CN108049628A CN201711345192.XA CN201711345192A CN108049628A CN 108049628 A CN108049628 A CN 108049628A CN 201711345192 A CN201711345192 A CN 201711345192A CN 108049628 A CN108049628 A CN 108049628A
Authority
CN
China
Prior art keywords
nut
template
fixed
prefabricated panel
exterior sheathing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711345192.XA
Other languages
Chinese (zh)
Other versions
CN108049628B (en
Inventor
李琰
邱迪
陶泽远
沈浅灏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201711345192.XA priority Critical patent/CN108049628B/en
Publication of CN108049628A publication Critical patent/CN108049628A/en
Application granted granted Critical
Publication of CN108049628B publication Critical patent/CN108049628B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of assembled architecture outer walls quickly to pacify form removal system and construction method without outrigger, belongs to assembled architecture technical field of construction.The template system is arranged at the cast-in-place node of two prefabricated panels, specifically includes Z-type component, exterior sheathing, inner template and several bolt jointing parts;The Z-type component is arranged on the splice ends lateral surface of the prefabricated panel and forms fixing groove;The exterior sheathing is arranged in the fixing groove, and is fixedly connected by the bolt jointing part with the inner template.The template system of the present invention eliminates the process of setting up of outdoor scaffold, saves a large amount of artificial and materials, greatly reduces construction cost.Meanwhile the construction method of the template system provided by the invention, the installation and removal operation of template system are completed, the security of construction greatly improved, and have the advantages that process is succinct, easy to operate, construction efficiency is high indoors.

