CN108071400A - Horizontal freezing consolidation combines shield driving construction method with steel jacket box - Google Patents

Horizontal freezing consolidation combines shield driving construction method with steel jacket box Download PDF

Info

Publication number
CN108071400A
CN108071400A CN201610988159.8A CN201610988159A CN108071400A CN 108071400 A CN108071400 A CN 108071400A CN 201610988159 A CN201610988159 A CN 201610988159A CN 108071400 A CN108071400 A CN 108071400A
Authority
CN
China
Prior art keywords
freezing
hole
steel
jacket box
steel jacket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610988159.8A
Other languages
Chinese (zh)
Inventor
葛艺超
姚喜民
凌建宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201610988159.8A priority Critical patent/CN108071400A/en
Publication of CN108071400A publication Critical patent/CN108071400A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Soil Sciences (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Shield driving construction method is combined with steel jacket box the present invention relates to a kind of horizontal freezing consolidation, freezing hole and thermometer hole are arranged at portal;Single portal, which freezes refrigeration equipment, to be included:Freeze unit, salt water circulating pump, cooling water circulating pump and cooling tower;Steel jacket box is including bolted adjustment ring, standard ring and rear end cap, adjustment ring front end are welded to connect with portal steel ring successively;Standard ring lower part is equipped with bearing, and standard ring is divided into two halves up and down, by being bolted;Counter force system is made of reaction frame and bracing members, and the force request of casing, is first laid with low grade mortar in steel jacket box when so that the counter force system is met shield;Soil of filling in barn is added in steel jacket box top-feed mouth from ground using conduit, making stream shape soil, remaining local space adds water to fill up full of steel jacket box, it is ensured that steel jacket box sealing is not leaked.The present invention improves shield-tunneling construction into the success rate and security in hole, and water burst when reducing shield gushes the risk of sand.

Description

Horizontal freezing consolidation combines shield driving construction method with steel jacket box
Technical field
The present invention relates to a kind of shield driving construction method, horizontal freezing consolidation combines shield construction party with steel jacket box Method.
Background technology
In China in recent years, City Underground Transportation is just in development like a raging fire." shield method " is undoubtedly carries out city instantly The preferred construction method of city's underground traffic construction." into hole " is risk control point important in Analysis on Shield Tunnel Driven Process.Into hole Water burst easily occurs in the process, gushes sand, landslide equivalent risk, therefore needs to take in complicated poor strata shield work progress Corresponding technical measures, to ensure shield-tunneling construction into the safety in hole.Current existing shield safeguards technique measure is mainly: Cement system method for strengthening shield construction technology.
Construction technique is reinforced using cement system and carries out shield portal soil stabilization, is had:Applicable stratum is wide, former material The material extent of supply is wide, consolidation shape can control and intensity is high, durability and concrete castability are good, maneuverability, slurries are concentrated and It is lost in less.Shortcoming is:When stake it is long more than 15m after pile body verticality be relatively difficult to guarantee, easily cause overlap joint occlusion effect between pile body Fruit is bad, and the effect of preferable sealing and soil mass consolidation is not achieved;It is poor to reinforce adaptability for sand, powder land floor.
The content of the invention
It is contemplated that the defects of overcoming the prior art, provides a kind of horizontal freezing consolidation and combines shield with steel jacket box Construction method avoids the reinforcing of cement system and is engaged bad the problem of causing water-stagnating effect bad;Also solves vertical freezing simultaneously The problem of method for strengthening is influenced by the limitation of ground construction condition and shield buried depth.
In order to solve the above-mentioned technical problem, the present invention is realized in:
A kind of horizontal freezing consolidation combines shield driving construction method with steel jacket box, which is characterized in that it includes:
(One)Shield horizontal freezing Design of Reinforcement and construction;
(1)Consolidation by freezing thickness designs;
P=0.013H;
P is Water And Earth Pressures at the center of hole;H is hole center buried depth;
H is consolidation by freezing body thickness;D excavates interior diameter for reinforcing body;B is coefficient 1.2;P is Water And Earth Pressures at the center of hole;K For safety coefficient 2.0;σ is anti-draw strength;
(2)The arrangement of horizontal frozen hole;
Freezing hole is arranged at portal, the quantity of freezing hole is 40-60, wherein outer ring arrangement 20-50, centre circle arrangement 10- 20, inner ring arrangement 5-10 is arranged in portal center in inner ring there are one freezing hole;
Thermometer hole 6-8 are set, in the uniformly distributed 4-6 thermometer hole in outer ring, between centre circle and inner ring and inner ring and portal 1-2 thermometer hole is respectively laid between center;
(3)Freezing refrigeration design
The coefficient of heat transfer of freezing pipe takes 250kcal/m2H, loss of refrigeration capacity coefficient take 1.3, using Q=π dHKmc, wherein, Q is single A portal freezes chilling requirement, and d reinforces diameter, H consolidation by freezing thickness for freezing, and K is loss of refrigeration capacity coefficient, and m radiates for freezing pipe Coefficient, c are temperature difference;
Single portal, which freezes refrigeration equipment, to be included:Freeze unit, salt water circulating pump, cooling water circulating pump and cooling tower;
Using to pipeline include salt water conduit tube, collection liquid distribution pipe, cooling water pipe, horizontal frozen pipe, vertical frozen pipe, temperature tube and Liquid supply pipe;
Further include brine tank, cooling water tank, refrigerator oil, refrigerant and refrigerant agent;
(4)The design requirement of consolidation by freezing;
A. drilling construction perforate error is not more than 100mm.Drilling maximum deflection value is not greater than 150mm, and all drillings should all Whole hole deviational survey is carried out, and draws hole scattering figure and each bore position into hole pattern, based thereon determines whether perforations adding and perforations adding position, outside Collar aperture does not enter shield tunneling face;
B. using No. 20 carbon structural steels, pipeline connection is welded to connect using outer pipe collar, selected for freezing pipe, temperature tube tubing Outer pipe collar material should be identical with connecting line material;
C. freezing hole drilling depth is not less than design load, no more than design 0.5m, it is impossible to which the tube head length of circulating brine must not be big In 150mm;
D. injected clear water pressure testing should be carried out after freezing pipe decentralization, test pressure is 1.5-2.0 times of work brine pressure, through pressure testing 30min pressure, which declines, is no more than 0.05MPa, then continues 15min pressure and do not become qualified;
E. soil body number of dropouts during construction freezing hole, which is not greater than, freezes pore volume, and otherwise should carry out grout injection control stratum in time sinks Drop;
F. positive freeze-off time is designed not less than 35 days.It is required that freezing hole single hole flow is not less than 5m3/h;Actively freeze 7 days salt Coolant-temperature gage is down to less than -18 DEG C;Brine temp is down to less than -28 DEG C during excavation;It goes, circuit salt water temperature difference is not more than 2 DEG C.Such as salt Design requirement is not achieved in coolant-temperature gage and brine flow, should extend positive freeze-off time;
When g. actively freezing, dewatering measure must not be taken in the range of 200m near the freezing zone.It must not in soil layer in freezing zone There is concentrated flow;
H. excavation area freezing hole arrangement circle frost wall with receiving well supporting intersection temperature not higher than -8 DEG C, freeze by other positions Wall mean temperature is for -10 DEG C and following;
(Two)Shield steel bushing box structure and installation;
Steel jacket box includes bolted adjustment ring, standard ring and rear end cap successively, and adjustment ring front end connects with the welding of portal steel ring It connects;Standard ring lower part is equipped with bearing, and standard ring is divided into two halves up and down, by being bolted;
Counter force system is made of reaction frame and bracing members, and reaction frame is arranged on rear end behind rear end, and bracing members are supportted in rear end cover back-end On reaction frame, the force request of casing, is first laid with low grade mortar in steel jacket box when so that the counter force system is met shield;
Installation casing duration degree is adjusted according to the length of shield received well, since shield machine is curve into hole, adjustment ring root Reserved angle is pre-set out according to the angle of shield, portal steel ring is connected with adjustment ring using freezing, the flange of steel jacket box End is connected by screw bolts with adjustment ring;
When steel jacket box positions, it is desirable that two steel bushing tank tower center line, central lines of track control lines overlap, and error is not more than 1cm, Before starting that steel jacket box is installed, central lines of track, that is, the center line of steel jacket box, steel jacket box installation are determined first in foundation pit After finishing, repetition measurement is carried out to steel jacket box position, after confirming that the center line satisfaction reached with shield machine overlaps requirement, using channel steel Or I-steel carries out propping to steel jacket box or so and fixes;
Soil of filling in barn is added in steel jacket box top-feed mouth from ground using conduit, makes stream shape soil full of steel jacket box, remaining local sky Between plus water fill up, it is ensured that steel jacket box sealing does not leak.
The horizontal freezing is consolidated combines shield driving construction method with steel jacket box, it is characterised in that:The freezing hole Quantity for 59, wherein outer ring arranges 34, and centre circle arranges 16, and inner ring arranges 9, and there are one freezing holes in inner ring to arrange At portal center;
The horizontal freezing is consolidated combines shield driving construction method with steel jacket box, it is characterised in that:The thermometer hole has 6 It is a, in uniformly distributed 4 thermometer holes in outer ring, 1 survey is respectively laid between centre circle and inner ring and between inner ring and portal center Wen Kong;
The horizontal freezing is consolidated combines shield driving construction method with steel jacket box, it is characterised in that:The freezing unit choosing With YSLGF300 types, every group of 23.65 ten thousand kcal/h of standard rating of refrigerating machine, 8.5 ten thousand kcal/h of actual condition refrigerating capacity, power of motor 110kw, salt water circulating pump select IS150-125-400 types, flow 200m3/h, lift 32m, power of motor 30kw;Cooling water follows Ring pump selects IS150-100-250 types, flow 100m3/h, lift 20m, power of motor 11kw;Cooling tower selects KST-80RT Type, motor general power 8kw.
The horizontal freezing is consolidated combines shield driving construction method with steel jacket box, it is characterised in that:The brine is done Pipe sum aggregate liquid distribution pipe selects 159 × 5mm seamless steel pipes, and collection liquid distribution pipe is connected with goat's horn selects 2 " high-pressure rubber pipes;Cooling water pipe Select 127 × 4.5mm seamless steel pipes;Horizontal frozen pipe uses the low-carbon seamless steel of the 89 × 8mm of φ of 20# (Q235B) steel Pipe, screwed connection, 1~2m of joint length;Vertical frozen pipe using 20# (Q235B) steel 127 × 4.5mm of φ low-carbon without Stitch steel pipe;Temperature tube uses the low-carbon seamless steel pipe of 50 × 3mm of φ;Liquid supply pipe selects φ 40PVE pipes.
The horizontal freezing is consolidated combines shield driving construction method with steel jacket box, it is characterised in that:The brine tank Volume 4.5m3;Cooling water tank volume 8m3, refrigerator oil selection N46 refrigerator oils, refrigerant selection R22 refrigerants, refrigerant agent use Calcium chloride solution is 1.26 as freeze cycle brine, brine proportion, and it is 15m to freeze refrigeration construction cooling water magnitude of recruitment3/h。
The beneficial effects of the invention are as follows:In order to ensure shield successfully carries out start tunneling under Complicated Geologic Condition, protect It demonstrate,proves the safety of shield and improves the success rate of shield, therefore horizontal freezing is used to consolidate and combines shield with steel jacket box Construction method avoids the reinforcing of cement system and is engaged bad the problem of causing water-stagnating effect bad;Also solves vertical freezing simultaneously The problem of method for strengthening is influenced by the limitation of ground construction condition and shield buried depth improves shield-tunneling construction into the success rate and safety in hole Property, water burst when reducing shield gushes the risk of sand.
Description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is the difference schematic diagram of freezing hole and thermometer hole.
Fig. 2 is the structure diagram of steel jacket box.
Specific embodiment
As shown in Figure 1:A kind of horizontal freezing consolidation combines shield driving construction method with steel jacket box, with 7.1m diameters hole , exemplified by the mono- circle earth pressure balance shield machine start tunnelings of 6.760m.This is reinforced into hole cement system using high-pressure rotary jet grouting pile, Stake footpath 1000mm, lap of splice 200mm, cement system 6.5 meters of overall length of reinforcing, reinforcing scope is each 3 meters or so up and down of tunnel. It cuts the earth afterwards since the station underground space uses first to reinforce, then the sequence of construction of constructing structure, therefore the shoveling carried out afterwards and structure Construction certainly will be to generating certain destruction into hole soil stabilization, and wall and soil mass consolidation seaming position are the most prominent in particular, and It is 0.5 ~ 0.8MPa that original, which reinforces 28d intensity indexs,.To solve cement system reinforcing body crack-leakage water problems, ensure shield success into Hole, therefore determine to consolidate using horizontal freezing and combine shield with steel jacket box.
(One)Shield horizontal freezing Design of Reinforcement and construction;
(1)Consolidation by freezing thickness designs;
If frost wall mean temperature T is -10 DEG C, frozen soil compression strength σ pressures=3.6MPa, anti-draw strength σ drawings=2.0MPa, shearing resistance Intensity τ cuts=1.6MPa.Plate freezing method is taken to reinforce in hole.Consolidation by freezing body plays when shield receives broken wall and resists water Soil pressure prevents soil layer slump and muddy water from pouring in the effect of active well.
P=0.013H;
P is Water And Earth Pressures at the center of hole;H is hole center buried depth;
H is consolidation by freezing body thickness;D excavates interior diameter for reinforcing body;B is coefficient 1.2;P is Water And Earth Pressures at the center of hole;K For safety coefficient 2.0;σ is anti-draw strength;
(2)The arrangement of horizontal frozen hole;
As shown in Figure 1:Freezing hole laying need to consider construction site and hole buried depth.Freezing hole, the example are arranged at portal The quantity of freezing hole 6 being set altogether for 59, wherein outer ring 34, W1-W34 represents outer ring freezing hole in figure, race diameter 8.4m, Into underground layer 2.8m;Centre circle 16, Z1-Z16 represents centre circle freezing hole, middle loop diameter 5.7m, into underground layer 1.8m in figure;Inner ring 9, N1-N9 represents inner ring freezing hole in figure, and inner ring diameter 2.9m, into underground layer 1.8m wherein inner rings, there are one freezing holes in hole At door center;
Thermometer hole 6 is set, C1-C6 represents thermometer hole in figure, in uniformly distributed 5 thermometer holes in outer ring, centre circle and inner ring it Between and inner ring and portal center between respectively lay 1 thermometer hole;
(3)Freezing refrigeration design
The coefficient of heat transfer of freezing pipe takes 250kcal/m2H, loss of refrigeration capacity coefficient take 1.3, using Q=π dHKmc, obtain each portal Freezing chilling requirement is:4.3 ten thousand kcal/h.Wherein, Q freezes chilling requirement for single portal, and d reinforces diameter, H consolidations by freezing for freezing Thickness, K are loss of refrigeration capacity coefficient, and m is freezing pipe coefficient of heat transfer, and c is temperature difference;
Single portal, which freezes refrigeration equipment, to be included:Freeze unit, salt water circulating pump, cooling water circulating pump and cooling tower;
The freezing unit selects YSLGF300 types, every group of 23.65 ten thousand kcal/h of standard rating of refrigerating machine, actual condition refrigerating capacity 8.5 Ten thousand kcal/h, power of motor 110kw, salt water circulating pump select IS150-125-400 types, flow 200m3/h, lift 32m, motor Power 30kw;Cooling water circulating pump selects IS150-100-250 types, flow 100m3/h, lift 20m, power of motor 11kw;It is cold But tower selects KST-80RT types, motor general power 8kw.
Using to pipeline include salt water conduit tube, collection liquid distribution pipe, cooling water pipe, horizontal frozen pipe, vertical frozen pipe, thermometric Pipe and liquid supply pipe;
The salt water conduit tube sum aggregate liquid distribution pipe selects 159 × 5mm seamless steel pipes, and collection liquid distribution pipe is connected with goat's horn selects 2 " high pressures Sebific duct;Cooling water pipe selects 127 × 4.5mm seamless steel pipes;Horizontal frozen pipe uses the 89 × 8mm of φ of 20# (Q235B) steel Low-carbon seamless steel pipe, screwed connection, 1~2m of joint length;Vertical frozen pipe using 20# (Q235B) steel φ 127 × The low-carbon seamless steel pipe of 4.5mm;Temperature tube uses the low-carbon seamless steel pipe of 50 × 3mm of φ;Liquid supply pipe selects φ 40PVE pipes.
Further include brine tank, cooling water tank, refrigerator oil, refrigerant and refrigerant agent;
The brine tank volume 4.5m3;Cooling water tank volume 8m3, refrigerator oil selection N46 refrigerator oils, refrigerant selection R22 Refrigerant, for refrigerant agent by the use of calcium chloride solution as freeze cycle brine, brine proportion is 1.26, freezes refrigeration construction cooling water and mends Charge is 15m3/h。
(4)The design requirement of consolidation by freezing;
A. drilling construction perforate error is not more than 100mm.Drilling maximum deflection value is not greater than 150mm, and all drillings should all Whole hole deviational survey is carried out, and draws hole scattering figure and each bore position into hole pattern, based thereon determines whether perforations adding and perforations adding position, outside Collar aperture does not enter shield tunneling face;
B. using No. 20 carbon structural steels, material property should meet for freezing pipe, temperature tube tubing《Carbon constructional quality steel》 (GB/T699-1999、JB/T639-1992)Regulation, tube quality should meet《Seamless steel pipe size, weight》(GB/T17395- 1998)Regulation, and should have qualified quality certificate.Pipeline connection is welded to connect using outer pipe collar, the outer pipe collar of selection Material should be identical with connecting line material.Welding rod should be complied with relevant regulations using E43 series, quality.
C. freezing hole drilling depth is not less than design load, no more than design 0.5m, it is impossible to which the tube head length of circulating brine is not 150mm must be more than;
D. injected clear water pressure testing should be carried out after freezing pipe decentralization, test pressure is 1.5-2.0 times of work brine pressure, through pressure testing 30min pressure, which declines, is no more than 0.05MPa, then continues 15min pressure and do not become qualified;
E. soil body number of dropouts during construction freezing hole, which is not greater than, freezes pore volume, and otherwise should carry out grout injection control stratum in time sinks Drop;
F. positive freeze-off time is designed not less than 35 days.It is required that freezing hole single hole flow is not less than 5m3/h;Actively freeze 7 days salt Coolant-temperature gage is down to less than -18 DEG C;Brine temp is down to less than -28 DEG C during excavation;It goes, circuit salt water temperature difference is not more than 2 DEG C.Such as salt Design requirement is not achieved in coolant-temperature gage and brine flow, should extend positive freeze-off time;
When g. actively freezing, dewatering measure must not be taken in the range of 200m near the freezing zone.It must not in soil layer in freezing zone There is concentrated flow;
H. excavation area freezing hole arrangement circle frost wall with receiving well supporting intersection temperature not higher than -8 DEG C, freeze by other positions Wall mean temperature is for -10 DEG C and following;
Freezing hole construction is crucial, first, wanting the deflection of control freezing hole drilling, two are ensured that the sealing performance of frigo installation Reach quality requirement.Select the construction of MD-60A types jumbolter.
Basic working procedure for locating holes and pipe of eating dishes without rice or wine install → eat dishes without rice or wine device installation → drilling → measurement → blind hole bottom → Bulge test → start to freeze.
(Two)Shield steel bushing box structure and installation;
As shown in Figure 2:The long 11.6m of steel jacket box, internal diameter 7.1m, entire casing is made of 6 sections, including adjustment ring 1,1-4 feast-brand marks Lead ring 2 and rear end cap 3.
Adjustment ring:For the coupling part of casing and hole circle 4, long 1m is divided into 2 pieces, is welded to connect with portal steel ring, and rear Portion's casing standard collar bolt connection.Upper long 1000mm, lower long 943mm, in 5 ‰ downward trend.
Standard ring:4 sections, single-unit length 2.5m are shared, lower part is equipped with bearing.Two halves up and down can be divided by often saving, by bolt Connection.Standard paragraphs also are bolted to form entirety each other.
Rear end cap:For closing casing, and the component of counter force system support is born, two halves formula design, with standard paragraphs Section 4 It is bolted, it is 0.6 meter long.
Steel jacket box uses 235 steel plate of thickness 20mm intensity Qs, and each standard ring sets 4 pressure relief vents, each standard ring top Discharge port at one is set, and vertical, the circumferential gusset of periphery welding of every section of cylinder forms netted to ensure cylinder rigidity, and gusset is thick 20mm, high 150mm are spaced about 550*600mm;The end and upper and lower two sections of circular arc composition surfaces of every section of cylinder are welded to connect method Orchid, the Q235A steel of flange 24mm thickness, between upper and lower two sections of junctions and two sections of cylinders using M30*150,10.8 grades It is bolted, centre plus 3mm thickness rubber pads, to ensure sealing effect.
Counter force system 5 is made of reaction frame and bracing members, altogether using 3 root posts, using 9 609 steel bearing diagonals, is supportted respectively On 9 points of casing rear end cap, according to the driving soil pressure of 0.2MPa during shield, the support force that counter force system can be born About 700t applies each point by oil pump the prestressing force of 100t, adds up to 900t > 700t, counter force system can be made to meet shield Into the force request of casing during hole.
Shield is kowtowed after being pushed into steel bushing in order to prevent, and low grade mortar, thickness 10cm, according to reality are first laid in round steel set Border condition of construction selects M7.5 cement mortar not only to can guarantee the ability of carrying shield machine, but also can guarantee and do not damage cutter head of shield machine.
Be computed shield when stress maximum be 57MPa, casing need to meet above-mentioned requirements, when just can ensure that into hole Safety.
On the basis of former portal ring flat-plate embedded board, one section of adjustment ring, present case tune are set between steel jacket box and portal ring flat-plate The long 80cm of the domain, length can be adjusted according to the length of shield received well, since this Project Shield machine is curve into hole, be adjusted The domain need to pre-set out reserved angle according to the angle of shield.Portal ring flat-plate is connected with adjustment ring using freezing, steel bushing The flange end of case is connected by screw bolts with adjustment ring.
When steel jacket box positions, it is desirable that two steel bushing tank tower center line, central lines of track control lines overlap, and error is not more than 1cm before starting to install steel jacket box, determines central lines of track, that is, the center line of steel jacket box, steel bushing first in foundation pit Case carries out repetition measurement after installation is complete, to steel jacket box position, after confirming that the center line satisfaction reached with shield machine is overlapped and required, adopts Propping is carried out with channel steel or I-steel to steel jacket box or so to fix;
Soil of filling in barn is added in steel jacket box top-feed mouth from ground using conduit, makes stream shape soil full of steel jacket box, remaining local sky Between plus water fill up, it is ensured that steel jacket box sealing does not leak.
Concrete mode is:March into the arena preparation → drilling construction and refrigeration station installation → actively freezing → shaft bottom yellow ground it is levelling, paving If steel plate → installation steel jacket box(Adjustment ring, standard paragraphs)→ shield machine is shut down in place → hole door for the first time → pull out cryovial → Steel spring plate → installation steel jacket box is installed(Back shroud, counter force system)→ door → the filler that holes for the second time → shield recovery driving → The mud → curved plate seals portal → that shield enters in steel jacket box → shield tail supplement slip casting → emptying steel jacket box dismantles steel jacket box Upper part → removal shield machine → ending.

Claims (6)

1. a kind of horizontal freezing consolidation combines shield driving construction method with steel jacket box, which is characterized in that it includes:
Shield horizontal freezing Design of Reinforcement and construction;
Consolidation by freezing thickness designs;
P=0.013H;
P is Water And Earth Pressures at the center of hole;H is hole center buried depth;
H is consolidation by freezing body thickness;D excavates interior diameter for reinforcing body;B is coefficient 1.2;P is Water And Earth Pressures at the center of hole;K For safety coefficient 2.0;σ is anti-draw strength;
The arrangement of horizontal frozen hole;
Freezing hole is arranged at portal, the quantity of freezing hole is 40-60, wherein outer ring arrangement 20-50, centre circle arrangement 10- 20, inner ring arrangement 5-10 is arranged in portal center in inner ring there are one freezing hole;
Thermometer hole 6-8 are set, in the uniformly distributed 4-6 thermometer hole in outer ring, between centre circle and inner ring and inner ring and portal 1-2 thermometer hole is respectively laid between center;
Freezing refrigeration design
The coefficient of heat transfer of freezing pipe takes 250kcal/m2H, loss of refrigeration capacity coefficient take 1.3, using Q=π dHKmc, wherein, Q is single Portal freezes chilling requirement, and d reinforces diameter, H consolidation by freezing thickness for freezing, and K is loss of refrigeration capacity coefficient, and m is freezing pipe heat dissipation system Number, c is temperature difference;
Single portal, which freezes refrigeration equipment, to be included:Freeze unit, salt water circulating pump, cooling water circulating pump and cooling tower;
Using to pipeline include salt water conduit tube, collection liquid distribution pipe, cooling water pipe, horizontal frozen pipe, vertical frozen pipe, temperature tube and Liquid supply pipe;
Further include brine tank, cooling water tank, refrigerator oil, refrigerant and refrigerant agent;
(4)The design requirement of consolidation by freezing;
A. drilling construction perforate error is not more than 100mm;
Drilling maximum deflection value is not greater than 150mm, and all drillings should all carry out whole hole deviational survey, and draw hole scattering figure and Each bore position based thereon determines whether perforations adding and perforations adding position, cycle hole does not enter shield tunneling face into hole pattern;
B. using No. 20 carbon structural steels, pipeline connection is welded to connect using outer pipe collar, selected for freezing pipe, temperature tube tubing Outer pipe collar material should be identical with connecting line material;
C. freezing hole drilling depth is not less than design load, no more than design 0.5m, it is impossible to which the tube head length of circulating brine must not be big In 150mm;
D. injected clear water pressure testing should be carried out after freezing pipe decentralization, test pressure is 1.5-2.0 times of work brine pressure, through pressure testing 30min pressure, which declines, is no more than 0.05MPa, then continues 15min pressure and do not become qualified;
E. soil body number of dropouts during construction freezing hole, which is not greater than, freezes pore volume, and otherwise should carry out grout injection control stratum in time sinks Drop;
F. positive freeze-off time is designed not less than 35 days;
It is required that freezing hole single hole flow is not less than 5m3/h;Actively freezing 7 days brine temps is down to less than -18 DEG C;Brine during excavation Temperature is down to less than -28 DEG C;It goes, circuit salt water temperature difference is not more than 2 DEG C;
If design requirement is not achieved in brine temp and brine flow, positive freeze-off time should be extended;
When g. actively freezing, dewatering measure must not be taken in the range of 200m near the freezing zone;
There must not be concentrated flow in soil layer in freezing zone;
H. excavation area freezing hole arrangement circle frost wall with receiving well supporting intersection temperature not higher than -8 DEG C, freeze by other positions Wall mean temperature is for -10 DEG C and following;
(Two)Shield steel bushing box structure and installation;
Steel jacket box includes bolted adjustment ring, standard ring and rear end cap successively, and adjustment ring front end connects with the welding of portal steel ring It connects;Standard ring lower part is equipped with bearing, and standard ring is divided into two halves up and down, by being bolted;
Counter force system is made of reaction frame and bracing members, and reaction frame is arranged on rear end behind rear end, and bracing members are supportted in rear end cover back-end On reaction frame, the force request of casing, is first laid with low grade mortar in steel jacket box when so that the counter force system is met shield;
Installation casing duration degree is adjusted according to the length of shield received well, since shield machine is curve into hole, adjustment ring root Reserved angle is pre-set out according to the angle of shield, portal steel ring is connected with adjustment ring using freezing, the flange of steel jacket box End is connected by screw bolts with adjustment ring;
When steel jacket box positions, it is desirable that two steel bushing tank tower center line, central lines of track control lines overlap, and error is not more than 1cm, Before starting that steel jacket box is installed, central lines of track, that is, the center line of steel jacket box, steel jacket box installation are determined first in foundation pit After finishing, repetition measurement is carried out to steel jacket box position, after confirming that the center line satisfaction reached with shield machine overlaps requirement, using channel steel Or I-steel carries out propping to steel jacket box or so and fixes;
Soil of filling in barn is added in steel jacket box top-feed mouth from ground using conduit, makes stream shape soil full of steel jacket box, remaining local sky Between plus water fill up, it is ensured that steel jacket box sealing does not leak.
2. horizontal freezing consolidation according to claim 1 combines shield driving construction method with steel jacket box, it is characterised in that: The quantity of the freezing hole be 59, wherein outer ring arrange 34, centre circle arrange 16, inner ring arrange 9, in inner ring there are one Freezing hole is arranged in portal center.
3. horizontal freezing consolidation according to claim 2 combines shield driving construction method with steel jacket box, it is characterised in that: The thermometer hole has 6, in uniformly distributed 4 thermometer holes in outer ring, between centre circle and inner ring and inner ring and portal center it Between respectively lay 1 thermometer hole.
4. horizontal freezing consolidation according to claim 3 combines shield driving construction method with steel jacket box, it is characterised in that: The freezing unit selects YSLGF300 types, every group of 23.65 ten thousand kcal/h of standard rating of refrigerating machine, actual condition refrigerating capacity 8.5 ten thousand Kcal/h, power of motor 110kw, salt water circulating pump select IS150-125-400 types, flow 200m3/h, lift 32m, motor work( Rate 30kw;Cooling water circulating pump selects IS150-100-250 types, flow 100m3/h, lift 20m, power of motor 11kw;Cooling Tower selects KST-80RT types, motor general power 8kw.
5. horizontal freezing consolidation according to claim 4 combines shield driving construction method with steel jacket box, it is characterised in that: The salt water conduit tube sum aggregate liquid distribution pipe selects 159 × 5mm seamless steel pipes, and collection liquid distribution pipe is connected with goat's horn selects 2 " high-pressure glues Pipe;Cooling water pipe selects 127 × 4.5mm seamless steel pipes;Horizontal frozen pipe is using the 89 × 8mm's of φ of 20# (Q235B) steel Low-carbon seamless steel pipe, screwed connection, 1~2m of joint length;Vertical frozen pipe using 20# (Q235B) steel φ 127 × The low-carbon seamless steel pipe of 4.5mm;Temperature tube uses the low-carbon seamless steel pipe of 50 × 3mm of φ;Liquid supply pipe selects φ 40PVE pipes.
6. horizontal freezing consolidation according to claim 5 combines shield driving construction method with steel jacket box, it is characterised in that: The brine tank volume 4.5m3;Cooling water tank volume 8m3, refrigerator oil selection N46 refrigerator oils, refrigerant selection R22 refrigeration Agent, for refrigerant agent by the use of calcium chloride solution as freeze cycle brine, brine proportion is 1.26, freezes refrigeration construction cooling water magnitude of recruitment For 15m3/h。
CN201610988159.8A 2016-11-10 2016-11-10 Horizontal freezing consolidation combines shield driving construction method with steel jacket box Pending CN108071400A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610988159.8A CN108071400A (en) 2016-11-10 2016-11-10 Horizontal freezing consolidation combines shield driving construction method with steel jacket box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610988159.8A CN108071400A (en) 2016-11-10 2016-11-10 Horizontal freezing consolidation combines shield driving construction method with steel jacket box

Publications (1)

Publication Number Publication Date
CN108071400A true CN108071400A (en) 2018-05-25

Family

ID=62154305

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610988159.8A Pending CN108071400A (en) 2016-11-10 2016-11-10 Horizontal freezing consolidation combines shield driving construction method with steel jacket box

Country Status (1)

Country Link
CN (1) CN108071400A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915710A (en) * 2018-06-28 2018-11-30 广东华隧建设集团股份有限公司 A kind of shield machine opens a position acceptance method
CN109184728A (en) * 2018-10-30 2019-01-11 浙江科技学院 The vertical combined type multidimensional of flank-for soft or hard stratum freezes drilling method
CN109268025A (en) * 2018-10-30 2019-01-25 浙江科技学院 The vertical combined type multidimensional of flank-for soft or hard stratum freezes cutting arrangement
CN109403987A (en) * 2018-12-11 2019-03-01 南京林业大学 Shield end horizontal frozen combines reception device and construction method with short steel case
CN109505295A (en) * 2018-11-19 2019-03-22 上海市基础工程集团有限公司 Diaphram wall joint seal freezes construction technology
CN110030007A (en) * 2019-05-06 2019-07-19 济南城建集团有限公司 Shield horizontal freezing receives construction method
CN111173517A (en) * 2020-01-03 2020-05-19 安徽理工大学 Local heat preservation freezing method for coal mine deep vertical shaft freezing method construction
CN113338950A (en) * 2021-06-28 2021-09-03 中铁(上海)投资集团有限公司 Shield closed arrival construction method of freezing method and cement system combined steel sleeve

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08219617A (en) * 1995-02-09 1996-08-30 Mayekawa Mfg Co Ltd Tunnel freezer for food refrigeration
CN101644161A (en) * 2009-07-24 2010-02-10 上海建工(集团)总公司 Water stopping device for tunneling machine going in and out of tunnel and water stopping method
CN201460904U (en) * 2009-06-29 2010-05-12 上海市基础工程公司 Ultra-long horizontal freezing consolidation structure for shield entry
CN101749485A (en) * 2008-12-18 2010-06-23 上海市机械施工有限公司 Pipeline laying construction method combining non-excavation jacking and liquid nitrogen horizontal freezing excavation laying
CN102797468A (en) * 2012-08-22 2012-11-28 中铁第四勘察设计院集团有限公司 Minimum over-burden originating method for shield tunnel
CN103527214A (en) * 2013-11-04 2014-01-22 南京林业大学 Horizontal freezing and pipe shed combined subway shield tunnel reinforcing tip and method
CN104675405A (en) * 2014-12-31 2015-06-03 上海市机械施工集团有限公司 Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
CN104790961A (en) * 2015-04-27 2015-07-22 海南大学 Vertical cup type freezing reinforcement structure and method at shield tunnel end
CN204609889U (en) * 2015-04-27 2015-09-02 海南大学 A kind of shield tunnel termination vertical cup type consolidation by freezing structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08219617A (en) * 1995-02-09 1996-08-30 Mayekawa Mfg Co Ltd Tunnel freezer for food refrigeration
CN101749485A (en) * 2008-12-18 2010-06-23 上海市机械施工有限公司 Pipeline laying construction method combining non-excavation jacking and liquid nitrogen horizontal freezing excavation laying
CN201460904U (en) * 2009-06-29 2010-05-12 上海市基础工程公司 Ultra-long horizontal freezing consolidation structure for shield entry
CN101644161A (en) * 2009-07-24 2010-02-10 上海建工(集团)总公司 Water stopping device for tunneling machine going in and out of tunnel and water stopping method
CN102797468A (en) * 2012-08-22 2012-11-28 中铁第四勘察设计院集团有限公司 Minimum over-burden originating method for shield tunnel
CN103527214A (en) * 2013-11-04 2014-01-22 南京林业大学 Horizontal freezing and pipe shed combined subway shield tunnel reinforcing tip and method
CN104675405A (en) * 2014-12-31 2015-06-03 上海市机械施工集团有限公司 Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
CN104790961A (en) * 2015-04-27 2015-07-22 海南大学 Vertical cup type freezing reinforcement structure and method at shield tunnel end
CN204609889U (en) * 2015-04-27 2015-09-02 海南大学 A kind of shield tunnel termination vertical cup type consolidation by freezing structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
380931729: "《盾构始发和接收冻结法地基加固工程》", 23 October 2015, 百度文库 *
姚伟峰: "水平冻结与钢套箱辅助盾构进洞施工技术研究", 《建筑施工》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915710A (en) * 2018-06-28 2018-11-30 广东华隧建设集团股份有限公司 A kind of shield machine opens a position acceptance method
CN109184728A (en) * 2018-10-30 2019-01-11 浙江科技学院 The vertical combined type multidimensional of flank-for soft or hard stratum freezes drilling method
CN109268025A (en) * 2018-10-30 2019-01-25 浙江科技学院 The vertical combined type multidimensional of flank-for soft or hard stratum freezes cutting arrangement
CN109184728B (en) * 2018-10-30 2020-07-24 浙江科技学院 Side wing-vertical combined type multi-dimensional freezing drilling and cutting method for soft and hard stratum
CN109505295A (en) * 2018-11-19 2019-03-22 上海市基础工程集团有限公司 Diaphram wall joint seal freezes construction technology
CN109403987A (en) * 2018-12-11 2019-03-01 南京林业大学 Shield end horizontal frozen combines reception device and construction method with short steel case
CN109403987B (en) * 2018-12-11 2023-10-20 南京林业大学 Shield end horizontal freezing and short steel box combined receiving device and construction method
CN110030007A (en) * 2019-05-06 2019-07-19 济南城建集团有限公司 Shield horizontal freezing receives construction method
CN111173517A (en) * 2020-01-03 2020-05-19 安徽理工大学 Local heat preservation freezing method for coal mine deep vertical shaft freezing method construction
CN111173517B (en) * 2020-01-03 2021-08-20 安徽理工大学 Local heat preservation freezing method for coal mine deep vertical shaft freezing method construction
CN113338950A (en) * 2021-06-28 2021-09-03 中铁(上海)投资集团有限公司 Shield closed arrival construction method of freezing method and cement system combined steel sleeve

Similar Documents

Publication Publication Date Title
CN108071400A (en) Horizontal freezing consolidation combines shield driving construction method with steel jacket box
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN104963334B (en) Reinforced with slip casting freezing pipe and freeze the construction method that service channel suppresses frozen swell and melt settlement
CN105909260B (en) Subway station water stop structure for protecting groundwater environment and construction method thereof
CN105908765B (en) For protecting the open trench tunnel water sealing structure and construction method of groundwater environment
CN104695964B (en) Subway shield tunnel freeze entering method
CN104806253B (en) A kind of construction method punched between rectangular top pipe passage
CN106121686B (en) Underground excavation tunnel water stop structure for protecting groundwater environment and construction method thereof
CN103015402B (en) Construction method for inhibiting frost heaving and thaw collapse of horizontally frozen end through cement-soil reinforcement method
CN101418567A (en) Protective cutting construction method for tunnel segment
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN102619522A (en) Construction method for subway contact passage
CN104343455A (en) Long-distance curved jacking pipe and pipe roof construction technique
CN106089214A (en) Service channel manual pipe jacking reinforced construction method
CN107119669A (en) For shield, the pre-pouring grout consolidated subsoil method in house is worn in side in water-rich sand layer
CN1614152A (en) Constructing method for in tunnel weak soil layer by freezing method horizontally
CN107034874B (en) Double-screw type slip casting type freezing plant and construction method
CN102913250A (en) Shield tunnel-entering construction method at stratum rich in water powder and soil powder sand
CN106122589A (en) A kind of earth pressure balance method
CN104675405B (en) Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method
CN107965335A (en) A kind of shield driving construction method
CN108843328A (en) A kind of Metro Connection Passage excavation construction support construction method
CN109209396A (en) A kind of shield tunnel end joint reinforcement structure and construction method
CN111593726A (en) Joint reinforcement method for underground tunnel penetrating sensitive pipeline of water-rich stratum and butt joint of existing structure MJS + artificial freezing
CN104790419A (en) Dewatering construction method applicable to tunnel in water-rich quicksand stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180525

RJ01 Rejection of invention patent application after publication