CN108104488A - The installation method of pre-embedded anchoring bolts - Google Patents

The installation method of pre-embedded anchoring bolts Download PDF

Info

Publication number
CN108104488A
CN108104488A CN201711179703.5A CN201711179703A CN108104488A CN 108104488 A CN108104488 A CN 108104488A CN 201711179703 A CN201711179703 A CN 201711179703A CN 108104488 A CN108104488 A CN 108104488A
Authority
CN
China
Prior art keywords
anchoring bolts
embedded anchoring
template
drilling
installation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711179703.5A
Other languages
Chinese (zh)
Inventor
光齐林
廖振斌
秦四翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711179703.5A priority Critical patent/CN108104488A/en
Publication of CN108104488A publication Critical patent/CN108104488A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a kind of installation methods of pre-embedded anchoring bolts, and this method comprises the following steps:Multiple drillings are drilled in template, wherein, the number of the drilling is equal with the number of the pre-embedded anchoring bolts;Each pre-embedded anchoring bolts are arranged in correspondingly in each drilling, and fastener is arranged respectively at the top of each pre-embedded anchoring bolts;Fixing bracket is welded in each pre-embedded anchoring bolts.In the present invention, first drill in template, then pre-embedded anchoring bolts are fixed in drilling again, since the position of each drilling is corresponding with the position of pre-embedded anchoring bolts, so in subsequent work progress, without being adjusted again to the position of pre-embedded anchoring bolts, reduce number of operations, installation process is made to become simple, also, pre-embedded anchoring bolts are fixed in template by fastener, reduce displacement of the pre-embedded anchoring bolts in stent welding process, it ensure that the installation accuracy of pre-embedded anchoring bolts, improve construction quality.

Description

The installation method of pre-embedded anchoring bolts
Technical field
The present invention relates to technical field of buildings, in particular to a kind of installation method of pre-embedded anchoring bolts 7.
Background technology
In architectural engineering, without the mechanical component of judder and impact when being installed in concrete foundation, being will be pre- For using in the Transducers Embedded in Concrete of buried foot bolt one end.Under normal conditions, when being installed using site welding fixing bracket, usually By angle steel or reinforcement welding into forms such as well word stent, three-legged supports, and pre-embedded anchoring bolts are easily moved in stent manufacturing process Position can cause its centre-to-centre spacing and absolute altitude to change, and the vibrations in concreting process are also easy to cause pre-embedded anchoring bolts Displacement, this can affect greatly the installation of later stage mechanical component or even influence construction quality.
The content of the invention
In consideration of it, the present invention proposes a kind of installation method of pre-embedded anchoring bolts, it is intended to solve in current work progress The problem of pre-embedded anchoring bolts is easily made to shift and influence construction quality.
The present invention proposes a kind of installation method of pre-embedded anchoring bolts, and this method comprises the following steps:It is bored in template If multiple drillings, wherein, the number of drilling is equal with the number of pre-embedded anchoring bolts;By each pre-embedded anchoring bolts correspondingly It is arranged in each drilling, and fastener is arranged respectively at the top of each pre-embedded anchoring bolts;Fixing bracket is welded in each pre-buried Foundation bolt.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, multiple drillings are drilled in template to be included:In template On mark the straight line of a plurality of central point by template, template is divided into multiple regions by each straight line;Needs are marked in each region The position respectively to drill being drilled with;Drilling is drilled in each position.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, when marking each straight line, straight line is two, also, Two straight lines are cross centre line.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, when marking each straight line, each straight line is equal by template It is even to be divided into multiple regions.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, when the position of drilling is marked in region, Mei Gequ Domain is respectively marked with the position of a drilling.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, fixing bracket is being welded in each pre-buried lower margin spiral shell It is further included after bolt:Centre bore is opened up at the center of template.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, after centre bore is opened up at the center of template also Including:Basis where pre-embedded anchoring bolts is poured.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, template is plank sheathing.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, when being drilled with drilling in template, the diameter that respectively drills It is all higher than the diameter of corresponding pre-embedded anchoring bolts.
Further, in the installation method of above-mentioned pre-embedded anchoring bolts, fastener is nut or swivel nut.
In the present invention, first drill in template, then pre-embedded anchoring bolts are fixed in corresponding drilling again, due to The position respectively to drill is corresponding with the position of pre-embedded anchoring bolts, so in subsequent work progress, without again to pre-buried The position of foundation bolt is adjusted, and reduces number of operations, and installation process is made to become simple, also, will be pre- by fastener Buried foot bolt is fixed in template, reduces displacement of the pre-embedded anchoring bolts in stent welding process, ensure that pre- buried The installation accuracy of foot bolt, improves construction quality.
Description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this field Technical staff will be apparent understanding.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the flow chart of the installation method of pre-embedded anchoring bolts provided in an embodiment of the present invention;
Fig. 2 is the structure diagram of the template provided in an embodiment of the present invention for being drilled with drilling;
Fig. 3 is the structure diagram for being installed on template of pre-embedded anchoring bolts provided in an embodiment of the present invention;
Fig. 4 is the structure diagram that fixing bracket provided in an embodiment of the present invention is welded in pre-embedded anchoring bolts;
Fig. 5 is the flow chart provided in an embodiment of the present invention that multiple drillings are drilled in template;
Fig. 6 is the another flow chart of the installation method of pre-embedded anchoring bolts provided in an embodiment of the present invention;
Fig. 7 is the another flow chart of the installation method of pre-embedded anchoring bolts provided in an embodiment of the present invention.
Specific embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the case where there is no conflict, embodiment in the present invention and Feature in embodiment can be mutually combined.The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, Fig. 1 is the flow chart of the installation method of pre-embedded anchoring bolts provided in this embodiment.It as shown in the figure, should Method includes the following steps:
Step S110 is drilled with multiple drillings in template, wherein, the number of drilling and the number phase of pre-embedded anchoring bolts Deng.
Specifically, referring to Fig. 2, the template 1 of suitable size is taken according to the position of pre-embedded anchoring bolts 7, also, is corresponded to each The position of pre-embedded anchoring bolts 7 is drilled with, position corresponding multiple drillings equal with 7 numbers of pre-embedded anchoring bolts in template 1 2.When it is implemented, template 1 can be plank sheathing 1.The diameter of each drilling 2 is slightly larger than corresponding each pre-embedded anchoring bolts 7 Diameter, the specific precision of diameter can determine according to design requirement.
Each pre-embedded anchoring bolts are arranged in each drilling by step S120 correspondingly, and in each pre-embedded anchoring bolts Top be arranged fastener respectively.
Specifically, referring to Fig. 3, each pre-embedded anchoring bolts 7 are arranged in correspondingly in each drilling 2, are adjusted each After the absolute altitude of pre-embedded anchoring bolts 7, fastener 3 is arranged in the top of each pre-embedded anchoring bolts 7, to fix pre-embedded anchoring bolts 7. When it is implemented, fastener 3 can be nut or swivel nut.
Fixing bracket is welded in each pre-embedded anchoring bolts by step S130.
Specifically, it is in the fixing bracket 4 of " well " word in the lower weld of each pre-embedded anchoring bolts 7 referring to Fig. 4.
In the present embodiment, first drill in template, then pre-embedded anchoring bolts are fixed in corresponding drilling again, by It is corresponding with the position of pre-embedded anchoring bolts in the position of each drilling, so in subsequent work progress, without again to pre- The position of buried foot bolt is adjusted, and reduces number of operations, and installation process is made to become simple, also, will by fastener Pre-embedded anchoring bolts are fixed in template, are reduced displacement of the pre-embedded anchoring bolts in stent welding process, be ensure that pre-buried The installation accuracy of foundation bolt, improves construction quality.
Referring to Fig. 5, in one embodiment of the invention, multiple drillings are drilled in template to be included:
Step S510, marks the straight line of a plurality of central point by template in template, and template is divided into multiple by each straight line Region.
Specifically, template 1 is generally square, and a plurality of straight line 6 is marked in template 1, and every straight line 6 passes through template 1 Central point, also, template 1 is divided the multiple regions for area equation by a plurality of straight line 6.When it is implemented, according to pre-buried lower margin The number of bolt 7 determines the number in region, if for example, the number of pre-embedded anchoring bolts 7 is four, it can in template 1 On mark two straight lines 6, also, two straight lines 6 are cross centre line, which divides template 1 for four area equations Region.
Step S520 marks the position respectively to drill for needing to be drilled in each region.
Specifically, being marked in each region needs the position of drilling 2, a position usually to be marked i.e. in each region It can.
Step S530 is drilled with drilling in each position.
Specifically, according to the position of the need drilling 2 marked in each region, drilling 2 is drilled in template 1.
In the present embodiment, the straight line by its center is marked in template, and then template is divided into multiple regions, region Number is equal with the number of pre-embedded anchoring bolts, that is to say, that a pre-embedded anchoring bolts are worn in each region, it so can be with The position of drilling is fast and accurately positioned, is improved work efficiency.
Referring to Fig. 6, Fig. 6 is the another flow chart of the installation method of pre-embedded anchoring bolts provided in this embodiment.As schemed Show, this method comprises the following steps:
Step S610 is drilled with multiple drillings in template, wherein, the number of drilling and the number phase of pre-embedded anchoring bolts Deng.
Each pre-embedded anchoring bolts are arranged in each drilling by step S620 correspondingly, and in each pre-embedded anchoring bolts 7 Top be arranged fastener respectively.
Fixing bracket is welded in each pre-embedded anchoring bolts by step S630.
Step S640 opens up centre bore at the center of template.
Specifically, after being welded and fixed stent 4 and adjusting the position of template 1, according to the diameter of pump line in template 1 The heart opens up centre bore 5.
In the present embodiment, centre bore is opened up at the center of template, for wearing for pump line or other pipelines, due to pre- buried Foot bolt has been fixed, so during pipeline is worn, it is also ensured that pre-embedded anchoring bolts are not shifted over.
Referring to Fig. 7, Fig. 7 is the another flow chart of the installation method of pre-embedded anchoring bolts provided in this embodiment.As schemed Show, this method comprises the following steps:
Step S710 is drilled with multiple drillings in template, wherein, the number of drilling and the number phase of pre-embedded anchoring bolts Deng.
Each pre-embedded anchoring bolts are arranged in each drilling by step S720 correspondingly, and in each pre-embedded anchoring bolts 7 Top be arranged fastener respectively.
Fixing bracket is welded in each pre-embedded anchoring bolts by step S730.
Step S740 opens up centre bore at the center of template.
Step S750 pours basis where pre-embedded anchoring bolts.
Specifically, the basis where mounted pre-embedded anchoring bolts 7 is poured using concrete.
In the present embodiment, pre-embedded anchoring bolts 7 are fixed before casting concrete, it can be to avoid in casting process The influence to pre-embedded anchoring bolts position is shaken, so as to ensure that the quality of subsequent construction.
To sum up, in the present embodiment, first drill in template, pre-embedded anchoring bolts are then fixed on corresponding drilling again It is interior, since the position of each drilling is corresponding with the position of pre-embedded anchoring bolts, so in subsequent work progress, without again The position of pre-embedded anchoring bolts is adjusted, reduces number of operations, installation process is made to become simple, also, passes through fastening Pre-embedded anchoring bolts are fixed in template by part, are reduced displacement of the pre-embedded anchoring bolts in stent welding process, be ensure that The installation accuracy of pre-embedded anchoring bolts, improves construction quality.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these modification and variations.

Claims (10)

1. a kind of installation method of pre-embedded anchoring bolts, which is characterized in that include the following steps:
Multiple drillings are drilled in template, wherein, the number of the drilling is equal with the number of the pre-embedded anchoring bolts;
Each pre-embedded anchoring bolts are arranged in correspondingly in each drilling, and in each pre-embedded anchoring bolts Top is arranged fastener respectively;
Fixing bracket is welded in each pre-embedded anchoring bolts.
2. the installation method of pre-embedded anchoring bolts according to claim 1, which is characterized in that it is described be drilled in template it is more A drilling includes:
The straight line of a plurality of central point by the template is marked in the template, the template is divided into more by each straight line A region;
The position for each drilling for needing to be drilled with is marked in each region;
The drilling is drilled on each position.
3. the installation method of pre-embedded anchoring bolts according to claim 2, which is characterized in that
When marking each straight line, the straight line is two, also, two straight lines are cross centre line.
4. the installation method of pre-embedded anchoring bolts according to claim 2, which is characterized in that
When marking each straight line, the template is uniformly divided into multiple regions by straight line described in each item.
5. the installation method of pre-embedded anchoring bolts according to claim 2, which is characterized in that
When the position of the drilling is marked in the region, each region is respectively marked with the position of the drilling.
6. the installation method of pre-embedded anchoring bolts according to claim 1, which is characterized in that weld fixing bracket described Each pre-embedded anchoring bolts are connected to further include afterwards:
Centre bore is opened up at the center of the template.
7. the installation method of pre-embedded anchoring bolts according to claim 6, which is characterized in that described in the template Center further includes after opening up centre bore:
Basis where the pre-embedded anchoring bolts is poured.
8. the installation method of pre-embedded anchoring bolts according to any one of claim 1 to 7, which is characterized in that
The template is plank sheathing.
9. the installation method of pre-embedded anchoring bolts according to any one of claim 1 to 7, which is characterized in that
When being drilled with the drilling in the template, the diameter of each drilling is all higher than the corresponding pre-embedded anchoring bolts Diameter.
10. the installation method of pre-embedded anchoring bolts according to any one of claim 1 to 7, which is characterized in that
The fastener is nut or swivel nut.
CN201711179703.5A 2017-11-22 2017-11-22 The installation method of pre-embedded anchoring bolts Pending CN108104488A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711179703.5A CN108104488A (en) 2017-11-22 2017-11-22 The installation method of pre-embedded anchoring bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711179703.5A CN108104488A (en) 2017-11-22 2017-11-22 The installation method of pre-embedded anchoring bolts

Publications (1)

Publication Number Publication Date
CN108104488A true CN108104488A (en) 2018-06-01

Family

ID=62206884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711179703.5A Pending CN108104488A (en) 2017-11-22 2017-11-22 The installation method of pre-embedded anchoring bolts

Country Status (1)

Country Link
CN (1) CN108104488A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129849A (en) * 2018-10-26 2019-01-04 中建局集团第二建筑有限公司 A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method
CN110747893A (en) * 2019-09-18 2020-02-04 中国二冶集团有限公司 Embedded bolt auxiliary device and embedded bolt fixing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201448561U (en) * 2009-08-24 2010-05-05 中建钢构江苏有限公司 Bench type simple fixing structure of foundation bolts
CN201770992U (en) * 2010-07-22 2011-03-23 武汉一冶钢结构有限责任公司 Foundation bolt positioning device
CN203174622U (en) * 2013-05-02 2013-09-04 中建新疆建工集团第五建筑工程有限公司 Pre-embedded mounting and fixing device of steel structure column foundation bolts
CN204225145U (en) * 2014-10-20 2015-03-25 中国建筑第六工程局有限公司 A kind of simple and easy orientation tool for basic embedding anchor bolts
US9399868B2 (en) * 2014-03-17 2016-07-26 Senqcia Corporation Column structure and base member
CN106013211A (en) * 2016-07-20 2016-10-12 河北科工建筑工程集团有限公司 Foundation bolt group fixing structure and construction method thereof
CN106193094A (en) * 2016-08-30 2016-12-07 中铁二十局集团有限公司 A kind of embedding anchor bolts construction mould and foundation bolt regulation construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201448561U (en) * 2009-08-24 2010-05-05 中建钢构江苏有限公司 Bench type simple fixing structure of foundation bolts
CN201770992U (en) * 2010-07-22 2011-03-23 武汉一冶钢结构有限责任公司 Foundation bolt positioning device
CN203174622U (en) * 2013-05-02 2013-09-04 中建新疆建工集团第五建筑工程有限公司 Pre-embedded mounting and fixing device of steel structure column foundation bolts
US9399868B2 (en) * 2014-03-17 2016-07-26 Senqcia Corporation Column structure and base member
CN204225145U (en) * 2014-10-20 2015-03-25 中国建筑第六工程局有限公司 A kind of simple and easy orientation tool for basic embedding anchor bolts
CN106013211A (en) * 2016-07-20 2016-10-12 河北科工建筑工程集团有限公司 Foundation bolt group fixing structure and construction method thereof
CN106193094A (en) * 2016-08-30 2016-12-07 中铁二十局集团有限公司 A kind of embedding anchor bolts construction mould and foundation bolt regulation construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109129849A (en) * 2018-10-26 2019-01-04 中建局集团第二建筑有限公司 A kind of precast beam wedge block and pre-embedded bolt installation mold and its construction method
CN109129849B (en) * 2018-10-26 2024-01-23 中建一局集团第二建筑有限公司 Prefabricated beam wedge block and embedded bolt mounting die and construction method thereof
CN110747893A (en) * 2019-09-18 2020-02-04 中国二冶集团有限公司 Embedded bolt auxiliary device and embedded bolt fixing method

Similar Documents

Publication Publication Date Title
CN102425187B (en) Large steel structure heel embedded part positioning device and method
CN104264902A (en) Steel-pipe column disc positioner, steel core concrete column and pile foundation connection structure
CN104747088A (en) Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof
JP4375733B2 (en) Steel pipe placing method
CN108104488A (en) The installation method of pre-embedded anchoring bolts
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN103821520A (en) Method for fixing mine vertical shaft device
CN108316290B (en) One-column one-pile structure without bearing platform and construction method thereof
CN201486579U (en) Drilling anchor rod hole positioning device
JP2003232033A (en) Foundation pile structure
CN208966022U (en) A kind of template poured for large-scale beam column
KR20150025409A (en) the tunnel structure using the small diameter steel pipe and the construction method thereof
CN113174942A (en) Precise positioning device for cage core bag anti-floating anchor rod of deep foundation pit and construction method
CN205605114U (en) Karst karst area prestressed anchorage cable drilling equipment
JP5430628B2 (en) Foundation pile construction method, foundation pile and solar cell array
CN201326380Y (en) Drill cushion block suitable for component with circular surface
JP6757003B2 (en) Construction method of double pipe pile and double pipe pile
CN114856195A (en) Post-pouring construction method for floor slab at building pipe well
KR101138499B1 (en) Method for Head Setting of Micro-Pile and Apparatus for the Same
CN211899714U (en) Top goes out muscle school and transfers auxiliary fixtures
KR101600477B1 (en) Top down construction method for developping stability through improved process of piller
CN208073012U (en) A kind of foundation bolt location centralizing device
CN102220760A (en) Method for casting deep inverted T-shaped pile
CN207228104U (en) A kind of isolating and protecting device for preventing pile foundation steel bar cage deflection
CN105625424A (en) Device used for controlling perpendicularity and azimuth angle of rectangular bracket pile and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601