CN108086130A - A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled - Google Patents
A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled Download PDFInfo
- Publication number
- CN108086130A CN108086130A CN201611046749.5A CN201611046749A CN108086130A CN 108086130 A CN108086130 A CN 108086130A CN 201611046749 A CN201611046749 A CN 201611046749A CN 108086130 A CN108086130 A CN 108086130A
- Authority
- CN
- China
- Prior art keywords
- steel tube
- tube confinement
- column
- steel
- bent cap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention provides a kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connections of assembled.Steel tube confinement reinforced column and bent cap are prefabricated in the factory, and pre-buried shaped steel shear key and grout sleeve in bent cap, and pier top groove and anchor bar are reserved in steel tube confinement reinforced column, and last scene splicing passes through connection of being in the milk.Prefabricated T-shaped steel tube confinement reinforced column in the present invention, which has, makes full use of the strength of materials, and fire-resistance anti-seismic performance is good, it is good in economic efficiency the advantages that.The present invention using fabricated construction, have many advantages, such as speed of application is fast, construction quality is high, construction environment improvement, working condition improvement, energy resource saving, cost savings.The present invention reserves groove in column, and shaped steel shear key is reserved in bent cap, and connects the two by way of injecting grouting material and fixes;The more existing assembled column of which can effectively improve the reliability being connected with bent cap connection mode and construct more convenient.
Description
Technical field
The invention belongs to a kind of bridge structure constructions, the more particularly to T-shaped steel tube confinement reinforced concrete bridge pier beam of assembled
Column connected node..
Background technology
Steel tube confined concrete fill concrete in thin-wall steel tube, steel pipe do not directly take on external loads, and main right
Core concrete plays a kind of combined member of effect of contraction;As a kind of new structure, steel tube confined concrete structure tool
There is high capacity, antidetonation and fire resistance are superior, can make full use of the advantages such as the intensity of high-strength steel and concrete.When steel pipe about
When beam reinforced column outside steel pipe is circular, steel pipe constrains uniformly core concrete, and steel pipe tension can be made full use of strong
Degree, economic benefit are good;The time can be saved to a greater extent using assembled in the structure, obtained in building structure
Using.The T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled is proposed according to industrialized building feature.
The content of the invention
For the popularization T-shaped steel tube confinement reinforced column of assembled in bridge structure, its mechanical property advantage is played,
Quantity of material is reduced to improve economic performance, the present invention provides a kind of T-shaped steel tube confinement reinforced concrete bridge pier beam columns of assembled
Connecting node.
To realize the present invention purpose and the technical solution adopted is that such, a kind of T-shaped steel tube confinement reinforcing bar of assembled mixes
Solidifying soil bridge pier beam-column connection, it is characterised in that:Including bent cap, steel tube confinement reinforced column, grout sleeve and basis.
The bent cap is prefabrication.Pre-buried shaped steel shear key and several pier top anchor bars in the bent cap.Grouting
Before sleeve is formed, annular groove is reserved in the lower surface of bent cap, and the upper end of the pier top anchor bar is located in bent cap, lower end is located at ring
In shape slot.The upper end of the shaped steel shear key is located in bent cap, the lower surface of lower end exposing bent cap.The steel shear key is located at institute
It states among annular groove.
The steel tube confinement reinforced column is prefabrication, outside mixed by the constraint of steel pipe package, inside for reinforcing bar
Solidifying soil.The lower end of the steel tube confinement reinforced column is connected with basis.
The pre-buried several anchor bars of steel tube confinement reinforced column.Expose steel pipe in the upper end of these anchor bars
Constrain the upper surface of reinforced column.Reserve pier top groove in the upper surface of the steel tube confinement reinforced column.The pier
Top groove is located at the center in the region that anchor bar surrounds.
After the bent cap to be lifted into the top of steel tube confinement reinforced column, annular groove is stretched into the upper end of anchor bar
In.The lower end of steel shear key is stretched into grout sleeve.
By the pipeline reserved on bent cap and/or steel tube confinement reinforced column, grouting material is poured into bent cap and steel pipe
Constrain the gap between reinforced column.Pier top anchor bar and anchor bar in annular groove are effectively anchored, and are formed and filled
Starch sleeve.
Further, reinforcing bar and pier top anchor bar use HRB335, HRB400 or RRB400 reinforcing bar in beam.
Further, shaped steel shear key is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
Further, the round hole for pier top groove and grout sleeve grouting is left in steel tube confinement armored concrete column top
Hole.
Further, shaped steel shear key is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
The solution have the advantages that unquestionable:
1. round steel pipe constrains reinforced column, the strength of materials can be made full use of, fire-resistance anti-seismic performance is good, economic benefit
OK etc..
2. fabricated construction, with speed of application is fast, construction quality is high, construction environment improves, working condition improves, resource
The advantages that energy conservation, cost savings.
3. reserving groove in column, shaped steel shear key is reserved in bent cap, and by the two by way of injecting grouting material
Connection is fixed;The more existing assembled column of which can effectively improve the reliability being connected with bent cap connection mode and construct more square
Just.
Description of the drawings
The T-shaped steel tube confinement reinforced concrete bridge pier front view of Fig. 1 assembleds.
The T-shaped steel tube confinement reinforced concrete bridge pier top view of Fig. 2 assembleds.
The T-shaped steel tube confinement reinforced concrete bridge pier 1-1 sectional views of Fig. 3 assembleds.
The T-shaped steel tube confinement reinforced concrete bridge pier 2-2 sectional views of Fig. 4 assembleds.
The T-shaped steel tube confinement reinforced concrete bridge pier 3-3 sectional views of Fig. 5 assembleds.
In figure:Bent cap 1, steel tube confinement reinforced column 2, shaped steel shear key 3, grout sleeve 4, grouting material 5, pier top are recessed
Slot 6, concrete seven, reinforcing bar 8, pier top anchor bar 9, anchor bar 10 in beam.
Specific embodiment
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only
It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used
With means, various replacements and change are made, should all be included within the scope of the present invention.
Referring to Fig. 1 and 2, a kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled, including bent cap 1,
Steel tube confinement reinforced column 2, grout sleeve 4 and basis.
Referring to Fig. 3 and 4, the bent cap 1 is prefabrication.Pre-buried shaped steel shear key 3 and several pier tops in the bent cap 1
Anchor bar 9.Before grout sleeve 4 is formed, annular groove is reserved in the lower surface of bent cap 1, and the upper end of the pier top anchor bar 9 is located at
Bent cap 1 is interior, lower end is located in annular groove.The upper end of the shaped steel shear key 3 is located in bent cap 1, the following table of lower end exposing bent cap 1
Face.The steel shear key 3 is located among the annular groove.
Referring to Fig. 5, the steel tube confinement reinforced column 2 is prefabrication, outside by steel pipe package constraint, internal
For armored concrete.The lower end of the steel tube confinement reinforced column 2 is connected with basis.
The pre-buried several anchor bars 10 of steel tube confinement reinforced column 2.The upper end dew of these anchor bars 10
Go out the upper surface of steel tube confinement reinforced column 2.Reserve pier top groove in the upper surface of the steel tube confinement reinforced column 2
6.The pier top groove 6 is located at the center in the region that anchor bar 10 surrounds.
After the bent cap 1 is lifted into the top of steel tube confinement reinforced column 2, ring is stretched into the upper end of anchor bar 10
In shape slot.The lower end of steel shear key 3 is stretched into grout sleeve 4.
By the pipeline reserved on bent cap 1 and/or steel tube confinement reinforced column 2, grouting material 5 is poured into 1 He of bent cap
Gap between steel tube confinement reinforced column 2.Pier top anchor bar 9 and anchor bar 10 in annular groove is by effective anchor
Gu form grout sleeve 4.
Claims (5)
1. a kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled, it is characterised in that:Including bent cap (1),
Steel tube confinement reinforced column (2), grout sleeve (4) and basis;
The bent cap (1) is prefabrication;Pre-buried shaped steel shear key (3) and several pier top anchor bars in the bent cap (1)
(9);Before grout sleeve (4) is formed, annular groove is reserved in the lower surface of bent cap (1), and the upper end of the pier top anchor bar (9) is located at
Bent cap (1) is interior, lower end is located in annular groove;The upper end of the shaped steel shear key (3) is located in bent cap (1), bent cap is exposed in lower end
(1) lower surface;The steel shear key (3) is located among the annular groove;
The steel tube confinement reinforced column (2) is prefabrication, outside by the constraint of steel pipe package, it is internal be reinforced concrete
Soil;The lower end of the steel tube confinement reinforced column (2) is connected with basis;
The pre-buried several anchor bars (10) of steel tube confinement reinforced column (2);The upper end of these anchor bars (10)
Expose the upper surface of steel tube confinement reinforced column (2);Reserve pier in the upper surface of the steel tube confinement reinforced column (2)
Push up groove (6);The pier top groove (6) is located at the center in the region that anchor bar (10) surrounds;
After the bent cap (1) is lifted into the top of steel tube confinement reinforced column (2), the upper end of anchor bar (10) is stretched into
In annular groove;The lower end of steel shear key (3) is stretched into grout sleeve (4);
By the pipeline reserved on bent cap (1) and/or steel tube confinement reinforced column (2), grouting material (5) is poured into bent cap
(1) gap between steel tube confinement reinforced column (2);Pier top anchor bar (9) and anchor bar in annular groove
(10) effectively anchored, form grout sleeve (4).
2. the T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of a kind of assembled according to claim 1, special
Sign is:Reinforcing bar (8) and pier top anchor bar (9) use HRB335, HRB400 or RRB400 reinforcing bar in beam.
3. the T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of a kind of assembled according to claim 1, special
Sign is:Shaped steel shear key (3) is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
4. the T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of a kind of assembled according to claim 1, special
Sign is:The circle for pier top groove (6) and grout sleeve (4) grouting is left at the top of steel tube confinement reinforced column (2)
Hole.
5. the T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of a kind of assembled according to claim 1, special
Sign is:Shaped steel shear key (3) is made of Q235 steel, Q345 steel, Q390 steel or Q420 steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611046749.5A CN108086130B (en) | 2016-11-23 | 2016-11-23 | Assembled T-shaped steel pipe constraint reinforced concrete bridge pier beam column connection node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611046749.5A CN108086130B (en) | 2016-11-23 | 2016-11-23 | Assembled T-shaped steel pipe constraint reinforced concrete bridge pier beam column connection node |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086130A true CN108086130A (en) | 2018-05-29 |
CN108086130B CN108086130B (en) | 2023-10-13 |
Family
ID=62170241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611046749.5A Active CN108086130B (en) | 2016-11-23 | 2016-11-23 | Assembled T-shaped steel pipe constraint reinforced concrete bridge pier beam column connection node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086130B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485264A (en) * | 2019-08-21 | 2019-11-22 | 保利长大工程有限公司 | A kind of center pier great cantilever bent cap and its construction method |
CN111254809A (en) * | 2019-12-12 | 2020-06-09 | 中铁二院工程集团有限责任公司 | Prefabricated pier stud and prefabricated bent cap quick connect structure |
CN112176886A (en) * | 2020-11-16 | 2021-01-05 | 山东高速建设管理集团有限公司 | Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof |
CN112942078A (en) * | 2021-02-03 | 2021-06-11 | 中国地震局工程力学研究所 | L-shaped joint assembly type splicing pier |
CN113944099A (en) * | 2021-10-29 | 2022-01-18 | 中交路桥建设有限公司 | Gate-type pier capping beam built-in anti-seismic reinforcing steel bar structure and construction method thereof |
CN114908870A (en) * | 2022-05-13 | 2022-08-16 | 西安建筑科技大学 | Novel assembled reinforced concrete beam column node |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012211452A1 (en) * | 2012-08-09 | 2014-02-27 | Jfe Steel Corporation | Joint structure of column and steel pipe pile |
CN105421223A (en) * | 2015-12-21 | 2016-03-23 | 上海市城市建设设计研究总院 | Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method |
CN105803925A (en) * | 2016-03-17 | 2016-07-27 | 浙江大学 | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam |
CN205444475U (en) * | 2016-03-11 | 2016-08-10 | 中民筑友有限公司 | Prefab and basic connected node |
CN105863049A (en) * | 2016-05-26 | 2016-08-17 | 南京长江都市建筑设计股份有限公司 | Prefabricated assembled integral framework column bottom grouting structure |
CN105908621A (en) * | 2016-06-29 | 2016-08-31 | 北京工业大学 | Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof |
CN106088348A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN106088351A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN206512588U (en) * | 2016-11-23 | 2017-09-22 | 重庆市中科大业建筑科技有限公司 | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled |
-
2016
- 2016-11-23 CN CN201611046749.5A patent/CN108086130B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012211452A1 (en) * | 2012-08-09 | 2014-02-27 | Jfe Steel Corporation | Joint structure of column and steel pipe pile |
CN105421223A (en) * | 2015-12-21 | 2016-03-23 | 上海市城市建设设计研究总院 | Prefabricated pier upright column, cushion cap spigot and insertion groove combined connection structure and splicing method |
CN205444475U (en) * | 2016-03-11 | 2016-08-10 | 中民筑友有限公司 | Prefab and basic connected node |
CN105803925A (en) * | 2016-03-17 | 2016-07-27 | 浙江大学 | Quick connection method for prefabricated steel pipe constraint type steel concrete pier columns and cover beam |
CN105863049A (en) * | 2016-05-26 | 2016-08-17 | 南京长江都市建筑设计股份有限公司 | Prefabricated assembled integral framework column bottom grouting structure |
CN105908621A (en) * | 2016-06-29 | 2016-08-31 | 北京工业大学 | Damage-controllable self-resetting section prefabricated assembled steel pipe concrete bridge pier and manufacturing method thereof |
CN106088348A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN106088351A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast concrete method of attachment |
CN206512588U (en) * | 2016-11-23 | 2017-09-22 | 重庆市中科大业建筑科技有限公司 | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485264A (en) * | 2019-08-21 | 2019-11-22 | 保利长大工程有限公司 | A kind of center pier great cantilever bent cap and its construction method |
CN110485264B (en) * | 2019-08-21 | 2020-06-02 | 保利长大工程有限公司 | Construction method of central pier large cantilever cover beam |
US10914043B1 (en) | 2019-08-21 | 2021-02-09 | Poly Changda Engineering Co., Ltd. | Construction method for a cantilever beam on a central pier |
CN111254809A (en) * | 2019-12-12 | 2020-06-09 | 中铁二院工程集团有限责任公司 | Prefabricated pier stud and prefabricated bent cap quick connect structure |
CN112176886A (en) * | 2020-11-16 | 2021-01-05 | 山东高速建设管理集团有限公司 | Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof |
CN112942078A (en) * | 2021-02-03 | 2021-06-11 | 中国地震局工程力学研究所 | L-shaped joint assembly type splicing pier |
CN113944099A (en) * | 2021-10-29 | 2022-01-18 | 中交路桥建设有限公司 | Gate-type pier capping beam built-in anti-seismic reinforcing steel bar structure and construction method thereof |
CN113944099B (en) * | 2021-10-29 | 2023-09-26 | 中交路桥建设有限公司 | Built-in anti-seismic steel bar structure of door pier capping beam and construction method thereof |
CN114908870A (en) * | 2022-05-13 | 2022-08-16 | 西安建筑科技大学 | Novel assembled reinforced concrete beam column node |
Also Published As
Publication number | Publication date |
---|---|
CN108086130B (en) | 2023-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108086130A (en) | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled | |
CN206512588U (en) | A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled | |
CN108301561A (en) | A kind of connection structure of assembly concrete-filled steel tube shaft | |
CN207003652U (en) | A kind of compound concrete-filled tubular column and steel tube concrete beam composite frame structure | |
CN206512590U (en) | A kind of assembled hollow steel pipe constrains reinforced column squat pier | |
CN208533868U (en) | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column | |
CN107190635A (en) | Concrete-filled steel tube with dumbbell sections assembled pier and the connection structure and method with cushion cap | |
CN106368348A (en) | Overlapped combined shear wall with double-phase stress characteristic | |
CN115045181A (en) | Socket joint type node connection method and structure for prefabricated pier column and bearing platform in middle and high intensity region | |
CN108086134A (en) | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier | |
CN210459769U (en) | Prefabricated hollow column and assembled concrete column | |
CN103924676B (en) | Prestressing force connects beams of concrete concrete-filled circular steel tube column node | |
CN109518593A (en) | Assembly concrete-filled steel tube lattice pier | |
CN103924679B (en) | Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars | |
CN108086135B (en) | Assembled steel pipe constraint reinforced concrete bent bridge pier | |
CN103147438A (en) | Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile | |
CN105735517B (en) | Assembled steel reinforced concrete wall structure based on heat bridge separating technology | |
CN206359881U (en) | A kind of assembled hollow steel pipe constrains armored concrete pillar height pier | |
CN207032010U (en) | A kind of assembled solid steel tube constrains armored concrete pillar height pier | |
CN108086136B (en) | Assembled solid steel pipe constraint reinforced concrete column short pier | |
CN108103925B (en) | Assembled hollow steel tube constraint reinforced concrete column short pier | |
CN204940527U (en) | With the precast member for reinforcing bar concrete that indeterminate node connects | |
CN206359882U (en) | A kind of assembled solid steel tube constrains reinforced column squat pier | |
CN108590037A (en) | A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column | |
CN103938732A (en) | Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |