The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that provide a kind of unsymmetrial loading tunnel
Construction method, method and step is simple, realizes that convenient and using effect is good, is judged according to tunnel sidewalls unstability clamped to tunnel anchorage
Supporting construction is designed used by watch box system, can effectively control unsymmetrial loading tunnel side wall failure and deformation of surrounding rocks, and tunnel encircles
Portion's support system is in stable state lower roof plate inbreak kiln crown according to tunnel sidewalls and determines, can meet tunnel and consolidate supporting need
It asks, and construction cost is low.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of unsymmetrial loading tunnel construction method, feature
It is:Along tunnel Longitudinal extending direction multiple segments is divided to construct unsymmetrial loading tunnel from the front to the back, multiple segments are applied
Work method all same;The unsymmetrial loading tunnel be soft rock tunnel and its be shallow tunnel, the one side buried depth of the unsymmetrial loading tunnel is H1
And its opposite side buried depth is H2, wherein H1 is the vertical height on one side tunnel sidewalls top to the ground of unsymmetrial loading tunnel, and H2 is inclined
The vertical height on opposite side tunnel sidewalls top to the ground in tunnel is pressed, H1 < H2, H2 < 2B, wherein B are opening for unsymmetrial loading tunnel
Width is dug, the unit of H1, H2 and B are m;When constructing for any segment, comprise the following steps:
Step 1: country rock basic mechanical parameter determines:Laboratory test is carried out by boring sample to scene, to currently being applied
The country rock basic mechanical parameter of work segment is tested, and record is synchronized to test result;
Step 2: tunnel arch supporting scheme is determined with tunnel sidewalls supporting scheme:Used tunnel arch supporting side
Case is to be laid in the multiple tunnel arch support system for excavating molding Tunnel arch from front to back along tunnel extending direction, more
The structure all same of a tunnel arch support system, each tunnel arch support system are laid in same tunnel and break
On face;Each tunnel arch support system includes the more arch anchor poles for being laid in the Tunnel arch from left to right,
The more arch anchor poles are laid on same tunnel cross section;
Tunnel sidewalls supporting scheme used by the left and right tunnel sidewalls of current segment of constructing is determined respectively, two institutes
Stating tunnel sidewalls uses the definite method of tunnel sidewalls supporting scheme identical;
When tunnel sidewalls supporting scheme is determined used by tunnel sidewalls any one described, it is to the tunnel sidewalls
It is no the supporting construction of tunnel sidewalls support system and used tunnel sidewalls support system to be used to be determined respectively;It is described
Tunnel sidewalls support system is the first tunnel sidewalls support system or the second tunnel sidewalls support system;
The first tunnel sidewalls support system includes multiple the first side walls laid from the front to the back along tunnel extending direction
Supporting unit, the structure all same of multiple first side wall supporting units, each first side wall supporting unit are laid
In on same tunnel cross-section;
The second tunnel sidewalls support system includes multiple the second side walls laid from the front to the back along tunnel extending direction
Supporting unit, the structure all same of multiple second side wall supporting units, each second side wall supporting unit are laid
In on same tunnel cross-section;
The quantity of the first side wall supporting unit and the second side wall supporting unit with tunnel arch supporting
The quantity of system is identical, and the tunnel cross section that each tunnel arch support system is laid is first side wall
The tunnel cross section that supporting unit and/or the second side wall supporting unit are laid;
Each first side wall supporting unit is that the split side wall drawing crack sliding dug on molding Tunnel side wall is collapsed
Area of collapsing carries out the asymmetric supporting construction of supporting, the top of side wall drawing crack sliding caving zone and the side wall of the Tunnel
Top flush, the cross section of side wall drawing crack sliding caving zone for right-angled trapezium and it include top drawing crack area and positioned at institute
The lower part slip region immediately below the drawing crack area of top is stated, the cross section in the top drawing crack area is rectangle, the lower part slip region
Cross section is of same size for right angled triangle and its upper part width and the top drawing crack area;Each first side wall supporting
Unit includes side wall deep support structure and the side wall shallow-layer supporting construction immediately below the side wall deep support structure;
The side wall deep support structure includes a side wall anchor cable that supporting is carried out in horizontal layout and to the top drawing crack area, institute
State side wall shallow-layer supporting construction include more from top to bottom to the lower part slip region carry out supporting the first side wall anchor poles, more
The first side wall anchor pole in it is parallel laying and its tilt gradually downward from the inside to the outside;
Each second side wall supporting unit is that the side wall monocline face caving zone on the Tunnel side wall is carried out
The supporting construction of supporting, the top of the side wall monocline face caving zone and the side wall top flush of the Tunnel, the side
The cross section of wall monocline face caving zone is triangle;Each second side wall supporting unit includes more from top to bottom to institute
The second side joist anchor bar that lower part slip region carries out supporting is stated, the more the second side joist anchor bars are in horizontal layout;
When tunnel sidewalls supporting scheme is determined used by tunnel sidewalls any one described, process is as follows:
Step 201, tunnel sidewalls unstability judge:With reference to identified country rock basic mechanical parameter in step 1, and according to
FormulaIt is calculated critical when currently judging tunnel sidewalls unstability
Height hcr;The critical altitude h that will be calculated againcrWith the side wall design height h of the Tunnel3It is compared:Work as h3≤hcr
When, judgement, which is drawn, currently judges that tunnel sidewalls are in stable state, and judges to draw and currently judge that tunnel sidewalls need not be adopted
With tunnel sidewalls support system, complete currently to judge the tunnel sidewalls supporting scheme determination process of tunnel sidewalls;Work as hcr< h3
≤h0maxWhen, judgement, which is drawn, currently judges that tunnel sidewalls are in drawing crack-sliding failure by shear state, while judges to draw and work as
The tunnel sidewalls support system that preceding judged tunnel sidewalls use enters step 202 for the first tunnel sidewalls support system;When
h3> h0maxWhen, judgement, which is drawn, currently judges that tunnel sidewalls are in monocline face failure by shear state, while judges to draw current institute
Tunnel sidewalls support system that tunnel sidewalls use is judged for the second tunnel sidewalls support system, and enters step 203;
Wherein, h0maxThe limit level being in by current judgement tunnel sidewalls under drawing crack-sliding failure by shear state
And By the internal friction angle of current judgement tunnel sidewalls Rock Mass, c is currently is judged
The cohesive strength of tunnel sidewalls Rock Mass, γ by current judgement tunnel sidewalls Rock Mass volume-weighted average;The unit of c is
The unit of Pa, γ are N/m3, h3、h0maxAnd hcrUnit be m;H in unsymmetrial loading tunnel by currently judging tunnel sidewalls one side
Buried depth and H=H1 or H2;
Step 202, tunnel sidewalls are in tunnel sidewalls supporting scheme under drawing crack-sliding failure by shear state and determine, mistake
Journey is as follows:
Step 2021, the slide surface inclination angle of side wall drawing crack sliding caving zone, inside height, outside height and the width that caves in are true
It is fixed:With reference to identified country rock basic mechanical parameter in step 1, and according to formulaCurrent institute is calculated
The slide surface inclination alpha of the side wall drawing crack sliding caving zone of construction segment;In formula, ψ encloses by the tunnel sidewalls of current construction segment
The dilative angle of rock rock mass;The slide surface inclination alpha of the side wall drawing crack sliding caving zone is slid for side wall drawing crack described in caving zone
Angle between the slide surface and horizontal plane of lower part slip region;
Further according to formula WithThe side wall of current segment of constructing is calculated respectively
Drawing crack slides the inside height h of caving zone0, outside height z and cave in width b, h0, z and b unit be m, 90 ° of α <;Its
In, q by the overlying rock of current institute construction segment act on currently judgement tunnel sidewalls tunnel sidewalls country rock on be evenly distributed with
Pressure and q=γ0(h1+h2), γ0By the volume-weighted average of the overlying rock of current construction segment, γ0Unit be N/m3;h1
Inbreak kiln crown when being in drawing crack-sliding failure by shear by current judgement tunnel sidewalls and
h4For the design excavation height of the Tunnel, h2+h3=h4, h2For the arch design height of the Tunnel, h1、h2And h4's
Unit is m;F by current construction segment overlying rock solid coefficient;
The height in the top drawing crack area is z and its width is b, and the height of the lower part slip region is h0-z;
Step 2022, supporting construction determine:According to the slide surface of the side wall drawing crack sliding caving zone determined in step 2021
Inclination alpha, inside height h0, outside height z and the width b that caves in, to side wall deep layer branch described in the first side wall supporting unit
Supporting construction is determined respectively used by protection structure and the side wall shallow-layer supporting construction;
Step 203, tunnel sidewalls are in tunnel sidewalls supporting scheme under the failure by shear state of monocline face and determine that process is such as
Under:
Step 2031, the width that caves in of side wall monocline face caving zone determine:According to formulaIt is calculated current
The width b1 that caves in of the side wall monocline face caving zone of constructed segment;
The side wall monocline face caving zone upper width is b1;
Step 2032, supporting construction determine:According to the width b1 that caves in determined in step 2031, to the second side wall branch
Supporting construction is determined used by shield unit;
When supporting construction carries out defect used by tunnel arch support system, process is as follows:
Step 2041, tunnel sidewalls are in stable state lower roof plate inbreak kiln crown and determine:With reference to being determined in step 1
Country rock basic mechanical parameter, and according to formulaIt is calculated when tunnel sidewalls are in stable state and forms nature
The rise h of caving arch5;
Step 2042, supporting construction determine:The rise h encircleed according to the natural caving determined in step 20415, to the tunnel
Supporting construction is determined used by the support system of road arch;
Step 3: Tunnel structure determination:According to identified tunnel arch supporting scheme and tunnel in step 2
Road side wall supporting scheme is determined used Tunnel structure;
The Tunnel structure is the split Bolt net and jet initial stage branch dug molding Tunnel and carry out tunneling boring supporting
Protection structure, the Bolt net and jet preliminary bracing structure are the preliminary bracing structure using bolt-mesh-spurting supporting method construction molding;It is described
Bolt net and jet preliminary bracing structure includes multiple tunnels being laid in from the front to the back along tunnel extending direction in the Tunnel and anchors
Support system, multiple tunnel anchorages consolidate the structure all same of support system;Each tunnel arch prop in step 2
The tunnel sidewalls support system that system is laid on same tunnel cross section with it forms a tunnel anchoring support
System;
Step 4: tunnel excavation and Tunnel construction:Current segment of constructing is excavated from the front to the back, is opened
During digging the molding tunnel is dug according to the identified Tunnel structure in step 3 is split from the front to the back
Hole carries out preliminary bracing, and obtains the Tunnel structure of construction molding;
Step 5: Tunnel Second Lining Construction:It is split from the front to the back in step 4 to dig the molding Tunnel progress just
In phase Bracing Process, on the inside of the Tunnel structure of construction molding, from the front to the back to current segment of constructing
Tunnel Second Lining is constructed;
Step 6: next segmental construction:Step 1 is repeated to step 5, is constructed to next segment;
Step 7: step 6 is repeated several times, until completing whole work progress of unsymmetrial loading tunnel.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:Country rock basic mechanical parameter is carried out in step 1 and determines it
Before, a segment is first chosen from current constructed segment and is excavated as test section;Country rock fundamental force is carried out in step 1
When parameter determines, bore sample from the test section and carry out laboratory test, and the result of the test obtained is current institute after excavation
The country rock basic mechanical parameter of construction segment.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:The longitudinal length of multiple segments is 10m~50m;
Spacing in step 2 between the front and rear two neighboring first side wall supporting unit with it is front and rear two neighboring described
Spacing between second side wall supporting unit is identical, and the spacing between the front and rear two neighboring first side wall supporting unit is
0.8m~1.2m.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:To the side wall deep support structure institute in step 2022
When the supporting construction of use is determined, according in step 2021 determine outside height z offside joist anchor ropes installation position into
Row determines and side wall anchor cable is made to be located in the top drawing crack area, is determined according to the length for the width b offside joist anchor ropes that cave in
And the front end of side wall anchor cable is made to extend out on the outside of the top drawing crack area;
When supporting construction is determined used by the side wall shallow-layer supporting construction, according to slide surface inclination alpha to
The angle of inclination of one side joist anchor bar is determined, according to inside height h0With outside height z and cave in width b to the first side wall anchor
The installation position of bar is determined and the more first side wall anchor poles is made from top to bottom to be laid on the lower part slip region, root
The length of the first side wall anchor pole is determined according to the width b that caves in and the front end of the every first side wall anchor pole is made to extend out to
On the outside of the lower part slip region.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:It is carried out according to the length for the width b offside joist anchor ropes that cave in true
Periodically, the length L of the side wall anchor cable1=l1+L1+l2, wherein l1=0.1m~15cm, l2=0.3m~0.4m, L1 >=1.5b;
When being determined according to the width b that caves in the length of the first side wall anchor pole, the length L of the first side wall anchor pole2
=l1+L2+l2, wherein L2 >=b and L2 < L1.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:L1=3b~the 6b, the L2=1.5b~
3b。
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:According to inclination of the slide surface inclination alpha to the first side wall anchor pole
When angle is determined, the inclination angle alpha 1=180 of the first side wall anchor pole°-α-α0, α0For the first side wall anchor pole and side wall drawing crack
Slide angle and 65 °≤α between the slide surface of lower part slip region described in caving zone0≤ 75 °, α 1 for the first side wall anchor pole with
Angle between horizontal plane.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:It is wrapped in the supporting construction of side wall shallow-layer described in step 2
The quantity of the first side wall anchor pole is included as three, three first side wall anchor poles are in uniformly distributed;
Side wall anchor cable described in step 2 is located at the middle part in the top drawing crack area, the side wall anchor cable and the Tunnel
Side wall at the top of between spacing be
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:To the second side wall supporting unit institute in step 2032
When the supporting construction of use is determined, according to determined in step 2031 cave in width b1 to the length of the second side joist anchor bar into
Row determines;The length all same of the more the second side joist anchor bars, the length of the second side joist anchor bar are not less than L3, wherein L3
=l1+b1+l2, l1=0.1m~15cm, l2=0.3m~0.4m;
In step 2042 to tunnel arch support system used by supporting construction when being determined, according to step
The rise h of the natural caving arch determined in 20415, the length of arch anchor pole is determined;The length of the more arch anchor poles
All same is spent, the length of the arch anchor pole is not less than L4, wherein L4=l1+h5+l2, l1=0.1m~15cm, l2=0.3m~
0.4m;.
A kind of above-mentioned unsymmetrial loading tunnel construction method, it is characterized in that:The length of the second side joist anchor bar is L3, the arch
The length of anchor pole is L4。
The present invention has the following advantages compared with prior art:
1st, construction method step is simple, realizes that convenient and input cost is low.
2nd, design rationally and realize it is convenient, by rationally designing tunnel sidewalls support system used by supporting construction, it is right
Tunnel sidewalls are effectively reinforced, and can effectively solve the problems, such as the failure by shear of tunnel sidewalls.
3rd, for the tunnel sidewalls surrouding rock deformation situation of unsymmetrial loading tunnel, the supporting construction of both sides tunnel sidewalls is carried out respectively
Design, first judges tunnel sidewalls unstability, and according to tunnel sidewalls unstability judging result, chooses corresponding tunnel sidewalls
Supporting scheme;Also, when determining tunnel sidewalls supporting scheme, consider that tunnel sidewalls monocline face shearing slip and tunnel sidewalls are drawn
- sliding shearing slip is split, thus can effectively ensure the validity and stability of tunnel sidewalls supporting.That is, according to tunnel
Road side wall unstability judging result, used tunnel sidewalls supporting scheme is otherwise varied, stable, reliable and safe meeting supporting
On the premise of, achieve the purpose that cost-effective.
Wherein, when tunnel sidewalls are under stable state, without carrying out supporting to tunnel sidewalls;When tunnel portion of side is in not
During under stable state and in tunnel sidewalls drawing crack-sliding failure by shear state, to the unstable state residing for tunnel sidewalls
It is analyzed, judges that tunnel sidewalls are in drawing crack-sliding failure by shear state or monocline face failure by shear state carries out
Judge, and tunnel sidewalls supporting construction is determined according to judging result.
Wherein, when tunnel sidewalls are in drawing crack-sliding failure by shear state, tunnel sidewalls supporting construction uses tunnel
Side wall asymmetric supporting construction, each side wall supporting unit is using non-right up and down in tunnel sidewalls asymmetric supporting construction
Title formula supporting construction when determining supporting scheme, considers drawing crack-sliding shearing slip of tunnel sidewalls, and is caved according to side wall
The slide surface inclination alpha in area, inside height h0, outside height z and the width b that caves in be determined, can be cut to being in drawing crack-sliding
The tunnel sidewalls for cutting sliding mode are effectively reinforced, thus can effectively ensure the validity and stability of tunnel sidewalls supporting,
So meeting, supporting is stable, on the premise of reliable and safety, achievees the purpose that cost-effective, and there is economic, input to be constructed into
The advantages that this is relatively low, safe and reliable, thus can be that soft rock tunnel safe construction provides a strong guarantee, it is asymmetric using tunnel sidewalls
Formula supporting construction carries out effective support to tunnel sidewalls, and can effectively control tunnel sidewalls failure and deformation of surrounding rocks, to tunnel sidewalls
Effectively reinforced.
When tunnel sidewalls are in monocline face failure by shear state, monocline face failure by shear state is according to tunnel sidewalls
The width that caves in of lower roof plate inbreak kiln crown and side wall monocline face caving zone, to tunnel sidewalls used by supporting construction carry out it is true
Fixed, so meeting, supporting is stable, on the premise of reliable and safety, achievees the purpose that cost-effective.
4th, since unsymmetrial loading tunnel is shallow tunnel, along with using identified tunnel sidewalls supporting scheme energy in step 2
Effectively ensure that tunnel sidewalls are in stable state, thus the rise h that tunnel arch support system encircles according to natural caving5It carries out true
Surely supporting demand can be met, and construction cost is relatively low.
5th, using effect is good, effectively tunnel wall rock deformation can be controlled to destroy, and unsymmetrial loading tunnel effectively can be reinforced, and
Construction cost is low, and input manpower and materials significantly reduce.
In conclusion the method for the present invention step is simple, realizes that convenient and using effect is good, judged according to tunnel sidewalls unstability
Supporting construction is designed used by consolidating support system to tunnel anchorage, and unsymmetrial loading tunnel side wall surrouding rock deformation can effectively be controlled to break
It is bad, and tunnel arch support system is in stable state lower roof plate inbreak kiln crown according to tunnel sidewalls and determines, can meet tunnel
Road consolidates supporting demand, and construction cost is low.
Below by drawings and examples, technical scheme is described in further detail.
Specific embodiment
A kind of unsymmetrial loading tunnel construction method as shown in Figure 1, it is characterised in that:Along tunnel Longitudinal extending direction from the front to the back
Multiple segments is divided to construct unsymmetrial loading tunnel 1, the construction method all same of multiple segments;The unsymmetrial loading tunnel 1 is soft
Rock tunnel and its be shallow tunnel, the one side buried depth of the unsymmetrial loading tunnel 1 is H1 and its opposite side buried depth is H2, and wherein H1 is inclined
Press tunnel 1 one side tunnel sidewalls top to ground vertical height, H2 be unsymmetrial loading tunnel 1 opposite side tunnel sidewalls top extremely
The vertical height on ground, H1 < H2, H2 < 2B, wherein B are the excavation width of unsymmetrial loading tunnel 1, and the unit of H1, H2 and B are m;
When constructing for any segment, comprise the following steps:
Step 1: country rock basic mechanical parameter determines:Laboratory test is carried out by boring sample to scene, to currently being applied
The country rock basic mechanical parameter of work segment is tested, and record is synchronized to test result;
Step 2: tunnel arch supporting scheme is determined with tunnel sidewalls supporting scheme:Used tunnel arch supporting side
Case is to be laid in the multiple tunnel arch support system for excavating molding Tunnel arch from front to back along tunnel extending direction, more
The structure all same of a tunnel arch support system, each tunnel arch support system are laid in same tunnel and break
On face;Each tunnel arch support system includes the more arch anchor poles 7 for being laid in the Tunnel arch from left to right,
The more arch anchor poles 7 are laid on same tunnel cross section;
Tunnel sidewalls supporting scheme used by the left and right tunnel sidewalls of current segment of constructing is determined respectively, two institutes
Stating tunnel sidewalls uses the definite method of tunnel sidewalls supporting scheme identical;
When tunnel sidewalls supporting scheme is determined used by tunnel sidewalls any one described, it is to the tunnel sidewalls
It is no the supporting construction of tunnel sidewalls support system and used tunnel sidewalls support system to be used to be determined respectively;It is described
Tunnel sidewalls support system is the first tunnel sidewalls support system or the second tunnel sidewalls support system;
The first tunnel sidewalls support system includes multiple the first side walls laid from the front to the back along tunnel extending direction
Supporting unit, the structure all same of multiple first side wall supporting units, each first side wall supporting unit are laid
In on same tunnel cross-section;
The second tunnel sidewalls support system includes multiple the second side walls laid from the front to the back along tunnel extending direction
Supporting unit, the structure all same of multiple second side wall supporting units, each second side wall supporting unit are laid
In on same tunnel cross-section;
The quantity of the first side wall supporting unit and the second side wall supporting unit with tunnel arch supporting
The quantity of system is identical, and the tunnel cross section that each tunnel arch support system is laid is first side wall
The tunnel cross section that supporting unit and/or the second side wall supporting unit are laid;
Each first side wall supporting unit is that the split side wall drawing crack sliding dug on molding Tunnel side wall is collapsed
The area 3-1 that collapses carries out the asymmetric supporting construction of supporting, the top of the side wall drawing crack sliding caving zone 3-1 and the Tunnel
Side wall top flush, the cross section of side wall drawing crack sliding caving zone 3-1 for right-angled trapezium and it include top drawing crack
Area and the lower part slip region immediately below the top drawing crack area, the cross section in the top drawing crack area is rectangle, under described
The cross section of portion slip region is of same size for right angled triangle and its upper part width and the top drawing crack area;Each described the
Side wall of the one side wall supporting unit including side wall deep support structure and immediately below the side wall deep support structure is shallow
Layer supporting construction;The side wall deep support structure includes one and carries out supporting in horizontal layout and to the top drawing crack area
Side wall anchor cable 4, the side wall shallow-layer supporting construction include more and from top to bottom carry out the first of supporting to the lower part slip region
Side wall anchor pole 5, more first side wall anchor poles 5 in parallel laying and its tilt gradually downward from the inside to the outside;
Each second side wall supporting unit be to the side wall monocline face caving zone 3-2 on the Tunnel side wall into
The supporting construction of row supporting, the top of the side wall monocline face caving zone 3-2 and the side wall top flush of the Tunnel, institute
The cross section for stating side wall monocline face caving zone 3-2 is triangle;Each second side wall supporting unit includes more by upper
To the lower the second side joist anchor bar 6 that supporting is carried out to the lower part slip region, the more the second side joist anchor bars 6 are in horizontal cloth
If;
When tunnel sidewalls supporting scheme is determined used by tunnel sidewalls any one described, process is as follows:
Step 201, tunnel sidewalls unstability judge:With reference to identified country rock basic mechanical parameter in step 1, and according to
FormulaIt is calculated critical when currently judging tunnel sidewalls unstability
Height hcr;The critical altitude h that will be calculated againcrWith the side wall design height h of the Tunnel3It is compared:Work as h3≤hcr
When, judgement, which is drawn, currently judges that tunnel sidewalls are in stable state, and judges to draw and currently judge that tunnel sidewalls need not be adopted
With tunnel sidewalls support system, complete currently to judge the tunnel sidewalls supporting scheme determination process of tunnel sidewalls;Work as hcr< h3
≤h0maxWhen, judgement, which is drawn, currently judges that tunnel sidewalls are in drawing crack-sliding failure by shear state, while judges to draw and work as
The tunnel sidewalls support system that preceding judged tunnel sidewalls use enters step 202 for the first tunnel sidewalls support system;When
h3> h0maxWhen, judgement, which is drawn, currently judges that tunnel sidewalls are in monocline face failure by shear state, while judges to draw current institute
Tunnel sidewalls support system that tunnel sidewalls use is judged for the second tunnel sidewalls support system, and enters step 203;
Wherein, h0maxThe limit level being in by current judgement tunnel sidewalls under drawing crack-sliding failure by shear state
And By the internal friction angle of current judgement tunnel sidewalls Rock Mass, c is currently is judged
The cohesive strength of tunnel sidewalls Rock Mass, γ by current judgement tunnel sidewalls Rock Mass volume-weighted average;The unit of c is
The unit of Pa, γ are N/m3, h3、h0maxAnd hcrUnit be m;H in unsymmetrial loading tunnel 1 by currently judging tunnel sidewalls one side
Buried depth and H=H1 or H2;
Step 202, tunnel sidewalls are in tunnel sidewalls supporting scheme under drawing crack-sliding failure by shear state and determine, mistake
Journey is as follows:
Step 2021, the slide surface inclination angle of side wall drawing crack sliding caving zone, inside height, outside height and the width that caves in are true
It is fixed:With reference to identified country rock basic mechanical parameter in step 1, and according to formulaCurrent institute is calculated
The slide surface inclination alpha of the side wall drawing crack sliding caving zone 3-1 of construction segment;In formula, ψ by current construction segment tunnel sidewalls
The dilative angle of Rock Mass;The slide surface inclination alpha of the side wall drawing crack sliding caving zone 3-1 slides caving zone 3- for side wall drawing crack
Angle between the slide surface and horizontal plane of lower part slip region described in 1;
Further according to formula
WithThe side of current segment of constructing is calculated respectively
The inside height h of wall drawing crack sliding caving zone 3-10, outside height z and cave in width b, h0, z and b unit be m, α <
90°;Wherein, q by the overlying rock of current institute construction segment act on currently judgement tunnel sidewalls tunnel sidewalls country rock 2 on
Well-distributed pressure and q=γ0(h1+h2), γ0By the volume-weighted average of the overlying rock of current construction segment, γ0Unit be N/
m3;h1Inbreak kiln crown when being in drawing crack-sliding failure by shear by current judgement tunnel sidewalls andh4For the design excavation height of the Tunnel, h2+h3=h4, h2For the Tunnel
Arch design height, h1、h2And h4Unit be m;F by current construction segment overlying rock solid coefficient;
The height in the top drawing crack area is z and its width is b, and the height of the lower part slip region is h0-z;
Step 2022, supporting construction determine:According to the sliding of the side wall drawing crack sliding caving zone 3-1 determined in step 2021
Face inclination alpha, inside height h0, outside height z and the width b that caves in, to side wall deep layer described in the first side wall supporting unit
Supporting construction is determined respectively used by supporting construction and the side wall shallow-layer supporting construction;
Step 203, tunnel sidewalls are in tunnel sidewalls supporting scheme under the failure by shear state of monocline face and determine that process is such as
Under:
Step 2031, the width that caves in of side wall monocline face caving zone determine:According to formulaIt is calculated current
The width b1 that caves in of the side wall monocline face caving zone 3-2 of constructed segment;
The side wall monocline face caving zone 3-2 upper widths are b1;
Step 2032, supporting construction determine:According to the width b1 that caves in determined in step 2031, to the second side wall branch
Supporting construction is determined used by shield unit;
When supporting construction carries out defect used by tunnel arch support system, process is as follows:
Step 2041, tunnel sidewalls are in stable state lower roof plate inbreak kiln crown and determine:With reference to being determined in step 1
Country rock basic mechanical parameter, and according to formulaIt is calculated when tunnel sidewalls are in stable state and forms nature
The rise h of caving arch5;
Step 2042, supporting construction determine:The rise h encircleed according to the natural caving determined in step 20415, to the tunnel
Supporting construction is determined used by the support system of road arch;
Step 3: Tunnel structure determination:According to identified tunnel arch supporting scheme and tunnel in step 2
Road side wall supporting scheme is determined used Tunnel structure;
The Tunnel structure is the split Bolt net and jet initial stage branch dug molding Tunnel and carry out tunneling boring supporting
Protection structure, the Bolt net and jet preliminary bracing structure are the preliminary bracing structure using bolt-mesh-spurting supporting method construction molding;It is described
Bolt net and jet preliminary bracing structure includes multiple tunnels being laid in from the front to the back along tunnel extending direction in the Tunnel and anchors
Support system, multiple tunnel anchorages consolidate the structure all same of support system;Each tunnel arch prop in step 2
The tunnel sidewalls support system that system is laid on same tunnel cross section with it forms a tunnel anchoring support
System;
Step 4: tunnel excavation and Tunnel construction:Current segment of constructing is excavated from the front to the back, is opened
During digging the molding tunnel is dug according to the identified Tunnel structure in step 3 is split from the front to the back
Hole carries out preliminary bracing, and obtains the Tunnel structure of construction molding;
Step 5: Tunnel Second Lining Construction:It is split from the front to the back in step 4 to dig the molding Tunnel progress just
In phase Bracing Process, on the inside of the Tunnel structure of construction molding, from the front to the back to current segment of constructing
Tunnel Second Lining is constructed;
Step 6: next segmental construction:Step 1 is repeated to step 5, is constructed to next segment;
Step 7: step 6 is repeated several times, until completing whole work progress of unsymmetrial loading tunnel 1.
Wherein, a is tunnel half-breadth.
In the present embodiment, when being excavated in step 4 to current segment of constructing, using full face tunneling method or step
Method is excavated.
Also, used full face tunneling method or benching tunnelling method are conventional tunnel excavation method.
In the present embodiment, when carrying out preliminary bracing to the Tunnel formed after segment is excavated of currently constructing, adopted
Tunnel structure is that the Bolt net and jet preliminary bracing structure of supporting, the Bolt net and jet are carried out to the Tunnel arch wall
Preliminary bracing structure is the preliminary bracing structure using bolt-mesh-spurting supporting method construction molding;
The Bolt net and jet preliminary bracing structure includes supporting used by the tunnel sidewalls supporting scheme determined in step 2
Structure.Also, the Bolt net and jet preliminary bracing structure further includes one layer of bar-mat reinforcement and one being mounted on the Tunnel arch wall
Layer is injected in the concrete ejection layer on the Tunnel arch wall, and the bar-mat reinforcement is fixed in the concrete ejection layer.Its
In, the arch wall includes the arch of the Tunnel and left and right sides tunnel side wall.
In the present embodiment, the concrete layer is steel fiber concrete layer and its thickness is 20cm~30cm.
Also, when constructing to the Bolt net and jet preliminary bracing structure, used construction method is conventional construction
Method.
In the present embodiment, the concrete layer is steel fiber concrete layer and its thickness is 20cm~30cm.
In the present embodiment, the longitudinal length of multiple segments is 10m~50m.
During practice of construction, the longitudinal length of the segment can be adjusted accordingly according to specific needs.
In the present embodiment, before progress country rock basic mechanical parameter determines in step 1, first from current constructed segment
A segment is chosen to be excavated as test section;When progress country rock basic mechanical parameter determines in step 1, from the test
Section, which is bored sample, carries out laboratory test, and the result of the test obtained is by currently the country rock basic mechanical of construction segment is joined after excavation
Number.
In the present embodiment, the test section is located at current construct segment rear end and the length of 1m.
When progress country rock basic mechanical parameter determines in step 1, bore sample from the test section and carry out laboratory test, and
The result of the test obtained is by the country rock basic mechanical parameter for segment of currently constructing after excavation.
Also, in view of the characteristics such as heterogeneous, discontinuous and anisotropy of the tunnel surrounding of unsymmetrial loading tunnel 1, mechanics ginseng
Number must determine on the basis of experiment, to ensure data accurately and reliably, reduce calculation error.
In the present embodiment, the spacing between the front and rear two neighboring first side wall supporting unit and front and rear phase in step 2
Spacing between adjacent two the second side wall supporting units is identical, between the front and rear two neighboring first side wall supporting unit
Spacing be 0.8m~1.2m.
It, can according to specific needs, between the front and rear two neighboring first side wall supporting unit during practice of construction
It is adjusted accordingly respectively away from the spacing between the front and rear two neighboring second side wall supporting unit.
When progress country rock basic mechanical parameter determines in step 1, identified mechanics parameter includes current segment of constructing
The cohesive strength c of tunnel sidewalls Rock Mass, current segment of constructing tunnel sidewalls Rock Mass internal friction angleCurrently
The volume-weighted average γ of the tunnel sidewalls Rock Mass of constructed segment, current segment of constructing overlying rock volume-weighted average
γ0, current segment of constructing the dilative angle ψ of tunnel sidewalls Rock Mass and the robustness for segment overlying rock of currently constructing
Coefficient f.
Meanwhile also need the excavation width B to unsymmetrial loading tunnel 1, current segment overlying rock of constructing solid coefficient f,
The arch design height h of the Tunnel2, the Tunnel design excavation height h4It is designed with the side wall of the Tunnel high
Spend h3It is determined.
Wherein, the overlying rock of current segment of constructing is also referred to as tunnel roof country rock, i.e., country rock above described Tunnel,
Also referred to as tunnel upper cover layer.
According to general knowledge known in this field, edpth of tunnel refer to top to the natural ground of tunnel excavation section it is vertical away from
From.
The excavation width in tunnel refers to that the maximum of outline excavation excavates after considering two linings, preliminary bracing, deformation allowance
Width.Herein, the excavation width B of unsymmetrial loading tunnel 1 is also referred to as span, refers to the maximum span of unsymmetrial loading tunnel 1.
In step 2022 to the side wall deep support structure used by supporting construction when being determined, according to step
The installation position of the outside height z offside joist anchors rope 4 determined in 2021 is determined and side wall anchor cable 4 is made to be located at top drawing
On split plot, it is determined according to the length for the width b offside joist anchors rope 4 that caves in and the front end of side wall anchor cable 4 is made to extend out on described
On the outside of drawing crack area of portion;
When supporting construction is determined used by the side wall shallow-layer supporting construction, according to slide surface inclination alpha to
The angle of inclination of one side joist anchor bar 5 is determined, according to inside height h0With outside height z and cave in width b to the first side wall
The installation position of anchor pole 5 is determined and the more first side wall anchor poles 5 is made from top to bottom to be laid in the lower part slip region
On, the length of the first side wall anchor pole 5 is determined according to the width b that caves in and makes the front end of the every first side wall anchor pole 5
It extend out on the outside of the lower part slip region.
For easy construction, when being determined according to the length for the width b offside joist anchors rope 4 that caves in, the length of the side wall anchor cable 4
Spend L1=l1+L1+l2, wherein l1=0.1m~15cm, l2=0.3m~0.4m, L1 >=1.5b;
When being determined according to the width b that caves in the length of the first side wall anchor pole 5, the length of the first side wall anchor pole 5
L2=l1+L2+l2, wherein L2 >=b and L2 < L1.
Wherein, l1And l2Represent that anchor pole is to ensure the length value that valid bonding length reserves anchor pole or anchor cable both ends.It is actual
In use, l1For any one numerical value in the range of 0.1m~15cm, l2For any one numerical value in the range of 0.3m~0.4m.
In the present embodiment, the L1=3b~6b, the L2=1.5b~3b.
In actual use, the value size of L1 and L2 can be adjusted accordingly according to specific needs.
When being determined according to slide surface inclination alpha to the angle of inclination of the first side wall anchor pole 5, the first side wall anchor pole 5 inclines
Rake angle α 1=180°-α-α0, α0Lower part slip region described in caving zone 3-1 is slid for the first side wall anchor pole 5 and side wall drawing crack
Angle and 65 °≤α between slide surface0≤ 75 °, angles of the α 1 between the first side wall anchor pole 5 and horizontal plane.
In the present embodiment, α0=69 °.
It, can according to specific needs, to α during practice of construction0Value size adjust accordingly.
In the present embodiment, the quantity of included side wall anchor pole 5 is three in the supporting construction of side wall shallow-layer described in step 2,
Three side wall anchor poles 5 are in uniformly distributed.
During practice of construction, can according to specific needs, the installation position of the quantity of offside joist anchor bar 5 and each side wall anchor pole 5 into
The corresponding adjustment of row.
In the present embodiment, side wall anchor cable described in step 24 is located at the middle part in the top drawing crack area, the side wall anchor cable
4 and the Tunnel side wall at the top of between spacing be
, can according to specific needs during practice of construction, the installation position of offside joist anchor rope 4 adjusts accordingly.
In step 2032 to the second side wall supporting unit used by supporting construction when being determined, according to step
The width b1 that caves in determined in 2031 is determined the length of the second side joist anchor bar 6;The length of the more the second side joist anchor bars 6
All same is spent, the length of the second side joist anchor bar 6 is not less than L3, wherein L3=l1+b1+l2, l1=0.1m~15cm, l2=
0.3m~0.4m.
In the present embodiment, the length of the second side joist anchor bar 6 is L3。
During practice of construction, the length of the second side joist anchor bar 6 can be adjusted accordingly according to specific needs.
In step 2042 to tunnel arch support system used by supporting construction when being determined, according to step
The rise h of the natural caving arch determined in 20415, the length of arch anchor pole 7 is determined;More arch anchor poles 7
Length all same, the length of the arch anchor pole 7 are not less than L4, wherein L4=l1+h5+l2, l1=0.1m~15cm, l2=0.3m
~0.4m;.
In the present embodiment, the length of the second side joist anchor bar 6 is L3, the length of the arch anchor pole 7 is L4。
During practice of construction, the length of arch anchor pole 7 can be adjusted accordingly according to specific needs.
Unsymmetrial loading tunnel is since landform is asymmetric or geological formations factor causes two area load of tunnel structure asymmetric, just
Bias is formd, there is very big difference in unsymmetrial loading tunnel both sides force-bearing of surrounding rock mass situation, thus to the both sides tunnel sidewalls of unsymmetrial loading tunnel
Side wall support system be designed respectively, while firm supporting demand is met, also can it is about cost-effective, save manpower
Material resources shorten construction period and other effects.
As Figure 1-1, when the tunnel sidewalls are in drawing crack-sliding failure by shear state, side wall caving zone 3 is (i.e.
Right-angled trapezium ABCD) it is the tunnel sidewalls Rock Mass in state of limit equilibrium, BC is potential slide surface, and α inclines for slip-crack surface
Angle (i.e. described slide surface inclination angle).By carrying out force analysis to the country rock of side wall caving zone 3, the drawing cracks of tunnel sidewalls-
Slide mass (i.e. side wall caving zone 3) is actually the crucial weak structure body in tunnel surrounding, and tunnel is effectively wide after unstability slides
Degree increases (tunnel sidewalls height accordingly increases), and pole is unfavorable for the stabilization of tunnel vault;In addition, side wall surface wall caving unloading after its
Top concentrates pressure peak to be shifted to deep, increase the elastic plastic interphase that is formed after side wall deforms to tunnel center away from
From so that the tunnel floor maximal destruction depth and its pucking amount generated under side wall extruding dramatically increases.Therefore, to side wall into
Timely and effectively supporting has important engineering significance to row.
In the present embodiment, the tunnel sidewalls of institute's construction unsymmetrial loading tunnel 1 are vertical wall and its height is 4.88m, sagitta 7.2m,
Excavation width B=14.3m, thus h4=12.08m, h2=7.2m, h3=4.88m.
As shown in figure 4, being sampled from 1 buried depth of unsymmetrial loading tunnel for the tunnel sidewalls Rock Mass of H2 one sides, and determine to enclose
This mechanics parameter of batholith carries out tunnel sidewalls unstability judgement according still further to the method described in step 201, and judgement draws the tunnel side
Wall is in stable state, and judges to draw the tunnel sidewalls without tunnel sidewalls support system.
As shown in figure 4, be sampled from 1 buried depth of unsymmetrial loading tunnel for the tunnel sidewalls Rock Mass of H2 one sides, after tested
Go out:The cohesive strength c=91kP of the tunnel sidewalls Rock Mass of current segment of constructinga=91 × 103Pa, current section of constructing
The internal friction angle of the tunnel sidewalls Rock Mass of sectionThe volume-weighted average γ of the overlying rock of current segment of constructing0
=21.6kN/m3=21.6 × 103N/m3, dilative angle ψ=9 ° of the tunnel sidewalls Rock Mass of current segment of constructing.Currently
The solid coefficient f=7.8 of constructed segment overlying rock.Also, the tunnel sidewalls Rock Mass of current segment of constructing
Volume-weighted average γ=γ0=21.6 × 103N/m3.Tunnel sidewalls unstability judgement is carried out according still further to the method described in step 201,
According to formulaIt is calculated when currently judging tunnel sidewalls unstability
Critical altitude hcr, corresponding judgement, which is drawn, currently judges that tunnel sidewalls are in drawing crack-sliding failure by shear state, judges simultaneously
It draws and current judges tunnel sidewalls support system that tunnel sidewalls use for the first tunnel sidewalls support system.
The current inbreak kiln crown judged when tunnel sidewalls are in drawing crack-sliding failure by shear
The overlying rock of current segment of constructing act on currently judge it is equal on the tunnel sidewalls country rock 2 of tunnel sidewalls
Cloth pressure (also referred to as evenly load) q=γ0(h1+h2)=21.6×103×(7.2+2.1)=200.9kPa=200.9 × 103Pa。
The slide surface inclination angle of the side wall drawing crack sliding caving zone 3-1 of current segment of constructing
The inside height of the side wall drawing crack sliding caving zone 3-1 of current segment of constructing
Outside height
Cave in width
And the tunnel originally the tunnel sidewalls anchor pole employed in phase supporting scheme in horizontal layout, such anchor pole and sliding
139 ° of face angle theoretical value, angle is excessive, cannot so give full play to the anti-shear ability of anchor rod body itself;Also,
The shearing slip after side wall drawing crack can not be limited.Also, due to the width b=0.87m that caves in, former side wall rock-bolt length is designed as
4.0m is also theoretically unsound, and easily causes the huge waste of manpower and materials.
In the present embodiment, the length of side wall anchor cable 4 is 5m, and the length of side wall anchor pole 5 is 2.5m, and side wall anchor pole 5 with
Angle α described in side wall caving zone 3 between the slide surface of lower part slip region0=69 °, thus anchor rod body can be given full play to certainly
The anti-shear ability of body;Also, side wall anchor pole 5 and the Design of length of side wall anchor cable 4 are reasonable, side wall anchor pole 5 and 4 phase of side wall anchor cable
Cooperation can effectively limit the shearing slip after side wall drawing crack, and will not cause the huge waste of manpower and materials.
Since unsymmetrial loading tunnel 1 is shallow tunnel, along with using identified tunnel sidewalls supporting scheme energy in step 2
Effectively ensure that tunnel sidewalls are in stable state, thus tunnel arch support system is according to the nature determined in step 2041
The rise h of caving arch5Supporting demand can be met by being determined, and construction cost is relatively low.
The above is only presently preferred embodiments of the present invention, not the present invention imposed any restrictions, it is every according to the present invention
Any simple modification, change and the equivalent structure that technical spirit makees above example change, and still fall within skill of the present invention
In the protection domain of art scheme.