CN108086492A CN201611042434.3A CN201611042434A CN108086492A CN 108086492 A CN108086492 A CN 108086492A CN 201611042434 A CN201611042434 A CN 201611042434A CN 108086492 A CN108086492 A CN 108086492A
Authority
CN
China
Prior art keywords
sealing
grouting pipe
slot
tick slot
glue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611042434.3A
Other languages
Chinese (zh)
Inventor
王鹏程
王天星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHONGLIAN TIANSHENG BUILDING MATERIALS Co Ltd
Original Assignee
BEIJING ZHONGLIAN TIANSHENG BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHONGLIAN TIANSHENG BUILDING MATERIALS Co Ltd filed Critical BEIJING ZHONGLIAN TIANSHENG BUILDING MATERIALS Co Ltd
Priority to CN201611042434.3A priority Critical patent/CN108086492A/en
Publication of CN108086492A publication Critical patent/CN108086492A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Sealing Material Composition (AREA)

Abstract

This application provides a kind of sealing blocking method and waterproof wall body structure, including:Tick slot is opened up along the cracking gap of base;Slot bottom along the cracking gap in the tick slot bores injected hole, and filling in polyurathamc in injected hole is sealed, and the first Grouting Pipe pre-buried in the injected hole before sealing fills in closely knit glue after sealing in first Grouting Pipe;Polyurathamc is filled in the tick slot to be sealed, the second Grouting Pipe pre-buried in the tick slot and the reserved filleting glue packing space on the inside of the tick slot, filleting glue is filled in fill the filleting glue packing space after sealing in second Grouting Pipe before sealing.Using the tick slot and the injected hole as the basic condition of sealing, the sealing construction operation of two-stage is carried out in the injected hole and the tick slot, improves waterproof, the effect of sealing.

Description

A kind of sealing blocking method and waterproof wall body structure
Technical field
The present invention relates to house waterproof technique field, more particularly, to a kind of sealing blocking method and waterproof wall knot Structure.
Background technology
As resident's living conditions increasingly improve, the development of real estate, finishing new house becomes what most of residents faced Problem, but because decoration industry managerial confusion construction quality is irregular, ground sweat, leak are increasingly becoming most people headache The problem of, once leak is caused to be difficult to repair and recover.It is built particularly with what is be composed of the building of different time construction In building, seep water leak the problem of it is extremely serious.
The content of the invention
It is an object of the invention to provide a kind of sealing blocking method and waterproof wall body structure, to solve in the prior art In the building that the building of existing different time construction is composed, infiltration leak it is serious the technical issues of.
A kind of sealing blocking method provided by the invention, including:
Tick slot is opened up along the cracking gap of base;
Slot bottom along the cracking gap in the tick slot bores injected hole, and it is close that polyurathamc progress is filled in injected hole Envelope, the first Grouting Pipe pre-buried in the injected hole before sealing, closely knit glue is filled in after sealing in first Grouting Pipe;
Polyurathamc is filled in the tick slot to be sealed, and seals preceding the second Grouting Pipe pre-buried in the tick slot simultaneously Filleting glue packing space is reserved on the inside of the tick slot, it is described to fill in second Grouting Pipe to fill in filleting glue after sealing Filleting glue packing space.
Further, in an embodiment of the present invention, before the sealing in the injected hole pre-buried first Grouting Pipe bag It includes:
The pre-buried quantity of first Grouting Pipe is set for multiple and axially spaced-apart, and adjacent first Grouting Pipe reserves observation Seam, the eye split is without sealing;Whether connected between adjacent Grouting Pipe for observing, and whether grouting serous fluid is full.
Further, in an embodiment of the present invention, it is described to fill in closely knit glue in first Grouting Pipe and include:
The closely knit glue filled in is overflowed along the eye split.
Further, in an embodiment of the present invention, after being sealed to the injected hole, and filled out in first Grouting Pipe Before noting closely knit glue, the pollutant in the cracking gap is cleared up.
Further, in an embodiment of the present invention, the manner of cleaning up of the pollutant in the cracking gap is included adopting It is purged with high-pressure blast.
Further, in an embodiment of the present invention, the filleting glue packing space of being reserved on the inside of the tick slot includes:
Install support plate in the tick slot, the support plate by the tick slot be divided into internal filleting glue packing space and External sealing space two parts.
Further, in an embodiment of the present invention, the pre-buried quantity of second Grouting Pipe is multiple and is picked along described The longitudinally spaced setting of slot, to the second Grouting Pipe slip casting when, are filled in order from the bottom to top.
Further, in an embodiment of the present invention, when to the second Grouting Pipe slip casting, when adjacent top second Outflow filleting glue in Grouting Pipe.
Further, in an embodiment of the present invention, width is gradually reduced the tick slot from the inside to the outside
Further, in an embodiment of the present invention, the width of rebate of the tick slot be 7-9cm, the slot bottom of the tick slot Width is 9-11cm, and the depth of the tick slot is 7-9cm.
Further, in an embodiment of the present invention, the length of the eye split is 2cm.
Further, in an embodiment of the present invention, the spacing distance of multiple second Grouting Pipes is 1M.
Present invention also provides a kind of waterproof wall body structure, the cracking gap including base and in base is described Tick slot is offered along the cracking gap in base, the slot bottom of the tick slot opens up injected hole;
The first Grouting Pipe is embedded in the injected hole, the outside of first Grouting Pipe is sealed by polyurathamc, Closely knit glue is filled in first Grouting Pipe;
The slot bottom of the tick slot sets filleting glue water stop portion, and the filleting glue water stop portion is filled by filleting glue and sealed;
The notch of the tick slot sets polyurathamc water stop portion, and the polyurathamc water stop portion passes through polyurathamc Filling sealing.
Further, in embodiments herein, the pre-buried quantity of first Grouting Pipe is multiple and axially spaced-apart It sets, adjacent first Grouting Pipe reserves eye split.
Further, in embodiments herein, the filleting glue water stop portion and the polyurathamc water stop portion are led to The support plate installed in the tick slot is crossed to separate.
Further, in embodiments herein, width is gradually reduced the tick slot from the inside to the outside.
Further, in embodiments herein, the injected hole is opened up along the direction in the cracking gap.
Further, in embodiments herein, the width of rebate of the tick slot is 7-9cm.
Further, in embodiments herein, the slot bottom width of the tick slot is 9-11cm.
Further, in embodiments herein, the depth of the tick slot is 7-9cm.
Further, in embodiments herein, the length of the eye split is 2cm.
It in the above-mentioned technical solutions, in the particular embodiment, can when opening up tick slot along the cracking gap of base It is operated with the center line for prolonging cracking gap, opening up for tick slot is carried out by the way of chisel or cutting mouth is picked;After opening up, The slot bottom along the cracking gap in the tick slot bores injected hole again, using the tick slot and the injected hole as the basis of sealing Condition carries out the sealing construction operation of two-stage in the injected hole and the tick slot, improves waterproof, the effect of sealing.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in describing below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the constructing structure schematic diagram of sealing blocking method provided in an embodiment of the present invention;
Fig. 2 is the structure diagram after the completion of the construction of sealing blocking method shown in FIG. 1;
Fig. 3 is the structure diagram of injected hole provided in an embodiment of the present invention;
Fig. 4 is the partial structural diagram of injected hole shown in Fig. 3.
Reference numeral:
0- bases;1- tick slots;2- injected holes;
The second Grouting Pipes of 11-;12- support plates;13- filleting glue water stop portions;
14- polyurathamc water stop portions;The first Grouting Pipes of 21-;22- eye splits.
Specific embodiment
Technical scheme is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's all other embodiments obtained without making creative work, belong to the scope of protection of the invention.
In the description of the present invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instructions such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to Convenient for the description present invention and simplify description rather than instruction or imply signified device or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " the 3rd " is only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this Concrete meaning in invention.
It has been investigated that general building can be made of the building of different times, for example, residential housing is built not with garage It is to build the same period, and the also Non-precondition water-stopping system in design, it is stitched without settlement reservation, it is straight first to build the building channel built with after Docking construction is connect, outsourcing waterproof material is using the thick constructions of SBS polymer waterproof roll 4mm;And after a period of time, house is built Sedimentation in various degree can be occurred and cause crack with garage construction by building, and damaged outer waterproofing layer, in turn resulted in leakage, this is One of the main reason for causing leak.
And in order to solve the above-mentioned technical problem, the application just proposes following technical solution:
Fig. 1 is the constructing structure schematic diagram of sealing blocking method provided in an embodiment of the present invention;Fig. 2 stops to be shown in FIG. 1 Structure diagram after the completion of the construction of water blocking method;First, as depicted in figs. 1 and 2, a kind of sealing provided in this embodiment Blocking method, including:
Tick slot 1 is opened up along the cracking gap of base 0;
Along it is described cracking gap the tick slot 1 slot bottom bore injected hole 2, filled in injected hole 2 polyurathamc into Row sealing, first Grouting Pipe 21 pre-buried in the injected hole 2 before sealing are filled in after sealing in first Grouting Pipe 21 close Real glue;
Polyurathamc is filled in the tick slot 1 to be sealed, second Grouting Pipe pre-buried in the tick slot 1 before sealing 11 and in the reserved filleting glue packing space in 1 inside of the tick slot, filled in after sealing in second Grouting Pipe 11 filleting glue with Fill the filleting glue packing space.
In the particular embodiment, when opening up tick slot 1 along the cracking gap of base 0, cracking gap can be prolonged Center line is operated, and opening up for tick slot 1 is carried out by the way of chisel or cutting mouth is picked;After opening up, then along the cracking Injected hole 2 is bored in gap in the slot bottom of the tick slot 1, using the tick slot 1 and the injected hole 2 as the basic condition of sealing, The sealing construction operation of two-stage is carried out in the injected hole 2 and the tick slot 1.
First, sealing construction operation is carried out to the injected hole 2, it is close that polyurathamc progress is filled in injected hole 2 Envelope, first Grouting Pipe 21 pre-buried in the injected hole 2 before sealing are filled in after sealing in first Grouting Pipe 21 closely knit Glue;Pre-buried first Grouting Pipe 21 in injected hole 2 is so equivalent to, the poly- ammonia of foaming is filled in the outside of first Grouting Pipe 21 Ester makes to form sealing between first Grouting Pipe 21 and the injected hole 2, then be filled in inside to the first Grouting Pipe 21 close Real glue carry out inside sealing, by the dual-seal of polyurathamc and closely knit glue, the effect of sealing can be improved, raising stops Outlet capacity.
Then, fill in polyurathamc in the tick slot 1 to be sealed, by polyurathamc to the notch of tick slot 1 Place is sealed, and forms polyurathamc water stop portion 14, seals preceding second Grouting Pipe 11 pre-buried in the tick slot 1 and described The reserved filleting glue packing space in 1 inside of tick slot, this is the notch by first sealing tick slot 1, then re-forms filleting glue water stop portion 13 order is sealed the constructing operation of sealing, specifically, when forming filleting glue water stop portion 13, after being sealed, then Filleting glue is filled in second Grouting Pipe 11 to fill the filleting glue packing space by the second Grouting Pipe 11, is ultimately formed Filleting glue water stop portion 13 completes the constructing operation of hermetic seal, and the further effect for improving sealing improves sealing ability.
Wherein, built-in filleting glue water stop portion 13 it is heavy because misplacing can to resist building when building settles again The shearing dropped and occurred, specifically, 8 centimeters of dislocation shearing can be resisted about;Its filleting glue used can include polyurethane Filleting glue, silicone filleting glue and PG road joint seal glue, but it is not limited to above-mentioned filleting glue.
Meanwhile the filleting glue can also use Patent No. 201410332863.9 patent in and Patent No. 201410339657.0 patent described in self-adhering rubber macromolecule waterproof caulking compounds.
Wherein, the self-adhering rubber macromolecule waterproof caulking compounds described in the patent of Patent No. 201410332863.9 by with The raw material of lower parts by weight is made:Subtract third fractional oil 10~25, tackifying resin 10~20, thermoplastic styrene butadiene rubber 10~25, BR rubber 20 ~40, softening agent 10~20, antiaging agent 0.1~1, fire retardant 0.2~1 and antioxidant 0.2~1.
The antiaging agent is antiaging agent AW-66.The antioxidant is antioxidant 168.
The self-adhering rubber macromolecule waterproof caulking compounds are prepared by following steps:
(1) third fractional oil will be subtracted and tackifying resin adds in heating stirring in mixer and melts completely to it;
(2) stir evenly rear in the mixed liquor for adding in thermoplastic styrene butadiene rubber in step (1) and ensure in certain temperature Lower high speed Stirring;
(3) it is put into after the mixed material in step (2) is fully ground in mixer, then adds in BR rubber and continue Several minutes of high-speed stirred;
(4) several minutes of high-speed stirred again after addition softening agent;
(5) antiaging agent, fire retardant and antioxidant is added in stir evenly;And
(6) mould cooling and shaping are entered.
Wherein, the self-adhering rubber macromolecule waterproof caulking compounds described in the patent of Patent No. 201410339657.0 by with The raw material of lower parts by weight is made:Thermoplastic elastomer 18~28, pitch 35~55, aromatic naphtha 9~28, age resister 0.1~6, resistance Fire agent 0.5~8, rubber additive 3~16 and inorganic fillings 2~18;It is 1 that the pitch, which includes weight ratio,:1 10# pitches With 100# pitches, the aromatic naphtha be 150# aromatic naphtha, the age resister be 1010# age resisters, the rubber additive For polyisobutene PB2400.
The inorganic fillings are coarse whiting.The fire retardant is aluminium hydroxide or magnesium hydroxide.
The self-adhering rubber macromolecule waterproof caulking compounds are prepared by following steps:
(1) it is made to melt completely heating stirring in the pitch input mixer of two kinds of models;
(2) aromatic naphtha and thermoplastic elastomer high-speed stirred in a heated condition are sequentially added;
(3) after the mixed material of step (2) being ground into liquid;
(4) rubber additive and high-speed stirred are added in the material of step (3);
(5) inorganic fillings and high-speed stirred are added in;
(6) age resister and fire retardant are added in and is stirred evenly;And
(7) it is cooled and shaped.
Wherein, the first Grouting Pipe 21 being embedded in injected hole 2 can not remove, and injected hole 2 is stayed in after construction It is interior.And second Grouting Pipe 11 can be removed after construction, specifically, after filleting glue thoroughly solidification, The operation removed.
Fig. 3 is the structure diagram of injected hole provided in an embodiment of the present invention;Fig. 4 is the part of injected hole shown in Fig. 3 Structure diagram.
As shown in Figure 3 and Figure 4, pre-buried first Grouting Pipe 21 includes in the injected hole 2 before the sealing:
The pre-buried quantity of first Grouting Pipe 21 is set for multiple and axially spaced-apart, adjacent first Grouting Pipe, 21 pre- attention Seam 22 is examined, the eye split 22 is without sealing.
The effect of reserved eye split 22 is can easily to observe two neighboring first Grouting Pipe 21 during construction Between whether communicate, and whether the slurries for observing injection in the first Grouting Pipe 21 full, and meet the standard of filling in.In a reality It applies in example, the length of the eye split 22 is 2cm.
It fills in closely knit glue specifically, described in first Grouting Pipe 21 and includes:
The closely knit glue filled in is overflowed along the eye split 22.
It, it is necessary to be reconciled into paste when polyurathamc is reconciled, is once not easy blended more, prevents from not using It is complete to have hardened, and just should not be reused after hardening, in order to avoid influence water-stagnating effect.
Further, after being sealed to the injected hole 2, and before filling in closely knit glue in first Grouting Pipe 21, cleaning Pollutant in the cracking gap.
Specifically, the manner of cleaning up of the pollutant in the cracking gap is included purging using high-pressure blast.And the dirt Water and dust can be included by contaminating object, simultaneously it is noted that whether pollutant flows out out of reserved injected hole during cleaning, If do not flowed out, it should add again and bury the first Grouting Pipe 21.
Further, it is described to include in the reserved filleting glue packing space in 1 inside of tick slot:
Support plate 12 is installed in the tick slot 1, the tick slot 1 is divided into internal filleting glue and filled by the support plate 12 Space and external sealing space two parts.
It is clearly demarcated in order to ensure to separate between the filleting glue water stop portion 13 and the polyurathamc water stop portion 14, it can Before foamed polyurethane and filleting glue is filled in, support plate 12 is installed in the tick slot 1, picked by support plate 12 by described Slot 1 is divided into internal filleting glue packing space and external sealing space two parts, is filled in the filleting glue packing space After filleting glue, filleting glue water stop portion 13 is just formed, in the sealing space after filled and process polyurethane, just forms the poly- ammonia that foams Ester water stop portion 14.
Further, the pre-buried quantity of second Grouting Pipe 11 is multiple and along the 1 longitudinally spaced setting of tick slot, right It is filled in during 11 slip casting of the second Grouting Pipe with order from the bottom to top.When to 11 slip casting of the second Grouting Pipe, when adjacent The second Grouting Pipe of top 11 in outflow filleting glue.In one embodiment, the interval of multiple second Grouting Pipes 11 Distance is 1M.
Specifically, when filleting glue is prepared, filleting glue should be dissolved with heater before slip casting, temperature should be controlled when dissolving System is constantly stirred in 160 degree~180 degree or so, accelerates solution time, to prevent local heating overlong time from causing Molecular structure destroys.Slip casting machine is added in after dissolving and carries out slip casting, when slip casting, which should be noted that, to get on, get off, from the second following slip casting After pipe 11 injects filleting glue, filleting glue is flowed out to be considered as and filled from adjacent the second Grouting Pipe of top 11, at this point, should close immediately Then second Grouting Pipe 11 carries out slip casting from the second Grouting Pipe 11 above the second Grouting Pipe 11 of closing again, and so on, directly To until last one note pipe fills.
In one embodiment, when the tick slot 1 opens up, making tick slot 1, width is gradually reduced from the inside to the outside, will be picked Slot 1 opens up the shape in the Eight Character trough.Such tick slot 1 is opened up, when building settles again, rigid seal object is not easy out Separation is split, and built-in slip casting is also more prone to operate, and specific size includes:
The width of rebate of the tick slot 1 is 7-9cm, is preferably 8cm;
The slot bottom width of the tick slot 1 is 9-11cm, is preferably 10cm;
The depth of the tick slot 1 is 7-9cm, is preferably 8cm.
The present invention also provides a kind of waterproof wall body structure, the cracking gap including base 0 and in base 0, institute It states and offers tick slot 1 along the cracking gap in base 0, the slot bottom of the tick slot 1 opens up injected hole 2;
The first Grouting Pipe 21 is embedded in the injected hole 2, the outside of first Grouting Pipe 21 passes through polyurathamc It seals, closely knit glue is filled in first Grouting Pipe 21;
The slot bottom of the tick slot 1 sets filleting glue water stop portion 13, and the filleting glue water stop portion 13 is filled close by filleting glue Envelope;
The notch of the tick slot 1 sets polyurathamc water stop portion 14, and the polyurathamc water stop portion 14 passes through foaming Filling polyurethane seals.
Further, the pre-buried quantity of first Grouting Pipe 21 is set for multiple and axially spaced-apart, adjacent first slip casting Pipe 21 reserves eye split 22.
Further, the filleting glue water stop portion 13 and the polyurathamc water stop portion 14 pass through in the tick slot 1 The support plate 12 installed separates.
Further, width is gradually reduced the tick slot 1 from the inside to the outside.
Further, the injected hole 2 is opened up along the direction in the cracking gap.
Further, the width of rebate of the tick slot 1 is 7-9cm.
Further, the slot bottom width of the tick slot 1 is 9-11cm.
Further, the depth of the tick slot 1 is 7-9cm.
Further, the length of the eye split 22 is 2cm.
Since the principle of work and power and technique effect of above-mentioned waterproof wall body structure have introduced sealing blocking method When be described in detail, meanwhile, waterproof wall body structure be also carry out sealing blocking method constructing operation after formed Concrete structure just repeats no more herein, with reference to the related introduction of sealing blocking method.
The application merely provides limited embodiment, any based on technical scheme, without creative labor The dynamic technical solution obtained, is all contained within the protection domain of technical scheme.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to Can so modify to the technical solution recorded in foregoing embodiments either to which part or all technical characteristic into Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is not made to depart from various embodiments of the present invention technology The scope of scheme.

Claims (10)

1. a kind of sealing blocking method, which is characterized in that including:
Tick slot (1) is opened up along the cracking gap of base (0);
Slot bottom along the cracking gap in the tick slot (1) bores injected hole (2), and polyurathamc is filled in injected hole (2) It is sealed, the first Grouting Pipe (21) pre-buried in the injected hole (2) before sealing, in first Grouting Pipe (21) after sealing Inside fill in closely knit glue;
Polyurathamc is filled in the tick slot (1) to be sealed, the second Grouting Pipe pre-buried in the tick slot (1) before sealing (11) the reserved filleting glue packing space and on the inside of the tick slot (1) is filled in after sealing in second Grouting Pipe (11) embedding Glue is stitched to fill the filleting glue packing space.
2. sealing blocking method according to claim 1, which is characterized in that before the sealing in the injected hole (2) Pre-buried first Grouting Pipe (21) includes:
The pre-buried quantity of first Grouting Pipe (21) is set for multiple and axially spaced-apart, the pre- attention of adjacent first Grouting Pipe (21) Seam (22) is examined, the eye split (22) is without sealing.
3. sealing blocking method according to claim 2, which is characterized in that described to be filled out in first Grouting Pipe (21) Note closely knit glue includes:
The closely knit glue filled in is overflowed along the eye split (22).
4. sealing blocking method according to claim 2, which is characterized in that after being sealed to the injected hole (2), and in institute It states before filling in closely knit glue in the first Grouting Pipe (21), clears up the pollutant in the cracking gap.
5. sealing blocking method according to claim 4, which is characterized in that the clear of the pollutant in the cracking gap Reason mode includes purging using high-pressure blast.
6. sealing blocking method according to claim 1, which is characterized in that described reserved embedding on the inside of the tick slot (1) Seam glue packing space includes:
Support plate (12) is installed in the tick slot (1), the tick slot (1) is divided into internal filleting glue by the support plate (12) Packing space and external sealing space two parts.
7. sealing blocking method according to claim 1, which is characterized in that the pre-buried quantity of second Grouting Pipe (11) To be multiple and along the tick slot (1) longitudinally spaced setting, with order from the bottom to top during to the second Grouting Pipe (11) slip casting It fills in.
8. sealing blocking method according to claim 7, which is characterized in that the second Grouting Pipe (11) slip casting When, when outflow filleting glue in adjacent the second Grouting Pipe of top (11).
9. sealing blocking method according to claim 1, which is characterized in that width is gradual from the inside to the outside for the tick slot (1) Reduce.
10. a kind of waterproof wall body structure, the cracking gap including base (0) and in base (0), which is characterized in that institute It states and offers tick slot (1) along the cracking gap in base (0), the slot bottom of the tick slot (1) opens up injected hole (2);
The first Grouting Pipe (21) is embedded in the injected hole (2), the outside of first Grouting Pipe (21) passes through the poly- ammonia that foams Ester seals, and closely knit glue is filled in first Grouting Pipe (21);
The slot bottom of the tick slot (1) sets filleting glue water stop portion (13), and the filleting glue water stop portion (13) is filled by filleting glue Sealing;
The notch of the tick slot (1) sets polyurathamc water stop portion (14), and the polyurathamc water stop portion (14) passes through hair Steep filling polyurethane sealing.
CN201611042434.3A 2016-11-23 2016-11-23 A kind of sealing blocking method and waterproof wall body structure Pending CN108086492A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611042434.3A CN108086492A (en) 2016-11-23 2016-11-23 A kind of sealing blocking method and waterproof wall body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611042434.3A CN108086492A (en) 2016-11-23 2016-11-23 A kind of sealing blocking method and waterproof wall body structure

Publications (1)

Publication Number Publication Date
CN108086492A true CN108086492A (en) 2018-05-29

Family

ID=62171038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611042434.3A Pending CN108086492A (en) 2016-11-23 2016-11-23 A kind of sealing blocking method and waterproof wall body structure

Country Status (1)

Country Link
CN (1) CN108086492A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629841A (en) * 2018-12-07 2019-04-16 江苏工程职业技术学院 A method of for preventing and treating water leakage in building wall bodies
CN110158666A (en) * 2019-06-18 2019-08-23 四川童燊防水工程有限公司 Building basement top plate subsiding crack plugging structure and its construction method
CN111550070A (en) * 2020-05-09 2020-08-18 上海橡树装饰工程有限公司 Deep seam repairing construction method
CN114086673A (en) * 2021-11-24 2022-02-25 中天建设集团有限公司 Method for plugging damper position of high-rise building outer wall

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1184193A (en) * 1996-12-02 1998-06-10 谢宗义 Waterproof construction method and equipment for concrete crack deposition
CN1982541A (en) * 2005-12-14 2007-06-20 李应芝 Underground channel of hydroelectric station and cavity group waterproofing and leakage-stopping construction
CN102505663A (en) * 2011-10-14 2012-06-20 中煤建筑安装工程公司第七十三工程处 Method for repairing seepage of concentration tank and water tank
CN102776905A (en) * 2012-07-21 2012-11-14 金坛建工集团有限公司 Grouting stoppage and guide repair method for leakage of deformation joint and special grouting device for grouting stoppage and guide repair method for leakage of deformation joint
CN103015538A (en) * 2011-09-22 2013-04-03 江苏鼎达建筑新技术有限公司 Leakage prevention device and leakage treatment method for concrete structure deformation joint
KR101372749B1 (en) * 2013-07-15 2014-03-11 (주)대한콜크 Multi-performance functional water stop plate with composite structure
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN206233390U (en) * 2016-11-23 2017-06-09 北京中联天盛建材有限公司 A kind of waterproof wall body structure and watertight building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1184193A (en) * 1996-12-02 1998-06-10 谢宗义 Waterproof construction method and equipment for concrete crack deposition
CN1982541A (en) * 2005-12-14 2007-06-20 李应芝 Underground channel of hydroelectric station and cavity group waterproofing and leakage-stopping construction
CN103015538A (en) * 2011-09-22 2013-04-03 江苏鼎达建筑新技术有限公司 Leakage prevention device and leakage treatment method for concrete structure deformation joint
CN102505663A (en) * 2011-10-14 2012-06-20 中煤建筑安装工程公司第七十三工程处 Method for repairing seepage of concentration tank and water tank
CN102776905A (en) * 2012-07-21 2012-11-14 金坛建工集团有限公司 Grouting stoppage and guide repair method for leakage of deformation joint and special grouting device for grouting stoppage and guide repair method for leakage of deformation joint
KR101372749B1 (en) * 2013-07-15 2014-03-11 (주)대한콜크 Multi-performance functional water stop plate with composite structure
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN206233390U (en) * 2016-11-23 2017-06-09 北京中联天盛建材有限公司 A kind of waterproof wall body structure and watertight building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629841A (en) * 2018-12-07 2019-04-16 江苏工程职业技术学院 A method of for preventing and treating water leakage in building wall bodies
CN110158666A (en) * 2019-06-18 2019-08-23 四川童燊防水工程有限公司 Building basement top plate subsiding crack plugging structure and its construction method
CN111550070A (en) * 2020-05-09 2020-08-18 上海橡树装饰工程有限公司 Deep seam repairing construction method
CN114086673A (en) * 2021-11-24 2022-02-25 中天建设集团有限公司 Method for plugging damper position of high-rise building outer wall

Similar Documents

Publication Publication Date Title
CN106013259B (en) Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN108086492A (en) A kind of sealing blocking method and waterproof wall body structure
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN107201910A (en) For shaking traffic tunnel fracture plugging and reinforcement means under bumpy weather
CN105951859A (en) Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement
CN104929143B (en) A kind of bottom of foundation ditch dewatering well shut-in well method
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN107575250B (en) Operation phase duct pieces of shield tunnel seam blowby area method for blocking and radical cure method for maintaining
CN206539354U (en) A kind of tunnel double-lining surface seep water cure structure
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN109371861A (en) A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN105908974A (en) Method of steel-bar sleeve grouting connection construction for vertical precast concrete component
CN206233390U (en) A kind of waterproof wall body structure and watertight building
CN207079638U (en) The waterproof construction of gravity dam retaining wall retaining design high-low bay sole plate
CN104988955A (en) Drainage-prevention combined waterproof system for ultra-deep basement and construction method
CN106894428A (en) Multi-channel waterproof plugging method for dewatering well of thick and large raft foundation
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN105926538B (en) A kind of vertical sealing swaging die of concrete works movement joint with reinforcing fiber
CN209179060U (en) The deformation joint structure of underground pipe gallery
CN109667586B (en) Grouting method of double-layer well wall grouting system
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN207143920U (en) Water-stopping system between novel pile under a kind of complicated circumstance of flowing water
CN109469102A (en) Piping lane expansion joint method for waterproofing
CN203768925U (en) Seal device for dewatering well in foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20210122

AD01 Patent right deemed abandoned