CN108060658B - Water channel construction strickle equipment for hydraulic engineering - Google Patents

Water channel construction strickle equipment for hydraulic engineering Download PDF

Info

Publication number
CN108060658B
CN108060658B CN201711362533.4A CN201711362533A CN108060658B CN 108060658 B CN108060658 B CN 108060658B CN 201711362533 A CN201711362533 A CN 201711362533A CN 108060658 B CN108060658 B CN 108060658B
Authority
CN
China
Prior art keywords
rotating shaft
plate
motor
cam
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711362533.4A
Other languages
Chinese (zh)
Other versions
CN108060658A (en
Inventor
孙伟平
张红
卢政
江俊华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINCHANG COUNTY KANGHONG MACHINERY TECHNOLOGY Co.,Ltd.
Original Assignee
Xinchang County Kanghong Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang County Kanghong Machinery Technology Co ltd filed Critical Xinchang County Kanghong Machinery Technology Co ltd
Priority to CN201711362533.4A priority Critical patent/CN108060658B/en
Publication of CN108060658A publication Critical patent/CN108060658A/en
Application granted granted Critical
Publication of CN108060658B publication Critical patent/CN108060658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)

Abstract

The invention relates to a strickle device, in particular to a strickle device for building a water channel for hydraulic engineering. The invention aims to provide the water channel construction and strickling equipment for the hydraulic engineering, which saves time, has good grinding effect and high grinding speed. In order to solve the technical problem, the invention provides a water channel construction strickling device for hydraulic engineering, which comprises a cart and the like; a supporting plate is vertically arranged on the right side of the top of a cart plate of the cart, a top plate is arranged on the top of the supporting plate, a height adjusting device is arranged on the right side face of the supporting plate, and a grinding device is arranged on a moving part of the height adjusting device. According to the invention, the position of the grinding device is adjusted by the height adjusting device, and the water channel is ground by the grinding device, so that the effects of time saving, good grinding effect and high grinding speed are achieved.

Description

Water channel construction strickle equipment for hydraulic engineering
Technical Field
The invention relates to a strickle device, in particular to a strickle device for building a water channel for hydraulic engineering.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
After the ditch is built, the surface of the ditch is uneven, and the prior art needs to consume a large amount of time for grinding the ditch manually, has poor grinding effect and low grinding speed, so that the ditch building and scraping equipment for hydraulic engineering, which saves time, has good grinding effect and high grinding speed, needs to be researched and developed urgently.
Disclosure of Invention
(1) Technical problem to be solved
The invention aims to overcome the defects that a large amount of time is consumed for grinding the water channel by manpower, the grinding effect is poor and the grinding speed is slow in the prior art, and the technical problem to be solved is to provide the water channel construction and strickling equipment for the hydraulic engineering, which is time-saving, good in grinding effect and high in grinding speed.
(2) Technical scheme
In order to solve the technical problem, the invention provides a water channel construction strickling device for hydraulic engineering, which comprises a cart, a support plate, a top plate, a height adjusting device and a grinding device, wherein the support plate is vertically arranged on the right side of the top of a cart plate of the cart, the top plate is arranged on the top of the support plate, the height adjusting device is arranged on the right side surface of the support plate, and the grinding device is arranged on a moving part of the height adjusting device.
Preferably, height adjusting device is including first slide rail, first slider, the mounting panel, electronic round, from driving wheel and act as go-between, the first slide rail is installed to the vertical of symmetry around the extension board right flank, all be equipped with two first sliders on every first slide rail, first slide rail and first slider sliding fit, the mounting panel is installed to four first slider right flanks, electronic round is all installed on two first slide rail medial surface upper portions, from the driving wheel is installed to two first slide rail medial surface lower parts, all be connected with in the middle of two first slider tops in the top and act as go-between, act as go-between and walk around electronic round in proper order and follow driving wheel and two first slider bottom intermediate connections in the below.
Preferably, grind flat device including first motor, L type pole, first bearing frame, first pivot and circular scraper blade, mounting panel right flank mid-mounting has first motor and L type pole, and first motor is located L type pole below, and the right-hand first bearing frame of installing of L type pole, and the bearing in the first bearing frame is connected with first pivot, and the first pivot left end is connected with the output shaft of first motor, and circular scraper blade is installed to first pivot right-hand member.
Preferably, the device is strickled off including still, strickle off the device including the installation piece, the second slide rail, the second slider, square scraper blade, the grooved cam, the connecting block, connecting rod and roller bearing, the installation piece is installed to installation board right flank front longitudinal symmetry, all install the second slide rail on the installation piece, all install two second sliders on two second slide rails, second slide rail and second slider sliding fit, square scraper blade is installed to four second slider right flanks, first pivot mid-mounting has the grooved cam, the grooved cam is located between primary shaft bearing and the circular scraper blade, square scraper blade left flank mid-mounting has the connecting block, the connecting block left surface is connected with the connecting rod, the roller bearing is installed to connecting rod left flank rear end, the roller bearing is located the inslot of grooved cam, roller bearing and grooved cam cooperation.
Preferably, the vibration device comprises a guide sleeve, a guide rod, a vibration plate, a first spring, a mounting rack, a second motor, a second rotating shaft and a first cam, four guide sleeves are installed at the rear of the right side face of the mounting plate and symmetrically arranged, a guide rod is arranged in each guide sleeve and is in sliding fit with the guide sleeve, the first spring is connected between the left end of each guide rod and the right end in each guide sleeve, the vibration plate is installed at the right end of each guide rod, the mounting rack is installed at the rear of the right side face of the mounting plate and is located between the guide sleeves at the upper side and the lower side, the second motor is installed on the mounting rack, the second rotating shaft is installed on an output shaft of the second motor through a coupler, the first cam is installed on the second rotating shaft and is located at the front side of the second motor, the first cam is located on the left side face of the.
Preferably, the scraper further comprises a third bearing seat, a third rotating shaft and a roller, the third bearing seat is installed on the front side and the rear side of the square scraper in an up-down symmetrical mode, the third rotating shaft is connected between two bearings in the upper-lower third bearing seat, and the roller is installed in the middle of the third rotating shaft.
Preferably, the mounting plate further comprises a supporting rod and a rubber plate, the supporting rod is symmetrically mounted on the rear portion of the right side face of the mounting plate from top to bottom, the supporting rod is located between the guide sleeve and the mounting frame, and the rubber plate is mounted at the right end of the supporting rod.
The working principle is as follows: when the automatic leveling device is used, an operator firstly adjusts the position of the leveling device through the height adjusting device, then starts the leveling device, enables the leveling part of the leveling rotating shaft to be in contact with the surface of the newly built water channel, and pushes the cart backwards, so that the leveling part of the leveling device can level the surface of the water channel, and after the leveling is finished, the operator closes the leveling device.