Description

Assembled architecture outer wall quickly pacifies form removal system and construction method without outrigger
Technical field
The present invention relates to a kind of assembled architecture outer walls quickly to pacify form removal system and construction method without outrigger, belongs to assembling Formula technical field of building construction.
Background technology
As assembled architecture develops, more and more using precast concrete wall panel in large panel building, so as to improve Batch production, mechanized construction degree save live recruitment, shorten the construction cycle, and reduce site operation to peripheral ring The influence degree in border.
In prefabrication, in order to meet equally cast-in-place design principle, prefabricated outer wall panel is generally in position of joints Reliable power transmission mechanism is formed using after-pouring concrete, for example the outside concrete wall linkage section that width is 200mm is set. And in order to complete this Cast-in-Situ Segment, it is necessary to which externally wall form is fixed, the mode of generally use is outer in building for worker at present It sets up scaffold and carries out outdoor fixed outer wall template in side.
However, worker in outdoor work fixed outer wall template, need to set up outdoor safeguard procedures, influence construction efficiency, and Outdoor work has danger.
The content of the invention
The low construction efficiency present in outer wall template is set up for existing outdoor and there is the problem of dangerous, the present invention It providing a kind of assembled architecture outer wall and quickly pacifies form removal system without outrigger, Z-type component is fixed on the splice ends of prefabricated panel, Fixing groove is formed in splice ends after prefabricated panel lifting is in place, exterior sheathing is fixed in fixing groove, and part is bolted by Template is fixedly connected with exterior sheathing, and template system of the invention eliminates the process of setting up of outdoor scaffold, is saved a large amount of artificial And material, greatly reduce construction cost.Meanwhile the present invention also provides a kind of construction method of the template system, template systems The installation and removal operation of system is completed indoors, is reduced and is relied on for outer safeguard procedures, the security of construction greatly improved, And have the advantages that process is succinct, easy to operate, construction efficiency is high.
For solution more than technical problem, the present invention includes following technical solution:
A kind of assembled architecture outer wall quickly pacifies form removal system without outrigger, and the template system is arranged at two dry walls At plate cast-in-place node, the template system includes:
The Z-type component being arranged in pairs, the Z-type component are respectively arranged on the splice ends lateral surface of the prefabricated panel, And U type slot is formed with the prefabricated panel, the openend of the U type slot is oppositely arranged and forms fixing groove;
Exterior sheathing is arranged in the fixing groove;
Inner template, is arranged at the inside of the cast-in-place node, and both ends are close to the splice ends medial surface of the prefabricated panel On;
Several bolt jointing parts, including nut one, nut two and Screw arbor with nut at both-ends, the nut one is fixed on the exterior sheathing On, the through hole with one location matches of nut is provided in the inner template, the Screw arbor with nut at both-ends is provided with external screw thread, described One end of Screw arbor with nut at both-ends is through the through hole and being fixed on the nut one, and the other end is by the nut two by the internal model Plate is fixed.
Preferably, one end that the Z-type component is close to the prefabricated panel is fixedly installed attaching nut, the dry wall Connecting hole is provided on plate, connect one end of bolt through the connecting hole and is fixed on the attaching nut, the connection The nut of bolt is close on the medial surface of the prefabricated panel.
Preferably, it is provided with lifting lug on the Z-type component.
Preferably, the top of the exterior sheathing is provided with clevis coupler, and the clevis coupler is fixed on last layer In floor plates.
Preferably, where the prefabricated panel bottom is fixed on storey floors, and passes through diagonal brace and fix.
Preferably, the Screw arbor with nut at both-ends between the inner template, exterior sheathing is located in cast-in-place node, the Screw arbor with nut at both-ends Outside is provided with casing.
Preferably, the prefabricated panel end set has a bolt hole passed through for the Screw arbor with nut at both-ends, the inner template, outer The Screw arbor with nut at both-ends between template is located in the bolt hole.
Correspondingly, the invention also discloses a kind of construction method of the template system, include the following steps:
S1. Z-type component is fixed on the splice ends outside of prefabricated panel, and two prefabricated panels liftings are in place and solid It is fixed, the openend of the U type slot on Z-type component is made to be oppositely arranged to form fixing groove;
S2. the top open part of exterior sheathing from the fixing groove is put into the fixing groove and fixed;
S3. inner template is installed in place, and Screw arbor with nut at both-ends one end is fixed on described through the through hole in the inner template On nut one on exterior sheathing, the other end is fixed the inner template by nut two;
S4. area's internal area casting concrete is enclosed in the exterior sheathing, inner template, prefabricated panel;
S5. when concrete reaches design strength, nut two, Screw arbor with nut at both-ends, inner template, Z-type component, external mold are removed successively Plate.
The present invention due to using the technology described above, is allowed to compared with prior art, have the following advantages that and actively imitate Fruit:(1) Z-type component is fixed on the splice ends of prefabricated panel and forms notch, after two prefabricated panel liftings are in place, two slots Mouth composition fixing groove, exterior sheathing are fixed in fixing groove, and nut one is provided on exterior sheathing, and exterior sheathing passes through screw rod with inner template Connector is fixedly connected, and the formwork erection operation of exterior sheathing, inner template can be completed indoors, compared with external scaffolding is constructed, save The process installed and dismantle scaffold has been gone, has had the advantages that easy to operate, construction cost is low, construction efficiency is high, and it is indoor Construction ensure that the personal safety of worker;(2) construction method provided by the invention includes step:Z-type component is fixed on prefabricated On wallboard, by prefabricated panel lifting it is in place, place in fixing groove exterior sheathing, by bolt jointing part by exterior sheathing and inner template It is fixedly connected, casting concrete, removes template system, all complete indoors, ensure that the personal safety of construction personnel, and And process is simple and convenient to operate, construction efficiency is high.
Description of the drawings
Fig. 1 quickly pacifies the structural representation of form removal system for the assembled architecture outer wall in one embodiment of the invention without outrigger Figure;
Fig. 2 is a kind of sectional view along A-A of Fig. 1;
Fig. 3 is the structure diagram of fixing groove;
Fig. 4 is along another sectional view of A-A in Fig. 1.
Figure label is as follows:
Template system 100;Z-type component 110;Attaching nut 111;Connect bolt 112;Lifting lug 113;Exterior sheathing 120;Hook Connector 121;Inner template 130;Bolt jointing part 140;Nut 1;Nut 2 142;Screw arbor with nut at both-ends 143;Fixing groove 150; Notch U-shaped 151;
Prefabricated panel 200;Connecting hole 201;Bolt hole 202;Diagonal brace 203;Cast-in-place node 210;N-th layer floor plates 310;The N+1 floors laminate 320.
Specific embodiment
Form removal is quickly pacified without outrigger to assembled architecture outer wall provided by the invention below in conjunction with the drawings and specific embodiments Plate system and construction method are described in further detail.With reference to following explanation and claims, advantages and features of the invention It will become apparent from.It should be noted that attached drawing is using very simplified form and using non-accurate ratio, only to it is convenient, Lucidly aid in illustrating the purpose of the embodiment of the present invention.
Embodiment one
It is former according to equally cast-in-place design, it is necessary to which prefabricated panel is spliced in the construction of assembled architecture outer wall Then, it is necessary to carry out cast-in-place, formation cast-in-place node in stitching portion.
With reference to shown in Fig. 1 and Fig. 2, prefabricated panel 200 lift it is in place after n-th layer floor plates 310 are fixed on by diagonal brace 203 On, the superimposed sheet of N+1 floors laminate 320 is fixed on the top of prefabricated panel 200.Assembled architecture outer wall provided by the invention No outrigger is quickly pacified form removal system 100 and is arranged at the cast-in-place node 210 of two prefabricated panels 200, and template system 100 is specific Including Z-type component 110, exterior sheathing 120, inner template 130 and several bolt jointing parts 140.
(it is located at and builds as shown in figure 3, Z-type component 110 is respectively arranged on the splice ends lateral surface of the prefabricated panel 200 The face inside object is built as medial surface, opposite with medial surface for lateral surface), and form U type slot with the prefabricated panel 200 151, the openend of the U type slot 151 is oppositely arranged and forms fixing groove 150.As an example, the Z-type at 150 both ends of fixing groove Component 110 can be a pair of of monoblock Z-shape steel plate or multipair Z-shape steel component.
With reference to shown in Fig. 2 and Fig. 3, exterior sheathing 120 is arranged in the fixing groove 150.Inner template 130 is arranged at described existing The inside of node 210 is poured, both ends are close on the splice ends medial surface of the prefabricated panel 200.As an example, exterior sheathing can be with For plank sheathing, or alloy sheets.
With reference to shown in Fig. 1 and Fig. 2, bolt jointing part 140 includes nut 1, nut 2 142 and Screw arbor with nut at both-ends 143.Institute It states nut 1 to be fixed on exterior sheathing 120, may be employed and be embedded in exterior sheathing 120, certainly, if being set on exterior sheathing 120 With Screw arbor with nut at both-ends 143 is matching, the female bolt hole of tool, with the nut 1 being embedded on exterior sheathing 120 is set to have There is same effect.The through hole with one 141 location matches of nut is provided in inner template 130, the Screw arbor with nut at both-ends 143 is set There is external screw thread, one end of the Screw arbor with nut at both-ends 143 is tightened through the through hole in inner template 130 and with the nut 1, The other end is fastened on by nut 2 142 in the inner template 130.
Assembled architecture outer wall provided in this embodiment is quickly pacified form removal system 100 without outrigger and is had the following advantages that:Z-type Component 110 is fixed on the splice ends of prefabricated panel 200 and forms notch 151, after two prefabricated panels 200 lift in place, two A notch 151 forms fixing groove 150, and exterior sheathing 120 is put into from top in fixing groove 150, and nut one is provided on exterior sheathing 110 141, exterior sheathing 120 is fixedly connected with inner template 130 by bolt jointing part 140, exterior sheathing 120, the formwork erection behaviour of inner template 130 Work can be completed indoors, compared with external scaffolding is constructed, eliminate installation and the process for dismantling scaffold, have operation side Just the advantages of, construction cost is low, construction efficiency is high, and indoor construction ensure that the personal safety of worker.
Further, as shown in Fig. 2, one end that Z-type component 110 is close to the prefabricated panel 200 is fixedly installed connection spiral shell Mother 111, is provided with connecting hole 201 on the prefabricated panel 200, and one end of connection bolt 112 is through the connecting hole 201 and solid It is scheduled on the attaching nut 111, the nut of the connection bolt 112 is close on the medial surface of the prefabricated panel 200.Make For citing, attaching nut 111 can be welded on Z-type component 110, can also be embedded on Z-type component 110, can also be in Z-type It is set on component 110 and has female bolt hole replacement attaching nut 111.By setting attaching nut 111 and connection bolt 112, the dismantlement work of Z-type component 110 can be easily carried out indoors, specifically only need to screw out connection bolt 112 indoors, And Z-type component 110 is taken out from 200 top of prefabricated panel.For convenience by Z-type component 110 at the top of prefabricated panel 200 It takes out, is preferably to be provided with lifting lug 113 on Z-type component 110, one end of rope is fixed on lifting lug 113, spiral shell is connected removing After bolt 112, easily Z-type component 110 can be removed by rope.
Further, exterior sheathing 120 is lifted for convenience, and 120 top of exterior sheathing is provided with clevis coupler 121, it is described Clevis coupler 121 is fixed on N+1 floors laminate 320, can fix vertical position of the exterior sheathing 120 in fixing groove 150 It puts.It is, of course, also possible in the setting of the bottom of Z-type component 110 for fixing the supporting plate of exterior sheathing 120, exterior sheathing 120 is supported on support On plate.
There are two types of set-up modes for Screw arbor with nut at both-ends 143 between inner template 130, exterior sheathing 120:(1) Fig. 2 and figure are referred to 3, Screw arbor with nut at both-ends 143 passes through prefabricated panel 200, specifically has bolt hole 202, Screw arbor with nut at both-ends in the end set of prefabricated panel 200 143 through in inner template 130 through hole, be tightened on nut 1 after bolt hole 202;(2) as shown in figure 4, to drawing spiral shell Bar 143 is located in cast-in-place node 210.When Screw arbor with nut at both-ends 143 is located at 210 inside of cast-in-place node, torn open in order to facilitate Screw arbor with nut at both-ends 143 It removes, is preferably, 143 outside cladding casing of Screw arbor with nut at both-ends, for example can be PVC casings.Two kinds of fixations of more than Screw arbor with nut at both-ends 143 Mode is respectively provided with the advantages of facilitating installation, removing.
Embodiment two
The present invention also provides a kind of construction method of the template system 100 in embodiment one, with reference to Fig. 1 to Fig. 4 The construction method is further described, which includes the following steps:
S1. Z-type component 110 is fixed on the splice ends lateral surface of prefabricated panel 200, and by two prefabricated panels 200 liftings are in place and fixed, and the openend of the U type slot 151 on Z-type component 110 is made to be oppositely arranged to form fixing groove 150.In advance Wallboard 200 processed can be fixed on by diagonal brace 203 in N floor plates 310, pre-buried in n-th layer floor plates 310 can be specifically used for The connector of fixed diagonal brace 203 sets the tie point of diagonal brace 203, the concrete structure of diagonal brace 203 and connection side on prefabricated panel Formula is referred to the scheme in existing construction, is not especially limited herein.
S2. the top open part of exterior sheathing 120 from the fixing groove 150 is put into the fixing groove 150 and fixed.It can With from N+1 floors laminate 320 by the lower section of exterior sheathing 120 into fixing groove 150.Exterior sheathing 120 can be by being arranged on top The clevis coupler 121 in portion is suspended on N+1 floors laminate 320, is used it is of course also possible to be set in the bottom of Z-type component 110 In the supporting plate of fixed exterior sheathing 120, exterior sheathing 120 is supported on supporting plate.
S3. inner template 130 is installed in place, and 143 one end of Screw arbor with nut at both-ends is passed through into the through hole in the inner template 130, It is fixed on the nut 1 on the exterior sheathing 120, the other end is fixed the inner template 130 by nut 2 142;
S4. casting concrete in region is enclosed in the exterior sheathing 120, inner template 130, prefabricated panel 200;
S5. when concrete reaches design strength, nut 2 142, Screw arbor with nut at both-ends 143, inner template 130, Z-type are removed successively Component 110, exterior sheathing 120.
The construction method includes step:Z-type component is fixed on prefabricated panel 200, lifts prefabricated panel 200 just Position, exterior sheathing 120 is placed in fixing groove 150, by bolt jointing part 140 by exterior sheathing 120 and 130 company of fixation of inner template It connects, casting concrete, remove template system, the installation of template system 100 and dismantling operation are all completed indoors, ensure that The personal safety of construction personnel, and process is simple and convenient to operate, construction efficiency is high.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (8)

1. a kind of assembled architecture outer wall quickly pacifies form removal system without outrigger, which is characterized in that the template system is arranged at At two prefabricated panel cast-in-place nodes, the template system includes:
The Z-type component being arranged in pairs, the Z-type component are respectively arranged on the splice ends lateral surface of the prefabricated panel, and with The prefabricated panel forms U type slot, and the openend of the U type slot is oppositely arranged and forms fixing groove;
Exterior sheathing is arranged in the fixing groove;
Inner template, is arranged at the inside of the cast-in-place node, and both ends are close on the splice ends medial surface of the prefabricated panel;
Several bolt jointing parts, including nut one, nut two and Screw arbor with nut at both-ends, the nut one is fixed on the exterior sheathing, The through hole with one location matches of nut is provided in the inner template, the Screw arbor with nut at both-ends is provided with external screw thread, described right One end of screw rod is drawn through the through hole and being fixed on the nut one, the other end is by the nut two by the inner template It is fixed.
2. template system as described in claim 1, which is characterized in that
One end that the Z-type component is close to the prefabricated panel is fixedly installed attaching nut, is provided on the prefabricated panel Connecting hole connects one end of bolt through the connecting hole and is fixed on the attaching nut, the nut of the connection bolt It is close on the medial surface of the prefabricated panel.
3. template system as claimed in claim 2, which is characterized in that be provided with lifting lug on the Z-type component.
4. template system as described in claim 1, which is characterized in that
The top of the exterior sheathing is provided with clevis coupler, and the clevis coupler is fixed in the floor plates of last layer.
5. template system as described in claim 1, which is characterized in that storey floors where the prefabricated panel bottom is fixed on On, and pass through diagonal brace and fix.
6. template system as described in claim 1, which is characterized in that described pair of drawing spiral shell between the inner template, exterior sheathing Bar is located in cast-in-place node, and casing is provided on the outside of the Screw arbor with nut at both-ends.
7. template system as described in claim 1, which is characterized in that the prefabricated panel end set has for described pair of drawing spiral shell The bolt hole that bar passes through, the Screw arbor with nut at both-ends between the inner template, exterior sheathing are located in the bolt hole.
8. a kind of construction method of template system as described in any one of claim 1 to 7, which is characterized in that including walking as follows Suddenly:
S1. Z-type component is fixed on the splice ends outside of prefabricated panel, and two prefabricated panels liftings are in place and fixed, The openend of the U type slot on Z-type component is made to be oppositely arranged to form fixing groove;
S2. the top open part of exterior sheathing from the fixing groove is put into the fixing groove and fixed;
S3. inner template is installed in place, and Screw arbor with nut at both-ends one end is fixed on the external mold through the through hole in the inner template On nut one on plate, the other end is fixed the inner template by nut two;
S4. area's internal area casting concrete is enclosed in the exterior sheathing, inner template, prefabricated panel;
S5. when concrete reaches design strength, nut two, Screw arbor with nut at both-ends, inner template, Z-type component, exterior sheathing are removed successively.
CN201711345192.XA 2017-12-15 2017-12-15 Assembled building outer wall frame-free rapid installing and dismantling formwork system and construction method Active CN108049628B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711345192.XA CN108049628B (en) 2017-12-15 2017-12-15 Assembled building outer wall frame-free rapid installing and dismantling formwork system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711345192.XA CN108049628B (en) 2017-12-15 2017-12-15 Assembled building outer wall frame-free rapid installing and dismantling formwork system and construction method

Publications (2)

Publication Number Publication Date
CN108049628A true CN108049628A (en) 2018-05-18
CN108049628B CN108049628B (en) 2023-10-20

Family

ID=62132991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711345192.XA Active CN108049628B (en) 2017-12-15 2017-12-15 Assembled building outer wall frame-free rapid installing and dismantling formwork system and construction method

Country Status (1)

Country Link
CN (1) CN108049628B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025261A (en) * 2018-08-17 2018-12-18 上海宝冶建筑工程有限公司 Superimposed sheet piece matches mold device and method
CN113235911A (en) * 2021-03-27 2021-08-10 慈溪市庵东建筑安装工程有限公司 Integrally poured building construction structure and method
CN113482168A (en) * 2021-08-09 2021-10-08 晟通科技集团有限公司 Connecting piece and template system
CN113818683A (en) * 2021-09-06 2021-12-21 中建新疆建工(集团)有限公司 Aluminum alloy formwork system and construction method thereof
CN114856167A (en) * 2022-03-14 2022-08-05 广东天凛高新科技有限公司 Cast-in-place mould for building exterior wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726644A (en) * 1993-07-09 1995-01-27 Showa Denko Kk Method for constructing parapet
CN105544979A (en) * 2016-02-03 2016-05-04 成都市第六建筑工程公司 Formwork supporting device for wall corner portion construction and construction method
CN205935642U (en) * 2016-08-26 2017-02-08 中国建筑西南设计研究院有限公司 Cast -in -place node of prefabricated wallboard of an assembly type structure mode structure
WO2017076070A1 (en) * 2015-11-06 2017-05-11 中建钢构有限公司 Integrated-assembly steel structure building
CN107130791A (en) * 2017-06-03 2017-09-05 二十二冶集团精密锻造有限公司 Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction
CN107313589A (en) * 2017-08-04 2017-11-03 上海建工五建集团有限公司 Outer wall of basement one side steel form support system and its construction method
CN207847077U (en) * 2017-12-15 2018-09-11 上海建工五建集团有限公司 Assembled architecture outer wall quickly pacifies form removal system without outrigger

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726644A (en) * 1993-07-09 1995-01-27 Showa Denko Kk Method for constructing parapet
WO2017076070A1 (en) * 2015-11-06 2017-05-11 中建钢构有限公司 Integrated-assembly steel structure building
CN105544979A (en) * 2016-02-03 2016-05-04 成都市第六建筑工程公司 Formwork supporting device for wall corner portion construction and construction method
CN205935642U (en) * 2016-08-26 2017-02-08 中国建筑西南设计研究院有限公司 Cast -in -place node of prefabricated wallboard of an assembly type structure mode structure
CN107130791A (en) * 2017-06-03 2017-09-05 二十二冶集团精密锻造有限公司 Combining aluminum alloy mould plate is used for the construction method of assembly concrete precast construction
CN107313589A (en) * 2017-08-04 2017-11-03 上海建工五建集团有限公司 Outer wall of basement one side steel form support system and its construction method
CN207847077U (en) * 2017-12-15 2018-09-11 上海建工五建集团有限公司 Assembled architecture outer wall quickly pacifies form removal system without outrigger

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025261A (en) * 2018-08-17 2018-12-18 上海宝冶建筑工程有限公司 Superimposed sheet piece matches mold device and method
CN113235911A (en) * 2021-03-27 2021-08-10 慈溪市庵东建筑安装工程有限公司 Integrally poured building construction structure and method
CN113235911B (en) * 2021-03-27 2022-12-30 中化学建筑工程有限公司 Integrally poured building construction structure and method
CN113482168A (en) * 2021-08-09 2021-10-08 晟通科技集团有限公司 Connecting piece and template system
CN113818683A (en) * 2021-09-06 2021-12-21 中建新疆建工(集团)有限公司 Aluminum alloy formwork system and construction method thereof
CN114856167A (en) * 2022-03-14 2022-08-05 广东天凛高新科技有限公司 Cast-in-place mould for building exterior wall
CN114856167B (en) * 2022-03-14 2024-04-23 广东天凛高新科技有限公司 Using method of cast-in-situ mold for building outer wall

Also Published As

Publication number Publication date
CN108049628B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
CN207847077U (en) Assembled architecture outer wall quickly pacifies form removal system without outrigger
CN108049628A (en) Assembled architecture outer wall quickly pacifies form removal system and construction method without outrigger
CN105971274A (en) Cantilever support frame formwork system and construction method thereof
US20100180519A1 (en) Precast Wall Panels and Method of Erecting a High-Rise Building Using the Panels
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN106192758A (en) Construction method for constructing large high pier column by using cantilever formwork
CN103741947A (en) Tube-frame-supporting type hydraulic climbing integral steel platform formwork truss layer construction method
CN212689564U (en) Temporary supporting device and temporary supporting structure for floor bearing plate
CN113090014A (en) High-rise assembled building integral operation platform and construction method and application thereof
CN210439705U (en) Precast concrete superimposed sheet hoist device
CN107882244A (en) A kind of construction method of steel bar truss floor support plate
CN111456425A (en) Temporary supporting device, temporary supporting structure and temporary supporting method for floor bearing plate
CN109252656B (en) High-rise building climbing template and assembling, pouring and lifting method
CN207879008U (en) Diameter Silo structure roof support system
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
JP2010133084A (en) Method of constructing hollow high structure
CN110043035B (en) Post-cast strip construction supporting method
CN209145256U (en) The dedicated climbing frame of assembled architecture
CN111139955A (en) Shear wall with transverse rib laminated wallboard and construction method thereof
CN206070598U (en) A kind of poured band of outer wall of basement outboard template and its fixed structure
CN210597724U (en) Shear force wall-graphite alkene assembled wallboard
CN209760761U (en) Construction platform and elevator core section of thick bamboo construction structures in a core section of thick bamboo
CN210597742U (en) Shear wall
CN207003989U (en) External hanging type scaffold is climbed in one kind

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant