CN108075472A - A kind of supply path setting method based on intelligent terminal - Google Patents

A kind of supply path setting method based on intelligent terminal Download PDF

Info

Publication number
CN108075472A
CN108075472A CN201711461700.0A CN201711461700A CN108075472A CN 108075472 A CN108075472 A CN 108075472A CN 201711461700 A CN201711461700 A CN 201711461700A CN 108075472 A CN108075472 A CN 108075472A
Authority
CN
China
Prior art keywords
intelligent terminal
supply path
average
real
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711461700.0A
Other languages
Chinese (zh)
Inventor
耿风慧
马剑
张国斌
王丹
崔玉辉
宋春雨
孙俊明
于希军
刘云涛
齐滨
成印健
郝伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201711461700.0A priority Critical patent/CN108075472A/en
Publication of CN108075472A publication Critical patent/CN108075472A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J13/0075
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of supply path setting methods based on intelligent terminal, pass through the intelligent terminal being arranged in power grid, for the purpose of the safe and stable operation of full-scope safeguards system, in the case of the economic loss that may be brought in consideration rate load level and reconstruct, by optimizing supply path so that electric system, which is tried one's best, is chronically at the state of most economical safe and stable operation.Method includes:It determines the initial grid structure of power grid, initializes Power grid structure;The load value that control centre gathers in real time according to intelligent terminal judges whether supply path needs to change, and need not change if load value is in allowed band, otherwise ending method continues;Control centre obtains power network topology circuit set, and resets supply path according to the object function related with economic loss.

Description

A kind of supply path setting method based on intelligent terminal
Technical field
The present invention relates to a kind of supply path setting method based on intelligent terminal, especially one kind can ensure power train The unified supply path setting method for directly stablizing safe and economical operation.
Background technology
The memory technology of a large amount of electric energy due to be limited to the development level of battery at this stage and can not large-scale application to electric In net, therefore, the electric energy of electric system is still still realized when load change is larger in present power grid using traditional measure The equilibrium of supply and demand, such as regulator generator are contributed, adjustment interconnection switch etc..
However, the existing premise for realizing power balance is that power grid larger load level variation integrally occurs, do not have Targetedly the considerations of power grid in specific node tolerable degree, this may cause need reconstruct rack in the case of do not have There is the change for implementing rack, such as in the case that load change direction is opposite at the different nodes, although integral load changes water It is flat smaller due to positive and negative offset but can not be with load for a certain node and the circuit being connected with the node.And And the reconstruct of supply path has seriously affected the service life of electric power component in electric system, while add electric power system fault Possibility.
The content of the invention
Therefore, in view of the above-mentioned problems, the present invention provides a kind of supply path setting method based on intelligent terminal, the party Method, for the purpose of the safe and stable operation of full-scope safeguards system, is considering load based on the intelligent terminal being arranged in power grid In the case of the economic loss that horizontal and reconstruct may be brought, by optimizing supply path so that electric system is as far as possible long-term State in most economical safe and stable operation.
In order to achieve the above object, the present invention proposes a kind of supply path setting method based on intelligent terminal, including Following steps:
1. initialize Power grid structure;
2. judge whether supply path needs to change;
3. reset supply path.
The above-mentioned supply path setting method based on intelligent terminal, also meets condition:Step 1 includes:
1.1 determine the initial grid structure of power grids, and the initial grid structure is power grid to meet all network load nodes Average load demand and reach most economical state simultaneously and operate generator, switch so as to formed initial Net Frame of Electric Network knot Structure;
1.2 according to initial Power grid structure control generator, switch action so that actual electric network according to it is definite just Beginning Power grid structure is run.
The above-mentioned supply path setting method based on intelligent terminal, also meets condition:Step 2 includes:
2.1 set an intelligent terminal in each network load node, and the intelligent terminal gathers corresponding network load in real time The real-time load numerical value of node, the shared n intelligent terminal T1, T2 set with n network load node one-to-one corresponding ..., Tn;
The permission model that the real-time load numerical value for the correspondence network load node that 2.2 each intelligent terminals are gathered prestores with itself It encloses and is compared, when the lower limit or the upper limit more than allowed band that the real-time load numerical value is less than allowed band, intelligence Terminal will ask the information redistributed and the real-time load numerical value to be sent to control centre, shared m intelligent terminal T1, T2 ..., Tm the information redistributed and real-time load numerical value will be asked to be sent to control centre;
2.3 control centres judge the information redistributed of request sent in the information received with the presence or absence of an intelligent terminal and Whether real-time load numerical value, i.e. m are not 0, and if so, judging that supply path needs to change, are simultaneously emitted by report real-time load It instructs to the information and the intelligent terminal Tm+ of real-time load numerical value do not redistributed to control centre's transmission request 1st ..., Tn, intelligent terminal Tm+1 ..., Tn receive report real-time load instruction when will itself detection correspondence power grid The real-time load numerical value of load bus returns to control centre;If there is no then ending method.
The above-mentioned supply path setting method based on intelligent terminal, also meets condition:Step 3 includes:
3.1 control centres are according to the real-time load numerical value of all network load nodes, by computer program emulation, in power grid tide Flow section is stable and under conditions of meeting N-2, obtains power grid to meet the real-time load numerical value of all network load nodes Demand and the new power network topology circuit set { S1, S2 ... Sp } that may be employed;
3.2 control centres are by each new power network topology circuit initial power network topology circuit corresponding with initial Power grid structure It is compared, obtains the situation that p power network topology circuit needs change, the corresponding power network topology electricity of new power network topology circuit Si Road change conditions include:Generator is by stopping quantity mgSi to, generator by playing the quantity ngSi stopped, overload number of, lines MlSi, light-loaded circuit quantity nlSi, line loss increase economic loss PLSi, switch by reaching the quantity msSi closed, switch by closing The quantity nsSi, mgSi, ngSi, mlSi, nlSi, msSi, nsSi that open are the natural number since 0;
3.3 control centres according to object function minFun in S1, S2 ... optimal power network topology circuit is selected in Sp;
Wherein, PGm is to be averaged each generator by stopping the economic loss brought to, by generator average price divided by generator It is average in specified life cycle to be obtained by stopping the number to;PGn is average each generator by playing the economy for stopping bringing Loss is obtained by generator average price divided by generator are average in specified life cycle by playing the number stopped;PLm is flat The economic loss that every overload circuit is brought is multiplied by average life span cycle and the line of circuit overload operation by circuit average price The ratio in the average life span cycle of the specified operation in road;PLn is the economic loss that average every light-loaded circuit is brought, and is averaged by circuit Price is multiplied by the ratio in the average life span cycle of circuit light running and the average life span cycle of the specified operation of circuit;PSm is flat Each switch by reaching the economic loss closed and brought, by switch average price divided by switch in specified life cycle it is average by The number closed is reached to obtain;PSn, by closing the economic loss opened and brought, by switch average price divided by opens for average each switch It closes and is averagely obtained in specified life cycle by the number closed out;
3.4 reset supply path according to the optimal power network topology circuit of selection.
The above-mentioned supply path setting method based on intelligent terminal, also meets condition:The intelligent terminal includes channel radio Believe module.
The above-mentioned supply path setting method based on intelligent terminal, also meets condition:The wireless communication module for GPRS, One or more combination among 4G, 5G, Zigbee.
The above-mentioned supply path setting method based on intelligent terminal, also meets condition:The wireless communication module can also be real Communication between existing intelligent terminal.
The present invention is by the intelligent terminal that is arranged in power grid, for the purpose of the safe and stable operation of full-scope safeguards system, In the case where considering load level and reconstructing the economic loss that may be brought, by optimizing supply path so that electric power Systems attempt is chronically at the state of most economical safe and stable operation.
Description of the drawings
Fig. 1 is the supply path setting method flow chart based on intelligent terminal.
Specific embodiment
Fig. 1 is referred to, a kind of supply path setting method based on intelligent terminal comprises the following steps:
1. initialize Power grid structure:
1.1 determine the initial grid structure of power grids, and the initial grid structure is power grid to meet all network load nodes Average load demand and reach most economical state simultaneously and operate generator, switch so as to formed initial Net Frame of Electric Network knot Structure;
1.2 according to initial Power grid structure control generator, switch action so that actual electric network according to it is definite just Beginning Power grid structure is run.
2. judge whether supply path needs to change:
2.1 set an intelligent terminal in each network load node, and the intelligent terminal gathers corresponding network load in real time The real-time load numerical value of node, the shared n intelligent terminal T1, T2 set with n network load node one-to-one corresponding ..., Tn;
The permission model that the real-time load numerical value for the correspondence network load node that 2.2 each intelligent terminals are gathered prestores with itself It encloses and is compared, when the lower limit or the upper limit more than allowed band that the real-time load numerical value is less than allowed band, intelligence Terminal will ask the information redistributed and the real-time load numerical value to be sent to control centre, shared m intelligent terminal T1, T2 ..., Tm the information redistributed and real-time load numerical value will be asked to be sent to control centre;
The intelligent terminal of each network load node realizes that load value is judged so as to which the comprehensive safety of safeguards system is steady It is fixed.Intelligent terminal can just communicate in the case of over range with control centre, so as to reduce the degree of crowding of communication port, protect The stabilization, reliable of data transmission is hindered.
2.3 control centres judge the information that the request sent in the information received with the presence or absence of an intelligent terminal is redistributed And whether real-time load numerical value, i.e. m are not 0, and if so, judging that supply path needs to change, it is real-time to be simultaneously emitted by report Load instruction asks the intelligent terminal Tm+ for the information and real-time load numerical value redistributed to not sent to control centre 1st ..., Tn, intelligent terminal Tm+1 ..., Tn receive report real-time load instruction when will itself detection correspondence power grid The real-time load numerical value of load bus returns to control centre.
3. reset supply path:
3.1 control centres are according to the real-time load numerical value of all network load nodes, by computer program emulation, in power grid tide Flow section is stable and under conditions of meeting N-2, obtains power grid to meet the real-time load numerical value of all network load nodes Demand and the new power network topology circuit set { S1, S2 ... Sp } that may be employed;
3.2 control centres are by each new power network topology circuit initial power network topology circuit corresponding with initial Power grid structure It is compared, obtains the situation that p power network topology circuit needs change, the corresponding power network topology electricity of new power network topology circuit Si Road change conditions include:Generator is by stopping the quantity mg toSi, generator is by playing the quantity ng stoppedSi, overload number of, lines mlSi, light-loaded circuit quantity nlSi, line loss increase economic loss PLSi, switch by reaching the quantity ms closedSi, switch is by closing open Quantity nsSi, mgSi、ngSi、mlSi、nlSi、msSi、nsSiIt is the natural number since 0;
3.3 control centres according to object function minFun in S1, S2 ... optimal power network topology circuit is selected in Sp;
Wherein, PGmIt is averagely each generator by stopping the economic loss brought to, by generator average price divided by generator It is average in specified life cycle to be obtained by stopping the number to;PGnIt is that averagely each generator is damaged by playing the economy for stopping bringing It loses, is obtained by generator average price divided by generator are average in specified life cycle by playing the number stopped;PLmIt is average The economic loss that every overload circuit is brought is multiplied by average life span cycle and the circuit of circuit overload operation by circuit average price The ratio in the average life span cycle of specified operation;PLnFor the economic loss that averagely every light-loaded circuit is brought, by circuit flat fare Lattice are multiplied by the ratio in the average life span cycle of circuit light running and the average life span cycle of the specified operation of circuit;PSmFor averagely often A switch is average by reaching in specified life cycle by switch average price divided by switch by reaching the economic loss closed and brought The number closed obtains;PSnIt is that averagely each switch by closing the economic loss opened and brought, is existed by switch average price divided by switch It is average in specified life cycle to be obtained by the number closed out;
3.4 reset supply path according to the optimal power network topology circuit of selection.
Intelligent terminal includes wireless communication module, one kind or more among wireless communication module GPRS, 4G, 5G, Zigbee The combination of kind, wireless communication module can also realize the communication between intelligent terminal.
It is it should be noted that made for the present invention further specifically the above content is specific embodiment is combined It is bright, it is impossible to assert that the specific embodiment of the present invention is only limitted to this, under the above-mentioned guidance of the present invention, those skilled in the art can To carry out various improvement and deformation on the basis of above-described embodiment, and these are improved or deformation falls in protection model of the invention In enclosing.

Claims (7)

1. a kind of supply path setting method based on intelligent terminal, comprises the following steps:
1. initialize Power grid structure;
2. judge whether supply path needs to change;
3. reset supply path.
2. a kind of supply path based on intelligent terminal according to claim 1 sets device, which is characterized in that step 1 Including:
1.1 determine the initial grid structure of power grids, and the initial grid structure is power grid to meet all network load nodes Average load demand and reach most economical state simultaneously and operate generator, switch so as to formed initial Net Frame of Electric Network knot Structure;
1.2 according to initial Power grid structure control generator, switch action so that actual electric network according to it is definite just Beginning Power grid structure is run.
A kind of 3. supply path setting method based on intelligent terminal according to claim 2, which is characterized in that step 2 Including:
2.1 set an intelligent terminal in each network load node, and the intelligent terminal gathers corresponding network load in real time The real-time load numerical value of node, the shared n intelligent terminal T1, T2 set with n network load node one-to-one corresponding ..., Tn;
The permission model that the real-time load numerical value for the correspondence network load node that 2.2 each intelligent terminals are gathered prestores with itself It encloses and is compared, when the lower limit or the upper limit more than allowed band that the real-time load numerical value is less than allowed band, intelligence Terminal will ask the information redistributed and the real-time load numerical value to be sent to control centre, shared m intelligent terminal T1, T2 ..., Tm the information redistributed and real-time load numerical value will be asked to be sent to control centre;
2.3 control centres judge the information redistributed of request sent in the information received with the presence or absence of an intelligent terminal and Whether real-time load numerical value, i.e. m are not 0, and if so, judging that supply path needs to change, are simultaneously emitted by report real-time load It instructs to the information and the intelligent terminal Tm+ of real-time load numerical value do not redistributed to control centre's transmission request 1st ..., Tn, intelligent terminal Tm+1 ..., Tn receive report real-time load instruction when will itself detection correspondence power grid The real-time load numerical value of load bus returns to control centre;If there is no then ending method.
A kind of 4. supply path setting method based on intelligent terminal according to claim 3, which is characterized in that step 3 Including:
3.1 control centres are according to the real-time load numerical value of all network load nodes, by computer program emulation, in power grid tide Flow section is stable and under conditions of meeting N-2, obtains power grid to meet the real-time load numerical value of all network load nodes Demand and the new power network topology circuit set { S1, S2 ... Sp } that may be employed;
3.2 control centres are by each new power network topology circuit initial power network topology circuit corresponding with initial Power grid structure It is compared, obtains the situation that p power network topology circuit needs change, the corresponding power network topology electricity of new power network topology circuit Si Road change conditions include:Generator is by stopping quantity mgSi to, generator by playing the quantity ngSi stopped, overload number of, lines MlSi, light-loaded circuit quantity nlSi, line loss increase economic loss PLSi, switch by reaching the quantity msSi closed, switch by closing The quantity nsSi, mgSi, ngSi, mlSi, nlSi, msSi, nsSi that open are the natural number since 0;
3.3 control centres according to object function minFun in S1, S2 ... optimal power network topology circuit is selected in Sp;
Wherein, PGm is to be averaged each generator by stopping the economic loss brought to, by generator average price divided by generator It is average in specified life cycle to be obtained by stopping the number to;PGn is average each generator by playing the economy for stopping bringing Loss is obtained by generator average price divided by generator are average in specified life cycle by playing the number stopped;PLm is flat The economic loss that every overload circuit is brought is multiplied by average life span cycle and the line of circuit overload operation by circuit average price The ratio in the average life span cycle of the specified operation in road;PLn is the economic loss that average every light-loaded circuit is brought, and is averaged by circuit Price is multiplied by the ratio in the average life span cycle of circuit light running and the average life span cycle of the specified operation of circuit;PSm is flat Each switch by reaching the economic loss closed and brought, by switch average price divided by switch in specified life cycle it is average by The number closed is reached to obtain;PSn, by closing the economic loss opened and brought, by switch average price divided by opens for average each switch It closes and is averagely obtained in specified life cycle by the number closed out;
3.4 reset supply path according to the optimal power network topology circuit of selection.
A kind of 5. supply path setting method based on intelligent terminal according to claim 4, which is characterized in that the intelligence Energy terminal includes wireless communication module.
A kind of 6. supply path setting method based on intelligent terminal according to claim 5, which is characterized in that the nothing Line communication module is combination one or more among GPRS, 4G, 5G, Zigbee.
A kind of 7. supply path setting method based on intelligent terminal according to claim 6, which is characterized in that the nothing Line communication module can also realize the communication between intelligent terminal.
CN201711461700.0A 2017-12-28 2017-12-28 A kind of supply path setting method based on intelligent terminal Pending CN108075472A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711461700.0A CN108075472A (en) 2017-12-28 2017-12-28 A kind of supply path setting method based on intelligent terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711461700.0A CN108075472A (en) 2017-12-28 2017-12-28 A kind of supply path setting method based on intelligent terminal

Publications (1)

Publication Number Publication Date
CN108075472A true CN108075472A (en) 2018-05-25

Family

ID=62156224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711461700.0A Pending CN108075472A (en) 2017-12-28 2017-12-28 A kind of supply path setting method based on intelligent terminal

Country Status (1)

Country Link
CN (1) CN108075472A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103426033A (en) * 2013-07-31 2013-12-04 国电南瑞科技股份有限公司 Power distribution network fault recovery optimization rebuilding algorithm based on critical path method
CN103746376A (en) * 2014-01-21 2014-04-23 重庆大学 Power distribution network dynamic power restoration method based on load curve
CN106779168A (en) * 2016-11-23 2017-05-31 国网山东省电力公司威海供电公司 A kind of distribution transformer addressing and low pressure rack plan optimization method
CN107516898A (en) * 2017-09-28 2017-12-26 国网山东省电力公司乳山市供电公司 A kind of intelligent dispatching method of active distribution network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103426033A (en) * 2013-07-31 2013-12-04 国电南瑞科技股份有限公司 Power distribution network fault recovery optimization rebuilding algorithm based on critical path method
CN103746376A (en) * 2014-01-21 2014-04-23 重庆大学 Power distribution network dynamic power restoration method based on load curve
CN106779168A (en) * 2016-11-23 2017-05-31 国网山东省电力公司威海供电公司 A kind of distribution transformer addressing and low pressure rack plan optimization method
CN107516898A (en) * 2017-09-28 2017-12-26 国网山东省电力公司乳山市供电公司 A kind of intelligent dispatching method of active distribution network

Similar Documents

Publication Publication Date Title
Hussain et al. Communication modeling of solar home system and smart meter in smart grids
CN104659780B (en) Suitable for the implementation method for the energy internet for dissolving large-scale distributed power supply
CN103944178B (en) Intelligent distribution network energy balance optimization dispatching method
JP6585454B2 (en) Power demand management apparatus and power demand management method for communication equipment
US20160233682A1 (en) Power Quality of Service Optimization for Microgrids
CN103970089B (en) Household electricity load intellectualized management system and method
CN105915250B (en) Method, equipment and the system of information in a kind of wearable device synchronous mobile terminal
CN106384162B (en) Consider electric system electric energy-spare joint optimal operation method of zonal reserve and N-1 verification
CN104505864B (en) Demand response control strategy analogue system and method for distributed power generation of dissolving
CN106160000B (en) The wind-powered electricity generation that a kind of point of tune-province's tune two-stage is coordinated issues additional control method
CN104036343B (en) A kind of Electric power network planning method based on multi-core construction network mode
CN109936395A (en) A kind of more charging pile networking control systems and method based on power coordination
Ahmed et al. Implementation of smart system based on smart grid Smart Meter and smart appliances
CN111740416A (en) Target cascade analysis-based receiving-end power grid direct-current maximum feed-in quantity evaluation method
CN111368407A (en) Power information physical system modeling method and system considering multilayer coupling
CN106340893A (en) Distributed photovoltaic power generation power control method based on virtual power plant
CN108075472A (en) A kind of supply path setting method based on intelligent terminal
CN104994030B (en) A kind of distribution method of dynamic bandwidth of EPON communication systems suitable for intelligent distribution network
CN107516898B (en) A kind of intelligent dispatching method of active distribution network
US11159046B1 (en) Dynamic computation and control of distributed assets at the edge of a power grid
CN104573878A (en) Coordination method of new energy source dispatching plan
CN107994585A (en) A kind of multifunction power control terminal
WO2021062573A1 (en) Load balancing system and method
CN102290816A (en) Method of regulating power consumption of electric equipment according to load of electrical power system and corresponding system and equipment
Zadeh et al. Model-Driven Microgrid Controller

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180525

RJ01 Rejection of invention patent application after publication