Because height adjusting device is including first slide rail, first slider, the mounting panel, electronic round, from driving wheel and act as go-between, the vertical of symmetry installs first slide rail around the extension board right flank, all be equipped with two first sliders on every first slide rail, first slide rail and first slider sliding fit, the mounting panel is installed to four first slider right flanks, electronic round is all installed on two first slide rail medial surface upper portions, from the driving wheel is installed to two first slide rail medial surface lower parts, all be connected with in the middle of two first slider tops in the top and act as go-between, act as go-between and walk around electronic round in proper order and follow driving wheel and two first slider bottom intermediate connections in the below. So operating personnel starts electronic round corotation or reversal, and electronic round drives first slider through acting as go-between and up or down removes, follows corotation or reversal thereupon from the driving wheel, and first slide rail and first slider play the guide effect, and first slider drives the mounting panel and up or down removes to the position of having adjusted the mill paper-back edition of books device, after mill paper-back edition of books device adjusted suitable position, operating personnel stop electronic round can.
Because the device of grinding flat is including first motor, L type pole, first bearing frame, first pivot and circular scraper blade, and mounting panel right flank mid-mounting has first motor and L type pole, and first motor is located L type pole below, and the right-hand first bearing frame of installing of L type pole, the bearing in the first bearing frame is connected with first pivot, and the output shaft of first pivot left end and first motor, circular scraper blade is installed to first pivot right-hand member. Therefore, the first motor is started to rotate by an operator, the first motor drives the first rotating shaft to rotate, the first rotating shaft drives the circular scraper to rotate, the operator enables the circular scraper to be in surface contact with the water channel, the surface of the water channel is ground to be flat by the circular scraper, and after the surface of the water channel is ground to be flat, the first motor is closed by the operator.
Because still including strickleing the device off, strickle the device off including the installation piece, the second slide rail, the second slider, square scraper blade, the grooved cam, the connecting block, connecting rod and roller bearing, the installation piece is installed to installation board right flank front longitudinal symmetry, all install the second slide rail on the installation piece, all install two second sliders on two second slide rails, second slide rail and second slider sliding fit, square scraper blade is installed to four second slider right flanks, first pivot mid-mounting has the grooved cam, the grooved cam is located between primary shaft bearing and the circular scraper blade, square scraper blade left flank mid-mounting has the connecting block, the connecting block left surface is connected with the connecting rod, the roller bearing is installed to connecting rod left flank rear end, the roller bearing is located the inslot of grooved cam, roller bearing and grooved cam cooperation. Therefore, when the first rotating shaft rotates, the first rotating shaft drives the groove cam to rotate, the groove cam drives the connecting rod to move back and forth without stopping through the rolling shaft, the connecting rod drives the square scraper to move back and forth without stopping, and the second sliding rail and the second sliding block play a guiding role in trimming and leveling the surface of the water channel, so that the effect of leveling the surface of the water channel is improved.
Because still including vibrator, vibrator is including the guide pin bushing, the guide arm, the vibrating plate, first spring, the mounting bracket, the second motor, second pivot and first cam, four guide pin bushings are installed to mounting panel right flank rear, four guide pin bushings are the symmetry setting, all be equipped with the guide arm in every guide pin bushing, guide arm and guide pin bushing sliding fit, be connected with first spring between guide arm left end and the interior right-hand member of guide pin bushing, the vibrating plate is installed to four guide arm right-hand members, mounting panel right flank rear mid-mounting has the mounting bracket, the mounting bracket is located between the guide pin bushing of upper and lower both sides, install the second motor on the mounting bracket, install the second pivot through the shaft coupling on the output shaft of second motor, install first cam in the second pivot, first cam is located second motor front side, first cam is located the vibrating plate left surface, first cam and vibrating plate cooperation. So at the in-process of strickleing off, operating personnel starts that the second motor is rotatory, and the second is electronic to drive the second pivot rotatory, and the second pivot drives first cam rotatory, and first cam drives vibrations about the vibrations that the vibrations board does not stop under the effect of first spring, and guide pin bushing and guide arm play the guide effect to strickle off the effect on canal surface has further been improved.
Because still including third bearing frame, third pivot and cylinder, both sides are all longitudinal symmetry around the square scraper blade install third bearing frame, are connected with the third pivot between two bearings in the upper and lower third bearing frame, and third pivot mid-mounting has the cylinder. Therefore, when the square scraper moves back and forth, the roller can play a role in guiding, so that the edge of the square scraper cannot scrape the surface of the water channel, and the effect of scraping the surface of the water channel is further improved.
Because still including branch and rubber slab, the installation panel right flank rear is the symmetry from top to bottom install branch, and branch is located the middle of guide pin bushing and the mounting bracket, and the rubber slab is installed to the branch right-hand member. Therefore, under the action of the supporting rod and the rubber plate, the vibration plate cannot be damaged due to overlarge elasticity of the first spring when moving downwards.
(3) Advantageous effects
According to the invention, the position of the grinding device is adjusted by the height adjusting device, and the water channel is ground by the grinding device, so that the effects of time saving, good grinding effect and high grinding speed are achieved.
Drawings
FIG. 1 is a schematic cross-sectional view of a front view of the present invention.
FIG. 2 is a schematic cross-sectional view of the right side view of the present invention.
Fig. 3 is a schematic cross-sectional view of a top view of the screed apparatus of the present invention.
Fig. 4 is a schematic cross-sectional view of a front view of the screed apparatus of the present invention.
Fig. 5 is a right-side view of the mounting plate of the present invention.
Fig. 6 is a cross-sectional view of a first front view of the vibration device of the present invention.
FIG. 7 is a right side view of the square screed according to the present invention.
Fig. 8 is a cross-sectional view of a second front view of the vibration device of the present invention.
The labels in the figures are: 1-trolley, 2-support plate, 3-top plate, 4-height adjusting device, 5-grinding device, 41-first slide rail, 42-first slide block, 43-mounting plate, 44-electric wheel, 45-driven wheel, 46-pull wire, 51-first motor, 52-L-shaped rod, 53-first bearing seat, 54-first rotating shaft, 55-circular scraper, 6-scraping device, 61-mounting block, 62-second slide rail, 63-second slide block, 64-square scraper, 65-grooved cam, 66-connecting block, 67-connecting rod, 68-rolling shaft, 7-vibration device, 71-guide sleeve, 72-guide rod, 73-vibration plate, 74-first spring, 75-mounting frame, 76-a second motor, 77-a second rotating shaft, 78-a first cam, 8-a third bearing seat, 9-a third rotating shaft, 10-a roller, 11-a support rod and 12-a rubber plate.
Detailed Description
The invention is further described below with reference to the figures and examples.
Example 1
The utility model provides a ditch construction strickles equipment for hydraulic engineering, as shown in fig. 1-8, including shallow 1, extension board 2, roof 3, height adjusting device 4 and grind flat device 5, the right-hand vertical extension board 2 of installing in sweep top of shallow 1, the roof 3 is installed at extension board 2 top, the extension board 2 right flank is equipped with height adjusting device 4, is equipped with on height adjusting device 4's the moving part and grinds flat device 5.
Example 2
The utility model provides a ditch construction strickles equipment for hydraulic engineering, as shown in fig. 1-8, including shallow 1, extension board 2, roof 3, height adjusting device 4 and grind flat device 5, the right-hand vertical extension board 2 of installing in sweep top of shallow 1, the roof 3 is installed at extension board 2 top, the extension board 2 right flank is equipped with height adjusting device 4, is equipped with on height adjusting device 4's the moving part and grinds flat device 5.
Height adjustment device 4 is including first slide rail 41, first slider 42, mounting panel 43, electronic round 44, follow driving wheel 45 and act as go-between 46, the vertical first slide rail 41 of installing of symmetry around the right flank of extension board 2, all be equipped with two first sliders 42 on every first slide rail 41, first slide rail 41 and first slider 42 sliding fit, mounting panel 43 is installed to four first slider 42 right flanks, electronic round 44 is all installed on two first slide rail 41 medial surface upper portions, driven wheel 45 is installed to two first slide rail 41 medial surface lower parts, all be connected with in the middle of two first slider 42 tops of top and act as go-between 46, act as go-between 46 walks around electronic round 44 in proper order and follows driving wheel 45 and two first slider 42 bottom intermediate connections in the below.
Example 3
The utility model provides a ditch construction strickles equipment for hydraulic engineering, as shown in fig. 1-8, including shallow 1, extension board 2, roof 3, height adjusting device 4 and grind flat device 5, the right-hand vertical extension board 2 of installing in sweep top of shallow 1, the roof 3 is installed at extension board 2 top, the extension board 2 right flank is equipped with height adjusting device 4, is equipped with on height adjusting device 4's the moving part and grinds flat device 5.
Height adjustment device 4 is including first slide rail 41, first slider 42, mounting panel 43, electronic round 44, follow driving wheel 45 and act as go-between 46, the vertical first slide rail 41 of installing of symmetry around the right flank of extension board 2, all be equipped with two first sliders 42 on every first slide rail 41, first slide rail 41 and first slider 42 sliding fit, mounting panel 43 is installed to four first slider 42 right flanks, electronic round 44 is all installed on two first slide rail 41 medial surface upper portions, driven wheel 45 is installed to two first slide rail 41 medial surface lower parts, all be connected with in the middle of two first slider 42 tops of top and act as go-between 46, act as go-between 46 walks around electronic round 44 in proper order and follows driving wheel 45 and two first slider 42 bottom intermediate connections in the below.
The grinding device 5 comprises a first motor 51, an L-shaped rod 52, a first bearing seat 53, a first rotating shaft 54 and a circular scraper 55, the first motor 51 and the L-shaped rod 52 are installed in the middle of the right side face of the installation plate 43, the first motor 51 is located below the L-shaped rod 52, the first bearing seat 53 is installed on the right side of the L-shaped rod 52, a first rotating shaft 54 is connected to a bearing in the first bearing seat 53, the left end of the first rotating shaft 54 is connected with an output shaft of the first motor 51, and the circular scraper 55 is installed on the right end of the first rotating shaft 54.
Example 4
The utility model provides a ditch construction strickles equipment for hydraulic engineering, as shown in fig. 1-8, including shallow 1, extension board 2, roof 3, height adjusting device 4 and grind flat device 5, the right-hand vertical extension board 2 of installing in sweep top of shallow 1, the roof 3 is installed at extension board 2 top, the extension board 2 right flank is equipped with height adjusting device 4, is equipped with on height adjusting device 4's the moving part and grinds flat device 5.
Height adjustment device 4 is including first slide rail 41, first slider 42, mounting panel 43, electronic round 44, follow driving wheel 45 and act as go-between 46, the vertical first slide rail 41 of installing of symmetry around the right flank of extension board 2, all be equipped with two first sliders 42 on every first slide rail 41, first slide rail 41 and first slider 42 sliding fit, mounting panel 43 is installed to four first slider 42 right flanks, electronic round 44 is all installed on two first slide rail 41 medial surface upper portions, driven wheel 45 is installed to two first slide rail 41 medial surface lower parts, all be connected with in the middle of two first slider 42 tops of top and act as go-between 46, act as go-between 46 walks around electronic round 44 in proper order and follows driving wheel 45 and two first slider 42 bottom intermediate connections in the below.
The grinding device 5 comprises a first motor 51, an L-shaped rod 52, a first bearing seat 53, a first rotating shaft 54 and a circular scraper 55, the first motor 51 and the L-shaped rod 52 are installed in the middle of the right side face of the installation plate 43, the first motor 51 is located below the L-shaped rod 52, the first bearing seat 53 is installed on the right side of the L-shaped rod 52, a first rotating shaft 54 is connected to a bearing in the first bearing seat 53, the left end of the first rotating shaft 54 is connected with an output shaft of the first motor 51, and the circular scraper 55 is installed on the right end of the first rotating shaft 54.
Also comprises a strickle device 6, the strickle device 6 comprises a mounting block 61, a second slide rail 62, a second slide block 63 and a square scraper 64, grooved cam 65, connecting block 66, connecting rod 67 and roller 68, the installation piece 61 of the upper and lower symmetry in front of the right flank of mounting panel 43, all install second slide rail 62 on the installation piece 61, all install two second sliders 63 on two second slide rails 62, second slide rail 62 and second slider 63 sliding fit, square scraper 64 is installed to four second slider 63 right flanks, first pivot 54 mid-mounting has grooved cam 65, grooved cam 65 is located between first bearing frame 53 and the circular scraper 55, square scraper 64 left flank mid-mounting has connecting block 66, connecting block 66 left flank is connected with connecting rod 67, roller 68 is installed to connecting rod 67 left flank rear end, roller 68 is located grooved cam 65's inslot, roller 68 and grooved cam 65 cooperate.
The vibration device 7 comprises guide sleeves 71, guide rods 72, a vibration plate 73, first springs 74, a mounting frame 75, a second motor 76, a second rotating shaft 77 and a first cam 78, wherein four guide sleeves 71 are symmetrically arranged behind the right side surface of the mounting plate 43, the guide rods 72 are arranged in each guide sleeve 71, the guide rods 72 are in sliding fit with the guide sleeves 71, the first springs 74 are connected between the left ends of the guide rods 72 and the inner right ends of the guide sleeves 71, the vibration plate 73 is arranged at the right ends of the four guide rods 72, the mounting frame 75 is arranged in the middle of the rear part of the right side surface of the mounting plate 43, the mounting frame 75 is positioned between the guide sleeves 71 at the upper side and the lower side, the second motor 76 is arranged on the mounting frame 75, the second rotating shaft 77 is arranged on an output shaft of the second motor 76 through a coupler, the first cam 78 is arranged on the second rotating shaft 77, the first cam 78 is positioned at the front side of the second, the first cam 78 cooperates with the diaphragm 73.
The scraper blade device is characterized by further comprising a third bearing seat 8, a third rotating shaft 9 and a roller 10, wherein the third bearing seat 8 is symmetrically arranged on the front side and the rear side of the square scraper blade 64 up and down, the third rotating shaft 9 is connected between two bearings in the upper and lower third bearing seats 8, and the roller 10 is arranged in the middle of the third rotating shaft 9.
The rubber plate mounting structure further comprises a supporting rod 11 and a rubber plate 12, the supporting rod 11 is symmetrically mounted on the rear portion of the right side face of the mounting plate 43 from top to bottom, the supporting rod 11 is located between the guide sleeve 71 and the mounting frame 75, and the rubber plate 12 is mounted at the right end of the supporting rod 11.
The working principle is as follows: when the automatic leveling device is used, an operator firstly adjusts the position of the leveling device 5 through the height adjusting device 4, then the leveling device 5 is started, so that the leveling part of the leveling rotating shaft is in contact with the surface of a newly built water channel, the operator pushes the cart 1 backwards, the leveling part of the leveling device 5 is enabled to level the surface of the water channel, and after the leveling is finished, the operator closes the leveling device 5.
Because height adjusting device 4 is including first slide rail 41, first slider 42, mounting panel 43, electronic round 44, from driving wheel 45 and act as go-between 46, the vertical first slide rail 41 of installing of symmetry around the right flank of extension board 2, all be equipped with two first sliders 42 on every first slide rail 41, first slide rail 41 and first slider 42 sliding fit, mounting panel 43 is installed to four first slider 42 right flanks, electronic round 44 is all installed on two first slide rail 41 medial surface upper portions, driven wheel 45 is installed to two first slide rail 41 medial surface lower parts, all be connected with in the middle of two first slider 42 tops of top and act as go-between 46, act as go-between 46 and walk around electronic round 44 in proper order and follow driving wheel 45 and two first slider 42 bottom intermediate connections in the below. Therefore, an operator starts the electric wheel 44 to rotate forwards or backwards, the electric wheel 44 drives the first sliding block 42 to move upwards or downwards through the pull wire 46, the driven wheel 45 rotates forwards or backwards along with the electric wheel, the first sliding rail 41 and the first sliding block 42 play a role in guiding, the first sliding block 42 drives the mounting plate 43 to move upwards or downwards, the position of the grinding device 5 is adjusted, and after the grinding device 5 is adjusted to a proper position, the operator stops the electric wheel 44.
Because the grinding device 5 comprises a first motor 51, an L-shaped rod 52, a first bearing seat 53, a first rotating shaft 54 and a circular scraper 55, the middle part of the right side surface of the mounting plate 43 is provided with the first motor 51 and the L-shaped rod 52, the first motor 51 is positioned below the L-shaped rod 52, the right side of the L-shaped rod 52 is provided with the first bearing seat 53, a bearing in the first bearing seat 53 is connected with the first rotating shaft 54, the left end of the first rotating shaft 54 is connected with an output shaft of the first motor 51, and the right end of the first rotating shaft 54 is provided with the circular scraper 55. Therefore, the operator starts the first motor 51 to rotate, the first motor 51 drives the first rotating shaft 54 to rotate, the first rotating shaft 54 drives the circular scraping plate 55 to rotate, the operator makes the circular scraping plate 55 contact with the surface of the water channel, so that the circular scraping plate 55 grinds the surface of the water channel, and after the water channel is ground, the operator closes the first motor 51.
Because the scraping device 6 is also included, the scraping device 6 comprises a mounting block 61, a second slide rail 62, a second slide block 63 and a square scraping plate 64, grooved cam 65, connecting block 66, connecting rod 67 and roller 68, the installation piece 61 of the upper and lower symmetry in front of the right flank of mounting panel 43, all install second slide rail 62 on the installation piece 61, all install two second sliders 63 on two second slide rails 62, second slide rail 62 and second slider 63 sliding fit, square scraper 64 is installed to four second slider 63 right flanks, first pivot 54 mid-mounting has grooved cam 65, grooved cam 65 is located between first bearing frame 53 and the circular scraper 55, square scraper 64 left flank mid-mounting has connecting block 66, connecting block 66 left flank is connected with connecting rod 67, roller 68 is installed to connecting rod 67 left flank rear end, roller 68 is located grooved cam 65's inslot, roller 68 and grooved cam 65 cooperate. Therefore, when the first rotating shaft 54 rotates, the first rotating shaft 54 drives the grooved cam 65 to rotate, the grooved cam 65 drives the connecting rod 67 to move back and forth ceaselessly through the roller 68, the connecting rod 67 drives the square scraping plate 64 to move back and forth ceaselessly, and the second sliding rail 62 and the second sliding block 63 play a guiding role in trimming and scraping the surface of the water channel, so that the effect of scraping the surface of the water channel is improved.
Because the vibration device 7 is further included, the vibration device 7 includes guide sleeves 71, guide rods 72, vibration plates 73, first springs 74, mounting frames 75, a second motor 76, a second rotating shaft 77 and a first cam 78, four guide sleeves 71 are installed behind the right side surface of the mounting plate 43, the four guide sleeves 71 are symmetrically arranged, each guide sleeve 71 is internally provided with a guide rod 72, the guide rods 72 are in sliding fit with the guide sleeves 71, the first springs 74 are connected between the left ends of the guide rods 72 and the right ends of the guide sleeves 71, the vibration plates 73 are installed at the right ends of the four guide rods 72, the mounting frames 75 are installed in the middle of the rear part of the right side surface of the mounting plate 43, the mounting frames 75 are positioned between the guide sleeves 71 on the upper side and the lower side, the second motor 76 is installed on the mounting frame 75, the second rotating shaft 77 is installed on the output shaft of the second motor 76 through a coupler, the first, the first cam 78 is located on the left side of the diaphragm 73, and the first cam 78 is engaged with the diaphragm 73. Therefore, in the scraping process, an operator starts the second motor 76 to rotate, the second motor drives the second rotating shaft 77 to rotate, the second rotating shaft 77 drives the first cam 78 to rotate, the first cam 78 drives the vibration plate 73 to continuously vibrate left and right under the action of the first spring 74, and the guide sleeve 71 and the guide rod 72 play a role in guiding, so that the effect of scraping the surface of the water channel is further improved.
Because still including third bearing frame 8, third pivot 9 and cylinder 10, the equal longitudinal symmetry of both sides installs third bearing frame 8 around the square scraper blade 64, is connected with third pivot 9 between two bearings in the upper and lower third bearing frame 8, and the cylinder 10 is installed to third pivot 9 mid-mounting. The square scrapers 64 can be guided by the roller 10 while moving back and forth so that the edges of the square scrapers 64 do not scratch the surface of the canal, thereby further improving the effect of scraping the surface of the canal.
Because still including branch 11 and rubber slab 12, the back of the right flank of mounting panel 43 is the symmetry from top to bottom installs branch 11, and branch 11 is located guide pin 71 and mounting bracket 75 centre, and rubber slab 12 is installed to branch 11 right-hand member. Therefore, the vibration plate 73 is not damaged due to the excessive elastic force of the first spring 74 when the vibration plate 73 moves downward by the strut 11 and the rubber plate 12.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, various changes, modifications and substitutions can be made without departing from the spirit of the present invention, and these are all within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (4)

1. A water channel construction strickling equipment for hydraulic engineering is characterized by comprising a cart (1), a support plate (2), a top plate (3), a height adjusting device (4) and a grinding device (5), wherein the support plate (2) is vertically installed on the right side of the top of a cart plate of the cart (1), the top plate (3) is installed on the top of the support plate (2), the height adjusting device (4) is arranged on the right side surface of the support plate (2), and the grinding device (5) is arranged on a moving part of the height adjusting device (4); the height adjusting device (4) comprises a first slide rail (41), a first slide block (42), a mounting plate (43), an electric wheel (44), a driven wheel (45) and a pull wire (46), the front and back of the right side surface of the support plate (2) are symmetrically and vertically provided with first slide rails (41), each first slide rail (41) is provided with two first slide blocks (42), the first slide rails (41) are in sliding fit with the first slide blocks (42), the right side surfaces of the four first slide blocks (42) are provided with mounting plates (43), the upper parts of the inner side surfaces of the two first slide rails (41) are provided with electric wheels (44), the lower parts of the inner side surfaces of the two first slide rails (41) are provided with driven wheels (45), the middles of the tops of the two upper first slide blocks (42) are respectively connected with pull wires (46), and the pull wires (46) sequentially bypass the electric wheels (44) and the driven wheels (45) and are connected with the middles of the bottoms of; the grinding device (5) comprises a first motor (51), an L-shaped rod (52), a first bearing seat (53), a first rotating shaft (54) and a circular scraper (55), the middle part of the right side surface of the mounting plate (43) is provided with the first motor (51) and the L-shaped rod (52), the first motor (51) is positioned below the L-shaped rod (52), the right side of the L-shaped rod (52) is provided with the first bearing seat (53), a bearing in the first bearing seat (53) is connected with the first rotating shaft (54), the left end of the first rotating shaft (54) is connected with an output shaft of the first motor (51), and the right end of the first rotating shaft (54) is provided with the circular scraper (55); the scraping device (6) comprises an installation block (61), second slide rails (62), second slide blocks (63), square scrapers (64), grooved cams (65), connecting blocks (66), connecting rods (67) and rollers (68), the installation block (61) is symmetrically installed above and below the front side of the right side face of the installation plate (43), the second slide rails (62) are installed on the installation block (61), the two second slide rails (62) are respectively provided with the two second slide blocks (63), the second slide rails (62) are in sliding fit with the second slide blocks (63), the square scrapers (64) are installed on the right side faces of the four second slide blocks (63), grooved cams (65) are installed in the middle of the first rotating shaft (54), the grooved cams (65) are located between the first bearing seats (53) and the circular scrapers (55), the connecting blocks (66) are installed in the middle of the left side faces of the square scrapers (64), connecting block (66) left surface is connected with connecting rod (67), and roller (68) are installed to connecting rod (67) left surface rear end, and roller (68) are located the inslot of grooved cam (65), and roller (68) and grooved cam (65) cooperation.
2. The water channel construction scraping equipment for the water conservancy project according to claim 1, which is characterized by further comprising a vibration device (7), wherein the vibration device (7) comprises guide sleeves (71), guide rods (72), vibration plates (73), first springs (74), a mounting frame (75), a second motor (76), a second rotating shaft (77) and a first cam (78), four guide sleeves (71) are installed behind the right side face of the mounting plate (43), the four guide sleeves (71) are symmetrically arranged, the guide rod (72) is arranged in each guide sleeve (71), the guide rods (72) are in sliding fit with the guide sleeves (71), the first springs (74) are connected between the left end of each guide rod (72) and the right end of each guide sleeve (71), the vibration plates (73) are installed at the right ends of the four guide rods (72), the mounting frame (75) is installed in the middle behind the right side face of the mounting plate (43), and the mounting frame (75) is located between the guide sleeves (71) on the upper side, install second motor (76) on mounting bracket (75), install second pivot (77) through the shaft coupling on the output shaft of second motor (76), install first cam (78) on second pivot (77), first cam (78) are located second motor (76) front side, and first cam (78) are located vibrations board (73) left surface, first cam (78) and vibrations board (73) cooperation.
3. The water channel construction strickling equipment for the hydraulic engineering according to claim 2, characterized by further comprising a third bearing seat (8), a third rotating shaft (9) and a roller (10), wherein the third bearing seat (8) is installed on the front side and the rear side of the square scraper (64) in an up-down symmetrical manner, the third rotating shaft (9) is connected between two bearings in the upper-lower third bearing seat (8), and the roller (10) is installed in the middle of the third rotating shaft (9).
4. The water channel construction strickling equipment for hydraulic engineering according to claim 3, characterized by further comprising a supporting rod (11) and a rubber plate (12), wherein the supporting rod (11) is installed in the rear of the right side surface of the installation plate (43) in an up-down symmetrical manner, the supporting rod (11) is located between the guide sleeve (71) and the installation frame (75), and the rubber plate (12) is installed at the right end of the supporting rod (11).
CN201711362533.4A 2017-12-18 2017-12-18 Water channel construction strickle equipment for hydraulic engineering Active CN108060658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711362533.4A CN108060658B (en) 2017-12-18 2017-12-18 Water channel construction strickle equipment for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711362533.4A CN108060658B (en) 2017-12-18 2017-12-18 Water channel construction strickle equipment for hydraulic engineering

Publications (2)

Publication Number Publication Date
CN108060658A CN108060658A (en) 2018-05-22
CN108060658B true CN108060658B (en) 2020-11-10

Family

ID=62139311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711362533.4A Active CN108060658B (en) 2017-12-18 2017-12-18 Water channel construction strickle equipment for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN108060658B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114382059A (en) * 2022-02-23 2022-04-22 李延坤 Water channel construction strickle equipment for hydraulic engineering

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2272862C1 (en) * 2004-09-06 2006-03-27 Государственное научное учреждение Поволжский научно-исследовательский институт эколого-мелиоративных технологий Российской академии сельскохозяйственных наук Slope concreting device
CN100510295C (en) * 2007-08-30 2009-07-08 于复生 Sandwich plate flattng device
CN104047267B (en) * 2014-06-18 2016-01-20 葛洲坝集团基础工程有限公司 A kind of channel domatic filter material cushion construction method and filter material bed course shake close compaction apparatus
CN106320317A (en) * 2016-08-26 2017-01-11 杨建锋 Efficient compaction device for artificial waterway
CN206376298U (en) * 2016-12-11 2017-08-04 顾明如 A kind of water conservancy automatic channel slope forming apparatus

Also Published As

Publication number Publication date
CN108060658A (en) 2018-05-22

Similar Documents

Publication Publication Date Title
CN107587539B (en) High-efficient device that levels of foundation for construction
CN208815359U (en) The warehouse that paves automatically of high-speed rail unballasted track bed plate concrete receives face all-in-one machine
CN108060658B (en) Water channel construction strickle equipment for hydraulic engineering
CN205328100U (en) Two doctor -bar lever belt cleaners
CN211227977U (en) Road surface rolling machine is used in highway construction
CN109263094B (en) Polyurethane foam composite sandwich plate processing system and plate processing method
CN215976712U (en) Concrete road surface paver of convenient regulation
CN107628421B (en) Belt conveyor adhesive tape drainage device
CN216371417U (en) Portable putty wall surface equipment of polishing
CN111535561B (en) Cast-in-place cement ground leveling device
CN211646267U (en) Water conservancy ditch diverging device
CN214271620U (en) Highway subgrade maintenance road surface cementation of fissures device
CN212670275U (en) Shock resistance bridge expansion joint device
CN215441350U (en) Road finishing device
CN209816612U (en) Road paving device for road and bridge construction
CN219563671U (en) Storage device is used in concrete production
CN209243152U (en) A kind of slag scraping device for dual-metal compound wire sinking roller
CN113199322A (en) Construction method for pasting, installing and constructing EPS insulation board of outer wall
CN220013328U (en) Highway crack processing apparatus
CN211597442U (en) Waterproof cloth construction equipment is built in room
CN221193599U (en) Anti-blocking drainage device for road hardening
CN215405454U (en) A road surface leveling device for road surface construction
CN108988213A (en) A kind of construction site prevention temporary cable laying apparatus
CN221052314U (en) Asphalt spreader scraping device
CN217419241U (en) Spreading and strickling device for municipal sidewalk brick laying construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201021

Address after: 312500, Zhejiang, Shaoxing province Xinchang County town 350 Village

Applicant after: XINCHANG COUNTY KANGHONG MACHINERY TECHNOLOGY Co.,Ltd.

Address before: 337000 Business Incubation Base 233 Mailbox No. 16 Hongshan Avenue, Pingxiang Technology Development Zone, Jiangxi Province

Applicant before: Jiang Junhua