CN108052776A - Based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method - Google Patents

Based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method Download PDF

Info

Publication number
CN108052776A
CN108052776A CN201810029756.7A CN201810029756A CN108052776A CN 108052776 A CN108052776 A CN 108052776A CN 201810029756 A CN201810029756 A CN 201810029756A CN 108052776 A CN108052776 A CN 108052776A
Authority
CN
China
Prior art keywords
model
flood
dimensional
result
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810029756.7A
Other languages
Chinese (zh)
Other versions
CN108052776B (en
Inventor
屈志刚
高英
冯光伟
王岩
王新平
姚亮亮
刘建龙
赵庆鹤
孙卫宾
孙哲
史亚军
付航帅
薛向华
李�一
郑秋灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Water and Power Engineering Consulting Co Ltd
Original Assignee
Henan Water and Power Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Water and Power Engineering Consulting Co Ltd filed Critical Henan Water and Power Engineering Consulting Co Ltd
Priority to CN201810029756.7A priority Critical patent/CN108052776B/en
Publication of CN108052776A publication Critical patent/CN108052776A/en
Application granted granted Critical
Publication of CN108052776B publication Critical patent/CN108052776B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/006Mixed reality
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The invention discloses a kind of based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method, three dimensional design platform, geographical information platform, hydrodynamics Modeling Platform, three-dimensional live Modeling Platform are subjected to Cross Platform Technology fusion, using three-dimensional live model construction high-precision flood model, and carry out three-dimensional dynamic exhibition;1st, the production of three-dimensional live model, DEM, orthography;2nd, the structure of flood risk analysis model and calculating;3rd, the export and conversion of Calculation of Flood result;4th, outdoor scene model, BIM design a model integrated with Calculation of Flood result;5th, the three-dimensional dynamic exhibition of flood result.Three dimensional design platform, geographical information platform, hydrodynamics Modeling Platform, three-dimensional visualization rendering platform etc. are carried out Cross Platform Technology fusion by the present invention, flood model is built on the basis of the outdoor scene model data of unmanned plane oblique photograph production, it is superimposed outdoor scene model and carries out flood three-dimensional dynamic exhibition so that flood model precision greatly improves.

Description

Based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method
Technical field
The present invention relates to application of the professional Hydrodynamic Model in hydraulic engineering, more particularly, to based on BIM and three-dimensional Flood model structure and the Dynamic Display method of outdoor scene model.
Background technology
BIM, that is, Building Information Model is both a kind of form of expression of engineering three dimensional design achievement and a kind of design reason Thought, method, flow and specification.Three-dimensional live model is by unmanned plane oblique photograph technology, calculates and calculates based on a set of empty three Method, builds the threedimensional model of real world from captured serial picture, and after being superimposed with captured picture texture, finally Obtain outdoor scene threedimensional model true to nature;It is public that Hydrodynamic Model is generally basede on the professional hydraulic theory such as flow energy equation Formula is built, for calculating and simulating the movement in river, sea, lake water stream.It is built at present in Hydrodynamic Model especially flood model Aspect is often based on the topographic map structure of low precision so that the Shortcomings in terms of model accuracy and bandwagon effect can not be given People is on the spot in person, the impression of real flood simulation and experience.
The content of the invention
It is a kind of based on the flood model of BIM and three-dimensional live model structure and Dynamic Display side present invention aims at providing Method greatly improves flood model structure precision, flood inundation on tracks evolution displaying high fidelity effect so as to reach.
To achieve the above object, the present invention takes following technical proposals:
It is of the present invention based on the flood model of BIM and three-dimensional live model structure with Dynamic Display method, three dimensional design is put down Platform, geographical information platform, hydrodynamics Modeling Platform, three-dimensional live Modeling Platform carry out Cross Platform Technology fusion, using three-dimensional Outdoor scene model construction high-precision flood model, and carry out three-dimensional dynamic exhibition;Step is as follows:
Step 1, three-dimensional live model, DEM(The abbreviation of English Digital Elevation Model;Digital elevation model), just The production of projection picture:
Using three-dimensional live Modeling Platform such as ContextCapture, in the ground aerial photograph acquired in unmanned plane oblique photograph On the basis of measurement control point, production outdoor scene model, orthography and DSM(The contracting of English Digital Surface Model It writes, digital surface model)Data, due to being three achievements that same set of basic document is produced by same set of flow, therefore it is sat Absolute altitude journey will exactly match;Software is handled by the professional landform such as ArcGis DSM erases behind Surface structure, thick grass forest belt To dem data, it is spare to be finally converted into elevation scatterplot;
Step 2, the structure of flood risk analysis model and calculating:
Using the MIKE21 FM module construction two dimension flood models in the hydrodynamics Modeling Platform Mike groupwares, by precision It is required that subdivision terrain mesh, and the elevation scatterplot that steps for importing 1 makes carries out terrain mesh interpolation, setting is matched with Gridding length Parameters(Such as calculate time step)And boundary condition, complete structure and the calculating of two-dimentional flood model;
The export and conversion of step 3, Calculation of Flood result:
Each moment Calculation of Flood result is exported and is converted into three-dimensional grid model;
Step 4, outdoor scene model, BIM design a model integrated with Calculation of Flood result:
In the connect versions of Bentley three-dimensional cooperative design platform MicroStation softwares, connect and deposited with .3mx forms The three-dimensional live model of storage(The three-dimensional live model criteria form of ContextCapture productions), and need to show with reference to other Engineering BIM design a model each moment flood result three-dimensional grid model made with step 3 step, realize that outdoor scene model, BIM are set The assembling of meter model and Calculation of Flood results model integrates;
The three-dimensional dynamic exhibition of step 5, flood result:
Model after described integrate integrally is imported in Bentley rendering platforms LumenRT, to each moment flood three-dimensional grid mould Type sets its animation effect after assigning the material and transparency of water, i.e., is in chronological sequence sequentially shown and hidden each with certain frame per second Moment flood three-dimensional grid model, it is final to realize the flood three-dimensional dynamic exhibition based on three-dimensional live model.
In step 3, the method for each moment Calculation of Flood result being exported and being converted into three-dimensional grid model is:
Step 3.1 is converted each moment Calculation of Flood result by the flood Modeling Platform such as MIKE instrument Mike2Shp of itself For the shp forms that ArcGis is used, so as to obtain a series of shp results figure layer files, in each shp results figure layer file Comprising identical triangle of vectors Shaping element, each triangle of vectors Shaping element has every waterpower such as water level, depth of water will Plain attribute field;
Step 3.2 needs to carry out the screening of result moment and result attribute according to front end displaying:In terms of the screening of result moment, According to displaying fluency screen, from multiple(Such as 10)As a result one is selected in the moment, in result attribute selection Aspect only filters out water level and depth of water attribute;
Step 3.3, the triangle of vectors Shaping element by each moment result shp figure layer files, in ArcGis, AutoCAD and In MicroStation softwares, three-dimensional grid model is converted to by same set of flow chart of data processing.
In step 3.3, by the triangle of vectors face element of each moment result shp figure layer files, in ArcGis, AutoCAD and The data processing method that three-dimensional grid model is converted in MicroStation softwares is:
Step 3.3.1, screening has the element of flood:In ArcGis, using " screening " instrument, from result shp figure layer files The triangle of vectors Shaping element that depth of water property value is more than 0 is filtered out, that is, the triangle of vectors Shaping element for having flood inundation on tracks;
Step 3.3.2, face element is switched into an element, in ArcGis, using " element turning point " instrument, in vector triangle face Triangle of vectors Shaping element is switched to an element by element geometric center position, and element succession has triangle of vectors Shaping element Water level, depth of water attribute;
Step 3.3.3, described element is switched into grid, in ArcGis, using " landform turnstile lattice " instrument in ArcGis, with The water level attribute field of point element is elevation field, is converted to an element with the resolution ratio that the same triangle centre plane length of side is close Grid;
Step 3.3.4, water level isopleth is extracted:In ArcGis, using " isopleth " instrument, to meet flood Dynamic Display The spacing such as 0.1m that precision needs extracts water level isopleth from grid, and the water level isopleth after extraction has Contour Attribute, representation level value;
Step 3.3.5, Height attribute field is added:It is equivalent to the water level using " addition field " instrument in ArcGis The attribute field that the element of line increases an entitled Elevation, type is floating type, so as in AutoCAD to line feature The identification of elevation;
Step 3.3.6, lightweight water level isopleth control point:In ArcGis, using " generalization " instrument, according to displaying precision It needs, generalization on water level equivalence line feature vertex is carried out by a certain percentage, so that the model being subsequently generated more lightweight;
Step 3.3.7, cad file is saved as:In ArcGis, using exporting to cad tools, by the isopleth after lightweight Shp figure layers save File As cad file;
Step 3.3.8, three-dimensional grid model is generated:In three dimensional design platform software MicroStation, by the cad file In the reference of water level contour and be copied into, and using the contour mesh tool in mesh modeling tool set, by water level etc. High line is generated as three-dimensional grid model.
The invention has the advantages that by three dimensional design platform, geographical information platform, hydrodynamics Modeling Platform, three-dimensional visualization Rendering platform etc. carries out Cross Platform Technology fusion, so as to fulfill data basis such as the outdoor scene models produced in unmanned plane oblique photograph Upper structure flood model, and be superimposed outdoor scene model and carry out flood three-dimensional dynamic exhibition so that the precision of flood model structure is significantly It improves, flood inundation on tracks evolution process high fidelity, gives people a kind of on the spot in person, real flood inundation on tracks experience.
Description of the drawings
Fig. 1 is the method for the present invention FB(flow block).
Specific embodiment
Elaborate below in conjunction with the accompanying drawings to the embodiment of the present invention, the present embodiment using technical solution of the present invention before It puts and is implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to down State embodiment.
It is as shown in Figure 1, of the present invention based on the flood model of BIM and three-dimensional live model structure and Dynamic Display side Three dimensional design platform, geographical information platform, hydrodynamics Modeling Platform, three-dimensional live Modeling Platform are carried out cross-platform skill by method Art merges, and using three-dimensional live model construction high-precision flood model, and carries out three-dimensional dynamic exhibition;Step is as follows:
The production of step 1, three-dimensional live model, DEM, orthography:Using three-dimensional live Modeling Platform such as ContextCapture, on the basis of the ground aerial photograph acquired in unmanned plane oblique photograph and measurement control point, production is real Scape model, orthography and DSM(The abbreviation of English Digital Surface Model, digital surface model)Data, due to being Three achievements that same set of basic document is produced by same set of flow, therefore its coordinate elevation will exactly match;Pass through ArcGis Erase Surface structure, thick grasses of DSM obtained into DEM behind forest belt Deng professional landform processing software(English Digital Elevation The abbreviation of Model, digital elevation model)It is spare to be finally converted into elevation scatterplot for data.
Step 2, the structure of flood risk analysis model and calculating:Using in the hydrodynamics Modeling Platform Mike groupwares MIKE21 FM module construction two dimension flood models, the elevation scatterplot made by required precision subdivision terrain mesh and steps for importing 1 Terrain mesh interpolation is carried out, is set and the matched parameters of Gridding length(Such as calculate time step)And boundary condition, Complete structure and the calculating of two-dimentional flood model.
The export and conversion of step 3, Calculation of Flood result:Two-dimentional Calculation of Flood result data by a series of moment result Composition, each moment result are the Calculation of Flood at the corresponding moment as a result, including all for storing each hydraulic elements knot The triangle of vectors face element of fruit attribute, the face element that each moment result includes are identical, hydraulic elements result Attribute class Type is also identical, but is worth different.It is by the method that Calculation of Flood result is exported and converted:
Step 3.1, first, by the flood Modeling Platform such as MIKE instrument Mike2Shp of itself by each moment Calculation of Flood result The shp forms that ArcGis is used are converted to, so as to obtain a series of shp results figure layer files, in each shp results figure layer file Comprising identical triangle of vectors Shaping element, each triangle of vectors Shaping element has every hydraulic elements category such as water level, depth of water Property field.
Step 3.2, then needs to carry out the screening of result moment and result attribute according to front end displaying:At the result moment In terms of screening, according to displaying fluency screen, such as one is selected from 10 result moment;In result attribute In terms of screening, water level and depth of water attribute are only filtered out.
It is step 3.3, last, by the triangle of vectors Shaping element of each moment result shp figure layer files, ArcGis, In AutoCAD and MicroStation softwares, three-dimensional grid model, specific steps are converted to by same set of flow chart of data processing For:
Step 3.3.1, screening has the element of flood:In ArcGis, using " screening " instrument, from result shp figure layer files The triangle of vectors Shaping element that depth of water property value is more than 0 is filtered out, that is, the triangle of vectors Shaping element for having flood inundation on tracks;
Step 3.3.2, triangle of vectors Shaping element is switched into an element:In ArcGis, using " element turning point " instrument, swearing Gore element geometric center position is measured, triangle of vectors Shaping element is switched into an element, element succession has vector three Water level, the depth of water attribute of angled face element;
Step 3.3.3, an element is switched into grid:It, will with point using " landform turnstile lattice " instrument in ArcGis in ArcGis The water level attribute field of element is elevation field, and an element is converted to grid with the resolution ratio that the same triangle centre plane length of side is close Lattice;
Step 3.3.4, water level isopleth is extracted:In ArcGis, using " isopleth " instrument, to meet flood Dynamic Display The spacing such as 0.1m that precision needs extracts water level isopleth from grid, and the isopleth after extraction will have Contour to belong to Property, representation level value;
Step 3.3.5, Height attribute field is added:It, will to water level isopleth using " addition field " instrument in ArcGis The attribute field that element increases an entitled Elevation, type is floating type, so as to the knowledge of the line feature elevation in AutoCAD Not;
Step 3.3.6, lightweight water level isopleth control point:In ArcGis, using " generalization " instrument, according to displaying precision It needs, generalization on water level equivalence line feature vertex is carried out by a certain percentage, so that the model being subsequently generated more lightweight;
Step 3.3.7, cad file is saved as:In ArcGis, using exporting to cad tools, by the isopleth after lightweight Shp figure layers save File As cad file;
Step 3.3.8, three-dimensional grid model is generated:It, will be in cad file in three dimensional design platform software MicroStation Water level contour, which is referred to and is copied into, to be come, and using the contour mesh tool in mesh modeling tool set, by water level contour It is generated as three-dimensional grid model.
Step 4, outdoor scene model, BIM design a model integrated with Calculation of Flood result:In Bentley three-dimensional collaborative designs In the connect versions of platform MicroStation softwares, the three-dimensional live model stored with .3mx forms is connected (The three-dimensional live model criteria form of ContextCapture productions), and the engineering BIM design moulds shown with reference to other needs Each moment flood three-dimensional grid model that type and step 3 make realizes that outdoor scene model, BIM design a model and Calculation of Flood result The assembling of model integrates.
The three-dimensional dynamic exhibition of step 5, flood result:Model after will be integrated integrally imports Bentley rendering platforms In LumenRT, its animation effect is set after assigning the material and transparency of water to each moment flood three-dimensional grid model, i.e., with one Framing rate in chronological sequence sequentially shows and hides each moment flood three-dimensional grid model, final to realize based on three-dimensional live model Flood three-dimensional dynamic exhibition.

Claims (3)

  1. It is 1. a kind of based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method, it is characterised in that:By three-dimensional Design platform, geographical information platform, hydrodynamics Modeling Platform, three-dimensional live Modeling Platform carry out Cross Platform Technology fusion, should With three-dimensional live model construction high-precision flood model, and carry out three-dimensional dynamic exhibition;Step is as follows:
    The production of step 1, three-dimensional live model, DEM, orthography:
    Using three-dimensional live Modeling Platform, in the ground aerial photograph acquired in unmanned plane oblique photograph and measurement control point basis On, production outdoor scene model, orthography and DSM data;Software is handled by professional landform DSM erases Surface structure, grass Dem data is obtained after jungle band, it is spare to be finally converted into elevation scatterplot;
    Step 2, the structure of flood risk analysis model and calculating:
    Using the MIKE21 FM module construction two dimension flood models in the hydrodynamics Modeling Platform Mike groupwares, by precision It is required that subdivision terrain mesh, and the elevation scatterplot that steps for importing 1 makes carries out terrain mesh interpolation, sets and the grid The matched parameters of length and boundary condition complete structure and the calculating of two-dimentional flood model;
    The export and conversion of step 3, Calculation of Flood result:
    Each moment Calculation of Flood result is exported and is converted into three-dimensional grid model;
    Step 4, outdoor scene model, BIM design a model integrated with Calculation of Flood result:
    In the connect versions of Bentley three-dimensional cooperative design platform MicroStation softwares, connect and deposited with .3mx forms The three-dimensional live model of storage, and each moment flood made with step 3 step that designs a model with reference to the engineering BIM that other needs are shown As a result three-dimensional grid model realizes that outdoor scene model, BIM design a model and integrated with the assembling of Calculation of Flood results model;
    The three-dimensional dynamic exhibition of step 5, flood result:
    Model after described integrate integrally is imported in Bentley rendering platforms LumenRT, to each moment flood three-dimensional grid mould Type sets its animation effect after assigning the material and transparency of water, i.e., is in chronological sequence sequentially shown and hidden each with certain frame per second Moment flood three-dimensional grid model, it is final to realize the flood three-dimensional dynamic exhibition based on three-dimensional live model.
  2. It is 2. special according to claim 1 based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method Sign is:In step 3, the method for each moment Calculation of Flood result being exported and being converted into three-dimensional grid model is:
    Step 3.1 is converted to each moment Calculation of Flood result by the instrument Mike2Shp of flood Modeling Platform MIKE itself The shp forms that ArcGis is used so as to obtain a series of shp results figure layer files, wrap in each shp results figure layer file Containing identical triangle of vectors Shaping element, each triangle of vectors Shaping element has every hydraulic elements such as water level, depth of water Attribute field;
    Step 3.2 needs to carry out the screening of result moment and result attribute according to front end displaying:In terms of the screening of result moment, According to displaying fluency screen, one is selected from multiple result moment, in terms of result attribute selection, only sieve Select water level and depth of water attribute;
    Step 3.3, the triangle of vectors Shaping element by each moment result shp figure layer files, in ArcGis, AutoCAD and In MicroStation softwares, three-dimensional grid model is converted to by same set of flow chart of data processing.
  3. It is 3. special according to claim 2 based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method Sign is:In step 3.3, by the triangle of vectors face element of each moment result shp figure layer files, in ArcGis, AutoCAD and The data processing method that three-dimensional grid model is converted in MicroStation softwares is:
    Step 3.3.1, screening has the element of flood:In ArcGis, using " screening " instrument, from result shp figure layer files The triangle of vectors Shaping element that depth of water property value is more than 0 is filtered out, that is, the triangle of vectors Shaping element for having flood inundation on tracks;
    Step 3.3.2, face element is switched into an element, in ArcGis, using " element turning point " instrument, in vector triangle face Triangle of vectors Shaping element is switched to an element by element geometric center position, and element succession has triangle of vectors Shaping element Water level, depth of water attribute;
    Step 3.3.3, described element is switched into grid, in ArcGis, using " landform turnstile lattice " instrument in ArcGis, with The water level attribute field of point element is elevation field, is converted to an element with the resolution ratio that the same triangle centre plane length of side is close Grid;
    Step 3.3.4, water level isopleth is extracted:In ArcGis, using " isopleth " instrument, to meet flood Dynamic Display essence The spacing needed is spent, water level isopleth is extracted from grid, the water level isopleth after extraction has Contour attributes, generation Table water level value;
    Step 3.3.5, Height attribute field is added:In ArcGis, using " addition field " instrument, to the water level isopleth Element increase an entitled Elevation, type be floating type attribute field, so as in AutoCAD to line feature height The identification of journey;
    Step 3.3.6, lightweight water level isopleth control point:In ArcGis, using " generalization " instrument, according to displaying precision need It wants, generalization on water level equivalence line feature vertex is carried out by a certain percentage, so that the model being subsequently generated more lightweight;
    Step 3.3.7, cad file is saved as:In ArcGis, using exporting to cad tools, by the isopleth after lightweight Shp figure layers save File As cad file;
    Step 3.3.8, three-dimensional grid model is generated:In three dimensional design platform software MicroStation, by the cad file In the reference of water level contour and be copied into, and using the contour mesh tool in mesh modeling tool set, by the water Position contour lines creation is three-dimensional grid model.
CN201810029756.7A 2018-01-12 2018-01-12 Flood model construction and dynamic display method based on BIM and three-dimensional live-action model Active CN108052776B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810029756.7A CN108052776B (en) 2018-01-12 2018-01-12 Flood model construction and dynamic display method based on BIM and three-dimensional live-action model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810029756.7A CN108052776B (en) 2018-01-12 2018-01-12 Flood model construction and dynamic display method based on BIM and three-dimensional live-action model

Publications (2)

Publication Number Publication Date
CN108052776A true CN108052776A (en) 2018-05-18
CN108052776B CN108052776B (en) 2022-02-15

Family

ID=62127434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810029756.7A Active CN108052776B (en) 2018-01-12 2018-01-12 Flood model construction and dynamic display method based on BIM and three-dimensional live-action model

Country Status (1)

Country Link
CN (1) CN108052776B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109242937A (en) * 2018-08-07 2019-01-18 北京市水利规划设计研究院 The method and apparatus that the flow field Mike destination file is converted into shapefile vector file
CN109544683A (en) * 2018-11-07 2019-03-29 北京科技大学 Architecture ensemble earthquake response dynamic and visual method based on oblique photograph data
CN109583642A (en) * 2018-11-27 2019-04-05 贵州东方世纪科技股份有限公司 A kind of regional flood method for early warning
CN109933637A (en) * 2019-03-19 2019-06-25 北京航天宏图信息技术股份有限公司 A kind of flood risk Dynamic Display and analysis system
CN110044337A (en) * 2019-04-29 2019-07-23 中国水利水电科学研究院 A kind of the unmanned plane monitoring method and system of urban flooding scene
CN110108257A (en) * 2019-05-20 2019-08-09 苏州中飞遥感技术服务有限公司 A kind of methods of exhibiting to be matched based on unmanned plane image and static programming figure
CN110411422A (en) * 2019-07-08 2019-11-05 中建五局土木工程有限公司 The planing method of builder's road based on BIM
CN110807835A (en) * 2019-10-25 2020-02-18 南京工业大学 Building BIM model and live-action three-dimensional model fusion method
CN110956412A (en) * 2019-12-16 2020-04-03 珠江水利委员会珠江水利科学研究院 Flood dynamic assessment method, device, medium and equipment based on real-scene model
CN110991822A (en) * 2019-11-18 2020-04-10 天津大学 Three-dimensional hydrodynamic numerical simulation method based on oblique image modeling
CN111062171A (en) * 2019-11-22 2020-04-24 北京思路创新科技有限公司 Application method, device and system of EFDC model based on cloud computing
CN111145350A (en) * 2019-12-25 2020-05-12 中国电建集团中南勘测设计研究院有限公司 Three-dimensional dynamic rendering display method for flood risk analysis result data
CN111581700A (en) * 2020-05-06 2020-08-25 中国电建集团成都勘测设计研究院有限公司 Method for adding BIM attribute and outputting BIM attribute table based on CATIA model
CN111612908A (en) * 2020-05-26 2020-09-01 江西省水利规划设计研究院 Hydraulic engineering inundation range display method, device, equipment and storage medium
CN111986320A (en) * 2020-04-28 2020-11-24 南京国图信息产业有限公司 DEM and oblique photography model space fitting optimization algorithm for smart city application
CN112669440A (en) * 2020-12-03 2021-04-16 悉地(苏州)勘察设计顾问有限公司 Traffic planning engineering project achievement display method, device and storage medium
CN113297663A (en) * 2021-06-11 2021-08-24 中国五冶集团有限公司 BIM technology-based park water flow visualization analysis method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102034001A (en) * 2010-12-16 2011-04-27 南京大学 Design method for distributed hydrological model by using grid as analog unit
CN102663827A (en) * 2012-03-02 2012-09-12 天津大学 Three-dimensional dynamic whole-process simulation method for storm surge and flood routing in complex flooding areas
CN102708227A (en) * 2012-04-18 2012-10-03 国家***卫星测绘应用中心 SPH (smoothed particle hydrodynamics) algorithm-based simulation method and simulation system of process of breaking dam by flood
US20140064634A1 (en) * 2007-07-30 2014-03-06 Dolby Laboratories Licensing Corporation Enhancing dynamic ranges of images
US20160210377A1 (en) * 2015-01-20 2016-07-21 Illinois Tool Works, Inc. Method, computer program product and apparatus for providing a building options configurator
CN205448910U (en) * 2016-03-23 2016-08-10 河南省水利勘测设计研究有限公司 Accuracy is measurationed prestressing force aqueduct hoop or vertical prestressing tendons and is returned device of volume of contracting
CN107330636A (en) * 2017-07-25 2017-11-07 成都宗升智能科技有限公司 Engineering construction risk source based on 3DGIS+BIM technologies is monitored and artificial intelligence Forecasting Methodology in real time

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140064634A1 (en) * 2007-07-30 2014-03-06 Dolby Laboratories Licensing Corporation Enhancing dynamic ranges of images
CN102034001A (en) * 2010-12-16 2011-04-27 南京大学 Design method for distributed hydrological model by using grid as analog unit
CN102663827A (en) * 2012-03-02 2012-09-12 天津大学 Three-dimensional dynamic whole-process simulation method for storm surge and flood routing in complex flooding areas
CN102708227A (en) * 2012-04-18 2012-10-03 国家***卫星测绘应用中心 SPH (smoothed particle hydrodynamics) algorithm-based simulation method and simulation system of process of breaking dam by flood
US20160210377A1 (en) * 2015-01-20 2016-07-21 Illinois Tool Works, Inc. Method, computer program product and apparatus for providing a building options configurator
CN205448910U (en) * 2016-03-23 2016-08-10 河南省水利勘测设计研究有限公司 Accuracy is measurationed prestressing force aqueduct hoop or vertical prestressing tendons and is returned device of volume of contracting
CN107330636A (en) * 2017-07-25 2017-11-07 成都宗升智能科技有限公司 Engineering construction risk source based on 3DGIS+BIM technologies is monitored and artificial intelligence Forecasting Methodology in real time

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
屈志刚: "三维设计跨平台联合应用探索与实践", 《智慧建造》 *
王念念: "洪水风险图快速制作及其三维可视化研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
王树臣等: "BIM+GIS的集成应用与发展", 《工程建设》 *
高英: ""BIM+"跨界应用开拓智慧水利", 《水利规划与设计》 *

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109242937A (en) * 2018-08-07 2019-01-18 北京市水利规划设计研究院 The method and apparatus that the flow field Mike destination file is converted into shapefile vector file
CN109242937B (en) * 2018-08-07 2023-04-07 北京市水利规划设计研究院 Method and device for converting Mike flow field result file into shape vector file
CN109544683A (en) * 2018-11-07 2019-03-29 北京科技大学 Architecture ensemble earthquake response dynamic and visual method based on oblique photograph data
CN109544683B (en) * 2018-11-07 2023-01-10 北京科技大学 Urban building group seismic response dynamic visualization method based on oblique photography data
CN109583642A (en) * 2018-11-27 2019-04-05 贵州东方世纪科技股份有限公司 A kind of regional flood method for early warning
CN109933637A (en) * 2019-03-19 2019-06-25 北京航天宏图信息技术股份有限公司 A kind of flood risk Dynamic Display and analysis system
CN110044337B (en) * 2019-04-29 2020-06-30 中国水利水电科学研究院 Unmanned aerial vehicle monitoring method and system for urban flood scene
CN110044337A (en) * 2019-04-29 2019-07-23 中国水利水电科学研究院 A kind of the unmanned plane monitoring method and system of urban flooding scene
CN110108257A (en) * 2019-05-20 2019-08-09 苏州中飞遥感技术服务有限公司 A kind of methods of exhibiting to be matched based on unmanned plane image and static programming figure
CN110108257B (en) * 2019-05-20 2021-05-14 苏州中飞遥感技术服务有限公司 Display method based on matching of aerial images of unmanned aerial vehicle and static planning map
CN110411422A (en) * 2019-07-08 2019-11-05 中建五局土木工程有限公司 The planing method of builder's road based on BIM
CN110807835B (en) * 2019-10-25 2021-03-30 南京工业大学 Building BIM model and live-action three-dimensional model fusion method
CN110807835A (en) * 2019-10-25 2020-02-18 南京工业大学 Building BIM model and live-action three-dimensional model fusion method
CN110991822A (en) * 2019-11-18 2020-04-10 天津大学 Three-dimensional hydrodynamic numerical simulation method based on oblique image modeling
CN111062171A (en) * 2019-11-22 2020-04-24 北京思路创新科技有限公司 Application method, device and system of EFDC model based on cloud computing
CN110956412A (en) * 2019-12-16 2020-04-03 珠江水利委员会珠江水利科学研究院 Flood dynamic assessment method, device, medium and equipment based on real-scene model
CN110956412B (en) * 2019-12-16 2020-11-13 珠江水利委员会珠江水利科学研究院 Flood dynamic assessment method, device, medium and equipment based on real-scene model
CN111145350A (en) * 2019-12-25 2020-05-12 中国电建集团中南勘测设计研究院有限公司 Three-dimensional dynamic rendering display method for flood risk analysis result data
CN111145350B (en) * 2019-12-25 2023-01-31 中国电建集团中南勘测设计研究院有限公司 Three-dimensional dynamic rendering display method for flood risk analysis result data
CN111986320A (en) * 2020-04-28 2020-11-24 南京国图信息产业有限公司 DEM and oblique photography model space fitting optimization algorithm for smart city application
CN111986320B (en) * 2020-04-28 2024-01-30 南京国图信息产业有限公司 Smart city application-oriented DEM and oblique photography model space fitting optimization method
CN111581700A (en) * 2020-05-06 2020-08-25 中国电建集团成都勘测设计研究院有限公司 Method for adding BIM attribute and outputting BIM attribute table based on CATIA model
CN111612908A (en) * 2020-05-26 2020-09-01 江西省水利规划设计研究院 Hydraulic engineering inundation range display method, device, equipment and storage medium
CN112669440A (en) * 2020-12-03 2021-04-16 悉地(苏州)勘察设计顾问有限公司 Traffic planning engineering project achievement display method, device and storage medium
CN113297663B (en) * 2021-06-11 2022-06-24 中国五冶集团有限公司 BIM technology-based park water flow visualization analysis method
CN113297663A (en) * 2021-06-11 2021-08-24 中国五冶集团有限公司 BIM technology-based park water flow visualization analysis method

Also Published As

Publication number Publication date
CN108052776B (en) 2022-02-15

Similar Documents

Publication Publication Date Title
CN108052776A (en) Based on the flood model of BIM and three-dimensional live model structure and Dynamic Display method
CN102663827B (en) Three-dimensional dynamic whole-process simulation method for storm surge and flood routing in complex flooding areas
CN109934914A (en) A kind of embedded urban design scene simulation method and system
CN104778744B (en) Extensive three-dimensional forest Visual Scene method for building up based on Lidar data
CN108108575A (en) High-precision engineering dimensional topography production method based on BIM Cross Platform Technologies
CN105976426B (en) A kind of quick three-dimensional atural object model building method
CN109887084A (en) A method of urban planning is used for using Immersed Virtual Reality Technology
CN104835202A (en) Quick three-dimensional virtual scene constructing method
CN105760581B (en) A kind of valley Renovation and planning emulation mode and system based on OSG
Zhao Application of 3D CAD in landscape architecture design and optimization of hierarchical details
TW200945253A (en) Geospatial modeling system providing simulated tree trunks and branches for groups of tree crown vegetation points and related methods
CN102855810A (en) Digital line graphic method based on satellite image map
CN114443793A (en) Method for designing detailed planning three-dimensional scene of space-time data visualization homeland space
CN108765567A (en) A kind of system for building urban design digitlization sand table
CN108197283A (en) The method that flood two, three-dimensional dynamic exhibition are carried out using river measured water level
CN108108563A (en) Cross-platform hydrodynamics modeling method based on BIM and GIS technology
CN111784831A (en) Urban river flood three-dimensional inundation analysis method based on oblique photography
CN105488844A (en) Method for displaying real-time shadow of massive models in three-dimensional scene
CN115983162A (en) Basin modeling method based on digital twinning
CN105678097B (en) Digital elevation model automated construction method
CN115690286A (en) Three-dimensional terrain generation method, terminal device and computer-readable storage medium
CN116486027A (en) Digital twin deduction method for urban flood
CN107221027A (en) A kind of method that User Defined content is embedded in oblique photograph threedimensional model
CN114633850B (en) Virtual visual reconstruction method for finite element model of ship structure
Ketabchi et al. 3D Maquetter: Sketch-based 3D content modeling for digital Earth

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant