing trepanning after installation is complete, by the first expanded metal lath 3-1 templates;
(2)Then the first expanded metal lath 3-1 templates insertion longitudinal reinforcement is installed;
(3)First expanded metal lath 3-1 is after installation is complete, then is abound in expanded metal lath 3-1 sides as perpendicular rib by the use of the first lumps of wood 3-2;
(4)It is connect using the first connector 3-3 as cross rib with the first double flute steel 3-4 of wall side form.
II, expansion joints Side Template installation:
Expansion joint end mould uses glued board 4-1, sealing installation synchronous with end template, by filler plate and glued board 4-1 with sealing Band 4-2 is cut-off rule, is divided to two sections of installations, the specific steps are:
(1)Filler plate 4-3 is first installed, then glued board 4-1 is installed outside filler plate 4-3;
(2)Waterstop 4-2 after installation is complete by half filler plate 4-3 and glued board 4-1 is installed, then the other half filler is installed again Plate 4-3 and glued board 4-1;
(3)Second expanded metal lath 4-7 is after installation is complete, then is abound with behind glued board 4-1 as perpendicular rib by the use of the second lumps of wood 4-4;
(4)It is connect using the second connector 4-5 as cross rib with the second double flute steel 4-6 of wall side form.
In preferred scheme, the first expanded metal lath 3-1 and the second expanded metal lath 4-7 use Hy-Rib expanded metal laths.
Embodiment 5:
If Fig. 9 is on the basis of embodiment 1, the wall side form uses Split form, in assembled place by wall side form Side form lifting installation exercise is carried out using tower crane after the completion of assembled, the specific steps are:
1)Two pieces of opposite templates are first shifted to an earlier date to the tie rod hole for being drilled with according to design and being passed through for pull rod 5-4;
2)The template of side is first installed, and is fixed, the cone cap 5-5 of template both sides and pull rod 5-4 are worn into fix stably;
3)The template of opposite side is installed to relative position, adjusts pull rod 5-4, and template bearing diagonal 5-1 is passed through into expansion bolt 5-3 is fixed on prefabricated concrete precast block 5-2.
Embodiment 6:
On the basis of embodiment 1, the step 3)In, concrete wall pumps placement layer by layer using day, does not surpass per layer thickness 30cm is crossed, the time interval that pours between layers must not exceed the concrete initial set time.
Intermittent time to shorten between layers is promoted, and ensure sublevel at the beginning of preceding layer concrete using staged It is poured before solidifying.Due to using Hy-Rib templates at this engineering construction seam, so at least wanting distance template 50cm in cloth, shaking When smashing, vibrating spear is at least distally from template 450mm.
Embodiment 7:
On the basis of embodiment 1, the step 4)In, after striking job is completed, using sprayer or use round brush will Uniformly sprinkling is applied on metope curing agent SETSEALAW.
Embodiment 8:
On the basis of embodiment 3, in the wall steel bar installation exercise, complete to carry out mobile foot hand after reinforcement installation The piecewise symmetrical piecemeal movement of frame, specific steps include:
1)Before movable Scaffold, the diagonal brace 2-2 of both sides is removed first, utilizes the No.1 foot of trolley successively mobile wall both sides Hand cradle is to next position in storehouse;
2)It is mobile in place after, using in two layback steel wire rope 2-1 of wall, will be connected between wall steel bar and scaffold;
3)It repeats the above steps, carries out subsequent scaffold movement operation;
4)After completing scaffold movement, it is segmented symmetrical progress model sheetinstallat operation.
By taking Fig. 1 as an example:
Scene is set using operating platform of the movable type Ring-Lock scaffold buildings stent as installation reinforcing bar, scaffold per side 3 are put, gap is 0.2m between per pass stent, and single side bracing length is 15.7m, and three 5.1m stents can divide in construction can It closes, can at the scene arrange in pairs or groups use by 5.1m, 10.3m and 15.7m length.Stent wall is divided into three sections of piecewise symmetrical piecemeals when moving It moves, can stent be split as to every section of 5.1m when stent moves moves, and reduces single weight support frame.First segment has moved After immediately by wall steel bar with steel wire rope 2-1 connections, prevent reinforcing bar from toppling.Then follow-up 2 sections, the 3rd section of reinforcing bar are carried out successively Rack platform moves.
The lifting of reinforcing bar is carried out using tower crane.Since wall steel bar is higher, preventive measures against overturning need to be carried out.As shown in Fig. 2, it adopts Triangular supports are set up with steel pipe to support, and longitudinally one of triangle scaffold diagonal brace 2- is set at a certain distance in wall steel bar 2, the diagonal brace 2-2 of supporting rack be fixed on it is pre- be formed in the concrete pad of bottom plate, the diagonal brace 2-2 on the same side is equipped at least two A, two diagonal brace 2-2 are respectively supported at midpoint and the apex of montant 2-3.
It using the construction method, is proved through practice result, has reached following effect:
(1)This method short construction period is Quick Release modular system, pipelining can be unfolded very well, can save template group collaboration System is removed and sets up the time 5 days, saves artificial about 272250 work days, converts into about 2722.5 ten thousand yuan of RMB;
(2)Construction joint 4962m is reduced, reduces by 75% quantity at location, saves reception time, greatly speed up construction speed, in addition 6 meters high about 300 tons of cross plate buckle scaffold is saved, converts into 2,600,000 yuan of RMB;
(3)This method easy construction, traveling centering support shuttering system is easy for assembly, and stent can be split into 1/3 progress It is mobile, assembling combination is carried out again after reaching designated position, is reduced the weight of single stent, manually can be carried and spell completely Dress, and left-hand seat is easy, and cost of labor is greatly saved;
(4)This method site operation rubbish is few, and support system is succinct, and scene is without rubbish after form removal, and it is convenient to remove, ring of entirely constructing Border is safe, clean and tidy.

Claims (10)

1. a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method, it is characterized in that including the following steps:
1)Template is processed according to design standard;
2)Bottom slab concreting operation is carried out after handling the walls concrete dabbing poured in advance, then utilizes traveling centering platform Carry out wall steel bar and model sheetinstallat;
3)Concrete wall is carried out in concrete blinding to pour;
4)After pouring completion, treat that concrete strength carries out form removable after reaching final strength.
2. a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 1, it is characterised in that:The step Rapid 2)In, it completes to carry out lateral treatment of construction joints, wall steel bar installation, the installation of wall end mould and wall successively after bottom slab concreting Side form is installed.
A kind of 3. ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 2, it is characterised in that the horizontal stroke It is specially to treatment of construction joints operation:Dabbing processing is carried out to the construction joint of concrete wall poured.
A kind of 4. ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 2, it is characterised in that the wall Body reinforcement installation operation is specially:Wall steel bar is installed according to the primary binding of design to top, wall steel bar according to design.
A kind of 5. ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 2, it is characterised in that the wall The installation of body end mould specifically includes following steps:
I, construction joints end mould installation:
(1)Wall steel bar is after installation is complete, by the first expanded metal lath(3-1)Template presses longitudinal reinforcement spacing trepanning;
(2)Then by the first expanded metal lath(3-1)Template is inserted into longitudinal reinforcement and is installed;
(3)First expanded metal lath(3-1)After installation is complete, then with first lumps of wood(3-2)It is abound in expanded metal lath(3-1)Side is as perpendicular Rib;
(4)Using the first connector(3-3)As cross rib and the first double flute steel of wall side form(3-4)Connection;
II, expansion joints Side Template installation:
Expansion joint end mould uses glued board(4-1), sealing installation synchronous with end template, by filler plate and glued board(4-1)With Waterstop(4-2)For cut-off rule, it is divided to two sections of installations, the specific steps are:
(1)Filler plate is first installed(4-3), then in filler plate(4-3)Outside installation glued board(4-1);
(2)When half filler plate(4-3)And glued board(4-1)Installation waterstop after installation is complete(4-2), then install again another Half filler plate(4-3)And glued board(4-1);
(3)Second expanded metal lath(4-7)After installation is complete, then with second lumps of wood(4-4)It is abound in glued board(4-1)Below as perpendicular Rib;
(4)Using the second connector(4-5)As cross rib and the second double flute steel of wall side form(4-6)Connection.
6. a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 5, it is characterised in that:Described One expanded metal lath(3-1)With the second expanded metal lath(4-7)Using Hy-Rib expanded metal laths.
7. a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 2, it is characterised in that:The wall Side mould uses Split form, and carrying out side form lifting installation using tower crane after the completion of assembled place is assembled by wall side form makees Industry, the specific steps are:
1)First two pieces of opposite templates are drilled with according to design for pull rod in advance(5-4)The tie rod hole passed through;
2)The template of side is first installed, and is fixed, by the cone cap of template both sides(5-5)And pull rod(5-4)Wear fixation It is firm;
3)The template of opposite side is installed to relative position, adjusts pull rod(5-4), and by template bearing diagonal(5-1)Pass through expansion Bolt(5-3)It is fixed at prefabricated concrete precast block(5-2)On.
8. a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 1, it is characterised in that:The step Rapid 3)In, concrete wall using day pump placement layer by layer, per layer thickness be no more than 30cm, between layers pour time interval It must not exceed the concrete initial set time.
A kind of 9. ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 1, it is characterised in that the step Rapid 4)In, after striking job is completed, using sprayer or using round brush, by curing agent SETSEALAW, uniformly sprinkling is applied to wall On face.
10. a kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method according to claim 4, it is characterised in that:Described In wall steel bar installation exercise, the piecewise symmetrical piecemeal movement of progress traveling centering after reinforcement installation is completed, it is specific to walk Suddenly include:
1)Before movable Scaffold, the diagonal brace of both sides is removed first(2-2), utilize the No.1 of trolley successively mobile wall both sides Scaffold is to next position in storehouse;
2)After movement in place, using in two layback steel wire rope of wall(2-1), will be connected between wall steel bar and scaffold;
3)It repeats the above steps, carries out subsequent scaffold movement operation;
4)After completing scaffold movement, it is segmented symmetrical progress model sheetinstallat operation.
CN201711433875.0A 2017-12-26 2017-12-26 A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method Pending CN108131012A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711433875.0A CN108131012A (en) 2017-12-26 2017-12-26 A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711433875.0A CN108131012A (en) 2017-12-26 2017-12-26 A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method

Publications (1)

Publication Number Publication Date
CN108131012A true CN108131012A (en) 2018-06-08

Family

ID=62393220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711433875.0A Pending CN108131012A (en) 2017-12-26 2017-12-26 A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method

Country Status (1)

Country Link
CN (1) CN108131012A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056537A (en) * 2018-08-09 2018-12-21 中铁建大桥工程局集团第五工程有限公司 Multi-layer board applies protecting wall breaking joint construction method
CN112810830A (en) * 2020-12-31 2021-05-18 四川省场道工程有限公司 Construction method of reinforced concrete folded plate type flow guide screen for airport
CN113802834A (en) * 2021-11-01 2021-12-17 中国水利水电第三工程局有限公司 Thin-wall concrete high wall construction method
CN114439202A (en) * 2022-02-11 2022-05-06 赵立财 Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN114775982A (en) * 2022-04-11 2022-07-22 赵立财 Lifting moving trolley for high-wall scaffold and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1760485A (en) * 2004-10-11 2006-04-19 上海市第一市政工程有限公司 Method for constructing plate body structure in super high thin wall
CN101956458A (en) * 2010-11-05 2011-01-26 中国建筑第八工程局有限公司 Construction method of overlong and superhigh single-side fair-faced concrete wall
CN202787957U (en) * 2012-09-23 2013-03-13 中国十七冶集团有限公司 Construction template device of parapet wall
CN104695703A (en) * 2015-02-11 2015-06-10 茂名市建筑集团有限公司 Non-drilled shear wall construction template system and shear wall construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1760485A (en) * 2004-10-11 2006-04-19 上海市第一市政工程有限公司 Method for constructing plate body structure in super high thin wall
CN101956458A (en) * 2010-11-05 2011-01-26 中国建筑第八工程局有限公司 Construction method of overlong and superhigh single-side fair-faced concrete wall
CN202787957U (en) * 2012-09-23 2013-03-13 中国十七冶集团有限公司 Construction template device of parapet wall
CN104695703A (en) * 2015-02-11 2015-06-10 茂名市建筑集团有限公司 Non-drilled shear wall construction template system and shear wall construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056537A (en) * 2018-08-09 2018-12-21 中铁建大桥工程局集团第五工程有限公司 Multi-layer board applies protecting wall breaking joint construction method
CN112810830A (en) * 2020-12-31 2021-05-18 四川省场道工程有限公司 Construction method of reinforced concrete folded plate type flow guide screen for airport
CN113802834A (en) * 2021-11-01 2021-12-17 中国水利水电第三工程局有限公司 Thin-wall concrete high wall construction method
CN114439202A (en) * 2022-02-11 2022-05-06 赵立财 Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
CN114775982A (en) * 2022-04-11 2022-07-22 赵立财 Lifting moving trolley for high-wall scaffold and construction method

Similar Documents

Publication Publication Date Title
CN108131012A (en) A kind of ultralong thin walled water conservancy diversion wall Formwork Installation Method
CN106677211B (en) Wall tears assembled piping lane aluminum dipping form trolley system and its construction method open with the top plate whole morning poured
CN110528402A (en) A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN104712143A (en) Reversed mould construction method for circular reinforced concrete chimney wall
CN108004927A (en) Double limb triangle hanging basket and large span continuous rigid frame bridge cantilever beam section construction methods
CN107227814B (en) A kind of large cantilever concrete structure section construction method
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN108005118A (en) Underground pipe gallery agent structure integrates construction method
CN109267490A (en) A kind of long nose-girder type mobile formwork and its construction method
CN106906841A (en) One kind is used for lateral wall form bracing system construction
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN209568450U (en) A kind of connection structure for foundation pit assembled inner bracing member and crown beam
CN102322022B (en) Construction method for concrete of decorative housing of cable stayed bridge
CN107100322A (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN201567793U (en) Simple material distributing device for high-rise concrete pouring construction
CN109057331A (en) A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint
CN104847111B (en) Construction method for coupling beam between shear wall limbs
CN107905115A (en) Through Steel pipe concrete truss combination beamss bridge construction method
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN204531405U (en) A kind of traveling formwork device being convenient to the cleaning of stair construction joint position

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180608