CN108115002A - The method for improving tail part of band steel scroll quality - Google Patents
The method for improving tail part of band steel scroll quality Download PDFInfo
- Publication number
- CN108115002A CN108115002A CN201611085852.0A CN201611085852A CN108115002A CN 108115002 A CN108115002 A CN 108115002A CN 201611085852 A CN201611085852 A CN 201611085852A CN 108115002 A CN108115002 A CN 108115002A
- Authority
- CN
- China
- Prior art keywords
- strip
- flipper guide
- coiling machine
- pair
- band steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C47/00—Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
- B21C47/02—Winding-up or coiling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C47/00—Winding-up, coiling or winding-off metal wire, metal band or other flexible metal material characterised by features relevant to metal processing only
- B21C47/34—Feeding or guiding devices not specially adapted to a particular type of apparatus
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Winding, Rewinding, Material Storage Devices (AREA)
Abstract
The present invention provides a kind of methods for improving tail part of band steel scroll quality, it is based on the taking-up equipment after being arranged in Hot Rolling Mill, including the first coiling machine being sequentially arranged along the traffic direction of the strip and the second coiling machine and a pair of first flipper guide and a pair of second flipper guide, the described method includes:When second coiling machine batches the strip:When the head of the strip reaches the pinch roll inlet of second coiling machine, the pair of second flipper guide is closed up to clamp the strip;Before the afterbody of the strip is transported from the last rack of the mm finishing mill unit, the pair of first flipper guide is closed up to clamp the strip.The present invention is using the flipper guide clamping strip of upstream coiling machine, and the method for clamping strip simultaneously using more than two flipper guides, the frictional force of raising flipper guide and steel edge portion, ensures that tail part of band steel is tauted, so as to improve the scroll quality of tail part of band steel whereby.
Description
Technical field
The present invention relates to the methods that tail part of band steel scroll quality is improved in hot rolling technology.
Background technology
Coiling machine is the important equipment of hot rolling line, for hot-strip to be rolled into coil of strip.Coiling machine is located at finishing mill
It is last procedure of hot continuous rolling production line after group.Referring to Fig. 1 and 2, strip 1 is delivered to from mm finishing mill unit by roller-way 3 and batched
Machine unit enters pinch roller 51 using the centering of flipper guide 41.The main function of pinch roller is that the steel stage is stung on head to band
Steel applies certain clamping force, while implements first time flexural deformation to it;Stabilization is applied to strip in afterbody coil ing one
Tension, to ensure good scroll quality.Three helps of Wrapping Roll 6 bend strip, and strip is made tightly to wind coiling 7.Volume
After cylinder 7 is in strip winding, tension is applied to it, to ensure that scroll is up-to-standard.
To ensure that serialization uninterruptedly produces, 2 to 3 coiling machines usually can be sequentially equipped on a hot rolling line
(such as what is shown in Fig. 1,2 is configured with 3 coiling machines), so when a coiling machine carries out unloading the operation of coil of strip, other
Coiling machine can work normally, so as to ensure continuous production.As shown in Figure 1, 2, it is also each on two coiling machines below to be equipped with
There are a pair of of flipper guide 42,43 and a pair of of pinch roller 52,53.
After strip is rolled into coil of strip, it may appear that some defects, such as overflow edge defect, flanging defect, side damage defect etc..
For example, referred to as overflow edge defect when the outer volume layer of coil of strip part protruding upward or downwardly projecting is more than certain standard;In the presence of excessive
In transportational process, edge easily causes to bend the coil of strip of side defect by the damage of driving fixture, is referred to as flanging defect;Strip edge
Portion because flipper guide scrape or transportational process in occur breakage caused by the defects of referred to as side damage defect.Overflow edge, flanging and side damage
Defect can seriously affect user's use, and may cause broken belt accident when cold rolling continues production.So drawbacks described above is user
Unacceptable defect, it is necessary to defect part be cut off in finishing procedure, so will also result in quality cost loss.
Coiling process of the prior art is described with reference to figure 3 to 5.As shown in figure 3, to batch chain-drive section speed control rank
Section:In 11 crossing process of head of strip 1, roller-way 3, pinch roller 5, reel 7 are using speed control, and speed is slightly larger than strip
The speed of service.As shown in figure 4, it is the tension force stage in the middle part of coiling machine:When the head of strip 1 enters coiling machine winding coiling
7 and after torque rises to setting moment values, the basic automatization computer of coiling machine just determines that reel tension is successfully established,
It entirely establishes hypertension to terminate, subsequent reel is switched to Torque Control state, and coiling machine enters the middle part tension force stage.This
When, tension is provided by batching the reel 7 of unit and the last rack 21 of mm finishing mill unit, and pinch roller 5 hardly provides tension.Such as figure
It is afterbody coil ing one shown in 5:After the afterbody 12 of strip 1 is dished out by the last rack 21 of mm finishing mill unit, reel 7 switches immediately
For speed control, pinch roller 51 is Torque Control, and tension is provided jointly by reel 7 and pinch roller 5 at this time, until entire volume steel coil
Take end.
Fig. 7 and Fig. 9 is respectively from the coiling process schematic diagram overlooked shown in visual angle.In 52 coiling band steel 1 of the second coiling machine
When, as shown in fig. 7, when the head of strip 1 reaches the pinch roll inlet of the second coiling machine 52, a pair of second flipper guide 42 closes up
(being respectively arranged at the second flipper guide of a pair 42 of 3 both sides of roller-way towards the center line movement of roller-way 3) is to clamp strip 1.
The second flipper guide of a pair 42 closed up is so that enter the position centering of the strip 1 of the second coiling machine 52, so as to ensure that coil of strip
Scroll quality.Hereafter, after the afterbody of strip 1 enters the second coiling machine 52, in order to ensure the normal operation of follow-up strip, one
Second flipper guide 42 is opened and (is respectively arranged at the second flipper guide of a pair 42 of 3 both sides of roller-way away from roller-way 3
The direction movement of heart line), to be returned to initial position.
In the 3rd 53 coiling band steel 1 of coiling machine, as shown in figure 9, when the head of strip 1 reaches the folder of the 3rd coiling machine 53
When sending roller entrance, a pair of 3rd flipper guide 43 close up (be respectively arranged at the 3rd flipper guides 43 of a pair of 3 both sides of roller-way towards
The center line movement of roller-way 3) to clamp strip 1.The 3rd flipper guide 43 of a pair closed up is so that enter the band of the 3rd coiling machine 53
The position centering of steel 1, so as to ensure that the scroll quality of coil of strip.Hereafter, when strip 1 afterbody into the 3rd coiling machine 53 it
Afterwards, in order to ensure the normal operation of follow-up strip, a pair of 3rd flipper guide 43, which is opened, (is respectively arranged at the one of 3 both sides of roller-way
3rd flipper guide 43 is moved away from the direction of the center line of roller-way 3), to be returned to initial position.
The shortcomings that can will become apparent from the prior art referring to Fig. 6.In afterbody coil ing one, the afterbody of strip 1 is by finish rolling
After unit end rack 21 is dished out, the strip of pinch roller 5 to magnetic tape trailer part loses tension, in relaxation, unstable state.Relaxation
Strip coiling when, easily generate overflow edge, flanging and side damage defect.
The prior art solves the problems, such as this using the method for roller-way hysteresis:When the afterbody of strip is thrown by mm finishing mill unit end rack 21
After going out, the speed for reducing roller-way 3 makes it below the speed of service of strip.Band is tightened by the frictional force of roller-way and strip lower surface
Steel improves the stability that tail part of band steel is run on roller-way.
But the above method still has following deficiency:
1) when Thin Strip Steel (such as thickness is less than or equal to the strip of 4mm) batches, effect is poor:Using the speed for reducing roller-way
The speed of service of strip is made it below, effect is preferable when Deformation in thick batches, but Thin Strip Steel is from heavy and light, strip following table and roller-way
Frictional force is small, and tail part of band steel cannot be tauted, and still in relaxation, unstable state, mass defect can not avoid.
2) quality of strip lower surface is influenced:Roller table speed is less than strip speed, can not be kept away between strip following table and roll surface
Exempt from the presence of friction, influence surface quality.In order to tighten Thin Strip Steel, it is necessary to increase the speed difference between roller-way and strip, but so
One, cause the possibility of surface defect also to increase.
The content of the invention
It is an object of the present invention to provide a kind of stability that can be improved tail part of band steel and be run on roller-way, reduce and overflow
While, flanging and while damage defect method.
The method of the raising tail part of band steel scroll quality of the present invention, the method is based on the volume after being arranged in Hot Rolling Mill
Taking equipment, the taking-up equipment include the first coiling machine and the second coiling machine that are sequentially arranged along the traffic direction of the strip,
It is also respectively provided with to position the first flipper guide of a pair of the strip and a pair of second flipper guide in roller-way both sides, described one
First coiling machine is separately positioned on to the traffic direction of the first flipper guide and the pair of second flipper guide along the strip
Before second coiling machine, the described method includes:When second coiling machine batches the strip:When the strip
When head reaches the pinch roll inlet of second coiling machine, the pair of second flipper guide is closed up to clamp the strip;
Before the afterbody of the strip is transported from the last rack of the mm finishing mill unit, described in the afterbody arrival preferably in the strip
When the last rack of mm finishing mill unit, the pair of first flipper guide is closed up to clamp the strip.
Further, the method further includes:When second coiling machine batches the strip:When the tail of the strip
When portion is carried out the region where first flipper guide, the pair of first flipper guide is opened.
Further, the taking-up equipment further include along the traffic direction of the strip be arranged in second coiling machine it
The 3rd coiling machine afterwards is provided with to position a pair for dividing row roller-way both sides of the strip before the 3rd coiling machine
3rd flipper guide, the method further include:When the 3rd coiling machine batches the strip:When the head of the strip reaches
During the pinch roll inlet of the 3rd coiling machine, the pair of 3rd flipper guide is closed up to clamp the strip;In the band
Before the afterbody of steel is transported from the last rack of the mm finishing mill unit, preferably the mm finishing mill unit is reached in the afterbody of the strip
Last rack when, the pair of first flipper guide is closed up to clamp the strip.
Further, the method further includes:When the 3rd coiling machine batches the strip:When the tail of the strip
When portion is carried out the region where first flipper guide, the pair of first flipper guide is opened.
Preferably, the thickness of the strip is less than or equal to 4mm.
The method of the raising tail part of band steel scroll quality of the present invention clamps strip using the flipper guide of upstream coiling machine, adopts
The method for clamping strip simultaneously with more than two flipper guides improves the frictional force of flipper guide and steel edge portion whereby, ensures band
Steel afterbody is tauted, so as to improve the scroll quality of tail part of band steel.
Description of the drawings
Fig. 1 is the structure diagram for being arranged in the taking-up equipment after Hot Rolling Mill;
Fig. 2 is the schematic top plan view of Fig. 1;
Fig. 3 is the schematic diagram for batching the chain-drive section speed control stage of the prior art;
Fig. 4 is the schematic diagram in tension force stage in the middle part of the coiling machine of the prior art;
Fig. 5 is the schematic diagram for batching drive end unit coil ing one of the prior art;
Fig. 6 is the schematic diagram of the stage generation defect shown in Fig. 5;
Fig. 7 is to overlook the schematic diagram that the second coiling machine batches in the prior art shown in visual angle;
Fig. 8 is to overlook the schematic diagram that the second coiling machine batches in the present invention shown in visual angle;
Fig. 9 is to overlook the schematic diagram that the 3rd coiling machine batches in the prior art shown in visual angle;
Figure 10 is to overlook the schematic diagram that the 3rd coiling machine batches in the present invention shown in visual angle;
Figure 11 is the flow diagram of one embodiment of the present of invention;
Figure 12 is the flow diagram of an alternative embodiment of the invention.
Specific embodiment
The method of the raising tail part of band steel scroll quality of the present invention is made into one with reference to the accompanying drawings and detailed description
The detailed description of step, but it is not as a limitation of the invention.
For ease of description, traffic direction of each coiling machine taking-up equipment after Hot Rolling Mill included along strip
It is known as the first coiling machine, the second coiling machine and the 3rd coiling machine successively, the first coiling machine, the second coiling machine and the 3rd will be arranged in
It is known as the successively before coiling machine for positioning the traffic direction for dividing each offside guide plates of row roller-way both sides along strip of strip
One flipper guide, the second flipper guide and the 3rd flipper guide.
As shown in Figure 11 and Fig. 8, the method for raising tail part of band steel scroll quality of the invention includes:In the second coiling machine 52
During coiling band steel 1:When the head of strip 1 reaches the pinch roll inlet of the second coiling machine 52 (such as by being arranged in volume Two
When taking the metal detector at the pinch roll inlet of machine 52 to detect the head of strip), the second flipper guide 42 of a pair is closed up into (example
Such as by hydraulic servo valve control system and hydraulic cylinder the second flipper guide 42 is controlled to close up) to clamp strip 1;In strip 1
Afterbody (such as is arranged on the pressure that the pressure-measuring head of mm finishing mill unit measures and meets certain item before being transported from the last rack of mm finishing mill unit
During part), the first flipper guide 41 of a pair is closed up and (such as by hydraulic servo valve control system and hydraulic cylinder the first side is controlled to lead
Plate 41 closes up) to clamp strip 1.
Comparison diagram 7 and Fig. 8, after the last rack of mm finishing mill unit throws steel, in Fig. 7 in the prior art, only a pair of second
Flipper guide 42 is clamping strip, can give strip frictional force;And in the method for the present invention of Fig. 8, a pair of second flipper guide 42
Strip is clamped jointly with the first flipper guide of a pair 41, can strip be given to provide frictional force, i.e., increased with the contact area of strip,
Its frictional force provided can also increase.As it can be seen that the method for the raising tail part of band steel scroll quality of the present invention, utilizes upstream coiling machine
(such as the first coiling machine be second and the 3rd coiling machine upstream coiling machine, the first and second coiling machines are the 3rd coiling machines
Upstream coiling machine) flipper guide clamping strip, due to clamping strip simultaneously using more than two flipper guides and can increase side
The contact area of guide plate and strip so as to improve the frictional force of flipper guide and steel edge portion, ensures that tail part of band steel is tauted, from
And improve the scroll quality of tail part of band steel.
Preferably, the opportunity for closing up a pair of first flipper guide be strip afterbody reach mm finishing mill unit last rack it
When.In order to ensure stability that tail part of band steel runs on roller-way, it is necessary to so that tail part of band steel be tightened up to provide always it is enough
Tension, it is therefore desirable to just the first flipper guide is closed up with clamping band before tail part of band steel is transported from the last rack of mm finishing mill unit
Steel afterbody, so as to ensure the continuous offer of tension.But if prematurely close up the first flipper guide, such as in tail part of band steel
Just close up before into mm finishing mill unit, the unnecessary abrasion to the first flipper guide and steel edge portion can be caused., whereas if it closes
The opportunity for holding together the first flipper guide too late, such as after tail part of band steel throws steel by the last rack of mm finishing mill unit just closes up, then can make
Tail part of band steel is obtained to be in an unsure state for some time.It is therefore preferred that the end of the afterbody arrival mm finishing mill unit in strip
When rack, the first flipper guide of a pair is closed up to clamp strip.
Hereafter, in the second 52 coiling band steel 1 of coiling machine, where the afterbody of strip 1 is carried out the first flipper guide 41
During region (such as being detected by metal detector), the first flipper guide 41 of a pair is opened (such as by hydraulic efficiency servo-valve control
System processed and hydraulic cylinder control);When the afterbody of strip 1 reaches the pinch roll inlet of the second coiling machine 52 (such as pass through gold
Belong to detector to detect), second flipper guide 42 of a pair is opened (such as controlled by hydraulic servo valve control system and hydraulic cylinder
System).
In addition, with reference to Figure 12 and Figure 10, when method of the invention is additionally included in the 3rd 53 coiling band steel 1 of coiling machine:Work as band
When the head of steel 1 reaches the pinch roll inlet of the 3rd coiling machine 53 (such as being detected by metal detector), by a pair the 3rd
Flipper guide 43 closes up to clamp strip 1 (such as controlling by hydraulic servo valve control system and hydraulic cylinder);In the tail of strip 1
Before portion is transported from the last rack of mm finishing mill unit (such as the pressure-measuring head for the last rack for passing through mm finishing mill unit to detect), preferably exist
When the afterbody of strip 1 reaches the last rack of mm finishing mill unit, the first flipper guide 41 of a pair is closed up (such as pass through hydraulic efficiency servo-valve
Control system and hydraulic cylinder control) to clamp strip 1.
Hereafter, when the region where the afterbody of strip 1 is carried out the first flipper guide 41 (such as by metal detector come
Detection), the first flipper guide 41 of a pair is opened (such as being controlled by hydraulic servo valve control system and hydraulic cylinder);Work as strip
When 1 afterbody reaches the pinch roll inlet of the 3rd coiling machine 53 (such as being detected by metal detector), by a pair of 3rd side
Guide plate 43 is opened (such as being controlled by hydraulic servo valve control system and hydraulic cylinder).
Comparison diagram 9 and Figure 10, after the last rack of mm finishing mill unit throws steel, in Fig. 9 in the prior art, the only a pair of 3rd
Flipper guide 43 is clamping strip, can give strip frictional force;And in the method for the present invention of Figure 10, a pair of 3rd flipper guide 43
Strip is clamped jointly with the first flipper guide of a pair 41, can strip be given to provide frictional force, i.e., increased with the contact area of strip,
Its frictional force provided can also increase.As it can be seen that the method for the raising tail part of band steel scroll quality of the present invention, utilizes upstream coiling machine
(such as the first coiling machine be second and the 3rd coiling machine upstream coiling machine, the second coiling machine is the upstream volume of the 3rd coiling machine
Take machine) flipper guide clamping strip, due to clamping strip simultaneously using more than two flipper guides and can increase flipper guide and band
The contact area of steel so as to improve the frictional force of flipper guide and steel edge portion, ensures that tail part of band steel is tauted, so as to improve
The scroll quality of tail part of band steel.
As described in background parts, Thin Strip Steel is lighter due to conducting oneself with dignity, by reducing rubbing to Thin Strip Steel for roller table speed generation
Wiping power is insufficient to allow Thin Strip Steel afterbody to tighten, therefore method of the invention is particularly suitable for Thin Strip Steel, for example, thickness is less than or equal to
The strip of 4mm.
Compared with the prior art, the method for raising tail part of band steel scroll quality of the invention, by increasing flipper guide and band
The contact area of steel edge improves the frictional force of flipper guide and steel edge portion, so as to be effectively improved tail part of band steel in roller
The stability run on road reduces overflow edge, flanging and side damage defect;It does not influence the quality of belt steel surface simultaneously, band will not be made
Steel arch rises;And the method for the present invention need not increase any hardware, also without to original based entirely on existing hardware facility
Any mechanism on some production lines, which is transformed, can be completed.
More than specific embodiment is only exemplary embodiments of the present invention, it is impossible to be used in limits the present invention, the present invention
Protection domain be defined by the claims.Those skilled in the art can be in the essence and protection domain of the present invention, to this
Various modifications or equivalent substitution are made in invention, these modifications or equivalent substitution also should be regarded as being within the scope of the present invention.
Claims (7)
1. a kind of method for improving tail part of band steel scroll quality, the method are set based on batching after being arranged in Hot Rolling Mill
Standby, the taking-up equipment includes the first coiling machine and the second coiling machine that are sequentially arranged along the traffic direction of the strip, in roller
Road both sides are also respectively provided with to position the first flipper guide of a pair of the strip and a pair of second flipper guide, and the pair of the
The traffic direction of one flipper guide and the pair of second flipper guide along the strip is separately positioned on first coiling machine and institute
Before stating the second coiling machine, which is characterized in that the described method includes:When second coiling machine batches the strip:
When the head of the strip reaches the pinch roll inlet of second coiling machine, the pair of second flipper guide is closed up
To clamp the strip;
Before the afterbody of the strip is transported from the last rack of the mm finishing mill unit, by the pair of first flipper guide close up with
Clamp the strip.
2. the method according to claim 1 for improving tail part of band steel scroll quality, which is characterized in that in the tail of the strip
When portion reaches the last rack of the mm finishing mill unit, the pair of first flipper guide is closed up to clamp the strip.
3. the method according to claim 1 for improving tail part of band steel scroll quality, which is characterized in that the method is also wrapped
It includes:When second coiling machine batches the strip:
When the region where the afterbody of the strip is carried out first flipper guide, the pair of first flipper guide is beaten
It opens.
4. the method according to claim 1 for improving tail part of band steel scroll quality, which is characterized in that the taking-up equipment is also
Including the 3rd coiling machine after being arranged in second coiling machine along the traffic direction of the strip, in the 3rd coiling machine
It is provided with to position the 3rd flipper guide of a pair for dividing row roller-way both sides of the strip before, the method further includes:Institute
When stating the 3rd coiling machine and batching the strip:
When the head of the strip reaches the pinch roll inlet of the 3rd coiling machine, the pair of 3rd flipper guide is closed up
To clamp the strip;
Before the afterbody of the strip is transported from the last rack of the mm finishing mill unit, by the pair of first flipper guide close up with
Clamp the strip.
5. the method according to claim 4 for improving tail part of band steel scroll quality, which is characterized in that in the tail of the strip
When portion reaches the last rack of the mm finishing mill unit, the pair of first flipper guide is closed up to clamp the strip.
6. the method according to claim 4 for improving tail part of band steel scroll quality, which is characterized in that the method is also wrapped
It includes:When the 3rd coiling machine batches the strip:
When the region where the afterbody of the strip is carried out first flipper guide, the pair of first flipper guide is beaten
It opens.
7. the method for the raising tail part of band steel scroll quality according to any one of claim 1-6, which is characterized in that described
The thickness of strip is less than or equal to 4mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611085852.0A CN108115002B (en) | 2016-11-30 | 2016-11-30 | The method for improving tail part of band steel scroll quality |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611085852.0A CN108115002B (en) | 2016-11-30 | 2016-11-30 | The method for improving tail part of band steel scroll quality |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108115002A true CN108115002A (en) | 2018-06-05 |
CN108115002B CN108115002B (en) | 2019-08-27 |
Family
ID=62226265
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611085852.0A Active CN108115002B (en) | 2016-11-30 | 2016-11-30 | The method for improving tail part of band steel scroll quality |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108115002B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109675928A (en) * | 2018-12-21 | 2019-04-26 | 首钢京唐钢铁联合有限责任公司 | A kind of strip coiling unit biting behavior method and apparatus |
CN112139258A (en) * | 2019-06-26 | 2020-12-29 | 宝山钢铁股份有限公司 | Control method of side guide plate of hot rolling coiler |
CN112453065A (en) * | 2020-10-14 | 2021-03-09 | 首钢京唐钢铁联合有限责任公司 | Coiling control method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1060797A (en) * | 1990-10-23 | 1992-05-06 | 石川岛播磨重工业株式会社 | Method for controlling side guide means |
GB9306138D0 (en) * | 1992-09-21 | 1993-05-12 | Ishikawajima Harima Heavy Ind | Guiding apparatus for roughing mill and method of guiding rolled product |
CN103447353A (en) * | 2013-01-09 | 2013-12-18 | 番禺珠江钢管(连云港)有限公司 | Control device and method of guide plate at front side of hot continuous rolling type wide flat steel reeling machine |
TW201509557A (en) * | 2013-09-14 | 2015-03-16 | China Steel Corp | Method for hot rolling steel slab |
CN104525575A (en) * | 2014-12-12 | 2015-04-22 | 湖南华菱涟源钢铁有限公司 | Hot rolled strip steel coiler side guide deviation correction control method |
-
2016
- 2016-11-30 CN CN201611085852.0A patent/CN108115002B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1060797A (en) * | 1990-10-23 | 1992-05-06 | 石川岛播磨重工业株式会社 | Method for controlling side guide means |
GB9306138D0 (en) * | 1992-09-21 | 1993-05-12 | Ishikawajima Harima Heavy Ind | Guiding apparatus for roughing mill and method of guiding rolled product |
CN103447353A (en) * | 2013-01-09 | 2013-12-18 | 番禺珠江钢管(连云港)有限公司 | Control device and method of guide plate at front side of hot continuous rolling type wide flat steel reeling machine |
TW201509557A (en) * | 2013-09-14 | 2015-03-16 | China Steel Corp | Method for hot rolling steel slab |
CN104525575A (en) * | 2014-12-12 | 2015-04-22 | 湖南华菱涟源钢铁有限公司 | Hot rolled strip steel coiler side guide deviation correction control method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109675928A (en) * | 2018-12-21 | 2019-04-26 | 首钢京唐钢铁联合有限责任公司 | A kind of strip coiling unit biting behavior method and apparatus |
CN109675928B (en) * | 2018-12-21 | 2020-07-21 | 首钢京唐钢铁联合有限责任公司 | Strip steel coiling machine set tail breaking treatment method and device |
CN112139258A (en) * | 2019-06-26 | 2020-12-29 | 宝山钢铁股份有限公司 | Control method of side guide plate of hot rolling coiler |
CN112453065A (en) * | 2020-10-14 | 2021-03-09 | 首钢京唐钢铁联合有限责任公司 | Coiling control method and device |
Also Published As
Publication number | Publication date |
---|---|
CN108115002B (en) | 2019-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2538153B2 (en) | Continuous processing line for the conversion of hot rolling to cold rolling | |
CN108115002B (en) | The method for improving tail part of band steel scroll quality | |
CN104801551B (en) | A kind of hot continuous rolling slab reeling temperature controlling method | |
CN102989839A (en) | Hot continuous rolling coiler parallel side guide plate control method | |
CN107597880A (en) | A kind of side guide plate of recoiling machine control method for reducing wearing plate abrasion | |
CN110918654B (en) | Threading control method and device | |
US5218848A (en) | Method and apparatus for correcting a widthwise bend in an end portion of a hot-rolled sheet-shaped product | |
CN106975662B (en) | A kind of hot rolling reeling inner ring of steel coil coil shape control method | |
JPS60145218A (en) | Control method of side guide for down coiler | |
JP2966743B2 (en) | Side guide control method in rolling line | |
JPS6340615A (en) | Side guide control method for strip winding device in hot rolling | |
JPH04294813A (en) | Preventing roll for buckling wave and wrinkle, etc., generated on passing extra thin metal strip and its use method | |
JP2005125334A (en) | Device train and method for pickling hot-rolled sheet | |
KR100900675B1 (en) | Strip winding control method with improved roll damage prevention function | |
WO2021205687A1 (en) | Cold-rolled steel strip manufacturing facility and method for manufacturing cold-rolled steel strip | |
JP2670164B2 (en) | Method of reducing L warpage in cold rolling | |
JP3537101B2 (en) | Metal strip rolling method and apparatus | |
JP2003025015A (en) | Method for coiling steel strip | |
AU765675B2 (en) | Method and device for producing a metal strip and reducing the risk of such a strip breaking | |
JPH08174063A (en) | Method for controlling centering of steel strip | |
JPH0584506A (en) | Method for controlling opening degree of side guide for roughing mill | |
JPH0796317A (en) | Method and device for controlling meandering of metallic strip | |
CN117983660A (en) | Rolling equipment, strip steel post-rolling coiling system and strip steel post-rolling coiling method | |
JPS59232608A (en) | Cold rolling method in tandem sendzimir mill | |
JPH0218367B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |