CN108090573A - A kind of preventative subway operational system and method - Google Patents

A kind of preventative subway operational system and method Download PDF

Info

Publication number
CN108090573A
CN108090573A CN201711321330.0A CN201711321330A CN108090573A CN 108090573 A CN108090573 A CN 108090573A CN 201711321330 A CN201711321330 A CN 201711321330A CN 108090573 A CN108090573 A CN 108090573A
Authority
CN
China
Prior art keywords
data
work station
maintenance work
status data
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711321330.0A
Other languages
Chinese (zh)
Inventor
王伟
张建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201711321330.0A priority Critical patent/CN108090573A/en
Publication of CN108090573A publication Critical patent/CN108090573A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Alarm Systems (AREA)

Abstract

The embodiment of the invention discloses a kind of preventative subway operational systems and method, system to include:Signal system safeguards monitoring system, maintenance work station and wechat enterprise platform;Signal system is modernized with safeguarding that monitoring system is connected for train traffic control and train operation;It safeguards that monitoring system is connected with maintenance work station, is monitored for the working condition to signal system, collect the status data of signal system, and status data is sent to maintenance work station;Maintenance work station is connected with wechat enterprise platform, for being handled according to status data and fault alarm, and fault alarm is sent to wechat enterprise platform;Wechat enterprise platform receives fault alarm, to inform staff's timely processing failure.Once equipment breaks down or alarm, can fast notification staff, without reporting layer by layer, flow is simple, saves substantial amounts of manpower and O&M cost, while by preventative alarm, reduces the failure rate of subway equipment.

Description

A kind of preventative subway operational system and method
Technical field
The present embodiments relate to technical field of rail traffic, and in particular to a kind of preventative subway operational system and side Method.
Background technology
Coming and develop with the big data epoch, the life for the mankind creates unprecedented quantifiable dimension Degree becomes the continuous source for creating new invention and new demand servicing of all trades and professions, using internet and big data technology, allows subway Mass data during O&M is collected, and management and analysis are possibly realized.It is fixed to monitor the service condition of subway equipment in real time The position position of fault, provides maintenance activity management, based on pre- measurement equipment life-span, establishes one based on the preventative of big data Subway operational system to realize trouble saving, improves subway O&M efficiency and management level into metro industry Development trend.
The key of subway O&M safety is prevention, and subway operational system possesses reliable safety analysis and failure prediction capability It is most important.First, current safety analysis and failure predication are independently of each other assumed condition generally between component, subsystem, In existing research, due to not accounting between system component existing multiple coupling relation and being consequently formed with emerging in large numbers spy The complication system behavior of sign, so that it cannot accurate description coupling and function dependence, so as to be difficult to solve train operation Safety issue.Secondly, lack at this stage for the state modeling of train operation control system to a variety of probabilistic synthesis Consider, cause information modeling accuracy relatively low, and how maintenance management scheme feeds back the design in train operation control system Lack with schedule management and further investigate, add rate of breakdown or maintenance loss.
During subway O&M, due to the distinctive preciseness of metro industry, once equipment breaks down or alarm, relate to And department it is more, the personnel of participation are wide, report layer by layer, and flow is complicated, and maintenance personal's response is slow, consume substantial amounts of manpower and Management cost.
The content of the invention
Since existing method is there are the above problem, the embodiment of the present invention proposes a kind of preventative subway operational system and side Method.
In a first aspect, the embodiment of the present invention proposes a kind of preventative subway operational system, including:Signal system safeguards prison Examining system, maintenance work station and wechat enterprise platform;
The signal system safeguards that monitoring system is connected with described, is modernized for train traffic control and train operation;
It is described to safeguard that monitoring system is connected with the maintenance work station, for being carried out to the working condition of the signal system Monitoring, collects the status data of the signal system, and the status data is sent to the maintenance work station;
The maintenance work station is connected with the wechat enterprise platform, for handled according to the status data and therefore Barrier alarm, and fault alarm is sent to the wechat enterprise platform;
The wechat enterprise platform receives the fault alarm, to inform staff's timely processing failure.
Optionally, the maintenance work station is specifically used for:
If the maintenance work station judges to know that faulty alarm occurs, triggering, which is safeguarded, to be reminded, and the maintenance is carried It wakes up and is sent to work area director's terminal;
If not receiving the feedback information of the work area director terminal in the first preset time, described safeguard is reminded into hair It send to project management department's dispatcher's terminal;
If not receiving the feedback information of the project management department dispatcher terminal in the second preset time, the maintenance is carried It wakes up and is sent to chief dispatcher terminal;
Wherein, the work area director terminal, the project management department dispatcher terminal and the chief dispatcher terminal are all provided with State wechat enterprise platform.
Optionally, it is described safeguard monitoring system be specifically used for collecting automatic train monitor ATS in the signal system, Zone controller ZC, Vehicle Controller VOBC, interlocking, microcomputer monitoring subsystem, data storage cell DSU, data communication system DCS, power-supply system, roadside unit LEU, the status data of meter shaft and track switch gap monitoring subsystem.
Optionally, the maintenance work station is specifically used for carrying out workform management, history playback, fortune according to the status data Seek statistics, information inquiry, security feature analysis and failure predication, control system life prediction and system monitoring administrative analysis.
Optionally, the maintenance work station is specifically used for:
Operation data, mantenance data and fault data in the status data is cleaned, is arranged, is converted and dimensionality reduction Processing, obtains preprocessed data;
Network modelling, cluster analysis and feature extraction are carried out according to the preprocessed data, obtain after-treatment data;
The after-treatment data are analyzed and predicted according to failure mechanism and fault propagation, obtain fault alarm.
Second aspect, the embodiment of the present invention also propose a kind of preventative subway O&M method, including:
It is described to safeguard that monitoring system is monitored the working condition of the signal system, collect the shape of the signal system State data, and the status data is sent to the maintenance work station;
The maintenance work station is handled according to the status data and fault alarm, and fault alarm is sent to institute State wechat enterprise platform;
The wechat enterprise platform receives the fault alarm, to inform staff's timely processing failure.
Optionally, the maintenance work station is handled and fault alarm according to the status data, and by fault alarm The wechat enterprise platform is sent to, is specifically included:
If the maintenance work station judges to know that faulty alarm occurs, triggering, which is safeguarded, to be reminded, and the maintenance is carried It wakes up and is sent to work area director's terminal;
If not receiving the feedback information of the work area director terminal in the first preset time, described safeguard is reminded into hair It send to project management department's dispatcher's terminal;
If not receiving the feedback information of the project management department dispatcher terminal in the second preset time, the maintenance is carried It wakes up and is sent to chief dispatcher terminal;
Wherein, the work area director terminal, the project management department dispatcher terminal and the chief dispatcher terminal are all provided with State wechat enterprise platform.
Optionally, the status data for collecting the signal system specifically includes:
Collect automatic train monitor ATS in the signal system, zone controller ZC, Vehicle Controller VOBC, connection Lock, microcomputer monitoring subsystem, data storage cell DSU, data communication system DCS, power-supply system, roadside unit LEU, meter shaft and The status data of track switch gap monitoring subsystem.
Optionally, the maintenance work station is handled according to the status data, is specifically included:
The maintenance work station carries out workform management, history playback, operation statistics, information according to the status data and looks into It askes, security feature is analyzed and failure predication, control system life prediction and system monitoring administrative analysis.
Optionally, the maintenance work station is handled according to the status data, is specifically included:
The maintenance work station cleans operation data, mantenance data and the fault data in the status data, Arrangement, conversion and dimension-reduction treatment, obtain preprocessed data;
Network modelling, cluster analysis and feature extraction are carried out according to the preprocessed data, obtain after-treatment data;
The after-treatment data are analyzed and predicted according to failure mechanism and fault propagation, obtain fault alarm.
As shown from the above technical solution, the embodiment of the present invention is by safeguarding that monitoring system is monitored simultaneously collection status number According to being handled by maintenance work station status data and fault alarm, and pass through wechat enterprise platform and receive the failure Alarm, inform staff's timely processing failure, once equipment break down or alarm, can fast notification staff, Without reporting layer by layer, flow is simple, saves substantial amounts of manpower and O&M cost, while by preventative alarm, reduces ground The failure rate of iron equipment.
Description of the drawings
It in order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention, for those of ordinary skill in the art, without creative efforts, can be with Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of connection diagram for preventative subway operational system that one embodiment of the invention provides;
Fig. 2 is the flow diagram for the data processing for safeguarding monitoring system that one embodiment of the invention provides;
Fig. 3 is the flow diagram for the maintenance work station data processing that one embodiment of the invention provides;
Fig. 4 is the collection schematic diagram data for safeguarding monitoring system that one embodiment of the invention provides;
Fig. 5 is the functional schematic at the maintenance work station that one embodiment of the invention provides;
Fig. 6 is the maintenance work station data processing content schematic diagram that one embodiment of the invention provides;
Fig. 7 is the flow diagram for the maintenance work station data processing that another embodiment of the present invention provides;
Fig. 8 is a kind of flow diagram for preventative subway O&M method that one embodiment of the invention provides.
Specific embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is further described.Following embodiment is only used for more Technical scheme is clearly demonstrated, and is not intended to limit the protection scope of the present invention and limits the scope of the invention.
Fig. 1 shows a kind of connection diagram of preventative subway operational system provided in this embodiment, including:Signal system System 101 safeguards monitoring system 102, maintenance work station 103 and wechat enterprise platform 104;
The signal system 101 safeguards that monitoring system 102 is connected with described, modern for train traffic control and train operation Change;
It is described to safeguard that monitoring system 102 is connected with the maintenance work station 103, for the work to the signal system 101 It is monitored as state, collects the status data of the signal system 101, and the status data is sent to the maintenance workers It stands;
The maintenance work station 103 is connected with the wechat enterprise platform 104, at according to the status data Reason and fault alarm, and fault alarm is sent to the wechat enterprise platform;
The wechat enterprise platform 104 receives the fault alarm, to inform staff's timely processing failure.
Wherein, signal system 101 is to ensure train operating safety, realizes train traffic control and train operation modernization, improves Core component in the critical system equipment and operational system of conevying efficiency.
It is the equipment condition monitoring of entire signal system and the auxiliary tool safeguarded to safeguard monitoring system (MSS) 102.It safeguards Monitoring system match line signal system and rolling stock section/parking lot signal system (including interlock system equipment, supporting power equipment, Microcomputer monitoring equipment, outdoor signal equipment, track switch gap monitoring device etc.) working condition be monitored and alarm, such as Fig. 2 institutes Show.
Maintenance work station (BDMS) 103 important component as operational system realizes the equipment shape of operational system State processing and fault alarm provide fault alarm process flow closed loop and the analysis by science, what trouble saving occurred Subway maintenance work platform.
Wechat enterprise platform 104 is that Tencent formally issues full platform enterprise office tools.It possesses to user-friendly behaviour Make characteristic, operator can be made to obtain very comfortable mobile interchange experience when using operational system, optimize O&M efficiency.
The present embodiment is by safeguarding that monitoring system is monitored simultaneously collection status data, by maintenance work station to status number According to being handled and fault alarm, and pass through wechat enterprise platform and receive the fault alarm, inform staff's timely processing Failure, once equipment break down or alarm, can fast notification staff, without reporting layer by layer, flow is simple, save Substantial amounts of manpower and O&M cost, while by preventative alarm, reduce the failure rate of subway equipment.
Further, on the basis of above system embodiment, the maintenance work station 103 is specifically used for:
If the maintenance work station 103 judges to know that faulty alarm occurs, triggering, which is safeguarded, to be reminded, and by the maintenance Prompting is sent to work area director's terminal;
If not receiving the feedback information of the work area director terminal in the first preset time, described safeguard is reminded into hair It send to project management department's dispatcher's terminal;
If not receiving the feedback information of the project management department dispatcher terminal in the second preset time, the maintenance is carried It wakes up and is sent to chief dispatcher terminal;
Wherein, the work area director terminal, the project management department dispatcher terminal and the chief dispatcher terminal are all provided with State wechat enterprise platform.
Specifically, maintenance work station 103 carry out signal system device status data reception and statistics, on request it is automatic/ Manually generated signalling arrangement fault alarm, and maintenance process flow closed loop is provided.
For example, as shown in figure 3, the data analysis at maintenance work station 103 comprises the following steps:
A1, for different user roles, divided work area grade maintenance person, project ministerial level maintenance schedule person and centre grade Three levels of chief dispatcher;
A2, when it is faulty alarm occur when, triggering safeguard remind, the maintenance prompting be issued to work area director;
A3, work area director should be responded in 10 minutes (time can configure) and handling failure, such as fails timely processing, should Warning message will be distributed to its higher level project management department maintenance schedule person;
After A4, project management department dispatcher receive failure prompting message, (time can configure) it should be dialed directly in 5 minutes to work area Phone;
A5, untreated in such as 5 minutes, which then pushes to its higher level's centre grade chief dispatcher;
A6, task time-out can push to mobile phone and be shown.
The present embodiment realizes a set of subway operational system for possessing safety analysis and failure predication based on big data, Strong metro operation support is provided, efficient breakdown maintenance process flow closed loop is provided, the health for different components is provided Managed Solution optimizes subway O&M efficiency, saves O&M cost, reduces rate of breakdown.
Further, it is described to safeguard that monitoring system 102 is specifically used for described in collection on the basis of above system embodiment Automatic train monitor ATS, zone controller ZC, Vehicle Controller VOBC, interlocking, microcomputer monitoring subsystem in signal system System, data storage cell DSU, data communication system DCS, power-supply system, roadside unit LEU, meter shaft and track switch gap monitoring The status data of system.
Specifically, each subsystem status data in following table is gathered in real time:
The magnanimity status data of above-mentioned subsystems, strategic importance are that these can be carried out containing significant data Specialized process, analysis and excavation.Make the data basis for building preventative subway operational system.
The status data of subsystems in signal system is the key that entire preventative subway operational system, and accurate The data for collecting each subsystem in real time are the most important things.The data acquisition of each subsystem is as shown in Figure 4:ZC is safeguarded by ZC Equipment state and system running state are sent to and safeguard monitoring system by equipment;ATS by ATS maintained equipments by equipment state and System running state, which is sent to, safeguards monitoring system;DSU is sent equipment state and system running state by DSU maintained equipments To safeguarding monitoring system;Mobile unit is safeguarded that information is reported to safeguarding monitoring system by VOBC by network management system;Interlocking passes through Interlocking maintained equipment will interlock host and basis signal facility switching amount information is sent to and safeguards monitoring system;Microcomputer monitoring passes through Basis signal equipment simulating amount information is sent to and safeguards monitoring system by microcomputer monitoring terminal;Network management system acquisition DCS system Network state and fault message, network management system are sent to network equipment failure information safeguard monitoring system again;Power-supply system is supervised It surveys module and all power-supply system information is gathered by autonomous channel, and the fault message of power-supply device is sent to maintenance monitoring system System;Equipment state and system running state by meter shaft maintenance unit are sent to and safeguard monitoring system by axle counting system;LEU systems Equipment state and system running state are sent to by LEU maintained equipments and safeguard monitoring system.
Further, on the basis of above system embodiment, the maintenance work station 103 is specifically used for according to the shape State data carry out workform management, history playback, operation statistics, information inquiry, security feature analysis and failure predication, control system Life prediction and system monitoring administrative analysis.
Specifically, as shown in figure 5, theory and method of the present embodiment based on big data, can carry out workform management, history Playback, operation statistics, information inquiry, security feature analysis and failure predication, control system life prediction and system monitoring management Analysis proposes the efficient plan that cluster, feature extraction and the uncertain data of multi-source, isomery and different reliability datas calculate Summary and method;Graph theory and community network model in application system science build the simulation model of train operating safety specificity analysis, Design corresponding core derivation algorithm;By higher-dimension, flood tide operation/maintenance data, rail transit train operational safety characteristic point is carried out Analysis, portrays correlation and nonlinear characteristic that data contain;Result of study current in machine learning is used for reference and improved, improves god Through network depth learning algorithm, propose to be suitble to higher-dimension, the Introduction of Train Operation Control System failure of flood tide operation/maintenance data pre- Survey model.
Further, on the basis of above system embodiment, the maintenance work station 103 is specifically used for:
Operation data, mantenance data and fault data in the status data is cleaned, is arranged, is converted and dimensionality reduction Processing, obtains preprocessed data;
Network modelling, cluster analysis and feature extraction are carried out according to the preprocessed data, obtain after-treatment data;
The after-treatment data are analyzed and predicted according to failure mechanism and fault propagation, obtain fault alarm.
Specifically, as shown in fig. 6, the present embodiment establishes the degradation model of train operation control system, and according to reliability Concept is substituted into model, considers the combined influence of loss and productivity effect.By during health control it is uncertain because Health management scheme is continued to optimize in the analysis of element, improves reliability.The health management scheme that will be obtained, feeds back in city rail In the train operation control system of traffic, more complete train operation control system health management scheme is ultimately formed.
The flow diagram of preventative subway O&M method provided in this embodiment is as shown in fig. 7, what the present embodiment was established Preventative subway operational system based on big data, it is rigorous efficiently to support subway O&M flow, reduce subway repair stream The expense of manpower in journey, time and management cost.By that be analyzed from the angle of big data, big system comprehensively, can have Effectively prevent the generation of a part of failure, reduce subway equipment failure rate.
Fig. 8 shows a kind of flow diagram of preventative subway O&M method provided in this embodiment, including:
S801, it is described safeguard that monitoring system is monitored the working condition of the signal system, collect the signal system The status data of system, and the status data is sent to the maintenance work station;
S802, the maintenance work station is handled according to the status data and fault alarm, and fault alarm is sent out It send to the wechat enterprise platform;
S803, the wechat enterprise platform receive the fault alarm, to inform staff's timely processing failure.
The present embodiment is by safeguarding that monitoring system is monitored simultaneously collection status data, by maintenance work station to status number According to being handled and fault alarm, and pass through wechat enterprise platform and receive the fault alarm, inform staff's timely processing Failure, once equipment break down or alarm, can fast notification staff, without reporting layer by layer, flow is simple, save Substantial amounts of manpower and O&M cost, while by preventative alarm, reduce the failure rate of subway equipment.
Further, on the basis of above method embodiment, S802 is specifically included:
If the maintenance work station judges to know that faulty alarm occurs, triggering, which is safeguarded, to be reminded, and the maintenance is carried It wakes up and is sent to work area director's terminal;
If not receiving the feedback information of the work area director terminal in the first preset time, described safeguard is reminded into hair It send to project management department's dispatcher's terminal;
If not receiving the feedback information of the project management department dispatcher terminal in the second preset time, the maintenance is carried It wakes up and is sent to chief dispatcher terminal;
Wherein, the work area director terminal, the project management department dispatcher terminal and the chief dispatcher terminal are all provided with State wechat enterprise platform.
Further, on the basis of above method embodiment, the status data of the collection signal system is specific Including:
Collect automatic train monitor ATS in the signal system, zone controller ZC, Vehicle Controller VOBC, connection Lock, microcomputer monitoring subsystem, data storage cell DSU, data communication system DCS, power-supply system, roadside unit LEU, meter shaft and The status data of track switch gap monitoring subsystem.
Further, on the basis of above method embodiment, S802 is specifically included:
The maintenance work station carries out workform management, history playback, operation statistics, information according to the status data and looks into It askes, security feature is analyzed and failure predication, control system life prediction and system monitoring administrative analysis.
Further, on the basis of above method embodiment, S802 is specifically included:
The maintenance work station cleans operation data, mantenance data and the fault data in the status data, Arrangement, conversion and dimension-reduction treatment, obtain preprocessed data;
Network modelling, cluster analysis and feature extraction are carried out according to the preprocessed data, obtain after-treatment data;
The after-treatment data are analyzed and predicted according to failure mechanism and fault propagation, obtain fault alarm.
Preventative subway O&M method described in the present embodiment can be used for performing above system embodiment, principle and skill Art effect is similar, and details are not described herein again.
The apparatus embodiments described above are merely exemplary, wherein the unit illustrated as separating component can To be or may not be physically separate, the component shown as unit may or may not be physics list Member, you can be located at a place or can also be distributed in multiple network element.It can be selected according to the actual needs In some or all of module realize the purpose of this embodiment scheme.Those of ordinary skill in the art are not paying creativeness Work in the case of, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It is realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on such understanding, on Technical solution is stated substantially in other words to embody the part that the prior art contributes in the form of software product, it should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including several fingers Order, which is used, so that computer equipment (can be personal computer, server or the network equipment etc.) performs each implementation Method described in some parts of example or embodiment.
It should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although reference The present invention is described in detail in previous embodiment, it will be understood by those of ordinary skill in the art that:It still can be right Technical solution recorded in foregoing embodiments modifies or carries out equivalent substitution to which part technical characteristic;And this A little modifications are replaced, and the essence of appropriate technical solution is not made to depart from the spirit and model of various embodiments of the present invention technical solution It encloses.

Claims (10)

1. a kind of preventative subway operational system, which is characterized in that including:Signal system safeguards monitoring system, maintenance work station With wechat enterprise platform;
The signal system safeguards that monitoring system is connected with described, is modernized for train traffic control and train operation;
It is described to safeguard that monitoring system is connected with the maintenance work station, it is supervised for the working condition to the signal system It surveys, collects the status data of the signal system, and the status data is sent to the maintenance work station;
The maintenance work station is connected with the wechat enterprise platform, for carrying out processing and failure report according to the status data It is alert, and fault alarm is sent to the wechat enterprise platform;
The wechat enterprise platform receives the fault alarm, to inform staff's timely processing failure.
2. preventative subway operational system according to claim 1, which is characterized in that specifically use at the maintenance work station In:
If the maintenance work station judges to know that faulty alarm occurs, triggering, which is safeguarded, to be reminded, and described safeguard is reminded hair It send to work area director's terminal;
If not receiving the feedback information of the work area director terminal in the first preset time, safeguard that prompting is sent to by described Project management department's dispatcher's terminal;
If not receiving the feedback information of the project management department dispatcher terminal in the second preset time, described safeguard is reminded into hair It send to chief dispatcher terminal;
Wherein, the work area director terminal, the project management department dispatcher terminal and the chief dispatcher terminal are equipped with the enterprise Industry wechat platform.
3. preventative subway operational system according to claim 1, which is characterized in that described to safeguard that monitoring system is specifically used Automatic train monitor ATS, zone controller ZC, Vehicle Controller VOBC, interlocking, microcomputer in the collection signal system Monitoring subsystem, data storage cell DSU, data communication system DCS, power-supply system, roadside unit LEU, meter shaft and track switch lack The status data of mouth monitoring subsystem.
4. preventative subway operational system according to claim 1, which is characterized in that the maintenance work station is specifically used for It is pre- that workform management, history playback, operation statistics, information inquiry, security feature analysis and failure are carried out according to the status data Survey, control system life prediction and system monitoring administrative analysis.
5. preventative subway operational system according to claim 1, which is characterized in that specifically use at the maintenance work station In:
Operation data, mantenance data and fault data in the status data is cleaned, is arranged, is converted and dimensionality reduction at Reason, obtains preprocessed data;
Network modelling, cluster analysis and feature extraction are carried out according to the preprocessed data, obtain after-treatment data;
The after-treatment data are analyzed and predicted according to failure mechanism and fault propagation, obtain fault alarm.
A kind of 6. method that O&M is carried out based on any preventative subway operational systems of claim 1-5, which is characterized in that Including:
It is described to safeguard that monitoring system is monitored the working condition of the signal system, collect the status number of the signal system According to, and the status data is sent to the maintenance work station;
The maintenance work station is handled according to the status data and fault alarm, and fault alarm is sent to the enterprise Industry wechat platform;
The wechat enterprise platform receives the fault alarm, to inform staff's timely processing failure.
7. according to the method described in claim 6, it is characterized in that, the maintenance work station according to the status data at Reason and fault alarm, and fault alarm is sent to the wechat enterprise platform, it specifically includes:
If the maintenance work station judges to know that faulty alarm occurs, triggering, which is safeguarded, to be reminded, and described safeguard is reminded hair It send to work area director's terminal;
If not receiving the feedback information of the work area director terminal in the first preset time, safeguard that prompting is sent to by described Project management department's dispatcher's terminal;
If not receiving the feedback information of the project management department dispatcher terminal in the second preset time, described safeguard is reminded into hair It send to chief dispatcher terminal;
Wherein, the work area director terminal, the project management department dispatcher terminal and the chief dispatcher terminal are equipped with the enterprise Industry wechat platform.
8. according to the method described in claim 6, it is characterized in that, the status data for collecting the signal system specifically wraps It includes:
Collect automatic train monitor ATS in the signal system, zone controller ZC, Vehicle Controller VOBC, interlocking, micro- Machine monitoring subsystem, data storage cell DSU, data communication system DCS, power-supply system, roadside unit LEU, meter shaft and track switch The status data of Gap monitoring subsystem.
9. according to the method described in claim 6, it is characterized in that, the maintenance work station according to the status data at Reason, specifically includes:
The maintenance work station carries out workform management, history playback, operation statistics, information inquiry, peace according to the status data Omnicharacteristic is analyzed and failure predication, control system life prediction and system monitoring administrative analysis.
10. according to the method described in claim 6, it is characterized in that, the maintenance work station is carried out according to the status data Processing, specifically includes:
The maintenance work station cleans operation data, mantenance data and the fault data in the status data, arranges, Conversion and dimension-reduction treatment, obtain preprocessed data;
Network modelling, cluster analysis and feature extraction are carried out according to the preprocessed data, obtain after-treatment data;
The after-treatment data are analyzed and predicted according to failure mechanism and fault propagation, obtain fault alarm.
CN201711321330.0A 2017-12-12 2017-12-12 A kind of preventative subway operational system and method Pending CN108090573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711321330.0A CN108090573A (en) 2017-12-12 2017-12-12 A kind of preventative subway operational system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711321330.0A CN108090573A (en) 2017-12-12 2017-12-12 A kind of preventative subway operational system and method

Publications (1)

Publication Number Publication Date
CN108090573A true CN108090573A (en) 2018-05-29

Family

ID=62174032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711321330.0A Pending CN108090573A (en) 2017-12-12 2017-12-12 A kind of preventative subway operational system and method

Country Status (1)

Country Link
CN (1) CN108090573A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109492784A (en) * 2018-12-08 2019-03-19 深圳科安达电子科技股份有限公司 The health state evaluation system of acclerating road switch
CN109508793A (en) * 2018-11-05 2019-03-22 青岛宏大纺织机械有限责任公司 A kind of textile machine equipment operational system
CN110188897A (en) * 2019-06-14 2019-08-30 安徽辉瑞轨道智能设备有限公司 A kind of urban track traffic intelligence operation management system
CN110516926A (en) * 2019-08-08 2019-11-29 浙江大学城市学院 A kind of data processing cloud platform system based on subway protection automatic monitoring
CN110728768A (en) * 2019-09-27 2020-01-24 交控科技股份有限公司 Switch operation and maintenance method and system
CN114596696A (en) * 2022-03-21 2022-06-07 广东电网有限责任公司 Abnormity early warning notification method and device, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103264717A (en) * 2013-05-21 2013-08-28 北京泰乐德信息技术有限公司 Rail transit comprehensive monitoring scheduling coordinating and operation and maintenance information-based system
CN103744383A (en) * 2013-12-26 2014-04-23 北京交控科技有限公司 An early warning method and an early warning system of subway signal faults
CN104890702A (en) * 2015-05-27 2015-09-09 中国铁路总公司 Vehicle-ground railway signal comprehensive analyzing and monitoring system
CN106411648A (en) * 2016-10-13 2017-02-15 交控科技股份有限公司 Data monitoring method and data monitoring server of urban rail transit signal system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103264717A (en) * 2013-05-21 2013-08-28 北京泰乐德信息技术有限公司 Rail transit comprehensive monitoring scheduling coordinating and operation and maintenance information-based system
CN103744383A (en) * 2013-12-26 2014-04-23 北京交控科技有限公司 An early warning method and an early warning system of subway signal faults
CN104890702A (en) * 2015-05-27 2015-09-09 中国铁路总公司 Vehicle-ground railway signal comprehensive analyzing and monitoring system
CN106411648A (en) * 2016-10-13 2017-02-15 交控科技股份有限公司 Data monitoring method and data monitoring server of urban rail transit signal system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109508793A (en) * 2018-11-05 2019-03-22 青岛宏大纺织机械有限责任公司 A kind of textile machine equipment operational system
CN109492784A (en) * 2018-12-08 2019-03-19 深圳科安达电子科技股份有限公司 The health state evaluation system of acclerating road switch
CN110188897A (en) * 2019-06-14 2019-08-30 安徽辉瑞轨道智能设备有限公司 A kind of urban track traffic intelligence operation management system
CN110516926A (en) * 2019-08-08 2019-11-29 浙江大学城市学院 A kind of data processing cloud platform system based on subway protection automatic monitoring
CN110728768A (en) * 2019-09-27 2020-01-24 交控科技股份有限公司 Switch operation and maintenance method and system
CN114596696A (en) * 2022-03-21 2022-06-07 广东电网有限责任公司 Abnormity early warning notification method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108090573A (en) A kind of preventative subway operational system and method
CN100588580C (en) Track traffic synthetic monitoring system and method
CN105564465B (en) A kind of railway electric signal plant maintenance operation control system and method
CN107219837A (en) One kind is used for subway shield door failure monitoring and early warning intelligence system
CN108591104A (en) A kind of Research on Fan Fault Forecasting based on cloud platform and health management system arranged, method
CN103065228B (en) Have a power failure monitoring assessment method for early warning and equipment
CN104555627A (en) Elevator Internet-of-Things operation control management system and operation control method thereof
CN103763127B (en) A kind of equipment state alarm monitoring method and system
CN106384303A (en) Distribution room operation and maintenance management system and method
CN103490919A (en) Fault management system and fault management method
CN112288541A (en) Battery lease management platform
CN104464271A (en) Intelligent traffic operation and maintenance management system
CN102163878B (en) Method for classifying and realizing integral alarm facing to dispatching running way
CN112477927A (en) Rail transit station control information system based on mobile terminal
CN106383286A (en) Electric power line fault alarm device
CN107545519A (en) A kind of power grid enterprises' fortune inspection management-control method
CN117294000A (en) Intelligent power failure early warning system for power grid
CN107480855A (en) Managing and control system is rushed to repair in distribution
CN112488436A (en) Trade power station operation system
CN105025511A (en) Energy consumption real time monitoring method of mobile communication base station
CN110739770A (en) relay protection tube control system based on information fusion
TWI380226B (en) System and method of prognostic analysis and resource planning for apparatu
CN202218244U (en) Information technology (IT) operation and maintenance system for business system monitoring
CN202009391U (en) Device for real-timely monitoring and prewarning operation of information system
CN204569041U (en) Elevator Internet of Things operation Control management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529