- CN108050680A CN108050680A CN201711401546.8A CN201711401546A CN108050680A CN 108050680 A CN108050680 A CN 108050680A CN 201711401546 A CN201711401546 A CN 201711401546A CN 108050680 A CN108050680 A CN 108050680A
- Authority
- CN
- China
- Prior art keywords
- tuyere structure
- perforate
- fixing piece
- tuyere
- installing matrix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000009434 installation Methods 0.000 claims abstract description 77
- 239000011159 matrix material Substances 0.000 claims description 96
- 239000007787 solid Substances 0.000 claims description 2
- 238000004378 air conditioning Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 12
- 238000011900 installation process Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 125000003003 spiro group Chemical group 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/32—Supports for air-conditioning, air-humidification or ventilation units
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/06—Outlets for directing or distributing air into rooms or spaces, e.g. ceiling air diffuser
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/0007—Indoor units, e.g. fan coil units
- F24F1/0043—Indoor units, e.g. fan coil units characterised by mounting arrangements
- F24F1/0047—Indoor units, e.g. fan coil units characterised by mounting arrangements mounted in the ceiling or at the ceiling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/14—Details or features not otherwise provided for mounted on the ceiling
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
- Duct Arrangements (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The embodiment of the invention discloses a tuyere structure mounting method and a tuyere structure, relates to the field of air conditioning equipment, and aims to simplify the mounting process of a tuyere structure and reduce the mounting complexity. The tuyere structure installation method comprises the following steps: mounting a fixing piece on the side surface of the tuyere structure; and connecting the fixing piece with a mounting base body, wherein the connecting position of the fixing piece and the mounting base body is adjustable. The installation method has strong installation universality and is simple, convenient and efficient to install.
Description
Technical field
The present invention relates to apparatus of air conditioning fields, and in particular to a kind of tuyere structure installation method and air port installation knot
Structure.
Background technology
The air outlet structure of air conditioner of existing ceiling type air conditioner is embedded into inside furred ceiling, and the installation of air outlet structure of air conditioner needs
It will following ten steps:Step 1: by furred ceiling opening;Step 2: in furred ceiling edge heavy platform;It is Step 3: nested for air port
Inward flange pastes U.S. line paper;Step 4: in the nested heavy platform joint place brush bonding glue with furred ceiling edge in air port;Step 5: it adopts
Air port nesting is fixed at furred ceiling with nailing gun;Step 6: mend high-strength putty for the nested periphery with furred ceiling heavy platform in air port;
Step 7: paper of squeegeeing is pasted with furred ceiling edge in air port nesting;Step 8: brush putty is polished, mopping filling-in;Step 9: it removes
The U.S. line paper and equating edge of air port nesting inward flange;Step 10: air port component is fixed in the nesting of air port with screw.
Inventor has found that at least there are following problems in the prior art:Outlet air mouthpiece uses above-mentioned peace in the prior art
Dress mode, installation process are complicated, are related to that process is more, and installation period is long, and emergency works project can not meet;The constructor of each step
Member may be different, and the cooperation personnel being related to are more, it is difficult to ensure the reliability of installation.
The content of the invention
One of purpose of the present invention is to propose a kind of tuyere structure installation method and air port mounting structure, to simplification
The installation procedure of tuyere structure reduces the complexity of installation.
To achieve the above object, the present invention provides following technical schemes:
The present invention provides a kind of tuyere structure installation methods, comprise the following steps:
In the side mounting fixing parts of the tuyere structure;
The fixing piece is connected with installing matrix, wherein, the fixing piece and the link position of the installing matrix are
It is adjustable.
In one or more embodiments, the fixing piece has the first perforate and the second perforate, wherein, it is described described
The step of side mounting fixing parts of tuyere structure, includes:
The fixing piece is by passing through the side of the secure component and the tuyere structure of first perforate to fix.
In one or more embodiments, described the step of being connected the fixing piece with installing matrix, includes:
The tuyere structure and the installing matrix are fixed through second perforate using fastener.
In one or more embodiments, it is described to include in the step of side mounting fixing parts of the tuyere structure:
The opposite both sides interval of the tuyere structure is installed by multiple fixing pieces.
In one or more embodiments, first perforate and second perforate are slotted hole;Described first opens
The transverse direction of the parallel tuyere structure of length direction in hole, the parallel tuyere structure of length direction of second perforate are indulged
To.
Another embodiment of the present invention provides a kind of air port mounting structure, including tuyere structure, the side of the tuyere structure
Fixing piece for being connected with the installing matrix is installed, the link position of the fixing piece and the installing matrix is adjustable
's.
In one or more embodiments, the fixing piece is by passing through the fastener of slotted hole to connect with the installing matrix
It connects.
In one or more embodiments, the fixing piece have the first perforate and the second perforate, first perforate and
Second perforate is slotted hole;The fixing piece is fixed by first perforate and the side of the tuyere structure;Institute
State the longitudinal direction of the parallel tuyere structure of length direction of the first perforate, the parallel air port of length direction of second perforate
The transverse direction of structure.
In one or more embodiments, the opposite both sides of the tuyere structure are installed on the peace by the fixing piece
Fill matrix.
In one or more embodiments, air port mounting structure further includes locating part, and the locating part is arranged on the air port
Structure, the locating part have the plane that can block the installing matrix bottom.
In one or more embodiments, air port mounting structure further includes panel, and the panel is arranged on the tuyere structure
Away from the one side of the interior machine.
In one or more embodiments, the fixing piece includes the first plate and the second plate, and first perforate is arranged on institute
State the first plate, second perforate is arranged on second plate, and first plate is fixed with the tuyere structure, second plate and
The installing matrix is fixed.
In one or more embodiments, the angle of first plate and second plate is 95 degree to 140 degree.
In one or more embodiments, the length of second perforate is 8mm to 20mm.
In one or more embodiments, the total height of the fixing piece is 7mm to 12mm.
In one or more embodiments, the installing matrix includes furred ceiling.
Based on above-mentioned technical proposal, the embodiment of the present invention can at least generate following technique effect:
Tuyere structure installation method provided by the invention according to actual needs, can only use one of which mounting means
Or two kinds of mounting means use simultaneously.Above-mentioned installation method, installation are versatile;When installing matrix opening has certain deviation still
Installation can so be met, do over again without installing matrix, be open again again;Hanging is reliable, can fully be pasted after tuyere structure installation
Close installing matrix;Simple installation after the completion of installing matrix opening, can be installed immediately, and installation is efficient.
Description of the drawings
Attached drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair
Bright schematic description and description does not constitute improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the tuyere structure installation method flow diagram that one embodiment of the invention provides;
Fig. 2 is the tuyere structure and the fixed schematic diagram of installing matrix that one embodiment of the invention provides;
Fig. 3 is the tuyere structure installation method flow diagram that another embodiment of the present invention provides;
Fig. 4 is the tuyere structure and the fixed schematic diagram of interior machine that another embodiment of the present invention provides;
Fig. 5 is the structure diagram of tuyere structure in Fig. 4;
Fig. 6 is the diagrammatic side-view cross-sectional schematic diagram at locating part in Fig. 5;
Fig. 7 is the diagrammatic side-view cross-sectional schematic diagram at fixing piece in Fig. 5;
Fig. 8 is the scheme of installation of tuyere structure and guide frame in Fig. 4;
Fig. 9 is the schematic cross-sectional view of guide frame in Fig. 8;
Figure 10 is the scheme of installation of guide frame and fixinig plate in Fig. 9;
Figure 11 is adjustable direction schematic diagram of fixinig plate in Figure 10;
Figure 12 is the structure diagram of fixinig plate in Figure 10;
Figure 13 is the structure diagram one of fixing piece in Fig. 5;
Figure 14 is the structure diagram two of fixing piece in Fig. 5;
Figure 15 is the structure diagram three of fixing piece in Fig. 5.
Reference numeral:
1st, interior machine;2nd, tuyere structure;3rd, fixing piece;4th, suspending assembly;5th, connector;6th, guide frame;7th, locating part;8、
Panel;9th, fixinig plate;10th, installing matrix;31st, the first perforate;32nd, the second perforate;33rd, the first plate;34th, the second plate;35th, fasten
Part;41st, connecting plate;42nd, nut;61st, guiding surface;91st, notch.
Specific embodiment
Technical solution provided by the invention is illustrated in more detail with reference to Fig. 1~Figure 15.
Referring to Fig. 1 and Fig. 2, the embodiment of the present invention provides a kind of tuyere structure installation method, realizes air port mounting structure
Side be connected with installing matrix, installing matrix specifically may include furred ceiling.This method specifically includes following steps:
Step S1, in the side mounting fixing parts 3 of tuyere structure 2.
In order to enable the tuyere structure 2 after installation is firm, reliable, it can be more in the opposite both sides interval installation of tuyere structure 2
A fixing piece 3.
Step S2, fixing piece 3 is connected with installing matrix 10.Wherein, the link position of fixing piece 3 and installing matrix be can
It adjusts.The company of fixing piece and the installing matrix can be selected according to the size of tuyere structure and the bulk of installation site
Connect position.
Above-mentioned technical proposal, using fixing piece 3 adjustable with the link position of installing matrix 10 by tuyere structure 2 with installing
Matrix 10 connects, and install convenient is efficient.
Fixing piece 3 can be located at each side of tuyere structure, may also be at one of which or multigroup opposite side.
In the present embodiment, fixing piece 3 has the first perforate 31 and the second perforate 32, wherein above-mentioned step one specifically can be with
Including:Fixing piece 3 is fixed by the first perforate 31 and the side of tuyere structure.The secure components such as stay bolt can be used through first
Fixing piece 3 and the side of tuyere structure are fixed in perforate 31.
Above-mentioned step two specifically may include:Second perforate 32 is passed through by tuyere structure and the peace using fastener
Dress matrix 10 is fixed.
First perforate 31 and the second perforate 32 are slotted hole.The parallel tuyere structure 2 of length direction of first perforate 31
Laterally (width of tuyere structure 2 shown in Fig. 4), the longitudinal direction (figure of the parallel tuyere structure 2 of length direction of the second perforate 32
The length direction of tuyere structure 2 shown in 4).
Referring to Fig. 2, another embodiment of the present invention provides a kind of air port mounting structure, including interior machine 1 and tuyere structure 2, wind
The side of mouth structure 2 is equipped with the fixing piece 3 being connected with installing matrix 10, fixing piece 3 and the connection position of installing matrix 10
It is adjustable to put.
Installing matrix 10 specifically includes furred ceiling.
Referring to Fig. 7, fixing piece 3 is by passing through the fastener 35 of slotted hole to be connected with installing matrix 10.
Referring to Figure 13, fixing piece 3 has the first perforate 31 and the second perforate 32, and the first perforate 31 and the second perforate 32 are
Slotted hole.Fixing piece 3 is fixed by the first perforate 31 and the side of tuyere structure 2;The parallel institute of length direction of first perforate 31
State the longitudinal direction of tuyere structure 2, the transverse direction of the parallel tuyere structure 2 of length direction of the second perforate 32.
It, can be in the horizontal, vertical of tuyere structure 2 by the first perforate 31 and the second perforate 32 for setting length direction different
The adjustment of installation site is carried out to both direction, installation is more convenient.
Referring to Fig. 2, the opposite both sides of tuyere structure 2 are installed on installing matrix 10 by fixing piece 3.So connection, air port
The installation of structure 2 is more convenient, and the tuyere structure 2 after installation is solid and reliable.
Referring to Fig. 2 and Fig. 6, air port mounting structure further includes locating part 7, and locating part 7 is arranged on tuyere structure 2, and locating part 7 has
The plane of 10 bottom of installing matrix can be blocked by having, in order to be positioned in installation process.
Referring to Fig. 2, Fig. 6, air port mounting structure further includes panel 8, and panel 8 is arranged on one that tuyere structure 2 deviates from interior machine 1
Side.
Referring to Figure 13, fixing piece 3 includes the first plate 33 and the second plate 34 that interfix, and the first perforate 31 is arranged on the first plate
33, the second perforate 32 is arranged on the second plate 34.First plate 33 is fixed with tuyere structure 2, and the second plate 34 is fixed with installing matrix 10.This
In embodiment, fixing piece 3 can to use the fastener 35 normally through the second opening 32 with regard to energy by using said structure
So that installing matrix 10 provides the second plate 34 active force obliquely, the vertical component which has can be with locating part 7
Cooperation, so that the ground of tuyere structure 2 is concordant with the bottom surface of installing matrix 10.The fastener 35 of so-called normal mounting refers to,
By fastener 35 using exemplified by screw, the length direction of fastener 35 is approximately perpendicular to the surface of the second plate 34.
Referring to Figure 14, the angle of the first plate 33 and the second plate 34 is 95 degree to 140 degree, for example, for 95 degree, 100 degree, 105
It spends, 110 degree, 120 degree, 130 degree, 140 degree etc..When the angle to install fastener 35, the fixed force F of fastener 35 is oblique
On, there are one upward component F1, while in the case of 7 /V of locating part, bottom surface and the installation of tuyere structure 2 can be made
The bottom surface of matrix 10 is concordant.
Referring to Figure 15, the length C of the second perforate 32 is 8mm to 20mm.Above-mentioned length can ensure original after the dismounting of air port
Bearing is destroyed when can not install, and can aside reinstall fastener 35.
Referring to Figure 14, the total height B of fixing piece 3 is 7mm to 12mm.Above-mentioned height can meet the general thickness of installing matrix
Degree ensures that it will not be excessively high or escapes to the lower section of installing matrix 10.
Referring to Figure 15, the diameter R of the second perforate 32 is 2.5mm to 4mm.Diameter R can meet can in existing project installation
The screw sizes that can be used, while ensure that the installation of screw will not relax.
Referring to Figure 15, distance D of second perforate 32 apart from bottom is 2mm to 5mm, which carries for the installation of fastener 35
Space has been supplied without interfering with tuyere structure 2.
Referring to Fig. 3 to Figure 15, another embodiment of the present invention provides a kind of tuyere structure installation method, comprises the following steps:
Step S10, judge whether the support strength of installing matrix 10 meets the lifting requirements of tuyere structure 2.
Can installing matrix 10 meet lifting requirements, depending on the material of installing matrix 10, thickness, shape, structure etc..It is real
Border in use, using tuyere structure 2 be installed in installing matrix 10 after total be it is safe, can normal use for mark
It is accurate.
If step S20, meeting the requirements, the side of tuyere structure 2 is mounted in installing matrix 10, is led by installing matrix 10
Carry tuyere structure 2.Tuyere structure 2 is mounted on the interior machine 1 of unit, carrying tuyere structure 2 is aided in by interior machine 1.Wherein,
The operation that the side of tuyere structure 2 is mounted in installing matrix 10 and the behaviour being mounted on tuyere structure 2 on the interior machine 1 of unit
Work can be carried out successively, can be also carried out at the same time.Being carried out at the same time needs more operating personnel.Operating personnel needed for successively carrying out
Quantity is then less.
In above-mentioned step S20, the support strength of installing matrix 10 is met the requirements, and there are two types of installation sides for tuyere structure 2
Formula:Direct side is loaded on installing matrix 10, the interior machine 1 for being directly mounted at unit.Both modes can be used alone, and can also combine it
His mounting means to carry the weight of tuyere structure 2 jointly.
The side mounting means of tuyere structure 2 refers to that the side of tuyere structure 2 is directly installed in installing matrix 10, no
Need nesting.Specifically, screw and plate may be employed directly to fix the side of tuyere structure 2 and installing matrix 10.Herein
Mounting means described in the air port mounting structure embodiment provided hereinafter is provided.
If step S30, being unsatisfactory for requiring, tuyere structure 2 is mounted on the interior machine 1 of unit, is mainly carried by interior machine 1
Tuyere structure 2;The side of tuyere structure 2 is mounted in installing matrix 10, carrying tuyere structure 2 is aided in by installing matrix 10.
Above-mentioned technical proposal provide tuyere structure installation method, the bearing capacity of itself can be based on installing matrix 10
The no mounting means for meeting the requirements to determine tuyere structure 2;If 10 bearing capacity of installing matrix is met the requirements, tuyere structure 2
Mainly using side dress (i.e. side is installed) carrying, the position of installation point is more, can disperse the weight of tuyere structure 2, even and if wind
The problems such as deformation, will not occur in 2 long enough of mouth structure.If the bearing capacity of installing matrix 10 is unsatisfactory for hanging for tuyere structure 2
Reload request is then mainly carried tuyere structure 2 by interior machine 1.Above two mounting means can save nesting, and then save nesting
Required complicated procedures of forming in installation process simplifies the installation procedure of tuyere structure 2, improves installation effectiveness.
Tuyere structure 2 is carried simultaneously by installing matrix 10 and interior machine 1, installation point when above-mentioned mounting means can reduce side dress
Quantity.
Step S20 is described below and specifically includes following steps:
Step 1: in the side mounting fixing parts 3 of tuyere structure 2.Referring to Fig. 5 and Figure 13, wherein, fixing piece 3 has the
One perforate 31 and the second perforate 32, the first perforate 31 and the second perforate 32 at least one be slotted hole.Fixing piece 3 passes through
One perforate 31 and the side of tuyere structure 2 are fixed.If the first perforate 31 and the second perforate 32 are slotted hole, the first perforate 31
First direction of the length direction along tuyere structure 2, the second direction of the length direction of the second perforate 32 along tuyere structure 2.
One of first direction and second direction be tuyere structure 2 longitudinal direction, another transverse direction for tuyere structure 2.First perforate 31
It can be slotted hole with the second perforate 32, fixing piece 3 and installing matrix 10, tuyere structure can be adjusted by two slotted holes
2 installation site.
Step 2: the side of tuyere structure 2 and installing matrix 10 are fixed through the second perforate 32 using fastener 35.Ginseng
See Fig. 7, fastener is such as bolt etc..
Above-mentioned step S30 specifically may include following steps:
Step 1: suspending assembly 4 is installed on to the interior machine 1 of unit.The structure of suspending assembly 4 can there are many, Ke Yiwei
Plate or frame class formation, will provide specific structure type hereinafter.
Step 2: tuyere structure 2 and suspending assembly 4 are fixed.Referring to Fig. 4, such as:Using connector 5 from tuyere structure 2
Bottom wear to top and fix tuyere structure 2 and suspending assembly 4.Referring to Fig. 4, connector 5 is specifically as follows long spiro nail.
The specific embodiment of above-mentioned tuyere structure installation method is described below.
Side dress mode is introduced first.It introduces tuyere structure 2 and installing matrix 10 is fixed on by side cartridge screw.Tuyere structure from
Under up install installing matrix 10, locating part (design is relatively thin, there is sufficient intensity) 7 prop up 10 lower face of installing matrix (see
Fig. 6), make tuyere structure and 10 bottom surface of installing matrix straight.At this time fastener (being specially side cartridge screw) 35 passes through fixing piece 3
On the second perforate 32 (Figure 13) be fixed in installing matrix 10.Further, fixinig plate 3 can also be equipped with the first of long waist shaped and open
Hole 31, it is therefore an objective to which can be open actual size according to installing matrix 10,3 position of adjustment fixinig plate so that when side cartridge screw fastens
It will not cause 2 deformation of tuyere structure, ensure that appearance is unaffected.
Next introduces lifting mode.Suspending assembly (suspending assembly 4 is equipped with screw hole) 4, hanging are installed on interior machine 1 in advance
Hanging nut 42 in pre-welding on component 4.Tuyere structure 2 can set guide frame 6, the fixed form of guide frame 6
Very much, for example it is buckled, screw is fixed, glue bond.Certainly, also can directly tuyere structure 2 be inherently designed with can play it is similar
The feature of guiding role.Finite place piece 7 is fixed on tuyere structure, tuyere structure 2 is fixed with the fixinig plate 9 of adjustable installation site,
Fixinig plate 9 is equipped with notch 91, can be snapped on connector 5 by 91 fixinig plate 9 of notch, referring to Fig. 5, Figure 11 and Figure 12.
Specific installation steps are as follows:
1) before installing, the fixing screws (see Figure 10) on the fixinig plate 9 of position adjustable are first unloaded, by the fixation of position adjustable
It is spare that piece 9 is placed on the installation of erector's pocket.
2) along interior 1 length direction of machine, two suspending assemblies 4 are fixed by screw in interior 1 both sides of machine, referring to Fig. 4.
3) connector 5 (being specially long spiro nail) pre- stubborn several threads are fixed on suspending assembly 4, hang head of screw at this time
Expose in 10 bottom surface of installing matrix, tuyere structure 2 enables hanging head of screw to pass through by the guiding surface 61 of guide frame 6
6 medial surface of guide frame, is shown in Fig. 8 to Figure 10.
4) after the head of connector 5 is by guide frame 6, tuyere structure 2 is up propped up with hand enables locating part 7 and installation
10 lower face of matrix is bonded.
5) erector can take out the fixinig plate 9 for the position adjustable that step 1 is removed inside pocket at this time, see Figure 10, figure
11 and Figure 12, the fixinig plate 9 are designed with the notch 91 of card screw, and by 91 snap-fit connection members 5 of notch, fixinig plate 9 is caught in direction
Referring to shown in arrow in Figure 10.Adjustable position long waist shaped through hole is designed on the fixinig plate 9, ensures that 5 head of connector will not lead to
Cross the through hole, and the body of rod of connector 5 can be in long waist shaped through hole slide inside, to ensure that tuyere structure 2 can be in length
Side is offset up.In addition the width of the fixinig plate 9 can also set adjustment long waist shaped hole, ensure tuyere structure 2 in width
It can also slightly be adjusted on degree.The arrow of length direction, width meaning shown in Figure 12.
6) connector 5 is finally tightened, tuyere structure 2 is made to be bonded with installing matrix 10.
It is surely filled since in project installation actual application, the opening of installing matrix 10 often differs with interior 1 air outlet of machine
Divide alignment, the design of more than clever structure, ensure that lifting is fixed can be adapted to major part requirement of engineering.
Described in detail above is to hang mounting means, and in actual application, this hanging method is suitble to tuyere structure 2 itself
Compare thick situation.If tuyere structure 2 is relatively thin, can also be installed using following mode:
1) suspending assembly 4 is fixed on interior machine 1.
2) installation of tuyere structure 2 is propped up in 10 bottom surface of installing matrix, i.e., locating part 7 is touched 10 bottom surface of installing matrix.
3) nut of the directly alignment suspending assembly 4 of connector (specifically including long screw) 5, then tightens, makes tuyere structure 2
Effectively fitting installing matrix 10, and be fixed on interior machine 1.
It should be noted that above-mentioned lifting fixed form only sets connector 5 in the longitudinal direction, if tuyere structure 2
Longer, tuyere structure 2 may deform, and intermediate place deformation be caused to expose gap, then can also be in 2 centre position of tuyere structure
It is fixed and is aided in by side cartridge screw mode.
The tuyere structure installation method that the above embodiment of the present invention provides, according to actual needs, can only use wherein one
Kind mounting means or two kinds of mounting means use simultaneously.Above-mentioned installation method, installation are versatile;The opening of installing matrix 10 has
Still installation can be met during certain deviation, do over again without installing matrix 10, be open again again.Hanging is reliable, tuyere structure 2
Installing matrix 10 can be fully bonded after installation;Simple installation after the completion of installing matrix 10 is open, can be installed immediately, facilitate height
Effect.
Referring to Fig. 4 to Figure 13, another embodiment of the present invention provides a kind of air port mounting structure, available for implementing above-mentioned implementation
The tuyere structure installation method that example provides.The air port mounting structure includes interior machine 1 and tuyere structure 2, and tuyere structure 2 is by interior machine 1
It is carried jointly with installing matrix.
Interior machine 1 is lifted on roof (or being ceiling).According to the difference of actual conditions, tuyere structure 2 may be employed
Following bearing modes of one of them:By installing matrix 10 mainly carrying and interior machine 1 aid in carrying, by interior machine 1 mainly carrying and
The auxiliary carrying of installing matrix 10.
Tuyere structure 2 is carried by interior machine 1, can be fixed on peace to avoid that in the prior art must be mounted on tuyere structure 2
Fill the complex procedures brought in the nesting of matrix 10, the problems such as required personnel are more.
Further, the side of tuyere structure 2 is equipped with the fixing piece 3 being connected with installing matrix 10, fixing piece 3 with
The link position of installing matrix 10 is adjustable.
Fixing piece 3 can be selected one according to actual needs and installed with installing matrix 10 by setting multiple mounting structures.Or
Person, fixing piece 3 set the adjustable holes of installation sites such as slotted hole, to realize may be selected for installation site.
Referring to Figure 13, in the present embodiment, fixing piece 3 has the first perforate 31 and the second perforate 32.First perforate 31 and
At least one is slotted hole for two perforates 32, this is sentenced be slotted hole exemplified by.Fixing piece 3 passes through the first perforate 31 and air port
The side of structure 2 is fixed;First direction of the length direction of first perforate 31 along tuyere structure 2, the length of the second perforate 32
Second direction of the direction along tuyere structure 2, one of first direction and second direction are the longitudinal direction of tuyere structure 2, separately
One is the transverse direction of tuyere structure 2.
It, can be in the horizontal, vertical of tuyere structure 2 by the first perforate 31 and the second perforate 32 for setting length direction different
The adjustment of installation site is carried out to both direction, installation is more convenient.
Further, interior machine 1 is fixed with suspending assembly 4, and tuyere structure 2 is fixed by connector 5 and suspending assembly 4.Even
Fitting 5 can be stay bolt.
Referring to Fig. 4, optionally, the transverse end surface of interior machine 1 is fixedly connected with tuyere structure 2 by suspending assembly 4.Setting is hung
Hanging component 4, convenient for machine in connection 1 and tuyere structure 2.The transverse end surface of interior machine 1 sets suspending assembly 4, has taken into full account interior machine 1
Design feature and installation convenience.
Referring to Fig. 4, in the present embodiment, the opposite both sides of tuyere structure 2 are installed on installing matrix 10, and tuyere structure 2 is opposite
Other both sides be fixedly connected by suspending assembly 4 with interior machine 1.In the present embodiment, two longitudinal edge sides of tuyere structure 2 are loaded on installation
Matrix 10, widthwise edge are lifted on interior machine 1.
Referring to Fig. 4, in the present embodiment, suspending assembly 4 includes connecting plate 41 and nut 42, and connecting plate 41 and interior machine 1 are removable
Connection is unloaded, tuyere structure 2 is connected by connector 5 and nut 42 with connecting plate 41.The suspending assembly 4 of said structure, structure is tight
It gathers, it is easy for installation.
Referring to Fig. 4, for the ease of installation connecting element 5, tuyere structure 2 is equipped with to guide leading for 5 installation direction of connector
To structure 6.Guide frame 6 can be inclined-plane or other structures, connector 5 to be helped to find threaded hole accurately.
Referring to Fig. 9, in the present embodiment, guide frame 6 can set guiding surface 61, and connecting plate 41 is found accurately for connector 5
Guiding is provided with nut 42.This is simple and compact for structure, manufacture easy to process.
Referring to Fig. 6, further, air port mounting structure further includes locating part 7, and locating part 7 is arranged on tuyere structure 2, /V
Part 7 has the plane that can block 10 bottom of installing matrix.Locating part 7 can be plate, the one side of locating part 7 and tuyere structure
2 installations, opposite side expose tuyere structure 2, which is used to support in installing matrix 101 when tuyere structure 2 install, to air port
Position-limiting action is played in the installation of 2 vertical direction of structure so that tuyere structure 2 is not retracted in excessively inside installing matrix 10.
Referring to Fig. 6 or Fig. 7, optionally, air port mounting structure further includes panel 8, and panel 8 is arranged on tuyere structure 2 away from interior
The one side of machine 1.
The size of panel 8 can be greater than or equal to the size that installing matrix 10 is open, and such panel 8 can block air port knot
The installation site of structure 2 so that lower to the precision requirement of installation site.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear",
The orientation or position relationship of the instructions such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on attached drawing institutes
The orientation or position relationship shown is only the present invention and simplified description rather than instruction for ease of description or implies signified device
Or element must have specific orientation, be specific azimuth configuration and operation, thus it is not intended that in present invention protection
The limitation of appearance.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:It still may be used
To modify to the technical solution recorded in foregoing embodiments or carry out equivalent substitution to which part technical characteristic,
But these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical solution spirit and
Scope.
Claims (16)
1. a kind of tuyere structure installation method, which is characterized in that comprise the following steps:
In the side mounting fixing parts of the tuyere structure;
The fixing piece is connected with installing matrix, wherein, the link position of the fixing piece and the installing matrix is adjustable
's.
2. tuyere structure installation method according to claim 1, which is characterized in that the fixing piece have the first perforate and
Second perforate, wherein, it is described to include in the step of side mounting fixing parts of the tuyere structure:
The fixing piece is by passing through the side of the secure component and the tuyere structure of first perforate to fix.
3. tuyere structure installation method according to claim 2, which is characterized in that described by the fixing piece and installation base
The step of body connects includes:
The tuyere structure and the installing matrix are fixed through second perforate using fastener.
4. tuyere structure installation method according to claim 1, which is characterized in that described in the side of the tuyere structure
The step of mounting fixing parts, includes:Multiple fixing pieces are installed at the opposite both sides interval of the tuyere structure.
5. tuyere structure installation method according to claim 2, which is characterized in that first perforate and described second is opened
Hole is slotted hole;The transverse direction of the parallel tuyere structure of length direction of first perforate, the length of second perforate
The longitudinal direction of the parallel tuyere structure in direction.
6. a kind of air port mounting structure, which is characterized in that including tuyere structure (2), the side of the tuyere structure (2) is equipped with
For the fixing piece (3) being connected with the installing matrix (10), the fixing piece (3) and the connection position of the installing matrix (10)
It is adjustable to put.
7. air port mounting structure according to claim 6, which is characterized in that the fixing piece (3) is by passing through slotted hole
Fastener (35) be connected with the installing matrix (10).
8. air port mounting structure according to claim 7, which is characterized in that the fixing piece (3) has the first perforate
(31) and the second perforate (32), first perforate (31) and second perforate (32) are slotted hole;The fixing piece (3)
It is fixed by first perforate (31) and the side of the tuyere structure (2);The length direction of first perforate (31) is put down
The longitudinal direction of the row tuyere structure (2), the transverse direction of the parallel tuyere structure (2) of length direction of second perforate (32).
9. air port mounting structure according to claim 6, which is characterized in that the opposite both sides of the tuyere structure (2) lead to
It crosses the fixing piece (3) and is installed on the installing matrix (10).
10. air port mounting structure according to claim 6, which is characterized in that further include locating part (7), the locating part
(7) tuyere structure (2) is arranged on, the locating part (7) has the plane that can block the installing matrix (10) bottom.
11. air port mounting structure according to claim 6, which is characterized in that further include panel (8), the panel (8) sets
Deviate from the one side of the interior machine (1) in the tuyere structure (2).
12. air port mounting structure according to claim 8, which is characterized in that the fixing piece (3) includes the first plate (33)
With the second plate (34), first perforate (31) is arranged on first plate (33), and second perforate (32) is arranged on described second
Plate (34), first plate (33) is fixed with the tuyere structure (2), and second plate (34) is solid with the installing matrix (10)
It is fixed.
13. air port mounting structure according to claim 12, which is characterized in that first plate (33) and second plate
(34) angle is 95 degree to 140 degree.
14. air port mounting structure according to claim 12, which is characterized in that the length of second perforate (32) is
8mm to 20mm.
15. air port mounting structure according to claim 6, which is characterized in that the total height of the fixing piece (3) is 7mm
To 12mm.
16. air port mounting structure according to claim 6, which is characterized in that the installing matrix (10) includes furred ceiling.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2017107429596 | 2017-08-25 | ||
CN201710742959 | 2017-08-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108050680A true CN108050680A (en) | 2018-05-18 |
Family
ID=61942238
Family Applications (7)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711401546.8A Pending CN108050680A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201711401437.6A Pending CN107940712A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201721812002.6U Active CN207815645U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201711401534.5A Pending CN109425089A (en) | 2017-08-25 | 2017-12-22 | Air port installation structure, indoor unit and air conditioning unit |
CN201721812269.5U Active CN207815646U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201721812367.9U Active CN208042459U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201711401439.5A Pending CN108151266A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
Family Applications After (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711401437.6A Pending CN107940712A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
CN201721812002.6U Active CN207815645U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201711401534.5A Pending CN109425089A (en) | 2017-08-25 | 2017-12-22 | Air port installation structure, indoor unit and air conditioning unit |
CN201721812269.5U Active CN207815646U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201721812367.9U Active CN208042459U (en) | 2017-08-25 | 2017-12-22 | Air port mounting structure |
CN201711401439.5A Pending CN108151266A (en) | 2017-08-25 | 2017-12-22 | Tuyere structure mounting method and tuyere structure |
Country Status (5)
Country | Link |
---|---|
US (1) | US20210071906A1 (en) |
EP (1) | EP3640559B1 (en) |
CN (7) | CN108050680A (en) |
ES (1) | ES2967707T3 (en) |
WO (1) | WO2019119873A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108050680A (en) * | 2017-08-25 | 2018-05-18 | 珠海格力电器股份有限公司 | Tuyere structure mounting method and tuyere structure |
CN109297165A (en) * | 2018-11-20 | 2019-02-01 | 宁波奥克斯电气股份有限公司 | A kind of hanger rod component and air conditioner |
CN114484839B (en) * | 2021-12-10 | 2023-05-23 | 惠瑞净化科技(江苏)有限公司 | Install high-efficient supply-air outlet of sealed on lithium cell toilet roof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104019536A (en) * | 2014-06-17 | 2014-09-03 | 珠海格力电器股份有限公司 | Ceiling type air conditioner indoor unit installation method and ceiling type air conditioner |
CN204084765U (en) * | 2014-07-18 | 2015-01-07 | 中国建筑第七工程局有限公司 | A kind of device for fixing air port system |
CN204648631U (en) * | 2015-05-28 | 2015-09-16 | 广东美的制冷设备有限公司 | Lifting fixtures and ceiling-mounted air conditioner |
DE102014001543A1 (en) * | 2014-02-07 | 2015-09-24 | Octanorm-Vertriebs-GmbH für Bauelemente | System for creating suspended ceiling constructions |
US20160252270A1 (en) * | 2013-12-26 | 2016-09-01 | Mitsubishi Electric Corporation | Unit attaching device and indoor unit |
CN205939596U (en) * | 2016-07-04 | 2017-02-08 | 珠海格力电器股份有限公司 | Air port fixing device, air port structure and ceiling type air conditioner |
CN207815645U (en) * | 2017-08-25 | 2018-09-04 | 珠海格力电器股份有限公司 | Air port mounting structure |
Family Cites Families (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1604111A1 (en) * | 1965-11-20 | 1970-04-30 | Air Devices Inc | Ceiling diffuser |
JP2575949Y2 (en) * | 1992-07-28 | 1998-07-02 | ダイキン工業株式会社 | Installation device for ceiling-mounted air conditioners |
JP3445428B2 (en) * | 1996-01-12 | 2003-09-08 | 東芝キヤリア株式会社 | Duct ventilation fan |
JPH10213345A (en) * | 1997-01-28 | 1998-08-11 | Nissei Kinzoku Kk | Room air conditioner mounting implement |
EP1029204B1 (en) * | 1997-11-06 | 2002-03-06 | Nerling Gmbh Systemräume | Measuring room with air-conditioning device |
JP4359955B2 (en) * | 1999-03-26 | 2009-11-11 | ダイキン工業株式会社 | Embedded ceiling air conditioner |
US6587642B1 (en) * | 2000-11-14 | 2003-07-01 | Daniel King | Ceiling fan cooling system |
CA2364672C (en) * | 2001-09-20 | 2010-06-29 | Canplas Industries Ltd. | Passive venting device |
JP2005049074A (en) * | 2003-07-31 | 2005-02-24 | Fuji Industrial Co Ltd | Ceiling suspension type range hood fan |
KR20050113319A (en) * | 2004-05-27 | 2005-12-02 | 삼성전자주식회사 | Ceiling flush type air conditioner |
JP4946185B2 (en) * | 2006-06-08 | 2012-06-06 | ダイキン工業株式会社 | Indoor unit of air conditioner |
KR101321544B1 (en) * | 2008-01-28 | 2013-10-25 | 엘지전자 주식회사 | Ceiling type air conditioner |
CN202401705U (en) * | 2011-10-17 | 2012-08-29 | 北京优尼法制药技术有限公司 | Integrated structure of suspended ceiling and air inlet |
CN203231490U (en) * | 2013-02-28 | 2013-10-09 | 大金工业株式会社 | Panel installation auxiliary device and indoor set of air conditioner |
CN204165215U (en) * | 2014-06-17 | 2015-02-18 | 珠海格力电器股份有限公司 | Ceiling type air conditioner |
CN204100439U (en) * | 2014-07-08 | 2015-01-14 | 广东松下环境***有限公司 | Ion generating device |
CN204134190U (en) * | 2014-10-14 | 2015-02-04 | 王彬 | A kind of elevating mechanism of Novel mahjong machine |
CN104330086A (en) * | 2014-10-16 | 2015-02-04 | 重庆金宏汽车电子有限公司 | Vehicle navigator rapid assembling structure |
CN205174759U (en) * | 2015-11-19 | 2016-04-20 | 宁波威霖住宅设施有限公司 | Vent panel switch structure |
CN205448203U (en) * | 2015-12-23 | 2016-08-10 | 宁波威霖住宅设施有限公司 | Central air conditioning wind gap shell fragment mounting structure |
CN106123263B (en) * | 2016-06-20 | 2019-06-11 | 珠海格力电器股份有限公司 | Ceiling type air conditioner and air outlet device thereof |
CN205726795U (en) * | 2016-06-30 | 2016-11-23 | 浙江光大通信设备有限公司 | The mounting structure of light current module |
CN106152449A (en) * | 2016-09-19 | 2016-11-23 | 珠海格力电器股份有限公司 | Air outlet structure and central air-conditioning system with same |
CN106642329B (en) * | 2016-11-29 | 2020-09-25 | 青岛海尔空调器有限总公司 | Indoor unit of air conditioner |
CN207831611U (en) * | 2017-12-22 | 2018-09-07 | 珠海格力电器股份有限公司 | Air port structure assembly and ceiling type air conditioner |
-
2017
- 2017-12-22 CN CN201711401546.8A patent/CN108050680A/en active Pending
- 2017-12-22 CN CN201711401437.6A patent/CN107940712A/en active Pending
- 2017-12-22 CN CN201721812002.6U patent/CN207815645U/en active Active
- 2017-12-22 CN CN201711401534.5A patent/CN109425089A/en active Pending
- 2017-12-22 CN CN201721812269.5U patent/CN207815646U/en active Active
- 2017-12-22 CN CN201721812367.9U patent/CN208042459U/en active Active
- 2017-12-22 CN CN201711401439.5A patent/CN108151266A/en active Pending
-
2018
- 2018-09-03 WO PCT/CN2018/103735 patent/WO2019119873A1/en unknown
- 2018-09-03 EP EP18892809.7A patent/EP3640559B1/en active Active
- 2018-09-03 ES ES18892809T patent/ES2967707T3/en active Active
- 2018-09-03 US US16/763,488 patent/US20210071906A1/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160252270A1 (en) * | 2013-12-26 | 2016-09-01 | Mitsubishi Electric Corporation | Unit attaching device and indoor unit |
DE102014001543A1 (en) * | 2014-02-07 | 2015-09-24 | Octanorm-Vertriebs-GmbH für Bauelemente | System for creating suspended ceiling constructions |
CN104019536A (en) * | 2014-06-17 | 2014-09-03 | 珠海格力电器股份有限公司 | Ceiling type air conditioner indoor unit installation method and ceiling type air conditioner |
CN204084765U (en) * | 2014-07-18 | 2015-01-07 | 中国建筑第七工程局有限公司 | A kind of device for fixing air port system |
CN204648631U (en) * | 2015-05-28 | 2015-09-16 | 广东美的制冷设备有限公司 | Lifting fixtures and ceiling-mounted air conditioner |
CN205939596U (en) * | 2016-07-04 | 2017-02-08 | 珠海格力电器股份有限公司 | Air port fixing device, air port structure and ceiling type air conditioner |
CN207815645U (en) * | 2017-08-25 | 2018-09-04 | 珠海格力电器股份有限公司 | Air port mounting structure |
Non-Patent Citations (2)
Title |
---|
吴铁庄等: "切诺基、桑塔纳、夏利轿车电气与电子设备维修图册", 30 November 1999, 机械工业出版社, pages: 242 * |
张金和: "水暖通风空调设备安装实习", 31 March 2003, 中国电力出版社, pages: 245 * |
Also Published As
Publication number | Publication date |
---|---|
CN207815646U (en) | 2018-09-04 |
CN108151266A (en) | 2018-06-12 |
CN109425089A (en) | 2019-03-05 |
EP3640559A4 (en) | 2020-11-04 |
CN208042459U (en) | 2018-11-02 |
WO2019119873A1 (en) | 2019-06-27 |
CN107940712A (en) | 2018-04-20 |
ES2967707T3 (en) | 2024-05-03 |
US20210071906A1 (en) | 2021-03-11 |
CN207815645U (en) | 2018-09-04 |
EP3640559A1 (en) | 2020-04-22 |
EP3640559B1 (en) | 2023-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108050680A (en) | Tuyere structure mounting method and tuyere structure | |
US8636566B2 (en) | Ceiling-embedded air conditioner | |
CN110026947A (en) | A kind of tool and its application method of angle steel flange air hose fastening bolt | |
CN206408938U (en) | A kind of large form back cord attachment fastener | |
CN209114796U (en) | A kind of building wall decoration panel fastener | |
CN209581423U (en) | A kind of plates of automobile recess reparation workbench | |
CN208430763U (en) | A kind of external scaffolding attachment device | |
CN110067331A (en) | A kind of installation method of glass curtain wall side hanging system and the side hanging system | |
CN207279911U (en) | Air conditioner air-out structure, air conditioner and house | |
CN208913952U (en) | Frame assembly leading portion general assembly tooling | |
CN208748926U (en) | A kind of device for hanging installation for curtain wall and point | |
CN206811812U (en) | A kind of hatch door installs auxiliary mould | |
CN207150078U (en) | A kind of tower crane cable support | |
CN207110198U (en) | A kind of air-conditioning system radiant panel and its installing mechanism | |
CN217581081U (en) | Scaffold frame that stability is strong | |
CN215595028U (en) | Wallboard auxiliary installation device for assembly type building | |
CN205369790U (en) | A composite board connection structure for transverse connection seam | |
CN217631163U (en) | High-rise building elevator shaft safety construction platform | |
CN209510224U (en) | A kind of monitoring device apparatus for examination and repair | |
CN108105495A (en) | A kind of antidetonation tube bundle devices being easily installed | |
CN208532687U (en) | Block burnt dedusting main pipe, smoke-guiding car main pipe installs flap valve additional | |
CN214364807U (en) | Scaffold for road and bridge engineering | |
CN110106810A (en) | Wave plate is installed on the positioning device and its construction method of fence upright | |
CN209627939U (en) | A kind of follow-on convenient for safeguarding and installation power control cabinet | |
CN201087498Y (en) | Connection component of roof keel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |