CN108035337A - For the connector of diaphram wall and the construction method of diaphram wall - Google Patents

For the connector of diaphram wall and the construction method of diaphram wall Download PDF

Info

Publication number
CN108035337A
CN108035337A CN201711363123.1A CN201711363123A CN108035337A CN 108035337 A CN108035337 A CN 108035337A CN 201711363123 A CN201711363123 A CN 201711363123A CN 108035337 A CN108035337 A CN 108035337A
Authority
CN
China
Prior art keywords
connector
width
wall
reinforcement cage
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711363123.1A
Other languages
Chinese (zh)
Other versions
CN108035337B (en
Inventor
杨永胜
仇圣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Technology
Original Assignee
Shanghai Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Technology filed Critical Shanghai Institute of Technology
Priority to CN201711363123.1A priority Critical patent/CN108035337B/en
Publication of CN108035337A publication Critical patent/CN108035337A/en
Application granted granted Critical
Publication of CN108035337B publication Critical patent/CN108035337B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention belongs to the device and method of construction engineering technical field, there is provided for the connector of diaphram wall and the construction method of diaphram wall.The connector is connected by U-shaped steel plate and yi word pattern steel plate combination, described yi word pattern steel plate one end with U-shaped steel plate bottom along symmetrical direction of principal axis.The construction method of diaphram wall is arranged on two width diaphragm wall seam crossings for connector, the connector is laterally disposed in diaphragm wall, banding steel cage side welding point yi word pattern end, opposite side is in convex, by in width continuous wall connector U-type groove before back panel steel reinforcement cage convex binding end insertion, back panel concrete continuous wall is poured.The characteristics of one word plate joint of the connector set of invention and H profile steel connector impervious waterproof, connector one end is welded with steel reinforcement cage, keeps globality, and the other end makes in steel reinforcement cage insertion U grooves, increases contact area and break, enhance waterproof effect;And continuous wall construction method is simple to operation, good water-proof effect, cost relative moderate, great application and promotional value.

Description

For the connector of diaphram wall and the construction method of diaphram wall
Technical field
The present invention relates to the device and method of construction engineering technical field, and in particular to for diaphram wall connector and The construction method of diaphram wall.
Background technology
Construction method of underground continuous wall mainly has:Slurry → fabrication of reinforcing cage and peace are changed in construction of guide wall → trenching construction → clear bottom Put → connector processing → casting concrete etc..Wherein diaphragm wall seam crossing construction be influence diaphragm wall water-impervious key problem in technology with Technical barrier.
Existing common diaphragm wall construction seam waterproof technology has:1. circular joint Manifold technology;2. yi word pattern steel plate Or cross-shaped steel plate technique;3. I-steel or king's word technology;4. seam crossing exterior wall rotary churning pile waterproof;5. rubber fastening band.Five is big The feature itself and defect of class connector are as shown in table 1:
Several connector characteristic comparing tables of table 1
The content of the invention
The present invention is directed to the above-mentioned problems in the prior art, there is provided a kind of connector and underground for diaphram wall The construction method of diaphragm wall.
To achieve the above object, the technical scheme is that:
In a first aspect, the connector for diaphram wall
The connector is composed of U-shaped board and yi word pattern plate, and described yi word pattern plate one end and U-shaped board bottom are along symmetry axis Direction connects;
The weld width is less than diaphragm wall design width, the width of remaining concrete cover.
The connector is arranged on two width diaphragm wall seam crossings, and the connector is laterally disposed in diaphragm wall, i.e., described connector Symmetry axis be to extend laterally direction along diaphragm wall.
The material of the connector is steel.
The width of the remaining concrete cover is 7cm.
Second aspect, the construction method of diaphram wall
Step 1:Pour and lead wall, then excavate diaphram wall foundation trench, basialveolar length is greater than or equal to steel reinforcement cage design length Spend the length of adjunction head.
Step 2:Junction block is placed in preparation spoil body position.
Step 3:The first width diaphram wall steel reinforcement cage is bound, the one or both sides medium position of the steel reinforcement cage connects First font end, connector transfer to commitment positions with steel reinforcement cage.
Step 4:Before pouring the first width diaphram wall, sand pocket is filled to pouring more than face in the U-type groove side of connector, and with connecing Head tube works together prevents concrete from streaming.
Step 5:Connector retains thickness of concrete cover, casting concrete continuous walls by soil body side.
Step 6:After second width foundation trench excavates, the first width continuous wall connector pipe is extracted, the soil body is excavated in preparation and places back panel Junction block.
Step 7:The second width diaphragm wall steel reinforcement cage, the steel reinforcement cage are bound, one end is in convex, with the first width continuous wall connector U-type groove matching, the medium position of the other end welds with connector yi word pattern end;By the second width steel reinforcement cage convex binding end in insertion Formula is put into the first width continuous wall connector U-type groove.
Step 8:Before pouring the second width diaphram wall, sand pocket is filled to pouring more than face in the U-type groove side of connector, and with connecing Head tube works together prevents concrete from streaming.
Step 9:Connector retains thickness of concrete cover, wherein casting concrete continuous walls, diaphragm wall and U by soil body side Type groove contact portion pours the concrete of addition anticracking waterproof additive.
Step 10:Remaining width diaphragm wall such as step 6-9, so pours successively, until diaphram wall pours completely, finally One width diaphragm wall steel reinforcement cage both ends convex binding, is put into U-shaped steel groove, pours completion.
Further, the junction block is the shape of a hoof.
Further, the connector stays the concrete cover of 7cm by soil body side.
The construction method of connector and diaphram wall provided by the present invention for diaphram wall, has following beneficial to effect Fruit:
(1) the advantages of connector of the invention has concentrated yi word pattern plate joint waterproof and H profile steel waterproof, in previous width underground There is steel reinforcement cage and steel plate to weld in construction of diaphragm wall, connector is contacted well with previous width diaphragm wall, be not in burning into sand mud and Cause waterproof bad, and can transferring structure stress, good integrity;Steel reinforcement cage is used in latter width diaphram wall interface The characteristics of form of embedded U-type groove, the globality that has continued I-shaped steel joint completely is strong, waterproof effect, make latter width diaphragm wall Wide, seepage flow approach length is contacted with preceding width diaphragm wall.
(2) junction block is with concrete because not contacting directly, has solved and has pulled out the time and be difficult to grasp, be difficult to pull out, to disturbance The problem of diaphragm wall disturbance destroys.
(3) compared with I-steel, the steel using amount of a wing plate is reduced, and the structure for combining I-steel and yi word pattern steel is prevented The characteristics of water, shearing resistance, simplify construction method, significantly reduce construction cost, and securely and reliably, excellent effect.
(4) diaphragm wall pours the concrete of addition anticracking waterproof additive, further optimization with U-type groove contact portion Water-stagnating effect.
(5) shape of a hoof junction block is used in work progress, is that concrete streams in order to prevent.
Brief description of the drawings
Fig. 1 is the structure diagram of apparatus of the present invention;
Fig. 2 is the scheme of installation of apparatus of the present invention;
Fig. 3 is that the node construction of apparatus of the present invention completes schematic diagram;
Fig. 4 is apparatus of the present invention and steel reinforcement cage connection diagram.
In figure:1- connectors;2- junction blocks;3- concrete continuous walls;4- fills sand pocket;5- concrete covers;6- preparations Excavate the soil body;7- adds the concrete of anticracking waterproof additive;8- steel reinforcement cages.
Embodiment
With reference to specific embodiments and the drawings, the present invention will be further described, to help present disclosure is understood.
In a first aspect, the connector for diaphram wall
As shown in Figs 1-4, a kind of connector 1 for diaphram wall of the invention, the connector 1 is by U-shaped board and a word Template is composed, and described yi word pattern plate one end is connected with U-shaped board bottom along symmetrical direction of principal axis;1 width of connector, which is less than, to be connected Continuous wall design width, the width of remaining concrete cover 5.The connector 1 is arranged on two width diaphragm wall seam crossings, the connector 1 is laterally disposed in diaphragm wall, i.e., the symmetry axis of described connector 1 is to extend laterally direction along diaphragm wall.The material of the connector 1 Expect for steel.The width of the remaining concrete cover 5 is 7cm.The connector 1 has gathered a word plate joint and H profile steel connects The characteristics of impervious waterproof, connector one end is welded with steel reinforcement cage 8, keeps globality, and the other end makes steel reinforcement cage 8 be embedded in U-type groove steel It is interior, increase contact area and break, effectively play waterproof action.
Second aspect, the construction method of diaphram wall
Step 1:Pour and lead wall, then excavate diaphram wall foundation trench, basialveolar length is greater than or equal to the design length of steel reinforcement cage 8 Spend the length of adjunction first 1.
Step 2:6 position of sound production junction block 2 of the soil body is excavated in preparation.
Step 3:Bind the first width diaphram wall steel reinforcement cage 8, the one or both sides medium position welding of the steel reinforcement cage 8 1 yi word pattern end of connector, connector 1 transfer to commitment positions with steel reinforcement cage 8, as 1 device of permanent waterproof connector.
Step 4:Before pouring the first width diaphram wall, sand pocket 4 is filled to pouring more than face in the U-type groove side of connector, and with Junction block 2 works prevent concrete from streaming together.
Step 5:Connector 1 retains 5 thickness of concrete cover, casting concrete continuous walls 3 by soil body side.
Step 6:After second width foundation trench excavates, the first width continuous wall connector pipe 2 is extracted, after the placement of the soil body 6 is excavated in preparation Width junction block 2.
Step 7:The second width diaphragm wall steel reinforcement cage 8, the steel reinforcement cage 8 are bound, one end is in convex, is connect with the first width diaphragm wall First 1 U-type groove matching, medium position and the 1 yi word pattern end of connector of the other end are welded;Second width steel reinforcement cage, 8 convex is bound into end It is put into embedded in the first width continuous wall connector 1U type grooves.
Step 8:Before pouring the second width diaphram wall, sand pocket 4 is filled to pouring more than face in the U-type groove side of connector 1, and with Junction block 2 works prevent concrete from streaming together.
Step 9:Connector 1 retains 5 thickness of concrete cover, wherein casting concrete continuous walls 3, diaphragm wall by soil body side The concrete seven of addition anticracking waterproof additive is poured with U-type groove contact portion, further optimizes water-stagnating effect.
Step 10:Remaining width diaphragm wall such as step 6-9, so pours successively, until buried concrete diaphragm wall 3 has poured Whole, last 8 both ends convex binding of width diaphragm wall steel reinforcement cage, is put into U-shaped steel groove, pours completion.
The construction method method is simple to operation, good water-proof effect, cost relative moderate, great application and promotion price Value.
Further, the junction block 2 is the shape of a hoof.The shape of a hoof junction block is that concrete streams in order to prevent.
Further, the connector 1 stays the concrete cover 5 of 7cm by soil body side.
Specific case used herein elaborates inventive concept, the explanation of above example is only intended to Help to understand core concept of the invention.It should be pointed out that for those skilled in the art, this is not being departed from On the premise of inventive concept, any obvious modification, equivalent substitution or the other improvements made, should be included in the present invention Protection domain within.

Claims (8)

  1. A kind of 1. connector for diaphram wall, it is characterised in that:The connector is composed of U-shaped board and yi word pattern plate, Described yi word pattern plate one end is connected with U-shaped board bottom along symmetrical direction of principal axis.
  2. 2. connector according to claim 1, it is characterised in that:The weld width is less than diaphragm wall design width, remaining The width of concrete cover.
  3. 3. connector according to claim 2, it is characterised in that:The connector is arranged on two width diaphragm wall seam crossings, described Connector is laterally disposed in diaphragm wall, i.e., the symmetry axis of described connector is to extend laterally direction along diaphragm wall.
  4. 4. connector according to claim 3, it is characterised in that:The material of the connector is steel.
  5. 5. connector according to claim 4, it is characterised in that:The width of connector 7cm small compared with the width of diaphragm wall.
  6. 6. a kind of construction method of diaphram wall using any connectors of claim 1-5 is as follows:
    Step 1:Pour and lead wall, then excavate diaphram wall foundation trench, basialveolar length adds more than or equal to steel reinforcement cage design length The length of connector;
    Step 2:Junction block is placed in preparation spoil body position;
    Step 3:Bind the first width diaphram wall steel reinforcement cage, the one or both sides medium position welding point one of the steel reinforcement cage Font end, connector transfer to commitment positions with steel reinforcement cage;
    Step 4:Before pouring the first width diaphram wall, sand pocket is filled to pouring more than face in the U-type groove side of connector, and and junction block Working together prevents concrete from streaming;
    Step 5:Connector retains thickness of concrete cover, casting concrete continuous walls by soil body side;
    Step 6:After second width foundation trench excavates, the first width continuous wall connector pipe is extracted, the soil body is excavated in preparation and places back panel connector Pipe;
    Step 7:Bind the second width diaphragm wall steel reinforcement cage, the steel reinforcement cage, one end is in convex, the U with the first width continuous wall connector Type groove matches, and medium position and the connector yi word pattern end of the other end are welded;By the second width steel reinforcement cage convex binding end in embedded It is put into the first width continuous wall connector U-type groove;
    Step 8:Before pouring the second width diaphram wall, sand pocket is filled to pouring more than face in the U-type groove side of connector, and and junction block Working together prevents concrete from streaming;
    Step 9:Connector retains thickness of concrete cover, wherein casting concrete continuous walls, diaphragm wall and U-type groove by soil body side Contact portion pours the concrete of addition anticracking waterproof additive;
    Step 10:Remaining width diaphragm wall such as step 6-9, so pours successively, until diaphram wall pours completely, last width The convex binding of diaphragm wall steel reinforcement cage both ends, is put into U-shaped steel groove, pours completion.
  7. 7. connector according to claim 6, it is characterised in that:The junction block is the shape of a hoof.
  8. 8. the connector according to claim 6 or 7, it is characterised in that:The connector stays the concrete protective of 7cm by soil body side Layer.
CN201711363123.1A 2017-12-18 2017-12-18 The construction method of a kind of diaphram wall and applied to the connector in this method Expired - Fee Related CN108035337B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711363123.1A CN108035337B (en) 2017-12-18 2017-12-18 The construction method of a kind of diaphram wall and applied to the connector in this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711363123.1A CN108035337B (en) 2017-12-18 2017-12-18 The construction method of a kind of diaphram wall and applied to the connector in this method

Publications (2)

Publication Number Publication Date
CN108035337A true CN108035337A (en) 2018-05-15
CN108035337B CN108035337B (en) 2019-10-11

Family

ID=62099695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711363123.1A Expired - Fee Related CN108035337B (en) 2017-12-18 2017-12-18 The construction method of a kind of diaphram wall and applied to the connector in this method

Country Status (1)

Country Link
CN (1) CN108035337B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537574A (en) * 2018-11-23 2019-03-29 福建建中建设科技股份有限公司 The construction technology of diaphram wall in a kind of extremely hard rock
CN110055952A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector structure and its construction method
CN110528502A (en) * 2018-05-23 2019-12-03 中铁七局集团西安铁路工程有限公司 A kind of anti-construction method streamed of diaphram wall H-type connector
CN112392029A (en) * 2020-11-20 2021-02-23 武汉盛士瑞建设工程有限公司 Underground continuous wall and green construction process thereof
CN114197490A (en) * 2022-01-07 2022-03-18 中铁二局集团有限公司 Cross continuous wall and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3725926B2 (en) * 1995-12-28 2005-12-14 ダウ化工株式会社 Underground wall drainage panel and drainage structure inside the underground wall
CN201288341Y (en) * 2008-10-15 2009-08-12 广东省建筑工程集团有限公司 Underground continuous wall joint
CN102535519A (en) * 2012-03-20 2012-07-04 广州中煤江南基础工程公司 I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN202577363U (en) * 2012-03-20 2012-12-05 广州中煤江南基础工程公司 H-shaped steel joint structure of underground diaphragm wall
CN203334322U (en) * 2013-07-15 2013-12-11 中国建筑第二工程局有限公司 Seepage-prevention slurry blocking device of underground continuous wall
CN204456070U (en) * 2014-12-24 2015-07-08 广州机施建设集团有限公司 Diaphragm wall shutoff stopping means
CN105672250A (en) * 2016-01-20 2016-06-15 中铁隆工程集团有限公司 Rabbet connecting mechanism and construction method for underground diaphragm wall and underwater concrete
CN106013086A (en) * 2016-06-23 2016-10-12 程华清 Construction method for processing underground continuous wall joint through boss type I-steel joint box
CN106381866A (en) * 2016-08-31 2017-02-08 中铁二局工程有限公司 Construction method of ultra-deep underground diaphragm wall in water-rich soft-soil area

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3725926B2 (en) * 1995-12-28 2005-12-14 ダウ化工株式会社 Underground wall drainage panel and drainage structure inside the underground wall
CN201288341Y (en) * 2008-10-15 2009-08-12 广东省建筑工程集团有限公司 Underground continuous wall joint
CN102535519A (en) * 2012-03-20 2012-07-04 广州中煤江南基础工程公司 I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN202577363U (en) * 2012-03-20 2012-12-05 广州中煤江南基础工程公司 H-shaped steel joint structure of underground diaphragm wall
CN203334322U (en) * 2013-07-15 2013-12-11 中国建筑第二工程局有限公司 Seepage-prevention slurry blocking device of underground continuous wall
CN204456070U (en) * 2014-12-24 2015-07-08 广州机施建设集团有限公司 Diaphragm wall shutoff stopping means
CN105672250A (en) * 2016-01-20 2016-06-15 中铁隆工程集团有限公司 Rabbet connecting mechanism and construction method for underground diaphragm wall and underwater concrete
CN106013086A (en) * 2016-06-23 2016-10-12 程华清 Construction method for processing underground continuous wall joint through boss type I-steel joint box
CN106381866A (en) * 2016-08-31 2017-02-08 中铁二局工程有限公司 Construction method of ultra-deep underground diaphragm wall in water-rich soft-soil area

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528502A (en) * 2018-05-23 2019-12-03 中铁七局集团西安铁路工程有限公司 A kind of anti-construction method streamed of diaphram wall H-type connector
CN109537574A (en) * 2018-11-23 2019-03-29 福建建中建设科技股份有限公司 The construction technology of diaphram wall in a kind of extremely hard rock
CN110055952A (en) * 2019-03-14 2019-07-26 姚燕明 A kind of underground continuous wall connector structure and its construction method
CN112392029A (en) * 2020-11-20 2021-02-23 武汉盛士瑞建设工程有限公司 Underground continuous wall and green construction process thereof
CN114197490A (en) * 2022-01-07 2022-03-18 中铁二局集团有限公司 Cross continuous wall and construction method thereof

Also Published As

Publication number Publication date
CN108035337B (en) 2019-10-11

Similar Documents

Publication Publication Date Title
CN108035337B (en) The construction method of a kind of diaphram wall and applied to the connector in this method
CN102061710B (en) Diaphragm wall joint and manufacturing method of diaphragm wall
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN102535441A (en) Construction method of underground diaphragm wall
CN107747308A (en) A kind of diaphram wall and construction method
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN206467695U (en) A kind of joint for sinking type empty stomach diaphram wall
CN105888693A (en) Treating construction method for water burst of small underground river of highway tunnel
CN102409702A (en) Method for performing seam waterproof construction in underground continuous wall by using embedded rubber water stop tapes
CN110387875A (en) Connector cutting device and its construction method
CN109914390A (en) It is a kind of to construct the slip casting structure and construction method of cold seam for biting connecions campshed
CN104912057B (en) Construction method of underground continuous wall
CN205954632U (en) Pipeline crosses supporting construction of foundation ditch department in rich water sand layer
CN107268602A (en) A kind of construction method of interlocking pile
CN85202494U (en) Interlocked reinforced concrete sheet pile
CN105133621B (en) The construction method and foundation pit enclosure system of foundation pit enclosure system
CN204690730U (en) Diaphragm wall skeleton
CN104790380B (en) Underground diaphragm wall framework
CN204691255U (en) Diaphragm wall
CN107940102A (en) Underground raw water pipe protection construction method
CN104790430B (en) Construction method of underground continuous wall
CN107100208A (en) The anti-floating waterproof construction and construction method of a kind of underground structure
CN207904990U (en) A kind of groutable underground continuous wall connector
CN106436749B (en) A kind of method of underwater splicing U-type groove construction subway station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191011