CN108098707A CN201810098344.9A CN201810098344A CN108098707A CN 108098707 A CN108098707 A CN 108098707A CN 201810098344 A CN201810098344 A CN 201810098344A CN 108098707 A CN108098707 A CN 108098707A
Authority
CN
China
Prior art keywords
working gantry
frame
longeron
crossbeam
storage cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810098344.9A
Other languages
Chinese (zh)
Inventor
彭勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Gujiu Metal Products Co Ltd
Original Assignee
Jiangxi Gujiu Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Gujiu Metal Products Co Ltd filed Critical Jiangxi Gujiu Metal Products Co Ltd
Priority to CN201810098344.9A priority Critical patent/CN108098707A/en
Publication of CN108098707A publication Critical patent/CN108098707A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/06Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby of trestle type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pallets (AREA)

Abstract

The invention discloses a kind of three veil assembly toolings of storage cage, including Working gantry, padded frame, the padded frame is movably connected on above Working gantry, the Working gantry is frame structure, the padded frame can the left and right movement on Working gantry, flat front end is equipped with strip parallels on Working gantry;Intermediate support is equipped on the Working gantry among frame, the intermediate support includes crossbeam I and longeron, the longeron is equipped with N parts, N part longerons, which are mutually parallel, to be fixedly arranged on the forward and backward two frames side medial surface of frame on Working gantry, the crossbeam I is equipped with 1 dry parts of N, and between being fixedly arranged on respectively in the middle part of longeron two-by-two, the crossbeam I uses angle bar with longeron, and the right angle of angle bar is upward, two right-angle sides are downward.The configuration of the present invention is simple, easy to operate, production efficiency greatly improves, and ensure that product assembly quality, while alleviates the labor intensity of worker.

Description

A kind of three veil assembly tooling of storage cage
Technical field
The present invention relates to the three veil assembly toolings of storage cage processing technique field more particularly to a kind of storage cage.
Background technology
Storage cage has many advantages, such as that store things capacity is fixed, stacks that clean and tidy, storage is very clear, convenient for inventory accounting, The effective rate of utilization of storage space is also improved simultaneously.In addition, the product is sturdy and durable, convenient transport, can reuse, can have Effect reduces manpower consumption and the packing cost of storage enterprise.This product can be not only used for plant produced workshop, and can use In supermarket as displaying promotion and storage, and can use outdoors.
The two vertical steel wires that the left and right side net of storage cage is adjacent with rear side net are connected by spring, and upper end passes through Iron clad connects, and existing assembly technology is that each assembling workpiece is placed on work top, and operative employee need to lift two assembly sides, and hand Work, which rotates spring, promotes installation, after iron clad installs, is extremely closed two side hammer of iron clad opening with iron hammer, but left and right side net Have that two steel wires are lower than iron clad bottom surface, and iron clad bottom cannot be implemented on workbench below, iron hammer is caused easily to be beaten when beaing The connected steel wire of askew side net.Existing process low production efficiency, installation quality are poor, and labor strength is big.
The content of the invention
In order to solve technical problem present in above-mentioned background technology, the present invention provides a kind of assemblings of three veil of storage cage Frock, the frock place side net using the Working gantry of frame structure, and spring can use electric tool electric blasting that rotation is driven to push away Into installation, production efficiency greatly improves, while using parallels, padded frame, iron clad is enable to implement hammering, ensure that the dress of product With quality.
The technical proposal of the invention is realized in this way:
A kind of three veil assembly tooling of storage cage, including Working gantry, it is characterised in that further include padded frame, the padded frame is lived Dynamic to be connected to above Working gantry, the Working gantry is frame structure, and the padded frame can the left and right shifting on Working gantry Dynamic, flat front end is equipped with strip parallels on Working gantry;
Intermediate support is equipped on the Working gantry among frame, the intermediate support includes crossbeam I and longeron, and the longeron is set There are N parts, N part longerons, which are mutually parallel, to be fixedly arranged on the forward and backward two frames side medial surface of frame on Working gantry, and the crossbeam I is equipped with N-1 Part, between being fixedly arranged on respectively in the middle part of longeron two-by-two, for the crossbeam I with longeron using angle bar, and the right angle of angle bar is upward, two is straight The arm of angle is downward.
Further, the padded frame includes crossbeam II and vertical beam, and the vertical beam is equipped with two, is respectively fixedly connected in horizontal stroke II bottom surface both ends of beam, frame inside casing on two vertical beam insertion Working gantry, the II bottom surface two ends of crossbeam respectively with Plane is affixed on the upper forward and backward frame side of frame.
Further, Working gantry upper ledge, which is provided with below parallels one side, adds two legs.Because parallels will be constantly subjected to It beats, adds two legs and ensure that Working gantry is more secured.
Further, the parallels uses quality carbon tool steel.Quality carbon tool steel is wear-resisting, it is resistance to beat, use the longevity Life length.
Further, shelf layer is arranged below in the Working gantry.Shelf layer is reduced for storing workpiece and assembly tool The time of workpiece is carried, further improves production efficiency.
During the work of the present invention, rear side net is put in the middle part of Working gantry, the one end for installing iron clad is put on parallels, another End is put on Working gantry on frame in plane, and left and right side net is put in the arranged on left and right sides of rear side net, similary to install the one of iron clad End be put on parallels, the other end is put on Working gantry on frame in plane, and one side of the left and right side net away from rear side net as On padded frame, such iron clad can be implemented on parallels, and when being beaten with iron hammer, side net connecting portion steel wire will not deform, and need to Pacify spring-loaded position to be put between two longeron of intermediate support, intermediate support head-up, makes three veils prop up with intermediate for right angle Frame is point contact, is assembled convenient for spring, and using Working gantry of the present invention, spring electric blasting can be used to assemble when assembling, work efficiency It greatly improves.
Compared with prior art, the beneficial effects of the invention are as follows:Simple in structure, easy to operate, production efficiency greatly improves, It ensure that product assembly quality, while alleviate the labor intensity of worker.
Description of the drawings
Fig. 1 is structure diagram of the embodiment of the present invention;
Structure diagram when Fig. 2 works for the embodiment of the present invention;
Fig. 3 is spring, iron clad and side net install enlarged drawing;
Fig. 4 assembles forward and backward structure diagram for iron clad;
Fig. 5 is padded frame structure diagram.
In figure:1st, Working gantry, 11, upper frame, 12, intermediate support, 121, crossbeam I, 122, longeron, 13, shelf layer, 14th, parallels, 2, padded frame, 21, crossbeam II, 22, vertical beam, 3, workpiece, 31a, left web, 31b, rear side net, 31c, right web, 32nd, spring, 33, iron clad, iron clad before 33a, assembling.
Specific embodiment
As shown in Fig. 1 to 5, the embodiment of the present invention includes Working gantry 1, padded frame 2, and padded frame 2 is movably connected on work Above rack 1, Working gantry 1 is frame structure, padded frame 2 can the left and right movement on Working gantry 1, plane on Working gantry 1 Front end is equipped with strip parallels 14;
Intermediate support 12 is equipped on Working gantry 1 among frame 11, intermediate support 12 includes crossbeam I 121 and longeron 122, longeron 122 are equipped with 3, and 3 longerons 122, which are mutually parallel, to be fixedly arranged on Working gantry on 11 forward and backward two frames side medial surface of frame, crossbeam I 121 are equipped with 2, are fixedly arranged on respectively between the middle part of longeron 122 two-by-two, and crossbeam I 121 and longeron 122 are using angle bar, and angle bar Upward, two right-angle sides are downward at right angle.
Padded frame 2 includes crossbeam II 21 and vertical beam 22, and vertical beam 22 is equipped with two, is respectively fixedly connected with and goes to the bottom in crossbeam II 21 Face both ends, two vertical beams 22 insertion Working gantry on 11 inside casing of frame, II 21 bottom surface two ends of crossbeam respectively with before upper frame 11, Plane is affixed on after-frame side.
Frame 11 is equipped with below 14 one side of parallels and adds two legs 15 on Working gantry 1.Because parallels 14 will be constantly subjected to It beats, adds two legs 15 and ensure Working gantry 1 more securely.
Shelf layer 13 is arranged below in Working gantry 1.Shelf layer 13 reduces for storing workpiece and assembly tool and carries workpiece Time, further improve production efficiency.
As preference, parallels 14 uses quality carbon tool steel, quality carbon tool steel is wear-resisting, it is resistance to beat, use the longevity Life length.
During the work of the present invention, rear side net 31b is put in 1 middle part of Working gantry, the one end for installing iron clad is put in parallels 14 On, the other end is put on Working gantry on frame 11 in plane, and left web 31a, right web 31c are put in the left and right of rear side net 31b Both sides, similary one end for installing iron clad are put on parallels 14, and the other end is put on Working gantry on frame 11 in plane, and left side 31a, one sides of the right web 31c away from rear side net 31b are netted as on padded frame 2, such iron clad 33 can be implemented on parallels 14, used When iron hammer beats, side net connecting portion steel wire will not deform, and the position for needing to install spring 32 is put in 12 liang of intermediate support Between longeron 122, for right angle head-up, it is point contact to make three veils and intermediate support 12 to intermediate support 12, is filled convenient for spring 32 Match somebody with somebody, using Working gantry of the present invention, spring electric blasting can be used to assemble when assembling, and work efficiency greatly improves.
The above is only the preferred embodiments of the disclosure, but protection scope of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of three veil assembly tooling of storage cage, including Working gantry, it is characterised in that further include padded frame, the padded frame It is movably connected on above Working gantry, the Working gantry is frame structure, and the padded frame can the left and right shifting on Working gantry Dynamic, flat front end is equipped with strip parallels on Working gantry;
Intermediate support is equipped on the Working gantry among frame, the intermediate support includes crossbeam I and longeron, and the longeron is set There are N parts, N part longerons, which are mutually parallel, to be fixedly arranged on the forward and backward two frames side medial surface of frame on Working gantry, and the crossbeam I is equipped with N-1 Part, between being fixedly arranged on respectively in the middle part of longeron two-by-two, for the crossbeam I with longeron using angle bar, and the right angle of angle bar is upward, two is straight The arm of angle is downward.
2. a kind of three veil assembly tooling of storage cage according to claim 1, it is characterised in that:The padded frame includes horizontal stroke Beam II and vertical beam, the vertical beam are equipped with two, are respectively fixedly connected in II bottom surface both ends of crossbeam, two vertical beam is inserted into work Frame inside casing on rack, the II bottom surface two ends of crossbeam are affixed respectively with plane on the forward and backward frame side of upper frame.
3. a kind of three veil assembly tooling of storage cage according to claim 1, it is characterised in that:The Working gantry upper ledge It is provided with below parallels one side and adds two legs.
4. a kind of three veil assembly tooling of storage cage according to claim 1, it is characterised in that:The parallels is using high-quality Carbon tool steel.
5. a kind of three veil assembly tooling of storage cage according to claim 1, it is characterised in that:Below the Working gantry Equipped with shelf layer.
CN201810098344.9A 2018-01-31 2018-01-31 A kind of three veil assembly tooling of storage cage Pending CN108098707A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810098344.9A CN108098707A (en) 2018-01-31 2018-01-31 A kind of three veil assembly tooling of storage cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810098344.9A CN108098707A (en) 2018-01-31 2018-01-31 A kind of three veil assembly tooling of storage cage

Publications (1)

Publication Number Publication Date
CN108098707A true CN108098707A (en) 2018-06-01

Family

ID=62221599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810098344.9A Pending CN108098707A (en) 2018-01-31 2018-01-31 A kind of three veil assembly tooling of storage cage

Country Status (1)

Country Link
CN (1) CN108098707A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR910016522U (en) * 1990-03-30 1991-10-26 에이지 야마모도 Folding work
JP2009018831A (en) * 2007-07-11 2009-01-29 Ito Seisakusho:Kk Basket type pallet
CN202684830U (en) * 2012-05-25 2013-01-23 意美吉铝型材设备(苏州)有限公司 Window sectional material assembly floor
CN103990971A (en) * 2013-02-15 2014-08-20 史丹利工具(以色列)有限公司 Work bench frame
CN104526237A (en) * 2014-12-31 2015-04-22 布劳恩电梯有限公司 Machining and positioning device for car bottom bracket
CN204819389U (en) * 2015-06-26 2015-12-02 常州市南飞机械有限公司 Portable strike to bind put
CN205201454U (en) * 2015-11-03 2016-05-04 泰州龙瑞金属制品有限公司 Steel tube machining workstation
CN206123591U (en) * 2016-10-08 2017-04-26 林口盛德车业研发制造有限公司 Welding is polished and is used work bench
CN206319609U (en) * 2016-11-29 2017-07-11 中机中联工程有限公司 A kind of adjustable molding bed for making steel reinforcement cage
CN206702444U (en) * 2017-02-17 2017-12-05 中国十九冶集团有限公司 Street lamp basis steel reinforcement cage preparation rack
CN206725313U (en) * 2017-05-02 2017-12-08 重庆科技学院 A kind of novel sintered experimental sample quickly tamps shaping mechanism
CN208051847U (en) * 2018-01-31 2018-11-06 江西固久金属制品有限公司 A kind of three veil assembly tooling of storage cage

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR910016522U (en) * 1990-03-30 1991-10-26 에이지 야마모도 Folding work
JP2009018831A (en) * 2007-07-11 2009-01-29 Ito Seisakusho:Kk Basket type pallet
CN202684830U (en) * 2012-05-25 2013-01-23 意美吉铝型材设备(苏州)有限公司 Window sectional material assembly floor
CN103990971A (en) * 2013-02-15 2014-08-20 史丹利工具(以色列)有限公司 Work bench frame
CN104526237A (en) * 2014-12-31 2015-04-22 布劳恩电梯有限公司 Machining and positioning device for car bottom bracket
CN204819389U (en) * 2015-06-26 2015-12-02 常州市南飞机械有限公司 Portable strike to bind put
CN205201454U (en) * 2015-11-03 2016-05-04 泰州龙瑞金属制品有限公司 Steel tube machining workstation
CN206123591U (en) * 2016-10-08 2017-04-26 林口盛德车业研发制造有限公司 Welding is polished and is used work bench
CN206319609U (en) * 2016-11-29 2017-07-11 中机中联工程有限公司 A kind of adjustable molding bed for making steel reinforcement cage
CN206702444U (en) * 2017-02-17 2017-12-05 中国十九冶集团有限公司 Street lamp basis steel reinforcement cage preparation rack
CN206725313U (en) * 2017-05-02 2017-12-08 重庆科技学院 A kind of novel sintered experimental sample quickly tamps shaping mechanism
CN208051847U (en) * 2018-01-31 2018-11-06 江西固久金属制品有限公司 A kind of three veil assembly tooling of storage cage

Similar Documents

Publication Publication Date Title
CN208051847U (en) A kind of three veil assembly tooling of storage cage
CN108098707A (en) A kind of three veil assembly tooling of storage cage
CN208051848U (en) A kind of storage cage door net assembly tooling
CN204524650U (en) A kind of frame tool
CN210605905U (en) Inside receiving mechanism of vending machine
CN204861506U (en) Vamp indenture flattening -out mechanism
CN205334493U (en) Barcode reader for electronic commerce
CN108044576A (en) A kind of storage cage door net assembly tooling
CN205833903U (en) A kind of efficiently steel pipe bender
CN207467166U (en) A kind of brake disc protection cap rack
CN214753946U (en) Battery cabinet convenient to dismouting
CN208483826U (en) A kind of convenient supporter of glove
CN217730522U (en) Door and window frame transfer equipment for door and window production
CN205813553U (en) Dissipate the leaf dress upper cigarette equipment of cigarette basket auxiliary
CN205285905U (en) Durable hook
CN206200048U (en) Stainless steel support wire rod preparation paying out machine
CN210961288U (en) Fabrics is show shelf for retail
CN211108536U (en) Detachable packing box
CN207712777U (en) A kind of magazine
CN207060661U (en) A kind of Foldable-type warehousing cage
CN201538341U (en) Part turnover vehicle
CN204188248U (en) Bracket rod type weighing device
CN204416243U (en) Novel feeding shelf
CN219687919U (en) Chip magazine
CN109625413A (en) Structure improved products feed inlet on a kind of box-packed packing machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination