CN108115827A - A kind of component production and transport system and method - Google Patents

A kind of component production and transport system and method Download PDF

Info

Publication number
CN108115827A
CN108115827A CN201711251335.0A CN201711251335A CN108115827A CN 108115827 A CN108115827 A CN 108115827A CN 201711251335 A CN201711251335 A CN 201711251335A CN 108115827 A CN108115827 A CN 108115827A
Authority
CN
China
Prior art keywords
rail
transport system
prefabricated components
component production
hoisting mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711251335.0A
Other languages
Chinese (zh)
Inventor
陈卿
徐鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Sany Kuaierju Housing Industry Co Ltd
Original Assignee
Hunan Sany Kuaierju Housing Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Sany Kuaierju Housing Industry Co Ltd filed Critical Hunan Sany Kuaierju Housing Industry Co Ltd
Priority to CN201711251335.0A priority Critical patent/CN108115827A/en
Publication of CN108115827A publication Critical patent/CN108115827A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/22Apparatus or processes for treating or working the shaped or preshaped articles for cleaning

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The present invention relates to construction engineering technical field, more particularly, to a kind of component production and transport system and method.The component production and transport system includes:Rollover mechanism, hoisting mechanism and rail mechanism;The hoisting mechanism is movably arranged on the rail mechanism, and the path of the rail mechanism at least extends to target place from the rollover mechanism.The component production and transport system only needs component to carry out the stacking that a lifting operation is just accomplished to target place, improves efficiency;The component production and transport system footprint area is small, cancels working area, greatly reduces cleaning area area, utilization of area rate is greatly improved;The component production and transport system is further cleaned automatically using assembly line instead of manually cleaning, greatly provides efficiency.

Description

A kind of component production and transport system and method
Technical field
The present invention relates to construction engineering technical field, more particularly, to a kind of component production and transport system and method, especially It is the production and transport system and method for being related to a kind of concrete prefabricated element.
Background technology
In correlation technique, the prefabricated components manufacturer of mainstream, which generally employs such a way, makes prefabricated components from production Line is transported to stockyard.With reference to Fig. 1 for example, component is moved to rollover after circulation die station prefabricated components production line completes Mechanism 2 hangs component cleaning area 3 by driving 1 afterwards and places, manually carries out washing and cleaning operation to concrete component surrounding afterwards, Component working area 5 being hung to again and carries out the operation such as repairing after having cleaned afterwards, transfer car(buggy) 4 reaches afterwards, drives a vehicle 1 afterwards by structure Part hangs on transfer car(buggy) 4, and component is transported to stockyard by transfer car(buggy) 4 afterwards, completes to stack by equipment such as gantry cranes in stockyard.
As it can be seen that there are following defects for traditional prefabricated components transportation system:
(1), component, which need to carry out four lifting operations, can just be accomplished to the stacking in stockyard, and efficiency is low;
(2), cleaning area takes up a large area, and need to be accomplished manually simple washing and cleaning operation, reduces utilization of area rate and operation is imitated Rate is low;
(3), working area is needed, reduces utilization of area rate;
(4), driving, transfer car(buggy) is needed to participate in, equipment cost is high.
The information for being disclosed in the background section is merely intended to deepen the understanding to the general background technology of the application, and It is not construed as recognizing or implies the information structure prior art known to those skilled in the art in any form.
The content of the invention
It is in the prior art to solve it is an object of the invention to provide a kind of component production and transport system and method The technical issues of lifting component operations number is more, and circulation efficiency is low, and cost of manufacture is high.
To achieve these goals, the present invention uses following technical scheme:
In a first aspect, the present invention provides a kind of component production and transport system, including:Rollover mechanism, hoisting mechanism and rail Road mechanism;The hoisting mechanism is movably arranged on the rail mechanism, and the path of the rail mechanism is at least from described Rollover mechanism extends to target place.
As a kind of further technical solution, which further includes:Wiper mechanism, the cleaning machine Structure is arranged on the path of the rail mechanism.
As a kind of further technical solution, which further includes:Repair mechanism, the repairing machine Structure is arranged on the path of the rail mechanism.
As a kind of further technical solution, which further includes:Stacking mechanism, the stacking machine Structure is arranged on the path of the rail mechanism.
As a kind of further technical solution, the rail mechanism includes:Crane rail and door frame, the crane rail The top of the door frame is arranged at, the hoisting mechanism is movably arranged on the crane rail.
As a kind of further technical solution, the door frame includes:The first supporting rack being oppositely arranged and the second support Frame offers a crane rail at the top of first supporting rack, another institute is offered at the top of second supporting rack Crane rail is stated, the hoisting mechanism is movably arranged between two crane rails.
As a kind of further technical solution, the door frame includes:Crossbeam, the first supporting rack and the second supporting rack, institute It states crossbeam and is connected to first supporting rack and the second supporting rack, suspension is described there are two the crane rail on the crossbeam Hoisting mechanism is movably arranged between two crane rails.
As a kind of further technical solution, the hoisting mechanism is arranged between two crane rails, and institute Stating the end set of hoisting mechanism has the idler wheel that connection is rolled with the basal plane of the crane rail.
As a kind of further technical solution, the end set of the hoisting mechanism has the side with the crane rail Roll the guide wheel of connection.
As a kind of further technical solution, the rail mechanism includes:Track track, the hoisting mechanism move Ground is arranged on the track track.
Using the technical solution of above-mentioned first aspect, the present invention has the advantages that:
1st, component production and transport system provided by the invention only needs component lifting operation of progress to be just accomplished to target Place (such as:Stockyard) stacking, improve efficiency;
2nd, component production and transport system footprint area provided by the invention is small, cancels working area, greatly reduces cleaning area face Product, is greatly improved utilization of area rate;
3rd, component production and transport system provided by the invention is further cleaned automatically using assembly line instead of manually cleaning, pole It is big that efficiency is provided.
Second aspect, the present invention also provides a kind of methods of the component production and transport system, include the following steps:
Overturning operation is carried out to prefabricated components to be transported by rollover mechanism;
Lifting operation is carried out to the prefabricated components after overturning by hoisting mechanism;
Control hoisting mechanism is moved along the path of rail mechanism, and the prefabricated components after lifting are hoisted to target field Ground.
It is described that overturning work is carried out to prefabricated components to be transported by rollover mechanism as a kind of further technical solution Industry includes:
Circulation die station circulates prefabricated components to be transported to the rollover mechanism;
Whole overturning is carried out to the circulation die station and the prefabricated components by rollover mechanism.
As a kind of further technical solution, the control hoisting mechanism is moved along the path of rail mechanism, will Prefabricated components after lifting, which are hoisted to target place, to be included:
During prefabricated components handling, washing and cleaning operation is carried out to the prefabricated components after lifting by wiper mechanism.
As a kind of further technical solution, the control hoisting mechanism is moved along the path of rail mechanism, will Prefabricated components after lifting, which are hoisted to target place, to be included:
During prefabricated components handling, repairing work is carried out to the prefabricated components after lifting by repair mechanism.
Using the technical solution of above-mentioned second aspect, the present invention has the advantages that:
1st, method provided by the invention by component only need carry out a lifting operation be just accomplished to target place (such as:Heap ) stacking, improve efficiency;
2nd, floor space is small when method provided by the invention is implemented, and cancels working area, greatly reduces cleaning area area, greatly Improve utilization of area rate;
3rd, method provided by the invention is further cleaned automatically using assembly line instead of manually cleaning, greatly provides efficiency.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in describing below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the schematic diagram that prefabricated components are transported to target place from production line in the prior art;
Fig. 2 is the schematic diagram of component production and transport system provided in an embodiment of the present invention;
Fig. 3 is the side view that component production and transport system provided in an embodiment of the present invention is in roll-over state;
Fig. 4 is the side view that component production and transport system provided in an embodiment of the present invention is in cleaning state;
Fig. 5 is the top view that component production and transport system provided in an embodiment of the present invention is in cleaning state;
Fig. 6 is the side view that the component production and transport system that another embodiment of the present invention provides is in roll-over state;
Fig. 7 is the first assembling schematic diagram of hoisting mechanism provided in an embodiment of the present invention and crane rail;
Fig. 8 is second of assembling schematic diagram of hoisting mechanism provided in an embodiment of the present invention and crane rail;
Fig. 9 is the third assembling schematic diagram of hoisting mechanism provided in an embodiment of the present invention and crane rail.
Icon:1- drives a vehicle;2- rollover mechanisms;3- components cleaning area;4- transfer car(buggy)s;5- components working area;6- targets place; 7- hoisting mechanisms;8- wiper mechanisms;9- repair mechanisms;10- rail mechanisms;11- crane rails;12- door frames;14- track tracks; 15- cleaning sprayer groups;16- idler wheels;17- guide wheels;20- prefabricated components;21- circulation die station;The first supporting racks of 121-;122- second Supporting rack;123- crossbeams.
Specific embodiment
Technical scheme is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's all other embodiments obtained without making creative work, belong to the scope of protection of the invention.
The specific embodiment of the present invention is described in detail below in conjunction with attached drawing.It should be appreciated that this place is retouched The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to limit the invention.
Embodiment one
With reference to shown in Fig. 2 to Fig. 3, the present embodiment provides a kind of component production and transport system, including:Rollover mechanism 2 is hung Mounting mechanism 7 and rail mechanism 10;Wherein, rollover mechanism 2 is used to overturn prefabricated components 20 to be transported, it is preferred that flip angle For 80-90 degree, so as to preferably complete lifting.Hoisting mechanism 7 is movably arranged on rail mechanism 10, for along rail The path of road mechanism 10 carries out handling prefabricated components 20.The path of rail mechanism 10 at least extends to target field from rollover mechanism 2 (preferred, target place 6 can be understood as loading and unloading the place for stacking prefabricated components 20, such as stockyard on ground 6;Certainly, except this Outside, target place 6 can also be considered as other regions, such as cleaning area, staging area etc.), so that prefabricated components 20 only need to carry out the stacking that a lifting operation is just accomplished to target place 6, improve efficiency.
What deserves to be explained is in the present embodiment component production and transport system, the initiating terminal in the path of rail mechanism 10 is not It is confined to the position of rollover mechanism 2.Similarly, the end in the path of rail mechanism 10 is also not limited to target place 6. That is as long as some or all of path for meeting rail mechanism 10 is to extend to target place 6 from rollover mechanism 2.
In the present embodiment, which further includes:Wiper mechanism 8, wiper mechanism 8 are arranged at rail mechanism On 10 path.The specific location of wiper mechanism 8 can flexibly be set according to actual needs, as long as being arranged on rollover mechanism 2 and mesh It marks on the path between place 6.The wiper mechanism 8 greatly carries for being cleaned automatically to the prefabricated components 20 of handling High utilization of area rate.
Preferably, the wiper mechanism 8 is in a manner that assembly line cleans automatically.
The wiper mechanism 8 includes:Cleaning framework and cleaning sprayer group 15;Cleaning framework is arranged at the path of rail mechanism 10 On, and cleaning framework be provided with allow prefabricated components 20 by space, to form automatic cleaning area, cleaning sprayer group 15 is set Surrounding in automatic cleaning area completes the surrounding cleaning to prefabricated components 20.
More specifically, the top of automatic cleaning area and bottom are provided with multiple cleaning sprayers, it is defeated in prefabricated components 20 Upper and lower two surfaces of prefabricated components 20 are cleaned during sending, are equipped in the side of 20 direction of advance of prefabricated components Multiple cleaning sprayers clean former and later two faces of prefabricated components 20, so as to complete the surrounding cleaning to prefabricated components 20 Work.
In addition, in order to reach intellectualized operation, can also the beginning of automatic cleaning area and tail end be provided with sensing detection Element, when prefabricated components 20 enter to automatic cleaning area, the position signal and feedback of sensing detection member detection prefabricated components 20 To control mechanism, control mechanism is controlled according to the position signal of feedback starts cleaning sprayer, and cleaning sprayer is to prefabricated components 20 Surrounding carries out cleaning;When prefabricated components 20 leave automatic cleaning area, the position of sensing detection member detection prefabricated components 20 Signal simultaneously feeds back to control mechanism, and control mechanism is controlled according to the position signal of feedback closes cleaning sprayer, and cleaning sprayer stops Work.
Certainly, for the present embodiment, on the basis of said structure, a variety of improvement can also be made.It illustrates It is bright:Effluent collection unit is provided with below at automatic cleaning area, effluent collection unit cleans for collecting prefabricated components 20 Sewage afterwards;Filter element is provided in effluent collection unit, filter element is used for the sewage being collected by filtration;Meanwhile also Cycling pumping unit is connected with, Xun Huan pumping unit is connected by each pipeline with cleaning sprayer.Certainly, this is only therein A kind of embodiment, those of ordinary skill in the art can flexibly be set according to actual needs.
In the present embodiment, which further includes:Repair mechanism 9, repair mechanism 9 are arranged at rail mechanism On 10 path.The repair mechanism 9 is realized carries out repairing work to the prefabricated components 20 of partial loss wound.What deserves to be explained is The repair mechanism 9 can include the various instruments for repairing prefabricated components 20, such as:Grinding machine, chisel, trowel etc..Certainly, The repair mechanism 9 is not limited to a kind of device, it can also include the patch area being arranged on the path of rail mechanism 10, Manual repair operation may be employed in the patch area, auto-mending operation can also be used.
In the present embodiment, as a kind of further technical solution, which further includes:Stacking machine Structure, stacking mechanism are arranged on the path of rail mechanism 10.Specifically, stacking mechanism is located at close to the path in target place 6 End.Preferably, stacking mechanism is gantry crane, that is to say, that prefabricated components 20 reach 6 gantry crane lifting position of target place into Row unloading.
With reference to shown in Fig. 3 to Fig. 5, in the present embodiment, which includes:Crane rail 11 and door frame 12, wherein, Crane rail 11 is arranged at the top of door frame 12, and crane rail 11 can extend to target place 6 from rollover mechanism 2.Hoisting mechanism 7 It is movably arranged on crane rail 11.
For crane rail 11 and door frame 12, it can be illustrated there are many assembling form.
Preferably, with reference to shown in Fig. 9, which includes:The first supporting rack 121 being oppositely arranged and the second supporting rack 122, the top of the first supporting rack 121 offers a crane rail 11, and the top of the second supporting rack 122 offers another hanger rail rail Road 11, hoisting mechanism are movably arranged between two crane rails 11.The structure is directly set crane rail 11 In the top of supporting rack, for example, top-side fluting etc., it is simple in structure.
Preferably, which includes:Crossbeam 123, the first supporting rack 121 and the second supporting rack 122, crossbeam 123 connect In there are two hanger rails for suspension on the first supporting rack 121 and the second supporting rack 122 (structure for being similar to portal frame 12), crossbeam 123 Track 11, hoisting mechanism are movably arranged between two crane rails 11.Such structure crane rail 11 can pass through suspension Part is lifted on crossbeam 123, and assembling structure is whole more to be stablized, security higher.
With reference to shown in Fig. 7, hoisting mechanism 7 is arranged between two crane rails 11, and is distinguished in the end of hoisting mechanism 7 It is provided with the idler wheel 16 that connection is rolled with 11 basal plane of crane rail (bottom surface).Preferably, 16 quantity of idler wheel herein is two, That is, it is correspondingly arranged an idler wheel 16 respectively in the end of hoisting mechanism 7.This assembling structure is simple, realizes 7 edge of hoisting mechanism Crane rail 11 is rolled.
In another example:With reference to shown in Fig. 8, hoisting mechanism 7 is arranged between two crane rails 11, in the hoisting mechanism 7 End be respectively arranged with the idler wheel 16 that connection is rolled with 11 basal plane of crane rail, while be also equipped with and 11 side of crane rail The guide wheel 17 of rolling.Preferably, 16 quantity of idler wheel herein is four, and 17 quantity of guide wheel is four, i.e. the end of hoisting mechanism 7 Portion is correspondingly arranged two idler wheels 16 and two guide wheels 17 respectively, and two idler wheels 16 are respectively arranged at the two of 11 basal plane of crane rail Side, two guide wheels 17 are respectively arranged on two opposite flanks of crane rail 11 (it is understood that each idler wheel 16 corresponds to One guide wheel 17).This assembling structure is whole more to be stablized, security higher, and is behaved under the action of guide wheel 17 not Derailing situation can occur.
In the present embodiment, the concrete form of hoisting mechanism 7 does not limit to, and is said with one of which preferred embodiment It is bright:With reference to shown in Fig. 5, hoisting mechanism 7 includes mast-up, suspension hook, lifting rope, device for revolving and driving and travel driving unit;Lifting Frame is slidably arranged on crane rail 11, it is preferred that the quantity of crane rail 11 is two, and mast-up is arranged at two hanger rails Between track 11, and to be slidably connected or roll connection between the corresponding crane rail 11 of mast-up.Hoofing part fills It puts that mast-up is driven to be moved along crane rail 11, device for revolving and driving drives suspension hook to move up and down by lifting rope.On State 7 hoisting prefabricated component 20 of hoisting mechanism control it is simple and practicable, technology realize difficulty it is relatively low, convenient for operation.
It is, of course, preferable to, hoisting mechanism 7 include two suspension hooks and two device for revolving and driving, two suspension hook arranged for interval, Two device for revolving and driving individually drive two suspension hooks to move up and down;Alternatively, hoisting mechanism 7 includes two suspension hooks and one Device for revolving and driving, two suspension hook arranged for interval, the device for revolving and driving drive two suspension hooks to move up and down simultaneously.In this way, Using suspension hook arranged for interval, in hoisting prefabricated component 20, the translation stability of lifting trolley is improved.And so that prefabricated structure Height, that is, Liftable that the lifting of part 20 is relatively low is completed.
In addition, in another embodiment of the invention, the rail mechanism 10 is except that using the above structure, can also use such as Lower structure is equally reached above-mentioned purpose.
Such as:The rail mechanism 10 includes:Track track 14, it is close which can be understood as being arranged at lower section The track on ground, such as:The track track 14 can be directly layed on ground, it is of course also possible to some or all of pre-buried In below ground etc..14 path of track track also at least extends to target place 6 from rollover mechanism 2.Hoisting mechanism 7 is removable It is arranged at dynamicly on track track 14.The rail mechanism 10 can equally realize the transport of prefabricated components 20, simple in structure.It is corresponding , the mast-up of the hoisting mechanism 7 is disposed in proximity to the one side of rollover mechanism 2, again by lifting rope suspension hook is driven to move up and down, And the opposite side of hoisting mechanism 7 is provided with balance weight mechanism.
To sum up, using the technical solution of above-described embodiment one, have the advantages that:
1st, component production and transport system provided in this embodiment only needs component lifting operation of progress to be just accomplished to mesh The stacking in place is marked, improves efficiency;
2nd, component production and transport system footprint area provided in this embodiment is small, cancels working area, greatly reduces cleaning area Utilization of area rate is greatly improved in area;
3rd, component production and transport system provided in this embodiment is further cleaned automatically using assembly line instead of manually cleaning, Efficiency is greatly provided.
Embodiment two
With reference to shown in Fig. 2 to Fig. 6, the present embodiment two also provides a kind of component production and transport system according to embodiment one The method of system, as other features in a kind of detailed description of above-described embodiment, the technical solution bag disclosed in the present embodiment two The technical solution disclosed in embodiment one is included, the content that embodiment one is protected falls within the protection content of the present embodiment two, It is no longer repeated for identical part.
Specifically, this method comprises the following steps:
S1, overturning operation is carried out to prefabricated components 20 to be transported by rollover mechanism 2;
Specifically, circulation die station 21 circulates prefabricated components 20 to be transported to rollover mechanism 2;It is right by rollover mechanism 2 Circulation die station 21 and prefabricated components 20 carry out whole overturning.Preferably, the flip angle of prefabricated components 20 is 80-90 °.
S2, lifting operation is carried out to the prefabricated components 20 after overturning by hoisting mechanism 7;
S3, control hoisting mechanism 7 are moved along the path of rail mechanism 10, and the prefabricated components 20 after lifting are hoisted to (preferred, target place 6 can be understood as loading and unloading the place for stacking prefabricated components 20, such as stockyard in target place 6;When So, in addition, target place 6 can also be considered as other regions, such as cleaning area, staging area etc.).
Wherein, during 20 handling of prefabricated components, the prefabricated components 20 after lifting are carried out clearly by wiper mechanism 8 Operation is washed, so as to complete the surrounding cleaning to prefabricated components 20.
Wherein, during 20 handling of prefabricated components, the prefabricated components 20 after lifting are repaiied by repair mechanism 9 Operation is mended, repairing work is carried out to the prefabricated components 20 of partial loss wound.
What deserves to be explained is prefabricated components 20 in the present embodiment are mainly basic material in advance in factory's system using concrete Into building element, including beam, plate, column and construction and decoration accessory etc..Certainly, this is also not limited to, the component of other materials Also can apply.
To sum up, using the technical solution of above-described embodiment two, the present invention has the advantages that:
1st, method provided by the invention only needs component to carry out the stacking that a lifting operation is just accomplished to target place, carries High efficiency;
2nd, floor space is small when method provided by the invention is implemented, and cancels working area, greatly reduces cleaning area area, greatly Improve utilization of area rate;
3rd, method provided by the invention is further cleaned automatically using assembly line instead of manually cleaning, greatly provides efficiency.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to Can so modify to the technical solution recorded in foregoing embodiments either to which part or all technical characteristic into Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is not made to depart from various embodiments of the present invention technology The scope of scheme.

Claims (14)

1. a kind of component production and transport system, which is characterized in that including:Rollover mechanism (2), hoisting mechanism (7) and rail mechanism (10);The hoisting mechanism (7) is movably arranged on the rail mechanism (10), and the path of the rail mechanism (10) is extremely It is few to extend to target place (6) from the rollover mechanism (2).
2. component production and transport system according to claim 1, which is characterized in that further include:Wiper mechanism (8), it is described Wiper mechanism (8) is arranged on the path of the rail mechanism (10).
3. component production and transport system according to claim 1, which is characterized in that further include:Repair mechanism (9), it is described Repair mechanism (9) is arranged on the path of the rail mechanism (10).
4. component production and transport system according to claim 1, which is characterized in that further include:Stacking mechanism, the stacking Mechanism is arranged on the path of the rail mechanism (10).
5. the component production and transport system according to any one of claim 1-4, which is characterized in that the rail mechanism (10) include:Crane rail (11) and door frame (12), the crane rail (11) is arranged at the top of the door frame (12), described Hoisting mechanism (7) is movably arranged on the crane rail (11).
6. component production and transport system according to claim 5, which is characterized in that the door frame (12) includes:It is opposite to set The first supporting rack (121) and the second supporting rack (122) put are offered at the top of first supporting rack (121) and hung described in one Rail track (11) offers another crane rail (11), the hoisting mechanism at the top of second supporting rack (122) (7) it is movably arranged between two crane rails (11).
7. component production and transport system according to claim 5, which is characterized in that the door frame (12) includes:Crossbeam (123), the first supporting rack (121) and the second supporting rack (122), the crossbeam (123) are connected to first supporting rack (121) With the second supporting rack (122), there are two the crane rail (11), the hoisting mechanism (7) is removable for suspension on the crossbeam Ground is arranged between two crane rails (11).
8. component production and transport system according to claim 5, which is characterized in that the end of the hoisting mechanism (7) is set It is equipped with the idler wheel (16) that connection is rolled with the basal plane of the crane rail (11).
9. component production and transport system according to claim 8, which is characterized in that the end of the hoisting mechanism (7) is set It is equipped with the guide wheel (17) that connection is rolled with the side of the crane rail (11).
10. the component production and transport system according to any one of claim 1-4, which is characterized in that the rail mechanism (10) include:Track track (14), the hoisting mechanism (7) are movably arranged on the track track (14).
A kind of 11. method of the component production and transport system according to any one of claim 1-10, which is characterized in that including Following steps:
Overturning operation is carried out to prefabricated components (20) to be transported by rollover mechanism (2);
Lifting operation is carried out to the prefabricated components (20) after overturning by hoisting mechanism (7);
Control hoisting mechanism (7) is moved along the path of rail mechanism (10), and the prefabricated components (20) after lifting are hoisted to Target place (6).
12. according to the method for claim 11, which is characterized in that it is described by rollover mechanism (2) to be transported prefabricated Component (20), which carries out overturning operation, to be included:
The die station that circulates (21) circulates prefabricated components (20) to be transported to the rollover mechanism (2);
Whole overturning is carried out to the circulation die station (21) and the prefabricated components (20) by rollover mechanism (2).
13. according to the method for claim 11, which is characterized in that described to control hoisting mechanism (7) along rail mechanism (10) Path moved, the prefabricated components (20) after lifting are hoisted to target place (6) includes:
During prefabricated components (20) handling, the prefabricated components (20) after lifting are cleaned by wiper mechanism (8) Operation.
14. according to the method for claim 11, which is characterized in that described to control hoisting mechanism (7) along rail mechanism (10) Path moved, the prefabricated components (20) after lifting are hoisted to target place (6) includes:
During prefabricated components (20) handling, the prefabricated components (20) after lifting are repaired by repair mechanism (9) Operation.
CN201711251335.0A 2017-12-01 2017-12-01 A kind of component production and transport system and method Pending CN108115827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711251335.0A CN108115827A (en) 2017-12-01 2017-12-01 A kind of component production and transport system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711251335.0A CN108115827A (en) 2017-12-01 2017-12-01 A kind of component production and transport system and method

Publications (1)

Publication Number Publication Date
CN108115827A true CN108115827A (en) 2018-06-05

Family

ID=62228702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711251335.0A Pending CN108115827A (en) 2017-12-01 2017-12-01 A kind of component production and transport system and method

Country Status (1)

Country Link
CN (1) CN108115827A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108748010A (en) * 2018-06-11 2018-11-06 彭春剑 A kind of mechanical equipment repairing frame

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433051Y (en) * 2009-06-02 2010-03-31 中冶东北建设有限公司建筑安装工程公司 Large-scale rack lower boom double-track single-beam lifting crane
CN103029212A (en) * 2012-12-26 2013-04-10 中南建设(沈阳)建筑产业有限公司 Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN203856217U (en) * 2014-06-04 2014-10-01 山东蓝岛新型建材科技股份有限公司 Building assembly type wall assembly production line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201433051Y (en) * 2009-06-02 2010-03-31 中冶东北建设有限公司建筑安装工程公司 Large-scale rack lower boom double-track single-beam lifting crane
CN103029212A (en) * 2012-12-26 2013-04-10 中南建设(沈阳)建筑产业有限公司 Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure
CN203856217U (en) * 2014-06-04 2014-10-01 山东蓝岛新型建材科技股份有限公司 Building assembly type wall assembly production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108748010A (en) * 2018-06-11 2018-11-06 彭春剑 A kind of mechanical equipment repairing frame

Similar Documents

Publication Publication Date Title
CN103111778B (en) Sucking disc hoist device and plate tailor-welding logistics conveying system
DE10244116A1 (en) System for loading and unloading ISO-containers from ships, comprises tower crane with lifting unit mounted on swiveling seaward section of boom and rails on landward section of boom, along which grabs move
CN203045200U (en) Sucking disc hoist device and plate tailor-welding logistics conveying system
EP1293469A1 (en) Loading device for ISO-containers
CN105966909B (en) A kind of robot automatic loading and unloading green tire system
US20170259307A1 (en) Mat Washing System
CN108115827A (en) A kind of component production and transport system and method
CN107445101A (en) A kind of lowering or hoisting gear for being easy to load and unload goods
CN206654689U (en) A kind of electronic stacker
CN103216092B (en) Construction material handling method and equipment thereof
CN111255275B (en) Transformer field overhaul frame combined house
CN209987894U (en) Cleaning equipment
CN212270670U (en) Movable hanging basket for bridge construction
CN109823953B (en) Automatic auxiliary loading bracket of hoisting machine
CN203727232U (en) Functional secondary trolley of mining van
CN211052038U (en) Brill wool cleaning system with small floor area
CN106884543A (en) A kind of curtain wall lifting and transporting device
CN113123634A (en) Full-automatic intelligent roofing maintenance system
CN210465289U (en) Manipulator for fluorescent penetrant inspection detection line
CN211284552U (en) Part pickling production line
CN105173672A (en) Automobile compartment workpiece transferring system
CN218230614U (en) Aerial translation type conveying equipment
CN211967170U (en) Section bar placing rack
JP2540000B2 (en) Reinforcing bar mounting work cart
CN109877018B (en) Automatic suspension system for door drying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605