CN108104479A CN201810069300.3A CN201810069300A CN108104479A CN 108104479 A CN108104479 A CN 108104479A CN 201810069300 A CN201810069300 A CN 201810069300A CN 108104479 A CN108104479 A CN 108104479A
Authority
CN
China
Prior art keywords
positioning seat
prestressing tendon
steel wire
connector
drawing head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810069300.3A
Other languages
Chinese (zh)
Other versions
CN108104479B (en
Inventor
陈宗泽
简铃方
吕兵
黄唤春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU OVM ENGINEERING Co Ltd
Liuzhou OVM Machinery Co Ltd
Original Assignee
LIUZHOU OVM ENGINEERING Co Ltd
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU OVM ENGINEERING Co Ltd, Liuzhou OVM Machinery Co Ltd filed Critical LIUZHOU OVM ENGINEERING Co Ltd
Priority to CN201810069300.3A priority Critical patent/CN108104479B/en
Publication of CN108104479A publication Critical patent/CN108104479A/en
Application granted granted Critical
Publication of CN108104479B publication Critical patent/CN108104479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A kind of prestressing tendon integrally dragging device, including positioning seat and drawing head;The positioning seat is that a circle tube member, its outer diameter and steel wire bundle minimum circumscribed circle diameter are equal or smaller, and circle tube member one end is thread segment, the side of the other end be evenly distributed with a plurality of central hair for one end heading by groove;One end of the drawing head is the connector to be connected with rotary connector with externally threaded cylindrical segment, the other end;Under use state, each groove that each steel strand wires of prestressing tendon heading are each passed through positioning seat is installed on positioning seat precalculated position, the externally threaded cylindrical segment of drawing head band is screwed with the thread segment of positioning seat to be coupled, another end connector of drawing head is connected with rotary connector one end of dimension, the rotary connector other end is connected with the steel wire rope of connecting power device, and the whole beam draft gear and its construction method effectively solve the problems, such as the whole beam traction of prestressing tendon in similar section assembling formula concrete wind-power tower engineering.

Description

The whole beam draft gear of a kind of prestress wire and its whole for prestressing tendon The construction method of body traction
Technical field
The present invention relates to a kind of constructing devices and its construction method of technical field of building construction, particularly a kind of prestressing force Steel strand integral bundle draft gear and its construction method for prestressing tendon integrally dragging.
Background technology
In building engineering construction, the lashing construction of prestressed pore passage steel strand wires is frequently encountered, especially in wind-power tower In engineering construction, the lashing construction that section assembling formula concrete air pylon tube construction is related to prestressed pore passage steel strand wires needs to carry out Prestressing tendon is drawn, and is particularly present substantial amounts of 6 hole and following steel wire bundle prestressed pore passage;Due to wind-power tower coagulation Native segment is more, causes at the composition surface of long range prestressed pore passage segment that there are faulting of slab ends reduces duct latus rectum, to prestress steel Strand bundle lashing brings difficulty;At present, the whole beam draft gear outer diameter in general construction means is both greater than steel wire bundle minimum Circumscribed circle diameter can pass through more difficult at prestressed pore passage concrete segment composition surface to steel wire bundle.
The content of the invention
It is an object of the invention to:There is provided a kind of prestress wire whole beam draft gear, the whole beam of the prestress wire Draft gear outer diameter is not more than steel wire bundle minimum circumscribed circle diameter, overcomes general draft gear outer diameter more than steel wire bundle most Small circumscribed circle diameter to steel wire bundle whole strand pricking it is more difficult the shortcomings that, invention also provides the prestress wire is whole Beam draft gear is used for the construction method of steel wire bundle integrally dragging, to solve the above problem existing for prior art.
The technical solution to solve the above problems is:A kind of prestressing tendon integrally dragging device, it is characterised in that:Bag Include positioning seat and drawing head;
The positioning seat is a circle tube member, the outer diameter of the circle tube member it is equal with steel wire bundle minimum circumscribed circle diameter or Smaller, to set female thread segment, the side of the circle tube member other end is evenly distributed with n items for one end for circle tube member one end The central hair of heading by groove;
It with externally threaded cylindrical segment, the other end is to connect for what is be connected with rotary connector that one end of the drawing head, which is, Head, maximum outside diameter are consistent or smaller with positioning seat outer diameter;
Under use state, each groove that each steel strand wires of prestressing tendon heading are each passed through positioning seat is installed on positioning Seat precalculated position, the externally threaded cylindrical segment of drawing head band is screwed with the thread segment of positioning seat to be coupled, another termination of drawing head Head is connected with rotary connector one end connector I of dimension, and rotary connector other end connector II is dynamic with being connected traction The steel wire rope of power apparatus is connected;The value range of above-mentioned n is:The integer of 2≤n≤6.
Relevant another technical solution is:A kind of prestressing tendon integrally dragging construction method, it is using this hair Bright above-mentioned prestressing tendon integrally dragging device realizes the construction method to prestressing tendon integrally dragging, it is wrapped Include following steps:
A, prestressing tendon pre-processes:
Each steel strand wires front end of the steel wire bundle of advance lower honest material is subjected to side silk stripping and cuts off certain length, leaves center Silk, and heading is carried out to central hair;
B, prestressed steel wire bundle integrally dragging device:
B1, by after pretreatment each steel strand wires of the heading of prestressing tendon be each passed through each groove of positioning seat It is installed on positioning seat precalculated position;
B2, the externally threaded cylindrical segment of drawing head band with positioning seat thread segment is screwed it is coupled, another end connector of drawing head and phase Rotary connector one end of specification is answered to be connected, the rotary connector other end is connected with being connected the steel wire rope of hauling power device;
C, prestressing tendon integrally dragging:
Start hauling power device, steel wire bundle is drawn into corresponding prestressed pore passage, the entirety for completing steel wire bundle is worn Beam.
Due to taking said structure, the present invention's《The whole beam draft gear of a kind of prestress wire and its for steel strand wires The construction method of beam integrally dragging》It has the advantages that:
1st, since the outer diameter of the whole beam draft gear of prestress wire of the present invention can be accomplished to be less than steel wire bundle minimum circumscribed circle Diameter overcomes and increases because draft gear outer diameter is more than steel wire bundle minimum circumscribed circle diameter to prestressing tendon whole strand pricking The shortcomings that adding difficulty.So as to be substantially reduced the whole beam traction of prestressing tendon in similar concrete segment pin-connected panel wind-power tower Difficulty.
2nd, using heading mode of traction, safety between the whole beam draft gear of the prestress wire of the present invention and steel wire bundle Reliability is high, and ancillary equipment is few, and simple to operation.
3rd, construction method is easy:Lead between the positioning seat and drawing head of the whole beam draft gear of prestress wire of the present invention Threaded connection is crossed, connection is reliable, convenient disassembly, greatly speeds up construction speed.
By it was verified that the whole beam draft gear of prestress wire of the present invention and its for steel wire bundle integrally dragging Construction method effectively solves the difficulty of the whole beam traction of prestressing tendon in section assembling formula concrete wind-power tower engineering Topic, and construction efficiency is high, has higher economy and practice significance.
With reference to the accompanying drawings and examples to the present invention's《The whole beam draft gear of a kind of prestress wire and its for steel The construction method of strand bundle integrally dragging》Technical characteristic be described further.
Description of the drawings
Fig. 1~Fig. 3 is the traction seat structure diagram in the whole beam draft gear of prestress wire of the present invention:
Fig. 1 is front sectional view, and Fig. 2 is the left view of Fig. 1, and Fig. 3 is the top view of Fig. 1;
Fig. 4~Fig. 5 is the drawing head structure diagram in the whole beam draft gear of prestress wire of the present invention:
Fig. 4 is front view, and Fig. 5 is the left view of Fig. 4;
Fig. 6 is the single steel strand view after prestressing tendon pre-treatment step in the embodiment of the present invention two;
Fig. 7 is the installation process schematic diagram of prestressed steel wire bundle integrally dragging device step in the embodiment of the present invention two;
Fig. 8~Figure 10 is in the embodiment of the present invention two, and state of the prestressing tendon integrally dragging device after installation is complete is shown It is intended to:
Fig. 8 is stereogram, and Fig. 9 is front view, and Figure 10 is the top view of Fig. 9.
In figure:
1- positioning seats, 101- thread segments, 102- grooves, 103- circle reamings;
2- drawing heads, 201- connectors, 202- cylindrical segments;
3- steel strand wires, 301- sides silk, 302- central hairs, 303- headings;
4- rotary connectors, 401- connectors I, 402- rotary connector main bodys, 403- connectors II;
5- steel wire ropes.
Specific embodiment
Embodiment one:
A kind of prestressing tendon integrally dragging device:
As shown in figure 8, the prestressing tendon integrally dragging device includes positioning seat 1 and drawing head 2;The positioning seat 1 is One circle tube member, the outer diameter and steel wire bundle minimum circumscribed circle diameter of the circle tube member are equal or smaller, circle tube member To set female thread segment 101, the side of the circle tube member other end is evenly distributed with 4 central hair for one end heading for one end By groove 102, the top connection one of the groove 102 circular reaming 103 bigger than 102 diameter of groove(Referring to Fig. 1-Fig. 3, figure 8);
One end of the drawing head 2 is for being connected with rotary connector with externally threaded cylindrical segment 202, the other end Connector 201, maximum outside diameter and 1 outer diameter of positioning seat are consistent or smaller(Referring to Fig. 4-Fig. 5, Fig. 8);
Under use state, each groove 102 that 4 steel strand wires 3 of prestressing tendon heading are each passed through positioning seat 1 is installed In positioning seat precalculated position, drawing head 2 is screwed with externally threaded cylindrical segment 202 with the thread segment 101 of positioning seat 1 to be coupled, and is led Another end connector 201 of leader 2 is connected with 4 one end connector I 401 of rotary connector of dimension, and rotary connector 4 is another End connector II 403 is connected with being connected the steel wire rope 5 of hauling power device(Referring to Fig. 8-Figure 10), the effect of rotary connector is The sth. made by twisting power of steel wire rope is discharged during traction.
Embodiment two
A kind of prestressing tendon integrally dragging construction method:
It is to be realized using the prestressing tendon integrally dragging device described in embodiment one to prestressing tendon entirety The construction method of traction, it comprises the following steps:
A, prestressing tendon pre-processes:
Each 3 front end of steel strand wires of the steel wire bundle of advance lower honest material is subjected to side silk stripping and cuts off certain length, in leaving Heart silk 302, and heading is carried out to central hair, the steel strand wires after handling well are referring to Fig. 6;
B, prestressed steel wire bundle integrally dragging device(Referring to Fig. 7, Fig. 9, Figure 10):
B1, by after pretreatment each steel strand wires of the heading of prestressing tendon be each passed through each ditch of positioning seat 1 Slot 102 is installed on positioning seat precalculated position, and the pier nose 303 of steel strand wires central hair is stuck in the circular reaming 103 at 102 top of groove On;
B2, drawing head 2 with externally threaded cylindrical segment 202 with positioning seat thread segment 101 is screwed it is coupled, another termination of drawing head First 201 are connected with rotary connector one end connector I 401 of dimension, and rotary connector other end connector II 403 is with connecting The steel wire rope 5 for connecing hauling power device is connected, and the sth. made by twisting power of steel wire rope is discharged when the effect of rotary connector is traction;
C, prestressing tendon integrally dragging:
Start hauling power device, steel wire bundle is drawn into corresponding prestressed pore passage, the entirety for completing steel wire bundle is worn Beam.
In the embodiment of the present invention one, embodiment two and its attached drawing, the steel strand wires for forming the steel wire bundle worn only have 4, The circle tube member side of the positioning seat 1 of corresponding prestressing tendon integrally dragging device for one end heading central hair By the item number of groove 102 there was only 4;
As a kind of conversion of various embodiments of the present invention, forming the radical n of the steel strand wires for the steel wire bundle worn can also increase Or reduce, it is corresponding, the 1 circle tube member side of positioning seat for one end heading central hair by groove 102 item Number n can also also be increased or decreased, and the value range of general n is:N is the integer less than or equal to 6 more than or equal to 2;It that is to say, The prestressing tendon integrally dragging device of the present invention is to be most suitable for implementing whole lead to 6 holes and following prestressing tendon Draw, significantly reduce the difficulty of the whole beam traction of prestressing tendon in similar concrete segment pin-connected panel wind-power tower.

Claims (2)

1. a kind of prestressing tendon integrally dragging device, it is characterised in that:Including positioning seat(1)And drawing head(2)It is described Positioning seat(1)It is a circle tube member, the outer diameter and steel wire bundle minimum circumscribed circle diameter of the circle tube member are equal or smaller, Circle tube member one end is to set female thread segment(101), the side of the circle tube member other end is evenly distributed with n items for one end The central hair of heading by groove(102);
The drawing head(2)One end be with externally threaded cylindrical segment(202), the other end be for connecting with rotary connector The connector connect(201), maximum outside diameter and positioning seat(1)Outer diameter is consistent or smaller;
Under use state, each steel strand wires of prestressing tendon heading(3)It is each passed through positioning seat(1)Each groove (102)It is installed on positioning seat precalculated position, drawing head(2)With externally threaded cylindrical segment(202)With positioning seat(1)Thread segment (101)Screw connection, drawing head(2)Another end connector(201)With the rotary connector of dimension(4)One end connector I (401)It is connected, rotary connector(4)Other end connector II(403)Steel wire rope with being connected hauling power device(5)It is connected; The value range of above-mentioned n is:The integer of 2≤n≤6.
2. a kind of prestressing tendon integrally dragging construction method, it is using prestress wire described in claim 1 Beam integrally dragging device realizes the construction method to prestressing tendon integrally dragging, it comprises the following steps:
A, prestressing tendon pre-processes:
By each steel strand wires of the steel wire bundle of advance lower honest material(3)Front end carries out side silk and removes and cut off certain length, leaves Central hair(302), and heading is carried out to central hair;
B, prestressed steel wire bundle integrally dragging device:
B1, by after pretreatment each steel strand wires of the heading of prestressing tendon be each passed through positioning seat(1)It is each Groove(102)It is installed on positioning seat precalculated position;
B2, by drawing head(2)With externally threaded cylindrical segment(202)With positioning seat thread segment(101)Connection is screwed, drawing head is another One end and rotary connector one end connector I of dimension(401)It is connected, rotary connector other end connector II(403) It is connected with the steel wire rope for being connected hauling power device;
C, prestressing tendon integrally dragging:
Start hauling power device, steel wire bundle is drawn into corresponding prestressed pore passage, the entirety for completing steel wire bundle is worn Beam.
CN201810069300.3A 2018-01-24 2018-01-24 Integral prestress steel strand traction device and construction method for integral traction of prestress steel strand Active CN108104479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810069300.3A CN108104479B (en) 2018-01-24 2018-01-24 Integral prestress steel strand traction device and construction method for integral traction of prestress steel strand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810069300.3A CN108104479B (en) 2018-01-24 2018-01-24 Integral prestress steel strand traction device and construction method for integral traction of prestress steel strand

Publications (2)

Publication Number Publication Date
CN108104479A true CN108104479A (en) 2018-06-01
CN108104479B CN108104479B (en) 2023-07-18

Family

ID=62220275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810069300.3A Active CN108104479B (en) 2018-01-24 2018-01-24 Integral prestress steel strand traction device and construction method for integral traction of prestress steel strand

Country Status (1)

Country Link
CN (1) CN108104479B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905217A (en) * 2019-12-25 2020-03-24 中国核工业二四建设有限公司 Large-radius annular horizontal channel prestressed steel strand pulling device and method
CN112281661A (en) * 2020-09-22 2021-01-29 中铁六局集团有限公司 Traction device and traction method for parallel steel strand stay cable
CN113235453A (en) * 2021-06-17 2021-08-10 中铁十八局集团有限公司 High-efficiency prestressed steel strand traction head

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5803641A (en) * 1995-04-15 1998-09-08 Dyckerhoff & Widmann Aktiengesellschaft Device for use in inserting individual tension elements of a freely tensioned member into a tubular sheathing
US6318038B1 (en) * 1997-12-31 2001-11-20 Jae Man Park Apparatus for retensing pre-stress structure
CN102003073A (en) * 2010-12-11 2011-04-06 中冶建工有限公司 Constructing method for threading pre-stress structure steel strands
CN202878483U (en) * 2012-08-17 2013-04-17 中铁四局集团第五工程有限公司 Long drill way passing device for whole bundle of prestress steel strands
CN105370043A (en) * 2015-09-29 2016-03-02 中国建筑第二工程局有限公司 Steel strand bundle guiding device and steel strand bundle penetrating method
CN208396320U (en) * 2018-01-24 2019-01-18 柳州欧维姆机械股份有限公司 A kind of whole beam traction device of prestress wire

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5803641A (en) * 1995-04-15 1998-09-08 Dyckerhoff & Widmann Aktiengesellschaft Device for use in inserting individual tension elements of a freely tensioned member into a tubular sheathing
US6318038B1 (en) * 1997-12-31 2001-11-20 Jae Man Park Apparatus for retensing pre-stress structure
CN102003073A (en) * 2010-12-11 2011-04-06 中冶建工有限公司 Constructing method for threading pre-stress structure steel strands
CN202878483U (en) * 2012-08-17 2013-04-17 中铁四局集团第五工程有限公司 Long drill way passing device for whole bundle of prestress steel strands
CN105370043A (en) * 2015-09-29 2016-03-02 中国建筑第二工程局有限公司 Steel strand bundle guiding device and steel strand bundle penetrating method
CN208396320U (en) * 2018-01-24 2019-01-18 柳州欧维姆机械股份有限公司 A kind of whole beam traction device of prestress wire

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905217A (en) * 2019-12-25 2020-03-24 中国核工业二四建设有限公司 Large-radius annular horizontal channel prestressed steel strand pulling device and method
CN110905217B (en) * 2019-12-25 2024-02-27 中国核工业二四建设有限公司 Large-radius circumferential horizontal duct prestress steel strand threading device and method
CN112281661A (en) * 2020-09-22 2021-01-29 中铁六局集团有限公司 Traction device and traction method for parallel steel strand stay cable
CN113235453A (en) * 2021-06-17 2021-08-10 中铁十八局集团有限公司 High-efficiency prestressed steel strand traction head

Also Published As

Publication number Publication date
CN108104479B (en) 2023-07-18

Similar Documents

Publication Publication Date Title
CN100507177C (en) Cable reeving device and its reeving method
CN108104479A (en) A kind of whole beam draft gear of prestress wire and its construction method for prestressing tendon integrally dragging
CN201581644U (en) Bundle combing, knitting and lashing device for steel strand
CN202248933U (en) Steel strands bundle threading device
CN104499652A (en) Finished prestressed steel stranded wire harness convenient for construction
CN210917022U (en) Ultra-long prestressed heading type beam penetrating device
CN2900616Y (en) Double line reciprocating type tracting device
CN110735401A (en) overall pulling method for ultra-long prestressed steel strand
CN105064214A (en) Stay cable tension device for eliminating back-twist
CN107190988B (en) Prestressed steel strand traction head
CN103352432A (en) Finished steel strand harness tractor with threaded connection sleeve
CN103362311B (en) A kind of traction apparatus of finished steel strand bundle band anchorage
CN202672034U (en) Cable threading plate of steel strand of stay cable
CN208396320U (en) A kind of whole beam traction device of prestress wire
CN203729496U (en) Finished steel strand bundle with wire carding plate
CN203487460U (en) Finished steel strand bundle tractor with threaded connection sleeve
CN209277566U (en) A kind of penetrating device for steel strand wires
CN103352538A (en) Prestress fiber reinforced polymer cable anchoring device with auxiliary clamp rings
CN103452244B (en) A kind of finished steel strand bundle
CN201843261U (en) Steel strands-woven bundle
CN208815415U (en) A kind of steel strand penetrating device
CN203547024U (en) Finished steel strand bundle product
CN203546593U (en) Propulsion device for finished steel strand harness
CN203924490U (en) A kind of finished product steel wire bundle
CN208815422U (en) A kind of cast-in-place floorings many places steel strand wires penetrating device simultaneously

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant