CN108104372A
CN108104372A CN201810111327.4A CN201810111327A CN108104372A CN 108104372 A CN108104372 A CN 108104372A CN 201810111327 A CN201810111327 A CN 201810111327A CN 108104372 A CN108104372 A CN 108104372A
Authority
CN
China
Prior art keywords
precast concrete
vertical muscle
precast
concrete section
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810111327.4A
Other languages
Chinese (zh)
Inventor
杨新磊
赵虎
张建新
任权昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201810111327.4A priority Critical patent/CN108104372A/en
Publication of CN108104372A publication Critical patent/CN108104372A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

For the precast combined constructional column and construction method of masonry structure, constructional column is vertically sequentially connected and is formed by steel connecting seat, the 3rd precast concrete section, the multiple first precast concrete sections being alternately arranged and multiple second precast concrete sections, and adjacent two precast concretes section is connected by inserting column and jack;The identical stirrup of shape is built-in in the main part of three kinds of precast concrete sections, vertical muscle mounting hole is equipped in the corner location of stirrup, vertical muscle is coated in vertical muscle mounting hole, vertical muscle is connected through grouting liquid solidifying body with each precast concrete section, is indulged muscle and is formed framework of steel reinforcement structure with stirrup.Construction method, step:Steel connecting seat is connected by S1 with the pre-embedded bolt on masonry ground beam;S2 builds three kinds of precast concrete sections by laying bricks or stones on steel connecting seat;S3 is inserted into vertical muscle into vertical muscle mounting hole, is anchored, grouting liquid is poured into the gap between vertical muscle mounting hole and vertical muscle.Pillar structure is simple, easy to install, construction efficiency is high;Construction method construction technology is simple, construction man-hour is short.

Description

For the precast combined constructional column and construction method of masonry structure
Technical field
The invention belongs to building engineering field, more particularly to a kind of precast combined constructional column for masonry structure and apply Work method.
Background technology
At present, the underdeveloped area of the Building technologies such as China rural area, building construction are mostly without regular design, structure Simple masonry structure, work progress is most of to be completed by oneself, lacks effective technological guidance and quality surveillance, while because For the barren consciousness of providing fortification against earthquakes of peasant, cause agriculture room local-style dwelling houses that this effective antidetonation knot of constructional column will not even be seldom set Structure.
The constructional column problem main cause for considering self-built agriculture room is as follows:
1. conventional construction column is higher to construction requirement, the construction technology of peasant does not reach requirement.Peasant theory know-how Universal not high, construction technology largely by summary of experience, including concrete proportioning mistake, pours leakiness of vibrating, template is not The appearance for the problems such as standard, supporting is insecure, and reinforcing bar binding connection is unqualified can all generate the quality of constructional column different degrees of Influence.
2. rural area economic level is relatively low, construction quality, material do not reach requirement.Peasant is not because income is high, and passes High expensive, many peasants often abandon the reinforcement mode using constructional column to system constructional column in order to reduce cost of a building cost again, Cause house entirety anti-seismic performance poor.
Therefore, design that a kind of relatively low construction technology suitable for rural area is horizontal, pillar structure at low cost, convenient for construction It is very necessary.
The content of the invention
The present invention provides a kind of Prefabricated composite for masonry structure to solve technical problem present in known technology Formula constructional column and construction method, the pillar structure is simple, easy to install, construction efficiency is high, suitable for wast rural area Area agriculture room Self-help construction demand;The constructional column builds that construction method construction technology is simple, construction man-hour is short.
The present invention is adopted the technical scheme that solve technical problem present in known technology:
A kind of precast combined constructional column for masonry structure, it is characterised in that:The precast combined constructional column by Steel connecting seat, the 3rd precast concrete section being placed in above steel connecting seat, be placed in above the 3rd precast concrete section and by Under the supreme multiple first precast concrete sections being alternately arranged successively and multiple second precast concrete sections vertically connect and compose;
The main body of three kinds of precast concrete sections is wide contour square block structure, and the second precast concrete section and the 3rd is in advance Concrete section processed is isometric, and the length of the first precast concrete section is less than the length of other two concrete section;In three kinds of concretes The upper end center position of soil section is both provided with the identical jack of structure, in the lower end center of the first precast concrete section and the The lower end center of two precast concrete sections is both provided with the identical inserting column of structure, and the inserting column of upper section precast concrete section is under The jack for saving precast concrete section forms inserting occlusion successively;Compared with center in the main part of three kinds of precast concrete sections Equivalent locations be built-in with the identical stirrup of shape, vertical muscle mounting hole is provided in a manner of being bonded in the corner location of stirrup, Vertical muscle is coated in vertical muscle mounting hole, vertical muscle cooperatively forms framework of steel reinforcement structure with stirrup, and vertical muscle is through grouting liquid solidifying body It is connected with each precast concrete section;It is located in the upper surface of the first precast concrete section around jack and is additionally provided with tension rib cloth Put slot;
The steel connecting seat is made of top plate, bottom plate and the both sides vertical supporting floor of connection top plate and bottom plate;It is pushing up The top connecting hole passed through for vertical muscle is provided on plate, is close in the lower end locking that vertical muscle is stretched out from top connecting hole and is connected to spiral shell Line set;Lower part connecting hole corresponding with the pre-embedded bolt on masonry ground beam is provided on bottom plate, the steel connecting seat passes through Lower part connecting hole and installing for pre-embedded bolt are connected on fixed and ground beam.
Preferably:The microlith coagulation of formation is filled after being provided in cavity between the top of steel connecting seat and bottom plate The soil body.
Preferably:The length of inserting column is less than the depth of jack, the cross-sectional shape of inserting column and the cross-sectional shape phase of jack Same and inserting column cross-sectional area is less than the cross-sectional area of jack, makes to form fit clearance between inserting column and jack, in inserting column with inserting Bonding mortar is filled at the fit clearance in hole.
Preferably:Stirrup in three kinds of precast concrete sections is respectively set in frame type structure in four corner locations of stirrup Put a vertical muscle mounting hole;The vertical muscle is four, and four vertical muscle are plugged in one by one to be indulged in muscle mounting hole everywhere.
The construction method of a kind of precast combined constructional column for masonry structure, which is characterized in that the constructional column is Above-mentioned precast combined constructional column, construction procedure are:
Steel connecting seat is connected by S1 with the pre-embedded bolt on masonry ground beam;
S2 builds the 3rd precast concrete section by laying bricks or stones on steel connecting seat, then builds the first precast concrete section by laying bricks or stones upwards, then Alternately build the second precast concrete section, the first precast concrete section by laying bricks or stones successively, building a wall to build by laying bricks or stones with precast concrete section is carried out at the same time, Whole process corresponds, and in building process, is arranged in the tension rib arrangement of grooves of the first precast concrete section upper surface Tension rib;
S3 is vertical from being inserted into the vertical muscle mounting hole at top after precast combined constructional column builds setting height by laying bricks or stones Muscle, the lower end for indulging muscle are stretched out from the top plate lower end of steel connecting seat, connected on the vertical muscle lower end by the processing of advance mantle fiber Thread bush is connected, is anchored, after the anchoring of vertical muscle, grouting is poured into the gap between vertical muscle mounting hole and vertical muscle from top Liquid after grouting liquid solidification, wraps vertical muscle.
Preferably:Construction procedure further includes:
S4 is filled in steel connection seat position support template in the cavity between steel connecting seat inner top panel and bottom plate Pea gravel concreten.
The invention has the advantages and positive effects that:
1st, this precast combined constructional column is connected structure successively up and down by steel connecting seat and more piece precast concrete section Into simple in structure, required component can be in factory for prefabrication's mass production, and pouring constructional column with respect to tradition and compare reduces construction journey Sequence shortens the construction period, reduces project cost, meets the self-built agriculture room use demand of existing the vast rural areas.
2nd, this precast combined constructional column is assembled by precast concrete, and construction technology is simple, knows professional Knowledge require it is relatively low, convenient for being promoted the use of in rural area.
3rd, the construction method construction technology of this constructional column is simple, it can be achieved that quick build of constructional column builds construction.
Description of the drawings
Fig. 1 is the precast combined constructional column overall structure diagram of the present invention;
Fig. 2 is the overall diagram of the first precast concrete section of the invention;
Fig. 3 is the sectional view of the first precast concrete section of the invention;
Fig. 4 is the overall diagram of the second precast concrete section of the invention;
Fig. 5 is the sectional view of the second precast concrete section of the invention;
Fig. 6 is the overall diagram of the 3rd precast concrete section of the invention;
Fig. 7 is the sectional view of the 3rd precast concrete section of the invention;
Fig. 8 is the combination section of the first precast concrete section and the second precast concrete section of the invention;
Fig. 9 a are tension rib arrangement of grooves schematic diagram;
Fig. 9 b are T-shaped arrangement tension rib schematic diagram;
Fig. 9 c arrange tension rib schematic diagram for L-type;
Figure 10 is the vertical muscle mounting hole cutting connection diagram of the present invention.
In figure:1st, steel connecting seat;1-1, top plate;1-2, bottom plate;1-3, vertical supporting floor;2nd, the first precast concrete Section;2-1, the first jack;2-2, the first inserting column;2-3, the first stirrup;2-4, the first vertical muscle mounting hole;2-5, tension rib arrangement Slot;3rd, the second precast concrete section;3-1, the second jack;3-2, the second inserting column;3-3, the second stirrup;3-4, the second vertical muscle install Hole;4th, the 3rd precast concrete section;4-1, the 3rd jack;4-2, the 3rd stirrup;4-3, the 3rd vertical muscle mounting hole;5th, muscle is indulged;6、 Thread bush;7th, pea gravel concreten body;1 ', masonry ground beam;2 ', pre-embedded bolt;3 ', tension rib.
Specific embodiment
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and coordinate attached drawing Detailed description are as follows:
Fig. 1-10, a kind of precast combined constructional column for masonry structure are referred to, innovative point is:
The precast combined constructional column is by steel connecting seat 1, the 3rd precast concrete being placed in above steel connecting seat Section 4 is placed in multiple first precast concrete sections 2 for being alternately arranged from the bottom to top above the 3rd precast concrete section and successively and more A second precast concrete section 3 vertically connects and composes.
The main body of three kinds of precast concrete sections is wide contour square block structure, and the second precast concrete section and the 3rd is in advance Concrete section processed is isometric, and the length of the first precast concrete section is less than the length of other two concrete section, can so form gingival cyst of mucous gland in the newborn Raft is combined more preferable with periphery wall.The first jack 2-1 is provided in the first precast concrete section upper end center position, Two precast concrete section upper end center positions are provided with the second jack 3-1, are set in the 3rd precast concrete section upper end center position It is equipped with the 3rd jack 4-1, the jack structure on three kinds of precast concrete sections is identical.At the lower end center of the first precast concrete section Position is provided with the first inserting column 2-2, the second inserting column 3-2 is provided in the lower end center of the second precast concrete section, two kinds Inserting column structure on precast concrete section is identical.The jack shape of the inserting column of upper section precast concrete section and lower section precast concrete section Into inserting occlusion successively, in this way, more piece precast concrete section is connected as a single entity above and below making.In the main part of the first precast concrete section The first stirrup 2-3 is provided in point, the second stirrup 3-3 is provided in the main part of the second precast concrete, it is pre- the 3rd It is provided with the 3rd stirrup 4-2 in the main part of concrete processed, the stirrup in three kinds of precast concrete sections is located at compared with center Equivalent locations, and use identical shape.The corner location of stirrup is both provided with vertical muscle and wears in three kinds of precast concrete sections Hole is filled, is respectively the first vertical muscle mounting hole 2-4, the second vertical muscle mounting hole 3-4, the 3rd vertical muscle mounting hole 4-3, indulges muscle mounting hole Hole wall is bonded with the corresponding corner of stirrup.Vertical muscle 5 is coated in vertical muscle mounting hole, vertical muscle cooperatively forms framework of steel reinforcement with stirrup Structure, vertical muscle are connected through grouting liquid solidifying body with each precast concrete section.It is integrally strong that the setting of vertical muscle plays reinforcement constructional column The effect of degree.Tension rib arrangement of grooves 2-5 is additionally provided with around the upper surface jack of the first precast concrete section, to avoid steel The vertical arranged superposed of muscle influences gray seam thickness, and tension rib cloth postpones the inserting column of the second precast concrete section lower part of fitting, helps In improving anchoring property of the tension rib in constructional column, be conducive to improve the shear resistance and globality of masonry.
Above-mentioned steel connecting seat is by top plate 1-1, bottom plate 1-2 and the both sides vertical supporting floor 1-3 of connection top plate and bottom plate It forms.The top connecting hole passed through for vertical muscle is provided on top plate, in the lower end locking that vertical muscle is stretched out from top connecting hole It is close to and is connected to thread bush 6, to realize the anchoring of vertical muscle.It is provided on bottom plate corresponding with the pre-embedded bolt 2 ' on masonry ground beam 1 ' Lower part connecting hole, the steel connecting seat is connected with masonry by installing for lower part connecting hole and the pre-embedded bolt on ground beam Beam forms a fixed connection.
In above-mentioned precast combined constructional column:It is further set in cavity between the top of steel connecting seat and bottom plate Pea gravel concreten body 7, pea gravel concreten body are filled after longeron installs anchoring and formed.Filling the effect of pea gravel concreten body is: Avoiding the steel constructions such as longeron lower end, thread bush, pre-embedded bolt and attaching nut, exposure generates corrosion for a long time, ensures steel construction Durability.
In above-mentioned precast combined constructional column:The inserting column of upper and lower section precast concrete section and the fit structure of jack are preferably such as Under:
The length of inserting column is less than the depth of jack, and the cross-sectional shape of inserting column is identical with the cross-sectional shape of jack and inserts The cross-sectional area of column is less than the cross-sectional area of jack, makes to form fit clearance between inserting column and jack, in matching somebody with somebody for inserting column and jack Gap location is closed filled with bonding mortar, in this way, eliminating the fit clearance between inserting column and jack by mortar, is made mixed up and down Solidifying soil section is securely connected as one, and so as to avoid the presence because of fit clearance, the changing of the relative positions is occurred between concrete section and is reduced structure Make the intensity of column.
In above-mentioned precast combined constructional column:Stirrup in three kinds of precast concrete sections is further preferably in frame type knot Structure respectively sets a vertical muscle mounting hole in four corner locations of stirrup.The vertical muscle is four, and four vertical muscle are plugged in four one by one Locate in total muscle mounting hole.
The construction method of the above-mentioned precast combined constructional column for masonry structure, innovative point are:Using applying as follows Work step is suddenly:
Steel connecting seat is connected by S1 with the pre-embedded bolt on masonry ground beam;
S2 builds the 3rd precast concrete section by laying bricks or stones on steel connecting seat, then builds the first precast concrete section by laying bricks or stones upwards, then Alternately build the second precast concrete section, the first precast concrete section by laying bricks or stones successively, building a wall to build by laying bricks or stones with precast concrete section is carried out at the same time, Whole process corresponds, and in building process, is arranged in the tension rib arrangement of grooves of the first precast concrete section upper surface Two ways can be used in tension rib 3 ', the arrangement of tension rib:1st, T-shaped arrangement is shown in attached drawing 9b;2nd, L-type arrangement is shown in attached Fig. 9 c.General constructional column at the position in corner, using L-type arranged by tension rib;And constructional column is at the position that transverse and longitudinal wall intersects, Using T-shaped arrangement.
S3 is vertical from being inserted into the vertical muscle mounting hole at top after precast combined constructional column builds setting height by laying bricks or stones Muscle, the lower end for indulging muscle are stretched out from the top plate lower end of steel connecting seat, connected on the vertical muscle lower end by the processing of advance mantle fiber Thread bush is connected, is anchored, after the anchoring of vertical muscle, grouting is poured into the gap between vertical muscle mounting hole and vertical muscle from top Liquid after grouting liquid solidification, wraps vertical muscle.Above-mentioned grouting liquid is auxiliary using cement as bonding agent using high-strength material as aggregate It is formed with prefabri cation configurations such as upper flow regime, microdilatancy, anti-isolations, a certain amount of water is added at the construction field (site), after stirring evenly It uses.Have the characteristics that self drainage is good, fast hard, high-strength, ungauged regions, microdilatancy, pouring quality is reliable.There is CGM-1 to lead at present It is all suitable for type, CGM-2 peastones type, the ultra-fine self-flow patterns of CGM-3 and CGM-4 ultra early-strength grouting materials, these types of model.

Claims (6)

1. a kind of precast combined constructional column for masonry structure, it is characterised in that:The precast combined constructional column is by steel Connecting seat processed, the 3rd precast concrete section being placed in above steel connecting seat are placed in above the 3rd precast concrete section and under The supreme multiple first precast concrete sections being alternately arranged successively and multiple second precast concrete sections vertically connect and compose;
The main body of three kinds of precast concrete sections is wide contour square block structure, the second precast concrete section and the 3rd prefabricated mixed Solidifying soil section is isometric, and the length of the first precast concrete section is less than the length of other two concrete section;In three kinds of precast concrete sections Upper end center position be both provided with the identical jack of structure, it is pre- in the lower end center of the first precast concrete section and second The lower end center of concrete section processed is both provided with the identical inserting column of structure, and the inserting column and lower section of upper section precast concrete section are pre- The jack of concrete section processed forms inserting occlusion successively;Compared with the same of center in the main part of three kinds of precast concrete sections Positions is waited to be built-in with the identical stirrup of shape, vertical muscle mounting hole is provided in a manner of being bonded in the corner location of stirrup, vertical Vertical muscle is coated in muscle mounting hole, vertical muscle cooperatively forms framework of steel reinforcement structure with stirrup, and vertical muscle is through grouting liquid solidifying body and respectively Precast concrete section connects;It is located in the upper surface of the first precast concrete section around jack and is additionally provided with tension rib arrangement Slot;
The steel connecting seat is made of top plate, bottom plate and the both sides vertical supporting floor of connection top plate and bottom plate;On top plate The top connecting hole passed through for vertical muscle is provided with, is close in the lower end locking that vertical muscle is stretched out from top connecting hole and is connected to screw thread Set;Lower part connecting hole corresponding with the pre-embedded bolt on masonry ground beam is provided on bottom plate, the steel connecting seat is under Portion's connecting hole and installing for pre-embedded bolt are connected on fixed and ground beam.
2. the precast combined constructional column according to claim 1 for masonry structure, it is characterised in that:It is connected in steel The pea gravel concreten body of formation is filled after being provided in cavity between the top of seat and bottom plate.
3. the precast combined constructional column according to claim 1 for masonry structure, it is characterised in that:The length of inserting column Less than the depth of jack, the cross-sectional shape of inserting column is identical with the cross-sectional shape of jack and the cross-sectional area of inserting column is less than and inserts The cross-sectional area in hole makes to form fit clearance between inserting column and jack, filled with Nian Jie at fit clearance of the inserting column with jack Use mortar.
4. the precast combined constructional column according to claim 1 for masonry structure, it is characterised in that:Three kinds prefabricated mixed Stirrup in solidifying soil section respectively sets a vertical muscle mounting hole in frame type structure in four corner locations of stirrup;The vertical muscle is Four, four vertical muscle are plugged in one by one to be indulged in muscle mounting hole everywhere.
5. the construction method of a kind of precast combined constructional column for masonry structure, which is characterized in that the constructional column is power Profit requires the precast combined constructional column described in 1, and construction procedure is:
Steel connecting seat is connected by S1 with the pre-embedded bolt on masonry ground beam;
S2 builds the 3rd precast concrete section by laying bricks or stones on steel connecting seat, then builds the first precast concrete section by laying bricks or stones upwards, then successively Alternating builds the second precast concrete section, the first precast concrete section by laying bricks or stones, and building a wall to build by laying bricks or stones with precast concrete section is carried out at the same time, entirely Process corresponds, and in building process, drawknot is arranged in the tension rib arrangement of grooves of the first precast concrete section upper surface Muscle;
S3, from vertical muscle is inserted into the vertical muscle mounting hole at top, is indulged after precast concrete construction column builds setting height by laying bricks or stones The lower end of muscle is stretched out from the top plate lower end of steel connecting seat, and locking is connected on the vertical muscle lower end for carrying out advance mantle fiber processing It is fixed, it is anchored, after the anchoring of vertical muscle, pours into grouting liquid into the gap between vertical muscle mounting hole and vertical muscle from top, treat After grouting liquid solidification, vertical muscle is wrapped.
6. the construction method of the precast combined constructional column according to claim 5 for masonry structure, it is characterised in that: The construction procedure further includes:
S4 formworks simultaneously fill pea gravel concreten to the inside of steel connecting seat.
CN201810111327.4A 2018-02-05 2018-02-05 For the precast combined constructional column and construction method of masonry structure Pending CN108104372A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810111327.4A CN108104372A (en) 2018-02-05 2018-02-05 For the precast combined constructional column and construction method of masonry structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810111327.4A CN108104372A (en) 2018-02-05 2018-02-05 For the precast combined constructional column and construction method of masonry structure

Publications (1)

Publication Number Publication Date
CN108104372A true CN108104372A (en) 2018-06-01

Family

ID=62220922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810111327.4A Pending CN108104372A (en) 2018-02-05 2018-02-05 For the precast combined constructional column and construction method of masonry structure

Country Status (1)

Country Link
CN (1) CN108104372A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485634A (en) * 2019-08-16 2019-11-22 广西建工集团第五建筑工程有限责任公司 Constructional column top rebars pre-buried structure component and its method for constructional column top rebars installation
CN111945880A (en) * 2020-08-11 2020-11-17 汪鹏 Tenon-and-mortise structure of T-shaped wall constructional column and construction method thereof
CN113374174A (en) * 2021-06-08 2021-09-10 华南理工大学 Novel prefabricated assembled constructional column made of recycled block concrete and construction method of prefabricated assembled constructional column
CN115419215A (en) * 2022-10-11 2022-12-02 中铁十一局集团有限公司 Construction method of assembled constructional column

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05230872A (en) * 1992-02-20 1993-09-07 Kajima Corp Precast concrete column member and construction thereof of column
CN101429803A (en) * 2008-12-05 2009-05-13 重庆大学 Construction column used for masonry structure and its production method and special precast segment
CN105113662A (en) * 2015-06-25 2015-12-02 李彦斌 Assembled constructional column constructed together with frame structure infilled wall
CN105155724A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of structural column for simultaneous construction with frame-structured filled wall
CN105155725A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of novel structural column for frame-structured T-shaped filled walls
CN205637228U (en) * 2015-06-25 2016-10-12 朱占元 Novel constructional column of cross infilled wall of frame construction
CN107060084A (en) * 2017-06-22 2017-08-18 吴亚峰 Prefabricated constructional column attachment structure and attaching method thereof
CN107254925A (en) * 2017-07-21 2017-10-17 天津城建大学 Vertical prestressing loam wall and its construction method
CN107299764A (en) * 2017-07-24 2017-10-27 中国十七冶集团有限公司 A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN207863306U (en) * 2018-02-05 2018-09-14 天津城建大学 Precast combined constructional column for masonry structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05230872A (en) * 1992-02-20 1993-09-07 Kajima Corp Precast concrete column member and construction thereof of column
CN101429803A (en) * 2008-12-05 2009-05-13 重庆大学 Construction column used for masonry structure and its production method and special precast segment
CN105113662A (en) * 2015-06-25 2015-12-02 李彦斌 Assembled constructional column constructed together with frame structure infilled wall
CN105155724A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of structural column for simultaneous construction with frame-structured filled wall
CN105155725A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of novel structural column for frame-structured T-shaped filled walls
CN205637228U (en) * 2015-06-25 2016-10-12 朱占元 Novel constructional column of cross infilled wall of frame construction
CN107060084A (en) * 2017-06-22 2017-08-18 吴亚峰 Prefabricated constructional column attachment structure and attaching method thereof
CN107254925A (en) * 2017-07-21 2017-10-17 天津城建大学 Vertical prestressing loam wall and its construction method
CN107299764A (en) * 2017-07-24 2017-10-27 中国十七冶集团有限公司 A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN207863306U (en) * 2018-02-05 2018-09-14 天津城建大学 Precast combined constructional column for masonry structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485634A (en) * 2019-08-16 2019-11-22 广西建工集团第五建筑工程有限责任公司 Constructional column top rebars pre-buried structure component and its method for constructional column top rebars installation
CN111945880A (en) * 2020-08-11 2020-11-17 汪鹏 Tenon-and-mortise structure of T-shaped wall constructional column and construction method thereof
CN113374174A (en) * 2021-06-08 2021-09-10 华南理工大学 Novel prefabricated assembled constructional column made of recycled block concrete and construction method of prefabricated assembled constructional column
CN115419215A (en) * 2022-10-11 2022-12-02 中铁十一局集团有限公司 Construction method of assembled constructional column
CN115419215B (en) * 2022-10-11 2024-04-16 中铁十一局集团有限公司 Construction method of assembled constructional column

Similar Documents

Publication Publication Date Title
CN108104372A (en) For the precast combined constructional column and construction method of masonry structure
CN105155724B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN105113660B (en) A kind of construction method for the constructional column constructed simultaneously with frame structure filling wall
CN103174260B (en) Ten shape steel reinforced concrete special-shaped columns of supporting role's steel skeleton
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN107355010A (en) Precast concrete shear wall shaped steel node connection structure
CN206707005U (en) A kind of prefabricated PC concrete frame structure
CN109610684A (en) A kind of efficient arrangement of reinforcement and connection precast shear wall
CN101225690A (en) Insulation roof slab and method for making same
CN105089182B (en) A kind of concrete partition system and its construction method for steel construction
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN208792505U (en) A kind of precast wall body and assembling structure of assembled architecture
CN107938856A (en) Walling system
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN113863703A (en) Single-span transverse wall reinforced masonry structure additionally provided with steel pull rods and ring beam structural columns and construction method thereof
CN207160270U (en) Precast concrete shear wall shaped steel node connection structure
CN207863306U (en) Precast combined constructional column for masonry structure
CN105735470A (en) Precast concrete frame system using high-performance materials differentially
CN105113663A (en) Assembly type constructional column constructed simultaneously with framework structure infill wall
CN105649259B (en) A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure
CN105113662A (en) Assembled constructional column constructed together with frame structure infilled wall
CN103334534A (en) Special building block for anti-seismic energy-saving reinforced masonry of well-off building and new construction technology
CN205063155U (en) Assembled constructional column building block of being under construction simultaneously with frame construction infilled wall
CN110107019A (en) A kind of combined type precast floor slab for assembled architecture
CN104775550A (en) Pre-hoisted internal partition wallboard and building structure integrally constructed wall body system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication